Elevator cooperative
113-14 72 ROAD
QUEENS · BIN 4052719
💬 Discuss this project
1941Year Built
6Stories
D4Building Class
R6Zoning
123,000 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: 113 14 OWNERS CORP · 62,244 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION1007/08/2026
METRO MANAGEMENT403/22/2026
113-14 OWNERS3103/22/2026
113-14 DUENERS CORP103/22/2026
OWNER OF 113-14 72 ROA103/22/2026
113-14 OWNERS CORP./DARWO203/22/2026
FLORENTIA CONSTRUCTION CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BERNARDO GAMBA203/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RK DESIGN INCGeneral Contractor603/21/2026
XINOS CONSTRUCTION CORPGeneral Contractor507/08/2026
REID, RICARDOElectrical103/21/2026
D' AMORE, JOSEPHElectrical103/21/2026
CROWN PLUMBING INCPlumbing107/08/2026
BRW CONSTRUCTION INCGeneral Contractor104/09/2026
DIGANGI, JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
W. ALLEN ENGINEERING PLLC664209/13/2024
AK ENGINEERING PC678208/29/2023
MERRITT ENGINEERING CONSU460105/05/2021
Building Lifecycle
All (96)Filed (7)Permit Issued (7)Signed Off (4)Facade (FISP) (12)Violation (36)Special Inspection (30)
01/23/2026
Special inspection requirement — Insulation placement and R values
WAYNE ALLEN
01/23/2026
Special inspection requirement — Mechanical Systems
WAYNE ALLEN
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE ALLEN
01/23/2026
Special inspection requirement — Final
WAYNE ALLEN
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
WAYNE ALLEN
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
WAYNE ALLEN
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
WAYNE ALLEN
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
WAYNE ALLEN
01/23/2026
Special inspection requirement — Lighting in dwelling units
WAYNE ALLEN
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
WAYNE ALLEN
01/23/2026
Special inspection requirement — Lighting controls
WAYNE ALLEN
01/23/2026
Special inspection requirement — Interior lighting power
WAYNE ALLEN
09/13/2024
Filed — Alteration
APPLICATION FILED TO COMBINE APT. 5D & 5EF AS PER TPPN #3/97. MINOR INTERIOR RENOVATION AT KITCHEN, BATHROOM, AND LIVING SPACE AT APARTMENTS 5EF, 5D. INSTALLATION OF NEW HVAC APPLIANCES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00480750-P1
09/13/2024
Special inspection requirement — Lighting controls
WAYNE ALLEN
09/13/2024
Special inspection requirement — Insulation placement and R values
WAYNE ALLEN
09/13/2024
Special inspection requirement — Interior lighting power
WAYNE ALLEN
09/13/2024
Special inspection requirement — Lighting in dwelling units
WAYNE ALLEN
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE ALLEN
09/13/2024
Special inspection requirement — Mechanical Systems
WAYNE ALLEN
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
WAYNE ALLEN
09/13/2024
Special inspection requirement — Final
WAYNE ALLEN
09/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
WAYNE ALLEN
09/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WAYNE ALLEN
09/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
WAYNE ALLEN
09/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
WAYNE ALLEN
11/27/2023
Signed off — Alteration
Q00894786-I1
11/21/2023
Permit issued — Structural
Q00894786-I1-ST
10/18/2023
Permit issued — Mechanical Systems
Q00480750-I1-GC-CX
09/05/2023
Special inspection requirement — Final
Ari Kamo
09/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
09/05/2023
Special inspection requirement — Structural Wood Frame
Ari Kamo
08/29/2023
Filed — Alteration
Q00894786-P1
08/29/2023
Special inspection requirement — Structural Wood Frame
Ari Kamo
08/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
08/29/2023
Special inspection requirement — Final
Ari Kamo
07/21/2023
Permit issued — General Construction
Q00894786-I1-GC
06/26/2023
Filed — Alteration
Q00894786-I1
06/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2023
Signed off — Alteration
Q00527936-I1
08/10/2022
Cycle 9 facade report submitted
08/10/2022
Cycle 9 facade inspection completed
08/08/2022
Cycle 9 facade report signed — SAFE
07/26/2022
Signed off — Alteration
Q00489855-I1
07/12/2022
Permit issued — Sidewalk Shed
Q00527936-I1-SH
07/15/2021
Permit issued — General Construction
Q00489855-I1-GC
07/01/2021
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURE IN UNIT 5GH ON 5TH FLOOR. NEW WHIRLPOOL, STEAM SHOWER, BIDET, AND WATER CLOSET. DIRECT REPLACE MENT OF DISHWASHER, KITCHEN SINK. AND GAS STOVE. FILED CONJUCTION WITH DOB JOB # 421659707
Q00310327-I1
05/27/2021
Permit issued — Sidewalk Shed
Q00527936-I1-SH
05/26/2021
Filed — Alteration
Q00527936-I1
05/05/2021
Filed — Alteration
Q00489855-I1
04/09/2021
