← Back
BuildNYC
Five to six families
1129 59TH STREET
BROOKLYN · Borough Park · BIN 3140684
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R5Zoning
4,800 sfGross Floor Area
6Units
Rent Stabilized18 Active Violations 2 old, status unconfirmed ▸FDNY Report ↗
Five to six families · Owner of record: 1129 59 Lofts · 2,504 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Mechanical system installation6p · 3 filings · 20 docs
Floor 2Mechanical system installation6p · 3 filings · 20 docs
Floor 1Mechanical system installation6p · 3 filings · 20 docs
CellarMechanical system installation6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1129 59th Street907/08/2026
1129 59 Lofts203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2022$1.8M—1129 59th Street → 1129 59 LOFTS LLC$375/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yang Engineering705/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Redcut Expediting503/21/2026
JRL Skyline403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Winway DevelopmentGeneral Contractor507/08/2026
B.P. ElectricElectrical103/22/2026
A. M. Plumbing CompanyPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Yang Engineering8376505/14/2025
NKM Engineering6244107/19/2022
Building Lifecycle
All (120)Filed (7)Permit Issued (4)Signed Off (1)Violation (37)Inspection (2)Objection (52)Special Inspection (17)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2025
Violation issued (HPD, closed)
A
05/14/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR THRU 3RD FLOOR. PLUMBING WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00776737-P2
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
02/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
02/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
02/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
02/11/2025
Special inspection requirement — Maintenance information
Jian Yang
01/22/2025
Objection raised — Other
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Other
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Other
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Zoning
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Mechanical
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Other
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Inspections
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Scope
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Other
01/22/2025
Objection resolved — Addressed
01/13/2025
Filed — Alteration
PROPOSED FILE APPLICATION TO INSTALL NEW HAVE SPLIT UNITS & INSTALL (7) NEW H.W.H. IN CONJUNCTION WITH GC JOB #: B00776727. MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01162702-I1
11/12/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR TO 3RD FLOOR, CEILING & PARTITION WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00776727-I1
11/07/2024
Permit issued — General Construction
B00776727-I1-GC
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
11/06/2024
Special inspection requirement — Final
Lester Katz
11/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
11/06/2024
Special inspection requirement — Interior lighting power
NARESH MAHANGU
10/31/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR TO 3RD FLOOR, CEILING & PARTITION WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00776727-P2
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2024
Objection resolved — Addressed
05/23/2024
Objection resolved — Addressed
05/14/2024
Objection resolved — Addressed
04/18/2024
Objection resolved — Addressed
04/18/2024
Objection resolved — Addressed
04/18/2024
Objection resolved — Addressed
04/18/2024
Objection resolved — Addressed
04/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/08/2024
Violation issued (HPD, closed)
A
03/22/2024
Objection raised — Accessibility
03/18/2024
Objection raised — Other
03/18/2024
Objection raised — Other
03/18/2024
Objection raised — Other
03/18/2024
Objection raised — Other
03/18/2024
Objection raised — Other
03/18/2024
Objection raised — Other
03/14/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR TO 3RD FLOOR, CEILING & PARTITION WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00776727-P1
02/14/2024
Permit issued — General Construction
B00776727-I1-GC
02/14/2024
Violation issued (HPD, closed)
C
02/14/2024
Violation issued (HPD, closed)
C
02/14/2024
Violation issued (HPD, closed)
C
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWinway Development11/07/2024
DOB NOWGeneral ConstructionSigned-offWinway Development02/14/2024
DOB NOWPlumbingPermit IssuedA. M. Plumbing Company02/14/2023
DOB NOWGeneral ConstructionSigned-offWinway Development12/02/2022
1 project · most recent 01/13/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/13/2025——Heating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36RMVJUA 36,000 BTU · Heat Pump Outdoor ×6
1 project · most recent 05/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/14/2025Permit IssuedA. M. Plumbing CompanyGas, Water/Sanitary
1 project · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024Permit IssuedB.P. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/11/2025Fire-Resistant Penetrations and JointsJian Yangspecial
02/11/2025Energy Code Compliance InspectionsJian Yangprogress
02/11/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
02/11/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
02/11/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
02/11/2025Maintenance informationJian Yangenergy_progress
11/06/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/06/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/06/2024FinalLester Katzprogress
11/06/2024Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
11/06/2024Interior lighting powerNARESH MAHANGUenergy_progress
09/27/2023Fire-Resistant Penetrations and JointsJian Yangspecial
09/27/2023Energy Code Compliance InspectionsJian Yangprogress
09/27/2023HVAC-R and service water heating equipmentJian Yangenergy_progress
09/27/2023HVAC-R and service water piping design and insulationJian Yangenergy_progress
09/27/2023HVAC-R and service water heating system controlsJian Yangenergy_progress
09/27/2023Maintenance informationJian Yangenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00776727-P2Request digital key ↗
08/21/2026B00776737-I1Request digital key ↗
08/21/2026B00776737-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026B00776727-P1Open ↗
08/29/2026B00776727-I1Open ↗
08/23/2026B01162702-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026B00776727-I1Open ↗
08/29/2026B00776727-I1Open ↗
08/29/2026B00776727-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B00776727-I1Open ↗
08/27/2026B00776737-P2Open ↗
08/27/2026B00776737-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026B00776737-P2Open ↗
08/21/2026B00776737-P1Open ↗
08/21/2026B00776737-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00776727-I1Open ↗