← Back
Elevator apt, fireproof with stores
1147 1 AVENUE
MANHATTAN · BIN 1044374
💬 Discuss this project
1900Year Built
16Stories
D6Building Class
C2-8Zoning
67,880 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized3 Open Violations 0 unresolved · 3 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: MMP 344 OWNER LLC · 6,522 sf lot · 10.41 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Permit Issued — active, not yet Signed-off
Floor 15Under Construction5p · 1 filing · 5 docs
Floor 14
Floor 13
Floor 12
Floor 11Under Construction5p · 1 filing · 5 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 8 docs
Floor 16p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIVINGSTON MANAGEMENT SERVICES5108/28/2026
OWNERS REP507/08/2026
MMP 344 OWNER LLC103/22/2026
344 E 63 LLC C/O BET603/22/2026
344 EAST 63RD LLC103/22/2026
344 EAST 63 LLC C/O BET103/22/2026
BNL MGMT LLC103/22/2026
BNL MGNT LLC103/22/2026
344 E 63 ST LLC103/22/2026
DVM INDUSTRIES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/10/2015$54.3M—344 E 63 LLC → BRE FSC MULTIFAMILY BORROWER LLC$800/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IDEAL2803/21/2026
PAUL FUSCO CONSULTING403/21/2026
HIERARCH-E203/21/2026
DESARNO ASSOCIATES203/21/2026
AE DESIGN SOLUTION203/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
JP EXPEDITE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE PUMA HOME REPAIR ANDGeneral Contractor1108/27/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor507/08/2026
MKSSKR CONSULTING SERVICEGeneral Contractor303/21/2026
JKT CONSTRUCTION INCGeneral Contractor207/08/2026
JANON ELECTRIC CORPElectrical103/22/2026
CAPITOL AWNING CO INCGeneral Contractor104/09/2026
TOWER CREATIONS CORPGeneral Contractor104/09/2026
DVM ELECTRICAL SERVICES LElectrical103/22/2026
TEC PLUMBING CORPPlumbing106/28/2026
EMPIRE STATE ELEC MAINT &Electrical103/22/2026
HUDSON SCENIC STUDIOElectrical103/21/2026
IVAN DUBBSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404905/11/2026
MOHAMMAD AHEAD - PROFESSI9286109/15/2025
SIA INSPECTIONS LLC7306108/20/2025
JIAN ENGINEERING PLLC7397305/08/2025
METROPOLITAN MECHANICAL C2277204/29/2025
Building Lifecycle
All (177)Filed (24)Permit Issued (17)Signed Off (11)Facade (FISP) (13)Violation (60)Inspection (1)Objection (21)Special Inspection (30)
08/26/2026
Permit issued — General Construction
M01390949-I1-GC
08/06/2026
Filed — Alteration
install new partition wall in apartment 7b and 10 b and 12a
M01438626-I1
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/30/2026
Special inspection requirement — Final
05/11/2026
Filed — Alteration
install new partition wall in apartment 15B AND 11 A
M01390949-I1
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
AKM RAHMAN
04/22/2026
Special inspection requirement — Final
AKM RAHMAN
03/13/2026
Special inspection requirement — Final
AKM RAHMAN
03/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
03/05/2026
Filed — Alteration
plumbing for 2 new ada bathrooms, new water fountain and mop sink
M01172376-P4
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
03/04/2026
Special inspection requirement — Final
AKM RAHMAN
03/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/09/2026
Filed — Alteration
plumbing for 2 new ada bathrooms, new water fountain and mop sink
M01172376-P3
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
02/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/05/2026
Special inspection requirement — Final
AKM RAHMAN
12/02/2025
Signed off — Alteration
M01286888-I1
10/23/2025
Permit issued — General Construction
M01286888-I1-GC
10/20/2025
Signed off — Alteration
MINOR RENOVATION AT APT 4F ON THE 4TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01258299-I1
