Elevator cooperative
112-50 NORTHERN BOULEVARD
QUEENS · North Corona · BIN 4431570
💬 Discuss this project
1953Year Built
6Stories
D4Building Class
R6Zoning
290,000 sfGross Floor Area
301Units
LL97 CoveredRent Stabilized88 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: DORIE MILLER HOUSING CO INC · 147,105 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeOther
Roof2p · 2 filings · 8 docs
Sub-Basement18p · 2 filings · 20 docs
Site & exterior11p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DORIE MILLER HOUSING3004/09/2026
METRO MANAGEMENT DEVELOPMENT INC.507/08/2026
XINOS CONSTRUCTION404/09/2026
S S P CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OLA CONSULTING ENGINEERS, PC612/09/2025
HOFFMANN ARCHITECTS, INC.108/21/2024
CRIBSTONE ENGINEERING PLLC108/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1403/21/2026
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor304/09/2026
MEGA PLBG CORPPlumbing207/08/2026
RYBURN PHILLIPSElectrical103/21/2026
VERDRY HARRISElectrical103/21/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
LENS ELECTRIC, INCElectrical103/22/2026
NEW YORK PLBG-HTG-COOLINGPlumbing107/08/2026
PHILIP ZUARDIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DNA CONTROLLED INSPECTION554208/21/2024
SOCOTEC ENGINEERING4983206/30/2023
Building Lifecycle
All (126)Filed (9)Permit Issued (9)Signed Off (5)Facade (FISP) (9)Violation (60)Inspection (5)Objection (2)Special Inspection (27)
01/16/2026
Signed off — Alteration
Interior renovation of boiler rooms includes replacement of light fixtures and repainting walls
Q00893737-I1
01/09/2026
Signed off — Alteration
DEMOLITION OF EXISTING GAS PIPING AND DOMESTIC WATER PIPING, INSTALLATION OF NEW GAS SERVICE, PIPING AND DOMESTIC WATER PIPING.
Q00894479-I1
12/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM FITZJOHN
12/11/2025
Special inspection requirement — Maintenance information
WILLIAM FITZJOHN
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM FITZJOHN
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
12/09/2025
Filed — Alteration
DEMOLITION OF EXISTING GAS PIPING AND DOMESTIC WATER PIPING, INSTALLATION OF NEW GAS SERVICE, PIPING AND DOMESTIC WATER PIPING.
Q00894479-P3
12/01/2025
Signed off — Alteration
Q01094732-I1
11/28/2025
Permit issued — Suspended Scaffold
Q01094732-I1-SC
11/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM FITZJOHN
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM FITZJOHN
11/21/2025
Special inspection requirement — Maintenance information
WILLIAM FITZJOHN
11/18/2025
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01091440-I1
11/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/23/2025
Permit issued — Plumbing
Q00894479-I1-PL
02/20/2025
Cycle 9 facade report submitted
02/20/2025
Cycle 9 facade report signed — SAFE
02/12/2025
Signed off — Alteration
Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair. No change in use, egress and occupancy.
Q01073314-I1
02/10/2025
Cycle 9 facade inspection completed
09/06/2024
Permit issued — General Construction
Q01073314-I1-GC
09/04/2024
Permit issued — Plumbing
Q00894479-I1-PL
08/29/2024
Permit issued — Suspended Scaffold
Q01094732-I1-SC
08/28/2024
Objection resolved — Addressed
08/26/2024
Objection raised — Other
08/21/2024
Filed — Alteration
Q01094732-I1
08/21/2024
Filed — Alteration
Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair. No change in use, egress and occupancy.
Q01073314-I1
08/08/2024
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01091440-I1
08/08/2024
Permit issued — Sidewalk Shed
Q01091440-I1-SH
08/01/2024
Special inspection requirement — Post-installed Anchors
WILLIAM FITZJOHN
08/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM FITZJOHN
08/01/2024
Special inspection requirement — Final
Juan Kuriyama
08/01/2024
Special inspection requirement — Masonry
WILLIAM FITZJOHN
06/28/2024
Filed — Alteration
DEMOLITION OF EXISTING GAS PIPING AND DOMESTIC WATER PIPING, INSTALLATION OF NEW GAS SERVICE, PIPING AND DOMESTIC WATER PIPING.
