← Back
Elevator apt, fireproof with stores
1130 BURKE AVENUE
BRONX · Pelham Gardens · BIN 2093498
💬 Discuss this project
1949Year Built
8Stories
D6Building Class
R5Zoning
881,200 sfGross Floor Area
881Units
LL97 CoveredRent Stabilized91 Open Violations 90 unresolved · 1 paperwork only ▸FISP: No Report Filed
Elevator apt, fireproof with stores · Owner of record: NYC HOUSING AUTHORITY · 607,392 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof9p · 1 filing · 8 docs
CellarUnder Construction99p · 8 filings · 20 docs
Site & exteriorUnder Construction61p · 9 filings · 20 docs
Filed — no permit issued32p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA6007/31/2026
NEW YORK CITY HOUSING AUTHORITY3308/08/2026
NYC Housing Authority603/21/2026
NEW YORK HOUSING AUTHORITY503/21/2026
EGC208/28/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES1203/21/2026
GREEN LIGHT EXPEDITING LLC1403/21/2026
JM ZONING, LLC.1803/21/2026
AK CONSULTING SERVICES403/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAVEN CONSTRUCTION SERVICGeneral Contractor2907/31/2026
KORDUN CONSTRUCTION CORPPlumbing1108/08/2026
KORDUN CONSTRUCTION CORPGeneral Contractor907/08/2026
ROMA SCAFFOLDING INCGeneral Contractor507/08/2026
SNS ORGNIZATION LTDGeneral Contractor208/01/2026
YARKS NYC INCGeneral Contractor204/09/2026
JOSEPH RUBELElectrical203/21/2026
RICHARD NEUElectrical103/21/2026
ANZELM KRYSAElectrical103/21/2026
VIEW 360 CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LORJAN AGALLIU ARCHITECT6104906/08/2026
HUDSON PEAKS CONSULTING L8381304/14/2025
BUREAU VERITAS NA69021410/17/2024
Building Lifecycle
All (139)Filed (32)Permit Issued (42)Signed Off (8)Facade (FISP) (12)Violation (20)Inspection (12)Objection (13)
08/07/2026
Permit issued — Plumbing
X00667868-I1-PL
08/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2026
Signed off — Alteration
SF/NYCHA EASTCHESTER HOUSES BLDG #3 SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00848725-I1
07/31/2026
Permit issued — Mechanical Systems
X01105949-S5-MS
07/30/2026
Permit issued — Supported Scaffold
X00848725-I1-SF
06/15/2026
Signed off — Alteration
interior removals and remodeling for new geothermal hvac system eastchester building 3
X00744789-I1
06/08/2026
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-P4
05/27/2026
Signed off — Alteration
Replacement of existing boilers, install new geothermal hvac system for eastchester building 3
X00737215-I1
05/27/2026
Signed off — Alteration
Install new boilers associated with new geothermal hvac system. Eastchester bldg 3
X08015813-I1
04/23/2026
Signed off — Alteration
install new concrete pads for hvac equipment eastchester building 3
X00743590-I1
04/21/2026
Signed off — Alteration
plumbing work filed in conjunction with new geothermal hvac system eastchester building 3
X00742752-I1
02/25/2026
Permit issued — Sidewalk Shed
X01251257-I1-SH
12/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/05/2025
Permit issued — Supported Scaffold
X00848725-I1-SF
09/16/2025
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-P3
07/09/2025
Permit issued — Structural
X01105949-S4-ST
07/07/2025
Permit issued — Sidewalk Shed
X01251257-I1-SH
07/03/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01251257-I1
06/17/2025
Permit issued — Mechanical Systems
X01105949-S5-MS
06/12/2025
Violation issued (HPD, closed)
A
05/14/2025
Permit issued — General Construction
X00744789-I1-GC
05/14/2025
Permit issued — Structural
X00743590-I1-ST
04/30/2025
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-S5
04/29/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Admin
04/14/2025
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-S4
04/11/2025
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-P2
04/02/2025
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-P1
03/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/05/2025
Permit issued — Construction Fence
X00616312-I1-FN
02/04/2025
