← Back
Elevator apt, fireproof with stores
1130 BURKE AVENUE
BRONX · BIN 2093503
💬 Discuss this project
1949Year Built
8Stories
D6Building Class
R5Zoning
881,200 sfGross Floor Area
881Units
LL97 CoveredRent Stabilized88 Open Violations 87 unresolved · 1 paperwork only ▸FISP: No Report Filed
Elevator apt, fireproof with stores · Owner of record: NYC HOUSING AUTHORITY · 607,392 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof7p · 3 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 73p · 1 filing · 20 docs
Floor 63p · 1 filing · 20 docs
Floor 54p · 1 filing · 20 docs
Floor 43p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar10p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EGC208/28/2026
NYCHA5407/11/2026
NEW YORK CITY HOUSING AUTHORITY2903/22/2026
NYCHA 99403/22/2026
NEW YORK HOUSING AUTH103/22/2026
NEW YORK HOUSING AUTHORITY603/22/2026
OWNER OF 3016 YATES AVE103/22/2026
OWNER 3010 YATES AVE103/22/2026
NYC HOUSING AUTHORITY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES403/21/2026
GREEN LIGHT EXPEDITING LLC803/21/2026
NYCHA103/21/2026
DSENY ENGINEERING SERVICES403/21/2026
A1 EXPEDITING SERVICE603/21/2026
JM ZONING, LLC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAVEN CONSTRUCTION SERVICGeneral Contractor2507/11/2026
KORDUN CONSTRUCTION CORPGeneral Contractor707/08/2026
YARKS NYC INCGeneral Contractor708/04/2026
ROMA SCAFFOLDING INCGeneral Contractor607/08/2026
KORDUN CONSTRUCTION CORPPlumbing507/08/2026
CAPONE ELECL CONTRS CORPElectrical203/22/2026
RICHARD NEUElectrical103/21/2026
A TECH ELEC ENTERPRISESElectrical103/22/2026
ANZELM KRYSAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LORJAN AGALLIU ARCHITECT6104606/08/2026
BUREAU VERITAS NA6902606/12/2025
HUDSON PEAKS CONSULTING L8381112/18/2024
Building Lifecycle
All (199)Filed (30)Permit Issued (33)Signed Off (7)Facade (FISP) (12)Violation (38)Inspection (5)Objection (44)Special Inspection (30)
08/13/2026
Signed off — Alteration
FN/NYCHA EASTCHESTER HOUSES BLDG #10 SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00622710-I1
08/03/2026
Permit issued — Sidewalk Shed
X01399266-I1-SH
07/10/2026
Permit issued — Construction Fence
X00622710-I1-FN
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
06/08/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01106328-P2
05/12/2026
Signed off — Alteration
install plumbing associated with new geothermal hvac system eastchester building 10
X00743396-I1
05/12/2026
Permit issued — Sidewalk Shed
X01399266-I1-SH
05/10/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01399266-I1
05/05/2026
Permit issued — Sidewalk Shed
X01309532-I1-SH
04/30/2026
Permit issued — Plumbing
X00743396-I1-PL
04/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/12/2026
Violation issued (HPD, open)
C
04/12/2026
Violation issued (HPD, open)
B
03/18/2026
Violation issued (HPD, open)
B
03/18/2026
Violation issued (HPD, closed)
C
02/27/2026
Permit issued — Sidewalk Shed
X01309532-I1-SH
02/19/2026
Violation issued (HPD, closed)
A
02/19/2026
Violation issued (HPD, closed)
B
02/19/2026
Violation issued (HPD, open)
C
12/19/2025
Signed off — Alteration
install new connections for geothermal hvac system eastchester building 10
X00741474-I1
10/30/2025
Violation issued (HPD, closed)
A
10/30/2025
Violation issued (HPD, closed)
A
10/30/2025
Violation issued (HPD, closed)
C
10/30/2025
Violation issued (HPD, closed)
C
10/30/2025
Violation issued (HPD, closed)
A
10/30/2025
Violation issued (HPD, closed)
A
10/29/2025
Permit issued — Protection and Mechanical Methods
X01309532-S1-PMM
10/29/2025
Permit issued — Protection and Mechanical Methods
X01309579-I1-PMM
10/29/2025
Permit issued — Sidewalk Shed
X01309532-I1-SH
10/28/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING FACADE REPAIRS FILED UNDER APPLICATION #X01141502-I1, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01309532-I1
10/28/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING FACADE REPAIRS FILED UNDER APPLICATION #X01141502-I1, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01309532-S1
10/28/2025
Filed — Alteration
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS DURING BLDG ALT, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01309579-I1
10/20/2025
Signed off — Alteration
X00743735-I1
10/11/2025
Violation issued (HPD, open)
B
08/27/2025
Signed off — Alteration
Interior removals and remodeling in conjunction with new geothermal hvac system. Eastchester building 10.