Q00894479-P2
06/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/18/2024
Special inspection requirement — Maintenance information
WILLIAM FITZJOHN
06/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM FITZJOHN
06/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM FITZJOHN
04/10/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/21/2023
Permit issued — Boiler Equipment
Q00893737-I1-BE
09/25/2023
Filed — Alteration
Interior renovation of boiler rooms includes replacement of light fixtures and repainting walls
Q00893737-P1
09/25/2023
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
09/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
09/25/2023
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
09/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
09/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
09/21/2023
Filed — Alteration
DEMOLITION OF EXISTING GAS PIPING AND DOMESTIC WATER PIPING, INSTALLATION OF NEW GAS SERVICE, PIPING AND DOMESTIC WATER PIPING.
Q00894479-P1
09/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/21/2023
Special inspection requirement — Heating Systems
WILLIAM FITZJOHN
09/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM FITZJOHN
09/21/2023
Special inspection requirement — Maintenance information
WILLIAM FITZJOHN
09/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM FITZJOHN
08/23/2023
Permit issued — Boiler Equipment
Q00893737-I1-BE
08/08/2023
Cycle 9 facade report signed — SWARMP
07/17/2023
Permit issued — Plumbing
Q00894479-I1-PL
06/30/2023
Filed — Alteration
Interior renovation of boiler rooms includes replacement of light fixtures and repainting walls
Q00893737-I1
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offXINOS CONSTRUCTION CORP11/28/2025
DOB NOWPlumbingSigned-offNEW YORK PLBG-HTG-COOLING10/23/2025
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP09/06/2024
DOB NOWPlumbingSigned-offMEGA PLBG CORP09/04/2024
DOB NOWSuspended ScaffoldSigned-offXINOS CONSTRUCTION CORP08/29/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP08/08/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP11/21/2023
DOB NOWBoiler EquipmentSigned-offCHAMP PLUMBING & HTG CORP08/23/2023
DOB NOWPlumbingSigned-offMEGA PLBG CORP07/17/2023
BISMHISSUEDCHAMPION COMBUSTION CORP09/25/2018
BISEQISSUEDA & S CONSTRUCT OF NY INC04/27/2016
BISOTISSUEDA & S CONSTRUCT OF NY INC10/13/2015
BISEQISSUEDSSP CONSTRUCTION CORP09/30/2015
BISOTISSUEDA & S CONSTRUCT OF NY INC07/01/2015
BISOTISSUEDSTONEHENGE RESTORATION IN06/05/2015
BISOTISSUEDSTONEHENGE RESTORATION IN04/07/2015
BISOTISSUEDA & S CONSTRUCT OF NY INC08/04/2014
BISPLISSUEDILG MECH SERVICES, INC12/12/2013
BISOTISSUEDA & S CONSTRUCT OF NY INC07/11/2012
BISOTISSUEDA & S CONSTRUCT OF NY INC06/20/2012
BISOTISSUEDA & S CONSTRUCT OF NY INC06/06/2011
BISOTISSUEDA & S CONSTRUCT OF NY INC09/20/2010
BISEQISSUEDSPRING SCAFFOLDING07/16/2004
BISFSISSUEDA L EASTMOND AND SONS INC11/15/2002
BISOTISSUEDKAY WATERPROOFING CORP10/30/1998
BISPLISSUEDCROOM PLUMBING AND HEATING CORP.12/13/1993
BISOTISSUEDMULTIPAK CORP.07/15/1993
6 projects · most recent 03/31/2025
General Wiring
FiledStatusContractorScope
03/31/2025CompleteS.A.L. ELECTRIC CO INC.—
09/18/2024Permit IssuedTOWER ELECTRIC INC.—
10/11/2023CompleteALLCOM ELECTRIC CORPGeneral Wiring
01/29/2019Permit IssuedLENS ELECTRIC, INCGeneral Wiring
01/07/2019CompleteABILENE ELECTRIC INC—
01/30/2018CompleteOHM PRO ELECTL CONST CORP—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
12/11/2025HVAC-R and service water heating equipmentWILLIAM FITZJOHNenergy_progress
12/11/2025Maintenance informationWILLIAM FITZJOHNenergy_progress
12/11/2025HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
12/11/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
11/21/2025HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
11/21/2025Tenant Protection Plan Compliance—special
11/21/2025HVAC-R and service water heating equipmentWILLIAM FITZJOHNenergy_progress
11/21/2025Maintenance informationWILLIAM FITZJOHNenergy_progress
08/01/2024Post-installed AnchorsWILLIAM FITZJOHNspecial
08/01/2024Tenant Protection Plan ComplianceWILLIAM FITZJOHNspecial
08/01/2024FinalJuan Kuriyamaprogress
08/01/2024MasonryWILLIAM FITZJOHNspecial
06/26/2024Tenant Protection Plan Compliance—special
06/18/2024Maintenance informationWILLIAM FITZJOHNenergy_progress