Filed — Alteration
APPLICATION FILED TO COMBINE APT. 5D & 5EF AS PER TPPN #3/97. MINOR INTERIOR RENOVATION AT KITCHEN, BATHROOM, AND LIVING SPACE AT APARTMENTS 5EF, 5D. INSTALLATION OF NEW HVAC APPLIANCES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00480750-I1
12/23/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/24/2020
Violation issued (ECB, open)
Elevators
07/13/2020
Permit issued — Plumbing
Q00310327-I1-PL
03/11/2020
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURE IN UNIT 5GH ON 5TH FLOOR. NEW WHIRLPOOL, STEAM SHOWER, BIDET, AND WATER CLOSET. DIRECT REPLACE MENT OF DISHWASHER, KITCHEN SINK. AND GAS STOVE. FILED CONJUCTION WITH DOB JOB # 421659707
Q00310327-I1
12/18/2018
Cycle 8 facade report submitted
11/26/2018
Cycle 8 facade inspection completed
11/21/2018
Cycle 8 facade report signed — SWARMP
11/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/24/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offRK DESIGN INC11/21/2023
DOB NOWMechanical SystemsSigned-offBRW CONSTRUCTION10/18/2023
DOB NOWGeneral ConstructionSigned-offRK DESIGN INC07/21/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP07/12/2022
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP07/15/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP05/27/2021
DOB NOWPlumbingSigned-offCROWN PLUMBING INC07/13/2020
BISOTISSUEDQRC HOME IMPROVEMENT INC07/09/2020
BISOTISSUEDE. CASTILLO CONSTR. CORP10/24/2019
BISPLISSUEDDRILON PLBG & HTG INC10/09/2019
BISPLISSUEDSERVICE TECH MECH&PLBG IN03/04/2019
BISPLISSUEDSERVICE TECH MECH&PLBG IN02/15/2019
BISFBISSUEDSERVICE TECH MECH&PLBG IN02/15/2019
BISOTISSUEDEMG INDUSTRIAL CHIMNEY IN12/31/2018
BISPLISSUEDORION PLUMBING & HTG CORP05/19/2016
BISOTISSUEDN/A05/16/2016
BISEQISSUEDXINOS CONSTRUCTION CORP07/16/2015
BISEQISSUEDWEST NEW YORK RESTORATION OF CT06/28/2006
BISOTISSUEDWEST NEW YORK RESTORATION OF CT06/20/2006
BISEQISSUEDWEST NEW YORK RESTORATION OF CT06/20/2006
BISEQISSUEDWEST NEW YORK RESTORATION OF CT12/22/2005
BISOTISSUEDDL RESTORATION & BUILDERS CORP11/09/2005
BISEQISSUEDWEST NEW YORK RESTORATION OF CT06/21/2005
BISMHISSUEDTOMASEVIC GENERAL CONTRACTING02/18/2005
BISEQISSUEDWEST NEW YORK RESTORATION OF CT11/10/2004
BISEQISSUEDWEST NEW YORK RESTORATION OF CT11/08/2004
BISOTISSUEDWAGNER ZIV PLUMBING & HEATING CO10/20/2004
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING CO10/05/2004
BISOTISSUEDWEST NEW YORK RESTORATION OF CT09/17/2004
BISOTISSUEDFIVE BORO ROOFING06/02/2004
BISPLISSUEDPLUMBING & HTG DOCTOR INC07/24/2000
BISOTISSUEDDERMEZIS ENTERPRISES INC./ GOLDE06/14/2000
BISOTISSUEDFIVE BORO ROOFING03/02/2000
BISEQISSUEDCOLGATE SCAFFOLDING02/16/2000
BISOTISSUEDFPC CONSTRUCTION09/13/1995
BISMHISSUEDVARSITY PLUMBING06/21/1994
BISPLISSUEDVARSITY PLUMBING06/21/1994
BISSPISSUEDROCKAWAY PLUMBING & HEATING CO.04/15/1993
BISPLISSUEDROCKAWAY PLUMBING & HEATING CO.04/15/1993
BISOTISSUEDAPPLE INCINERATOR&COMPACTION COR04/05/1993
1 project · most recent 09/13/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/13/2024Signed-offBRW CONSTRUCTION INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-4C36NA4 48,000 BTU · Heat Pump Outdoor ×3
MSZ-GL06NA 48,000 BTU · Condensing Unit ×1
MSZ-GL12NA 12,000 BTU · Ahu ×2
MXZ-SM48NAM 48,000 BTU · Condensing Unit ×2
7 projects · most recent 10/22/2024
General Wiring
FiledStatusContractorScope
10/22/2024CompleteTERRANOVA ELECTRIC INCGeneral Wiring
05/25/2021Permit IssuedTOWER ELECTRIC INC.—
06/23/2020CompleteA ELECTRICAL MAIN SVC INC—
10/09/2019CompleteV&B ELECTRICAL CONTNG INCGeneral Wiring
03/03/2019Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
02/26/2019Permit IssuedTRINCITY ELECTRIC, INCGeneral Wiring
01/16/2018CompleteR & T ELECTRICAL CORP—
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
01/23/2026Insulation placement and R valuesWAYNE ALLENenergy_progress
01/23/2026Mechanical SystemsWAYNE ALLENspecial
01/23/2026Fire-Resistant Penetrations and JointsWAYNE ALLENspecial
01/23/2026FinalWAYNE ALLENprogress
01/23/2026Fire-Resistance Rated ConstructionWAYNE ALLENprogress
01/23/2026Energy Code Compliance InspectionsWAYNE ALLENprogress
01/23/2026HVAC-R and service water piping design and insulationWAYNE ALLENenergy_progress
01/23/2026HVAC-R and service water heating equipmentWAYNE ALLENenergy_progress
01/23/2026Lighting in dwelling unitsWAYNE ALLENenergy_progress
01/23/2026HVAC-R and service water heating system controlsWAYNE ALLENenergy_progress
01/23/2026Lighting controlsWAYNE ALLENenergy_progress
01/23/2026Interior lighting powerWAYNE ALLENenergy_progress
09/13/2024Lighting controlsWAYNE ALLENenergy_progress
09/13/2024Insulation placement and R valuesWAYNE ALLENenergy_progress