X00745170-I1
08/17/2025
Violation issued (HPD, closed)
B
08/17/2025
Violation issued (HPD, closed)
C
08/13/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01106328-P1
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
08/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/18/2025
Permit issued — Construction Fence
X00622710-I1-FN
07/18/2025
Permit issued — General Construction
X00745170-I1-GC
06/12/2025
Filed — Alteration
install plumbing associated with new geothermal hvac system eastchester building 10
X00743396-P2
06/12/2025
Violation issued (HPD, closed)
A
05/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
05/14/2025
Permit issued — Structural
X00743735-I1-ST
04/17/2025
Permit issued — Mechanical Systems
X00741474-I1-MS
02/04/2025
Filed — Alteration
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
X01141502-I1
01/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/10/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01106328-S1
01/09/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01106328-S3
01/03/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/18/2024
Filed — Alteration
PLUMBING WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01106328-S2
11/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
11/18/2024
Special inspection requirement — Final
lorjan agalliu
11/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
lorjan agalliu
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC08/03/2026
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC07/10/2026
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC05/12/2026
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC05/05/2026
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP04/30/2026
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedYARKS NYC INC10/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedYARKS NYC INC10/29/2025
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC10/29/2025
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC07/18/2025
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC07/18/2025
DOB NOWStructuralSigned-offRAVEN CONSTRUCTION SERVIC05/14/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/17/2025
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC07/26/2024
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC07/26/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP05/15/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/11/2024
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC08/16/2023
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC08/08/2023
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP04/04/2023
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/04/2023
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC03/14/2023
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP12/02/2022
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP11/22/2022
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC10/12/2022
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC08/05/2022
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/13/2022
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP07/13/2022
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC02/11/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/14/2020
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/14/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/16/2019
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/14/2019
BISOTISSUEDROMA SCAFFOLDING INC02/10/2020
BISOTISSUEDROMA SCAFFOLDING INC05/28/2019
BISEQISSUEDROMA SCAFFOLDING INC09/08/2017