06/18/2024HVAC-R and service water heating equipmentWILLIAM FITZJOHNenergy_progress
06/18/2024HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
09/25/2023Heating SystemsALEXIS SCHLESSINGERMANspecial
09/25/2023HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
09/25/2023Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
09/25/2023HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
09/25/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
09/21/2023Tenant Protection Plan Compliance—special
09/21/2023Heating SystemsWILLIAM FITZJOHNspecial
09/21/2023Tenant Protection Plan Compliance—special
09/21/2023HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
Latest 25 of 27.
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026Q00894479-P3Request digital key ↗
08/24/2026Q00894479-P1Request digital key ↗
08/24/2026Q00894479-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION14
01/26/2019421428155Open ↗
04/26/2016440307348Open ↗
10/23/2015420250490Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
12/26/2017421586849Open ↗
02/02/2017421428155Open ↗
04/26/2016440307348Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
12/26/2017421586849Open ↗
07/25/2017421428155Open ↗
03/06/2017421428155Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00894479-P3Open ↗
08/24/2026Q00894479-P2Open ↗
08/24/2026Q00894479-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026Q00893737-I1Open ↗
09/01/2026Q00893737-P1Open ↗
08/28/2026Q01073314-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/26/2017421586849Open ↗
01/21/2015421070147Open ↗
12/18/2013420931558Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00893737-I1Open ↗
09/01/2026Q00893737-P1Open ↗
08/28/2026Q01073314-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/26/2017421586849Open ↗
04/26/2016440307348Open ↗
09/29/2015440255368Open ↗
▸BISProfessional and Owner Certification (POC3)2
01/21/2015421070147Open ↗
12/18/2013420931558Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/26/2016440307348Open ↗
09/29/2015440255368Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/26/2016440307348Open ↗
09/29/2015440255368Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/15/2010420250490Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
01/24/2015420931558Open ↗
10/02/2014420931558Open ↗
▸BISSCHEDULE B - PLUMBING1
12/18/2013420931558Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
12/26/2017421586849Open ↗
02/02/2017421428155Open ↗
▸BISSTREET TREE CHECKLIST1
12/18/2013420931558Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00894479-P3Open ↗
08/24/2026Q00894479-P2Open ↗
08/24/2026Q00894479-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/02/2017421428155Open ↗
02/21/2015421070147Open ↗
12/18/2013420931558Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/15/2010420250490Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
12/26/2017421586849Open ↗
03/06/2017421428155Open ↗
02/27/2017421428155Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00894479-I1Open ↗
08/13/2026Q00893737-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/15/2023421428155Open ↗
▸BISEN2 - As Built Energy Analysis1
12/16/2014420931558Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/21/2015421070147Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/15/2023421428155Open ↗
04/26/2016440307348Open ↗
09/29/2015440255368Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/29/2016420250490Open ↗
10/26/2016420250490Open ↗
03/31/2015420931558Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/18/2013420931558Open ↗
09/15/2010420250490Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/26/2016420250490Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
12/26/2017421586849Open ↗
02/02/2017421428155Open ↗
10/26/2016420250490Open ↗
Showing 3 of 7 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
12/18/2013420931558Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
12/26/2017421586849Open ↗
02/02/2017421428155Open ↗
01/21/2015421070147Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/26/2016440307348Open ↗
09/29/2015440255368Open ↗
▸BISADDITIONAL INFORMATION2
12/26/2017421586849Open ↗
02/02/2017421428155Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026Q01094732-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01094732-I1Open ↗