Filed — Alteration
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
X01130446-I1
01/17/2025
Permit issued — Plumbing
X00667868-I1-PL
01/17/2025
Permit issued — Mechanical Systems
X00667826-I1-MS
01/10/2025
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-S2
01/09/2025
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-S1
01/02/2025
Permit issued — Construction Fence
X00616312-I1-FN
12/20/2024
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-S3
12/18/2024
Filed — Alteration
SITE CONVERSION FROM STEAM HEATING TO HYDRONIC. INSTALL NEW STEAM TO WATER HEAT EXCHANGERS. CONNECT TO EXISTING STEAM BOILER PLANT. INSTALL NEW SITE DISTRIBUTION PUMPS. INSTALL NEW SITE DISTRIBUTION PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01105949-I1
12/13/2024
Permit issued — Supported Scaffold
X00848725-I1-SF
10/17/2024
Filed — Alteration
install new concrete pads for hvac equipment eastchester building 3
X00743590-P1
09/05/2024
Filed — Alteration
Replacement of existing boilers, install new geothermal hvac system for eastchester building 3
X00737215-P1
06/24/2024
Filed — Alteration
interior removals and remodeling for new geothermal hvac system eastchester building 3
X00744789-P1
04/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/12/2024
Filed — Alteration
plumbing work filed in conjunction with new geothermal hvac system eastchester building 3
X00742752-P1
04/11/2024
Permit issued — Mechanical Systems
X00737215-I1-MS
04/02/2024
Permit issued — Plumbing
X00742752-I1-PL
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/06/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/08/2024
Permit issued — Construction Fence
X00616312-I1-FN
12/27/2023
Permit issued — Supported Scaffold
X00848725-I1-SF
11/28/2023
Permit issued — Boiler Equipment
X08015813-I1-BE
06/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2023
Permit issued — Plumbing
X00742752-I1-PL
04/03/2023
Permit issued — Mechanical Systems
X00737215-I1-MS
03/27/2023
Filed — Alteration
SF/NYCHA EASTCHESTER HOUSES BLDG #3 SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00848725-I1
01/12/2023
Permit issued — Construction Fence
X00616312-I1-FN
12/20/2022
Permit issued — Mechanical Systems
X00737215-I1-MS
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP08/07/2026
DOB NOWMechanical SystemsPermit IssuedSNS ORGNIZATION LTD07/31/2026
DOB NOWSupported ScaffoldSigned-offRAVEN CONSTRUCTION SERVIC07/30/2026
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/25/2026
DOB NOWSupported ScaffoldSigned-offRAVEN CONSTRUCTION SERVIC12/05/2025
DOB NOWStructuralPermit IssuedVIEW 360 CONSTRUCTION INC07/09/2025
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC07/07/2025
DOB NOWMechanical SystemsPermit IssuedSNS ORGNIZATION LTD06/17/2025
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC05/14/2025
DOB NOWStructuralSigned-offRAVEN CONSTRUCTION SERVIC05/14/2025
DOB NOWConstruction FencePermit IssuedRAVEN CONSTRUCTION SERVIC03/05/2025
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP01/17/2025
DOB NOWMechanical SystemsPermit IssuedKORDUN CONSTRUCTION CORP01/17/2025
DOB NOWConstruction FencePermit IssuedRAVEN CONSTRUCTION SERVIC01/02/2025
DOB NOWSupported ScaffoldSigned-offRAVEN CONSTRUCTION SERVIC12/13/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/11/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP04/02/2024
DOB NOWConstruction FencePermit IssuedRAVEN CONSTRUCTION SERVIC01/08/2024
DOB NOWSupported ScaffoldSigned-offRAVEN CONSTRUCTION SERVIC12/27/2023
DOB NOWBoiler EquipmentSigned-offKORDUN CONSTRUCTION CORP11/28/2023
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP04/04/2023
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/03/2023
DOB NOWConstruction FencePermit IssuedRAVEN CONSTRUCTION SERVIC01/12/2023
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP12/20/2022
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP12/20/2022
DOB NOWBoiler EquipmentSigned-offKORDUN CONSTRUCTION CORP12/02/2022