10/14/2025
Permit issued — General Construction
M01253449-I1-GC
10/01/2025
Permit issued — General Construction
M01258299-I1-GC
10/01/2025
Violation issued (HPD, closed)
C
09/15/2025
Filed — Alteration
M01286888-I1
08/27/2025
Signed off — Alteration
install new partition wall in apartment 7b and 10 b and 12a
M01218285-I1
08/20/2025
Filed — Alteration
REMOVE AND REPLACE AWNING CANVAS ON (2) EXISTING AWNING FRAMES. AWNINGS ARE ACCESSORY TO KID STRONG
M01253449-I1
08/07/2025
Signed off — Alteration
INTERIOR ALTERATIONS OF EXISTING 1ST FLOOR COMMERCIAL SPACE TO INCLUDE PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01209021-S1
08/07/2025
Signed off — Alteration
INTERIOR ALTERATIONS OF EXISTING 1ST FLOOR COMMERCIAL SPACE TO INCLUDE PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01209021-I1
08/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
08/05/2025
Special inspection requirement — Final
ACRE QIU
07/31/2025
Filed — Alteration
MINOR RENOVATION AT APT 4F ON THE 4TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01258299-I1
07/30/2025
Filed — Alteration
install new partition wall in apartment 7b and 10 b and 12a
M01218285-P1
07/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/25/2025
Special inspection requirement — Final
ACRE QIU
07/18/2025
Special inspection requirement — Final
PING MAN HO
07/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
JEFF AKERMAN
07/09/2025
Special inspection requirement — Final
SALVATOR CARADONNA
07/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2025
Permit issued — General Construction
M01218285-I1-GC
05/09/2025
Permit issued — General Construction
M01209021-I1-GC
05/09/2025
Permit issued — Mechanical Systems
M01209021-S1-MS
05/08/2025
Filed — Alteration
install new partition wall in apartment 7b and 10 b and 12a
M01218285-I1
04/29/2025
Filed — Alteration
INTERIOR ALTERATIONS OF EXISTING 1ST FLOOR COMMERCIAL SPACE TO INCLUDE PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01209021-S1
04/29/2025
Filed — Alteration
INTERIOR ALTERATIONS OF EXISTING 1ST FLOOR COMMERCIAL SPACE TO INCLUDE PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01209021-I1
04/18/2025
Special inspection requirement — Final
PATRICK MCDONALD
04/18/2025
Special inspection requirement — Mechanical Systems
PATRICK MCDONALD
04/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
PATRICK MCDONALD
03/29/2025
Filed — Alteration
plumbing for 2 new ada bathrooms, new water fountain and mop sink
M01172376-P1
03/29/2025
Filed — Alteration
plumbing for 2 new ada bathrooms, new water fountain and mop sink
M01172376-P2
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2025
Special inspection requirement — Final
AKM RAHMAN
03/11/2025
Permit issued — Plumbing
M01172376-S2-PL
03/11/2025
Permit issued — General Construction
M01172376-I1-GC
02/05/2025
Filed — Alteration
plumbing for 2 new ada bathrooms, new water fountain and mop sink
M01172376-S2
02/05/2025
Filed — Alteration
plumbing for 2 new ada bathrooms, new water fountain and mop sink
M01172376-I1
01/03/2025
Signed off — Alteration
M08049021-I1
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTHE PUMA HOME REPAIR AND08/26/2026
DOB NOWGeneral ConstructionSigned-offTOWER CREATIONS CORP10/23/2025
DOB NOWGeneral ConstructionPermit IssuedCAPITOL AWNING CO INC10/14/2025
DOB NOWGeneral ConstructionSigned-offTHE PUMA HOME REPAIR AND10/01/2025
DOB NOWGeneral ConstructionSigned-offTHE PUMA HOME REPAIR AND06/20/2025
DOB NOWGeneral ConstructionSigned-offJKT CONSTRUCTION INC05/09/2025
DOB NOWMechanical SystemsSigned-offJKT CONSTRUCTION INC05/09/2025
DOB NOWPlumbingPermit IssuedTEC PLUMBING CORP03/11/2025