BISOTISSUEDROMA SCAFFOLDING INC05/15/2017
BISEQISSUEDROMA SCAFFOLDING INC11/30/2016
BISEQISSUEDROMA SCAFFOLDING INC09/12/2016
BISEQISSUEDROMA SCAFFOLDING INC10/30/2015
+ 43 more permits on file
2 jobs · most recent 06/08/2026
Ventilation Systems Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg KCHH083VDGC (KCHH033VDGC+KCHH050VDGC) 81 tons · Air Cooled Chiller ×1
Ventilation
Greenheck BCF-106 660 CFM · Exhaust Fan ×6
SQ-60 50 CFM · Exhaust Fan ×3
USF-10-F3 1,217 CFM · Exhaust Fan ×2
BSQ-130 1,500 CFM · Exhaust Fan ×1
BSQ-160 2,000 CFM · Exhaust Fan ×1
BSQ-180 3,000 CFM · Exhaust Fan ×1
CSP-A200 150 CFM · Exhaust Fan ×1
CUBE-260 5,000 CFM · Exhaust Fan ×1
G-300-VG 8,000 CFM · Exhaust Fan ×1
SQ-22-VG 8,000 CFM · Exhaust Fan ×1
11/12/2021——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric variable 60 tons · Vrf Indoor ×54
Heating
Mitsubishi Electric Variable 60 tons · Vrf Indoor ×54
Ventilation
Greenheck Variable 22,770 CFM · Erv ×32
2 jobs · most recent 06/08/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/08/2026——Gas, Storm, Water/Sanitary
06/10/2021——Water/Sanitary
9 jobs · most recent 05/12/2026
General Wiring
FiledStatusContractorScope
05/12/2026Permit IssuedRICHARD NEU—
02/20/2026Permit IssuedRICHARD NEU—
12/17/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
12/17/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
12/17/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
07/05/2022CompleteARCADIA ELECT'L CO. INC.—
12/22/2021CompleteARCADIA ELECT'L CO. INC.General Wiring
02/03/2020CompleteA TECH ELEC ENTERPRISESGeneral Wiring
04/22/2019CompleteRAIDEN ELECTRIC LLC—
2 jobs · most recent 06/08/2026
Steel
FiledStatusContractorScope
06/08/2026——1 scope_items
10/06/2021——Steel
3 jobs · most recent 05/10/2026
Sidewalk Shed Fence
FiledStatusContractorScope
05/10/2026Permit IssuedYARKS NYC INCSidewalk Shed
10/28/2025Permit IssuedYARKS NYC INCSidewalk Shed
04/07/2022Signed-offRAVEN CONSTRUCTION SERVICFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/03/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/06/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
06/15/2026Fire-Resistant Penetrations and Jointslorjan agalliuspecial
06/15/2026Tenant Protection Plan Compliance—special
04/23/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
04/16/2026Tenant Protection Plan Compliance—special
04/16/2026Fire-Resistant Penetrations and Jointslorjan agalliuspecial
08/04/2025Tenant Protection Plan Compliance—special
08/04/2025Fire-Resistant Penetrations and Jointslorjan agalliuspecial
05/30/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
11/18/2024Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
11/18/2024Tenant Protection Plan Compliancelorjan agalliuspecial
11/18/2024Finallorjan agalliuprogress
11/12/2024Tenant Protection Plan Compliancelorjan agalliuspecial
11/12/2024Finallorjan agalliuprogress
11/12/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
11/12/2024Mechanical Systemslorjan agalliuspecial
09/04/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
09/04/2024Fire-Resistance Rated Constructionlorjan agalliuprogress
09/04/2024Finallorjan agalliuprogress
09/04/2024Tenant Protection Plan Compliancelorjan agalliuspecial
09/03/2024HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
09/03/2024Heating SystemsIBRAHIM MOURADspecial
09/03/2024Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/03/2024Mechanical SystemsIBRAHIM MOURADspecial
09/03/2024FinalIBRAHIM MOURADprogress
09/03/2024Maintenance informationIBRAHIM MOURADenergy_progress
Latest 25 of 71.