09/13/2024Interior lighting powerWAYNE ALLENenergy_progress
09/13/2024Lighting in dwelling unitsWAYNE ALLENenergy_progress
09/13/2024Fire-Resistant Penetrations and JointsWAYNE ALLENspecial
09/13/2024Mechanical SystemsWAYNE ALLENspecial
09/13/2024Energy Code Compliance InspectionsWAYNE ALLENprogress
09/13/2024FinalWAYNE ALLENprogress
09/13/2024Fire-Resistance Rated ConstructionWAYNE ALLENprogress
09/13/2024HVAC-R and service water piping design and insulationWAYNE ALLENenergy_progress
09/13/2024HVAC-R and service water heating system controlsWAYNE ALLENenergy_progress
09/13/2024HVAC-R and service water heating equipmentWAYNE ALLENenergy_progress
09/05/2023FinalAri Kamoprogress
Latest 25 of 31.
▾Documents — 189 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/27/2026Q00489855-I1Request digital key ↗
08/27/2026Q00527936-I1Request digital key ↗
08/24/2026Q00894786-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00310327-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION17
03/23/2020421659707Open ↗
03/16/2020421659707Open ↗
12/27/2019421897264Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION12
07/09/2020421659707Open ↗
10/24/2019421897264Open ↗
10/09/2019421897264Open ↗
Showing 3 of 12 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/01/2016421248956Open ↗
▸Seals & Professional Certifications64
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026Q00310327-I1Open ↗
08/26/2026Q00480750-I1Open ↗
08/26/2026Q00480750-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
03/23/2020421659707Open ↗
03/16/2020421659707Open ↗
08/28/2019421897264Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
03/16/2020421659707Open ↗
03/16/2020421659707Open ↗
03/16/2020421659707Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00489855-I1Open ↗
08/27/2026Q00527936-I1Open ↗
08/24/2026Q00894786-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/26/2026Q00480750-I1Open ↗
08/26/2026Q00480750-I1Open ↗
08/25/2026Q00894786-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/11/2019421895854Open ↗
03/01/2019421897264Open ↗
01/12/2019421718984Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/17/2015440220725Open ↗
07/15/2015440233766Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/17/2015440220725Open ↗
07/15/2015440233766Open ↗
▸BISProfessional and Owner Certification (POC3)1
01/12/2019421718984Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
12/27/2019421897264Open ↗
11/12/2019421897264Open ↗
03/11/2019421895854Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/12/2019421718984Open ↗
▸BISSCHEDULE B - PLUMBING1
03/22/2012420546920Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes5
03/16/2020421659707Open ↗
03/11/2019421895854Open ↗
03/01/2019421897264Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
08/06/2014421007289Open ↗
03/22/2012420546920Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
03/16/2020421659707Open ↗
03/11/2019421895854Open ↗
03/01/2019421897264Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00894786-P1Open ↗
08/24/2026Q00894786-I1Open ↗
08/21/2026Q00480750-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/22/2012420546920Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026Q00489855-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/16/2020421659707Open ↗
08/28/2019421897264Open ↗
03/11/2019421895854Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/21/2021421659707Open ↗
06/02/2020421897264Open ↗
09/01/2016421248956Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/21/2021421659707Open ↗
06/02/2020421897264Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/22/2012420546920Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00489855-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/21/2021421659707Open ↗
06/04/2020421897264Open ↗
07/17/2015440220725Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
07/21/2021421659707Open ↗
06/04/2020421897264Open ↗
06/02/2020421897264Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/24/2019421897264Open ↗
03/11/2019421895854Open ↗
05/18/2016421248956Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/13/2016421248956Open ↗
03/22/2012420546920Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
07/21/2021421659707Open ↗
06/02/2020421897264Open ↗
03/16/2020421659707Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET8
03/16/2020421659707Open ↗
03/11/2019421895854Open ↗
03/01/2019421897264Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION7
03/23/2020421659707Open ↗
01/23/2020421897264Open ↗
11/12/2019421897264Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/17/2015440220725Open ↗
07/15/2015440233766Open ↗
▸BISBOROUGH INTAKE FORM1
10/28/2017440233766Open ↗