← Back
Two family converted from one family
114 HART STREET
BROOKLYN · BIN 3049348
💬 Discuss this project
1910Year Built
3Stories
B3Building Class
R6BZoning
2,752 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family converted from one family · 1,250 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 34p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMS CONTRACTOR507/08/2026
BEDSTUY REALTY VENTURE1703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/01/2024$2.1M—BEDSTUY REALTY VENTURE INC. → Private party$763/sf building
06/21/2022$1.1M—LUNALAND LLC → BEDSTUY REALTY VENTURE INC.$400/sf building
03/14/2022$850K—Private party → LUNALAND LLC$309/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.412/05/2023
MOHAMMAD AHEAD, PE104/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor303/21/2026
OGC ELECTRICAL CONTRACTORElectrical103/22/2026
AMS CONTRACTOR INCGeneral Contractor107/08/2026
GSR CONTRACTOR INCGeneral Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781412/05/2023
Building Lifecycle
All (34)Filed (5)Permit Issued (5)Signed Off (2)Violation (16)Inspection (6)
11/24/2025
Violation issued (HPD, open)
I
05/23/2024
Signed off — Alteration CO
CONVERT EXIST. THREE-STORY ONE-FAM. BUILDING WITH BASEMENT & CELLAR INTO A TWO-FAMILY DWELLING AS SHOWN ON THE PLANS. INSTALLATION OF HVAC UNITS. INSTALLATION OF DECK AT REAR YARD. NO CHANGES IN BULK. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. TO RESOLVE VIO
B00783548-S1
05/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/24/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00723307-I1
01/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2023
Filed — Alteration CO
CONVERT EXIST. THREE-STORY ONE-FAM. BUILDING WITH BASEMENT & CELLAR INTO A TWO-FAMILY DWELLING AS SHOWN ON THE PLANS. INSTALLATION OF HVAC UNITS. INSTALLATION OF DECK AT REAR YARD. NO CHANGES IN BULK. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. TO RESOLVE VIO
B00783548-P1
12/05/2023
Filed — Alteration CO
CONVERT EXIST. THREE-STORY ONE-FAM. BUILDING WITH BASEMENT & CELLAR INTO A TWO-FAMILY DWELLING AS SHOWN ON THE PLANS. INSTALLATION OF HVAC UNITS. INSTALLATION OF DECK AT REAR YARD. NO CHANGES IN BULK. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. TO RESOLVE VIO
B00783548-P2
11/28/2023
Violation issued (HPD, closed)
I
04/12/2023
Permit issued — Plumbing
B00783548-S1-PL
03/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/20/2022
Permit issued — Plumbing
B00783548-S1-PL
11/22/2022
Filed — Alteration CO
CONVERT EXIST. THREE-STORY ONE-FAM. BUILDING WITH BASEMENT & CELLAR INTO A TWO-FAMILY DWELLING AS SHOWN ON THE PLANS. INSTALLATION OF HVAC UNITS. INSTALLATION OF DECK AT REAR YARD. NO CHANGES IN BULK. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. TO RESOLVE VIO
B00783548-S1
10/24/2022
Permit issued — Structural
B00783548-I1-GC-CX
09/23/2022
Filed — Alteration CO
CONVERT EXIST. THREE-STORY ONE-FAM. BUILDING WITH BASEMENT & CELLAR INTO A TWO-FAMILY DWELLING AS SHOWN ON THE PLANS. INSTALLATION OF HVAC UNITS. INSTALLATION OF DECK AT REAR YARD. NO CHANGES IN BULK. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. TO RESOLVE VIO
B00783548-I1
07/15/2022
Permit issued — Sidewalk Shed
B00723307-I1-SH
04/23/2022
Permit issued — Sidewalk Shed
B00723307-I1-SH
04/22/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00723307-I1
03/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/18/2021
Violation issued (ECB, closed)
Construction
11/06/2021
Violation issued (ECB, closed)
Construction
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2021
Violation issued (ECB, closed)
Construction
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2021
Violation issued (ECB, closed)
Construction
04/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP04/12/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT12/20/2022
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC10/24/2022
DOB NOWSidewalk ShedSigned-offGSR CONTRACTOR INC07/15/2022
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC04/23/2022
1 project · most recent 12/05/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/05/2023Permit IssuedJ&J DESIGNS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NAHZ3-U1 30,600 BTU · Condensing Unit ×2
MXZ-3C30NAHZ4-U1 24,500 BTU · Condensing Unit ×2
SUZ-KA18NAHZ 21,600 BTU · Condensing Unit ×2
Ventilation
Greenheck GB-081 50 CFM · Exhaust Fan ×10
GB-091 150 CFM · Exhaust Fan ×4
1 project · most recent 12/05/2023
Gas Water/Sanitary
FiledStatusContractorScope
12/05/2023Signed-offTRI CITY MECHANICAL GROUPGas, Water/Sanitary
2 projects · most recent 03/13/2025
General Wiring
FiledStatusContractorScope
03/13/2025Permit IssuedBROOKYLN SOLARWORKS, LLC—
03/12/2024CompleteOGC ELECTRICAL CONTRACTORGeneral Wiring
1 project · most recent 12/05/2023
Steel Wood
FiledStatusContractorScope
12/05/2023Signed-offTRI CITY MECHANICAL GROUPSteel, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
12/21/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
12/21/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
12/21/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
12/21/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/21/2023Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
12/21/2023MasonryCHRISTIAN LOZADAspecial
12/21/2023Heating SystemsCHRISTIAN LOZADAspecial
12/21/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/21/2023Mechanical SystemsCHRISTIAN LOZADAspecial
12/21/2023Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
12/21/2023Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
12/21/2023Chimneys and ventsCHRISTIAN LOZADAspecial
12/21/2023Structural Steel - DetailsCHRISTIAN LOZADAspecial
12/21/2023Subgrade InspectionsCHRISTIAN LOZADAspecial
12/21/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
12/21/2023Structural Wood FrameCHRISTIAN LOZADAprogress
12/21/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
12/21/2023FinalCHRISTIAN LOZADAprogress
12/21/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
12/21/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
12/21/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
12/21/2023Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
12/21/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
12/21/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
12/21/2023Exterior lighting powerCHRISTIAN LOZADAenergy_progress
Latest 25 of 68.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026B00723307-I1Request digital key ↗
08/26/2026B00783548-S1Request digital key ↗
08/15/2026B00783548-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00783548-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B00783548-P1Open ↗
08/28/2026B00783548-P1Open ↗
08/28/2026B00783548-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026B00783548-P1Open ↗
08/28/2026B00783548-P1Open ↗
08/28/2026B00783548-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026B00723307-I1Open ↗
08/26/2026B00783548-P1Open ↗
08/26/2026B00783548-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B00783548-P1Open ↗
08/15/2026B00783548-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00783548-S1Open ↗
08/15/2026B00783548-P1Open ↗
08/15/2026B00783548-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B00783548-P1Open ↗
08/13/2026B00783548-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00783548-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/15/2026B00783548-P1Open ↗
08/15/2026B00783548-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00783548-I1Open ↗