▾Documents — 380 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch28
08/25/2026X00536875-I1Request digital key ↗
08/25/2026X00513797-P1Request digital key ↗
08/25/2026X00513797-P2Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00163634-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00163488-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION28
08/10/2021240248086Open ↗
03/20/2019240246257Open ↗
02/06/2019240248086Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION25
02/11/2020240248086Open ↗
05/28/2019240248086Open ↗
09/12/2017240113621Open ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications119
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
11/06/2017240113621Open ↗
11/01/2017240120089Open ↗
09/29/2017240120962Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/26/2026X00163634-I1Open ↗
08/25/2026X00536875-I1Open ↗
08/25/2026X00505805-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
05/16/2017240113621Open ↗
05/16/2017240120962Open ↗
03/21/2017240120089Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/22/2026X00741474-P1Open ↗
09/22/2026X00741474-P1Open ↗
09/02/2026X01106328-S2Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
02/06/2019240248086Open ↗
01/23/2019240246257Open ↗
05/16/2017240113621Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
06/12/2013220307291Open ↗
06/12/2013220307308Open ↗
10/12/2012220236698Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/22/2026X00741474-P1Open ↗
09/22/2026X00741474-P1Open ↗
09/22/2026X00741474-P1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
02/06/2019240248086Open ↗
01/23/2019240246257Open ↗
11/25/2015240120089Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/06/2019240248086Open ↗
11/25/2015240120089Open ↗
10/29/2015240120962Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
02/06/2019240248086Open ↗
01/23/2019240246257Open ↗
Showing 2 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
02/06/2019240248086Open ↗
01/23/2019240246257Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
05/28/2019240248086Open ↗
01/23/2019240246257Open ↗
11/01/2017240120089Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/24/2026X00741474-I1Open ↗
08/24/2026X00743735-I1Open ↗
08/24/2026X00745170-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/10/2014220386213Open ↗
09/12/2012220221962Open ↗
Showing 2 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026X00505805-I1Open ↗
08/13/2026X01141502-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/22/2021240248086Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/20/2021240248086Open ↗
05/28/2019240248086Open ↗
02/06/2019240248086Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/01/2017240120089Open ↗
03/21/2017240120089Open ↗
10/09/2014220178689Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
09/20/2021240248086Open ↗
11/01/2017240120089Open ↗
02/10/2015220178689Open ↗
▸BISNYCECC ANALYSIS3
02/06/2019240248086Open ↗
01/23/2019240246257Open ↗
11/25/2015240120089Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/06/2019240248086Open ↗
11/25/2015240120089Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/13/2015240113621Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00741474-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY7
09/20/2021240248086Open ↗
05/28/2019240248086Open ↗
02/06/2019240248086Open ↗
Showing 3 of 7 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
11/25/2015240120089Open ↗
10/29/2015240120962Open ↗
09/13/2015240113621Open ↗
▸Approvals, Objections & Sign-offs79
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter29
08/24/2026X00622710-P1Open ↗
08/24/2026X00622710-I1Open ↗
08/24/2026X00741474-I1Open ↗
Showing 3 of 29 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
10/25/2021240248086Open ↗
11/06/2017240113621Open ↗
11/01/2017240120089Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
10/12/2012220236698Open ↗
08/31/2012220221971Open ↗
Showing 2 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/29/2014220386213Open ↗
08/22/2014220236698Open ↗
08/16/2014220207336Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER5
09/12/2017240113621Open ↗
09/28/2016240113621Open ↗
08/16/2014220221971Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026X00743735-I1Open ↗
08/13/2026X00743396-I1Open ↗
08/13/2026X00745170-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/24/2026X00741474-I1Open ↗
08/13/2026X00743396-I1Open ↗
08/13/2026X00743735-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026X00741474-I1Open ↗
08/13/2026X00741474-P1Open ↗
08/13/2026X00743735-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
09/20/2021240248086Open ↗
02/06/2019240248086Open ↗
01/23/2019240246257Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET10
06/10/2014220386213Open ↗
06/12/2013220307291Open ↗
06/12/2013220307308Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION10
05/17/2017240120962Open ↗
05/17/2017240113621Open ↗
05/16/2017240113621Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
02/06/2019240248086Open ↗
01/23/2019240246257Open ↗
11/25/2015240120089Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
03/20/2019240246257Open ↗
11/06/2017240113621Open ↗
11/01/2017240120089Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸BISFEE EXEMPTION DOCUMENTATION2
11/25/2015240120089Open ↗
10/29/2015240120962Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026X01141502-I1Open ↗
08/13/2026X01106328-I1Open ↗