← Back
Walk-up cooperative
1135 TELLER AVENUE
BRONX · BIN 2826082
💬 Discuss this project
1915Year Built
5Stories
C6Building Class
R7-1Zoning
11,040 sfGross Floor Area
10Units
Walk-up cooperative · Owner of record: 1120 COLLEGE AVENUE H · 3,851 sf lot · 2.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IDEA BUILDERS1807/08/2026
AMS CONTRACTOR INC703/22/2026
GSR CONTRACTOR INC.503/22/2026
R M PROPERTY MANAGEMENT703/21/2026
TELLER PARTNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
PREPARER303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GSR CONTRACTOR INCGeneral Contractor603/21/2026
SION CONSULTING ENGINEERINGGeneral Contractor403/22/2026
AMS CONTRACTOR INCGeneral Contractor303/21/2026
IDEA BUILDERS LLCGeneral Contractor207/08/2026
DENNISON ELECTRIC CORP 003326General Contractor103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
SION HOURIZADEHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895208/17/2023
Building Lifecycle
All (23)Filed (7)Permit Issued (5)Signed Off (4)Inspection (4)Special Inspection (3)
08/24/2023
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#220152590. The system is hydraulically calculated. There is no change in use occupancy or egress.
X08008246-I1
08/18/2023
Special inspection requirement — Sprinkler Systems
Gregory Mortman
08/17/2023
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#220152590. The system is hydraulically calculated. There is no change in use occupancy or egress.
X08008246-P1
08/15/2023
Signed off — Alteration
X00893229-I1
08/14/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/08/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/22/2023
Permit issued — Curb Cut
X00893229-I1-CC
06/22/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/20/2023
Filed — Alteration
X00893229-I1
01/27/2023
Signed off — Alteration
X00733578-I1
01/27/2023
Signed off — Alteration
X07995457-I1
09/27/2022
Permit issued — Sprinklers
X08008246-I1-EW-SP
09/22/2022
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#220152590. The system is hydraulically calculated. There is no change in use occupancy or egress.
X08008246-I1
09/05/2022
Permit issued — Supported Scaffold
X07995457-I1-SF
09/02/2022
Filed — Alteration
X07995457-I1
07/29/2022
Permit issued — Sidewalk Shed
X00733578-I1-SH
05/09/2022
Filed — Alteration
X00733578-I1
05/09/2022
Permit issued — Sidewalk Shed
X00733578-I1-SH
05/21/2021
Special inspection requirement — Mechanical Systems
05/21/2021
Special inspection requirement — Final
02/08/2019
Filed — Alteration
X00128599-I1
02/07/2019
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00126968-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offIDEA BUILDERS LLC06/22/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC09/27/2022
DOB NOWSupported ScaffoldSigned-offGSR CONTRACTOR INC09/05/2022
DOB NOWSidewalk ShedSigned-offGSR CONTRACTOR INC07/29/2022
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC05/09/2022
4 projects · most recent 08/09/2023
General Wiring
FiledStatusContractorScope
08/09/2023CompleteDENNISON ELECTRIC CORPGeneral Wiring
05/09/2023CompleteGRID CITY ELECTRIC, CORP41 meters, 1 new_meters
08/01/2022CompleteKJK ELECTRIC INC—
05/09/2022CompleteRICHARD NEU—
1 project · most recent 02/07/2019
Fence
FiledStatusContractorScope
02/07/2019——Fence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/14/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/08/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/18/2023Sprinkler SystemsGregory Mortmanspecial
05/21/2021Mechanical Systems—special
05/21/2021Final—progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/24/2026X00733578-I1Request digital key ↗
08/24/2026X07995457-I1Request digital key ↗
08/23/2026X00893229-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00126968-I1Request digital key ↗
08/26/2026X00128599-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026X00123274-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00123274-I1Open ↗
08/26/2026X00126968-I1Open ↗
08/24/2026X00733578-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026X08008246-I1Open ↗