ECB07/13/2026PROPOSED 5 STORY NEW BUILDING, ACTIVE JOB SITE, I OBSERVED WORKER JOSE MARINO IN 5TH FLOOR PERFORMING TILE PLACEMENT. UPON REQUEST FOR THE REQUIRED SAFETY TRAINING CONNECT CARD, SST NONE WAS PROVIDED.THIS TRAI$2K due
ECB07/13/2026OBSERVED: ACTIVE SITE UPON REQUEST FOR SSP AND SUPER,ORIENTATION,PRESHIFT, AND TOOL BOX LOG BOOKS NONE WAS PROVIDED CONTRARY TO BUILDING CODE . STOP ALL WORK UNDER PERMIT 421133534MAINTAIN ALL DOCUMENTATION ON$1K due
ECB07/13/2026OBSERVED: SITE WITH HOUSEEKEEPING ISUES AT GROUND LEVEL NOTED GREAT AMOUNT OF BLACK PLASTIC BAGS,AT 5TH FLOOR ROOF PILE OF BROKEN TILES ,STERAFOAM , PIECES OF SHETROCK AND WOOD PALETS,DEBRIS OF CONSTRUCTION MAT$2K due
ECB07/13/2026OBSERVED ACTIVE SITE POURING CONCRETE AT CELLAR AND PLACED TILE ON 5TH FLOOR , REQUESTED FOR RAGHBIR SINGH CS OR CP NO ONE KNOWS THEM, THEY WAS'ENT PRESENT., CS FAILURE TO PERFORM DUTIES ,FAILURE TO DESIGNATE$5K due
ECB02/27/2024TEMPORARY CONSTRUCTION EQUIPMENT ONSITE-EXPIRED PERMIT.AS NOTED:AT TIME OF INSPECTION CONSTRUCTION SITE WAS CLOSED,OBSERVED CONSTRUCTION PLYWOOD FENCE PERMIT HAD EXPIRED ON 02/01/2024 WITH PERMIT#Q00473674-I1-F$6K due
ECB06/25/2024TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE WAS CLOSED. OBSERVED CONSTRUCTIONPLYWOOD FENCE PERMIT HAD EXPIRED ON 02/01/2024 WITH PERMIT #Q00473674-Nothing owed — awaiting certificate of correction
ECB06/25/2024TEMPORARY CONSTRUCTION EQUIPMENT/INSTALLATION ON SITE EXPIRED PERMIT SIDE. AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE WAS OF A PROPOSED 5 STORY BUILDING WAS CLOSED. OBSERVED CONSTRUCTION SIDEWALK SHED WINothing owed — awaiting certificate of correction
ECB01/12/2024FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAP. 33.AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE IN WHICH WAS ALREADY AT THE 5TH FLOOR LEVEL. OBSERVED STAYFORMS INSTALLED ADJNothing owed — awaiting certificate of correction
ECB08/31/2023INADEQUATE FIRE EXTINGUISHERS//AT THE TIME OF MY INSPECTION OF ACTIVE CONSTRUCTION JOB SITE I OBSERVED 2FIRE EXTUINGUISHERS-WITH EXPIRED TAGS(LAST SERVICED FEBRUARY 2022),NOT MONTHLY CHECKED,1 OF DIAL SHOWING FNothing owed — awaiting certificate of correction
ECB08/31/2023INADEQUATE OVERHEAD PROTECTIO/AT THE TIME OF MY INSPECTION I OBSERVED BUILDING IN SUPERSTRUCTURE PHASE AT 2ND FLOOR LEVEL -OBSERVED AT EXP#4 NO OVERHEAD PROTECTION FOR ADJOINING PROPERTY YARD WHILE WORK BEING PNothing owed — awaiting certificate of correction
ECB04/05/2023FAILURE TO PROVIDE SPECIAL INSPECTION OF CONCRETE PLACEMENT TR1 AND TR2 CONCRETE SAMPLING AND TESTING.AS NOTED AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 5 STORY BUILDING OBSERVED A CONCRETE POURNothing owed — awaiting certificate of correction
ECB06/03/2006NOTED:ACCESS DENIED.VIOLATION IN BASED UPON NO RECORD OF CORRECTION FOR#34442501X ON 11/29/04 FOR WORK W/O A WORK PERMIT.ERECTED AT THE CELLAR LEVEL.1 APT.WITH 3 PIECE BATH.INSTALLING WASTE + WATER LINES.Nothing owed — awaiting certificate of correction
Miscellaneous religious facility · Owner of record: BABA MAKHAN SHAH LOBANA SIKH CENTER INC. · 8,123 sf lot · 2.23 FAR built · Flood zone X