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP12/02/2022
DOB NOWMechanical SystemsPermit IssuedKORDUN CONSTRUCTION CORP11/22/2022
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP11/22/2022
DOB NOWBoiler EquipmentSigned-offKORDUN CONSTRUCTION CORP10/13/2022
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC09/28/2022
DOB NOWStructuralSigned-offRAVEN CONSTRUCTION SERVIC09/28/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedRAVEN CONSTRUCTION SERVIC09/09/2022
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/20/2022
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP07/19/2022
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP04/20/2022
DOB NOWMechanical SystemsPermit IssuedKORDUN CONSTRUCTION CORP04/20/2022
DOB NOWConstruction FencePermit IssuedRAVEN CONSTRUCTION SERVIC03/29/2022
DOB NOWConstruction FencePermit IssuedRAVEN CONSTRUCTION SERVIC02/01/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/11/2020
+ 35 more permits on file
1 project · most recent 06/08/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2026Permit IssuedSNS ORGNIZATION LTDHeating Systems, Ventilation Systems
Ventilation
Greenheck SQ-60 50 CFM · Exhaust Fan ×8
USF-12-B6 1,217 CFM · Exhaust Fan ×4
BEF500X 4,000 CFM · Exhaust Fan ×2
Heating
Lochinvar AWH0800NPM 800,000 BTU · Water Heater ×1
1 project · most recent 06/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/08/2026——Gas, Storm, Water/Sanitary
9 projects · most recent 06/20/2026
General Wiring
FiledStatusContractorScope
06/20/2026CompleteARCADIA ELECT'L CO. INC.General Wiring
02/20/2026Permit IssuedRICHARD NEU—
12/15/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
09/23/2022CompleteARCADIA ELECT'L CO. INC.—
07/05/2022CompleteARCADIA ELECT'L CO. INC.—
01/31/2021Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
02/03/2020CompleteA TECH ELEC ENTERPRISESGeneral Wiring
04/22/2019CompleteRAIDEN ELECTRIC LLC—
02/20/2019CompleteRAIDEN ELECTRIC LLC—
1 project · most recent 06/08/2026
Concrete
FiledStatusContractorScope
06/08/2026Permit IssuedSNS ORGNIZATION LTDConcrete
4 projects · most recent 07/03/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
07/03/2025Permit IssuedYARKS NYC INCSidewalk Shed
03/27/2023Signed-offRAVEN CONSTRUCTION SERVICScaffold
04/07/2022Permit IssuedRAVEN CONSTRUCTION SERVICFence
11/19/2021——Scaffold
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2024Pass-Final Boiler Equipment InspectionPassView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
06/15/2026Tenant Protection Plan Compliance—special
06/15/2026Fire-Resistant Penetrations and Jointslorjan agalliuspecial
04/16/2026Tenant Protection Plan Compliance—special
04/16/2026Fire-Resistant Penetrations and Jointslorjan agalliuspecial
08/06/2025Tenant Protection Plan Compliance—special
08/01/2025Fire-Resistant Penetrations and Jointslorjan agalliuspecial
04/25/2025Finallorjan agalliuprogress
04/25/2025Tenant Protection Plan Compliancelorjan agalliuspecial
04/25/2025Mechanical Systemslorjan agalliuspecial
04/25/2025Finallorjan agalliuprogress
04/25/2025Tenant Protection Plan Compliancelorjan agalliuspecial
04/25/2025Mechanical Systemslorjan agalliuspecial
04/25/2025Fire-Resistant Penetrations and Jointslorjan agalliuspecial
04/16/2025Finallorjan agalliuprogress
04/16/2025Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
04/16/2025Tenant Protection Plan Compliancelorjan agalliuspecial
04/09/2025Tenant Protection Plan Compliancelorjan agalliuspecial
04/09/2025Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
04/09/2025Finallorjan agalliuprogress
03/31/2025Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
03/31/2025Tenant Protection Plan Compliance—special
03/31/2025Finallorjan agalliuprogress
10/17/2024Post-installed AnchorsIBRAHIM MOURADspecial
10/17/2024FinalIBRAHIM MOURADprogress
10/17/2024Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
Latest 25 of 79.
▾Documents — 392 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch30
08/24/2026X00616312-I1Request digital key ↗
08/24/2026X00667826-I1Request digital key ↗
08/24/2026X00667868-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00163632-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00163474-I1Request digital key ↗
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION24
08/13/2021240247979Open ↗
03/19/2019240246382Open ↗
02/06/2019240247979Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION19
02/11/2020240247979Open ↗
05/28/2019240247979Open ↗
05/01/2017240180683Open ↗
Showing 3 of 19 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/10/2013220123934Open ↗
▸Seals & Professional Certifications141
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/26/2026X00163474-I1Open ↗
08/25/2026X00619601-I1Open ↗
08/24/2026X00616312-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026X08015813-I1Open ↗
09/02/2026X01105949-S4Open ↗
09/02/2026X01105949-S4Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026X08015813-I1Open ↗
09/02/2026X01105949-S4Open ↗
08/31/2026X00163632-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
11/01/2017240119974Open ↗
09/29/2017240120926Open ↗
09/29/2017240180683Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
02/06/2019240247979Open ↗
01/23/2019240246382Open ↗
05/16/2017240113532Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/16/2017240113532Open ↗
05/16/2017240120926Open ↗
03/21/2017240119974Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
02/06/2019240247979Open ↗
01/23/2019240246382Open ↗
05/01/2017240180683Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
06/13/2012220207416Open ↗
05/29/2012220207443Open ↗
04/05/2012220177485Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
02/06/2019240247979Open ↗
05/01/2017240180683Open ↗
11/25/2015240119974Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING3
02/06/2019240247979Open ↗
01/23/2019240246382Open ↗
Showing 2 of 3 on file for this type
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
02/06/2019240247979Open ↗
01/23/2019240246382Open ↗
05/01/2017240180683Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00667826-I1Open ↗
08/24/2026X00667868-I1Open ↗
08/13/2026X01130446-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/24/2026X00742752-I1Open ↗
08/24/2026X00743590-I1Open ↗
08/23/2026X08015813-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
05/28/2019240247979Open ↗
01/23/2019240246382Open ↗
11/01/2017240119974Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/07/2011220123934Open ↗
07/21/2009220019085Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/01/2017240180683Open ↗
06/19/2012220207416Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/21/2021240247979Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/20/2021240247979Open ↗
05/28/2019240247979Open ↗
02/06/2019240247979Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
08/23/2026X08015813-I1Open ↗
08/21/2026X00737215-I1Open ↗
08/13/2026X08015813-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/20/2021240247979Open ↗
11/01/2017240119974Open ↗
01/23/2015220177485Open ↗
▸BISNYCECC ANALYSIS3
02/06/2019240247979Open ↗
01/23/2019240246382Open ↗
11/25/2015240119974Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/01/2017240119974Open ↗
03/21/2017240119974Open ↗
10/09/2014220177485Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/06/2019240247979Open ↗
11/25/2015240119974Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/11/2015240113532Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/05/2012220177485Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00737215-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/20/2021240247979Open ↗
05/28/2019240247979Open ↗
02/06/2019240247979Open ↗
Showing 3 of 8 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
05/01/2017240180683Open ↗
11/25/2015240119974Open ↗
10/29/2015240120926Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs73
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter32
08/24/2026X00667868-I1Open ↗
08/24/2026X00742752-I1Open ↗
08/24/2026X00742752-P1Open ↗
Showing 3 of 32 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
10/25/2021240247979Open ↗
11/01/2017240119974Open ↗
09/29/2017240113532Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/24/2026X00743590-I1Open ↗
08/13/2026X00667868-I1Open ↗
08/13/2026X00744789-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/24/2026X00742752-I1Open ↗
08/24/2026X00743590-I1Open ↗
08/13/2026X00737215-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/20/2014220207443Open ↗
08/14/2014220207416Open ↗
08/10/2013220123934Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/13/2012220207416Open ↗
05/29/2012220207443Open ↗
04/05/2012220177485Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER3
09/28/2016240113532Open ↗
03/24/2014220207443Open ↗
06/17/2013220207443Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/24/2026X00743590-I1Open ↗
08/13/2026X00742752-I1Open ↗
08/13/2026X00737215-I1Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/20/2021240247979Open ↗
02/06/2019240247979Open ↗
01/23/2019240246382Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION10
05/17/2017240180683Open ↗
05/17/2017240120926Open ↗
05/17/2017240113532Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/06/2019240247979Open ↗
01/23/2019240246382Open ↗
05/01/2017240180683Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
03/19/2019240246382Open ↗
11/01/2017240119974Open ↗
09/29/2017240113532Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
06/13/2012220207416Open ↗
05/29/2012220207443Open ↗
04/05/2012220177485Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸BISFEE EXEMPTION DOCUMENTATION2
11/25/2015240119974Open ↗
10/29/2015240120926Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026X01130446-I1Open ↗
08/13/2026X01105949-I1Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
07/11/2011220019085Open ↗