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE03/11/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/09/2024
DOB NOWGeneral ConstructionSigned-offTHE PUMA HOME REPAIR AND11/26/2024
DOB NOWGeneral ConstructionSigned-offTHE PUMA HOME REPAIR AND09/19/2024
DOB NOWGeneral ConstructionSigned-offTHE PUMA HOME REPAIR AND09/11/2024
DOB NOWGeneral ConstructionSigned-offTHE PUMA HOME REPAIR AND09/10/2024
DOB NOWSuspended ScaffoldSigned-offAMERICAN VENTILATION SERV06/28/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/14/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/16/2022
BISSPISSUEDCAPITOL FIRE SPRINKLER CO12/27/2019
BISOTISSUEDCRUXPX LLC09/07/2017
BISOTISSUEDCOOK & KRUPA LLC12/13/2016
BISOTISSUEDCOOK & KRUPA LLC12/13/2016
BISMHISSUEDCOOK & KRUPA LLC12/13/2016
BISOTISSUEDCRUXPX LLC09/20/2016
BISSPISSUEDCAPITOL FIRE SPRINKLER CO09/20/2016
BISOTISSUEDCOOK & KRUPA LLC07/08/2016
BISPLISSUEDBEDROCK PLBG. & HTG., INC07/08/2016
BISMHISSUEDCOOK & KRUPA LLC04/13/2016
BISOTISSUEDCOOK & KRUPA LLC04/13/2016
BISOTISSUEDMR SIGN USA INC12/18/2014
BISPLISSUEDTOP PLUMBING GROUP INC11/26/2014
BISOTISSUEDD & D DEVELOPMENT GROUP I11/17/2014
BISEQISSUEDD & D DEVELOPMENT GROUP I11/13/2014
BISPLISSUEDJOSEPH MOEHLENHOFF P&H IN09/04/2014
BISOTISSUEDBOLT CONSTRUCTION CORP08/27/2014
BISOTISSUEDD & D DEVELOPMENT GROUP I08/14/2014
BISPLISSUEDMETRO INCORPORATED07/11/2014
BISOTISSUEDB & L MANAGEMENT CO. LLC07/11/2014
BISOTRE-ISSUEDD & D DEVELOPMENT GROUP I06/30/2014
BISMHISSUEDD & D DEVELOPMENT GROUP I06/16/2014
BISSPISSUEDFIRE SPRINKLER ASSOC INC06/10/2014
+ 22 more permits on file
1 job · most recent 08/30/2024
FiledStatusContractorScope
08/30/2024——2 heads
2 jobs · most recent 03/05/2026
Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
03/05/2026Permit IssuedPLATINUM PLBG & HTG INCWater/Sanitary
08/30/2024——Plumbing-Sprinkler, Water/Sanitary
8 jobs · most recent 05/21/2025
General Wiring Lighting
FiledStatusContractorScope
05/21/2025CompleteJANON ELECTRIC CORPGeneral Wiring
07/12/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
06/20/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
06/11/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
04/26/2023Permit IssuedGRX EURO ELECTRIC CORPGeneral Wiring
12/06/2022CompleteSOLAS ELECTRICAL CORP—
05/31/2022CompleteEMPIRE STATE ELEC MAINT &—
05/25/2022Permit IssuedDVM ELECTRICAL SERVICES LLighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/30/2026Tenant Protection Plan Compliance—special
07/30/2026Final—progress
04/22/2026Tenant Protection Plan ComplianceAKM RAHMANspecial
04/22/2026FinalAKM RAHMANprogress
03/13/2026FinalAKM RAHMANprogress
03/13/2026Tenant Protection Plan Compliance—special
03/13/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
03/04/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
03/04/2026FinalAKM RAHMANprogress
03/04/2026Tenant Protection Plan Compliance—special
02/05/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
02/05/2026Tenant Protection Plan Compliance—special
02/05/2026FinalAKM RAHMANprogress
08/05/2025Tenant Protection Plan ComplianceJIAN DENGspecial
08/05/2025FinalACRE QIUprogress
07/29/2025Tenant Protection Plan Compliance—special
07/25/2025FinalACRE QIUprogress
07/18/2025FinalPING MAN HOprogress
07/09/2025Tenant Protection Plan ComplianceJEFF AKERMANspecial
07/09/2025FinalSALVATOR CARADONNAprogress
04/18/2025FinalPATRICK MCDONALDprogress
04/18/2025Mechanical SystemsPATRICK MCDONALDspecial
04/18/2025Tenant Protection Plan CompliancePATRICK MCDONALDspecial
03/26/2025Fire-Resistant Penetrations and JointsAKM RAHMANspecial
03/26/2025Tenant Protection Plan Compliance—special
Latest 25 of 36.
▾Documents — 452 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
09/01/2026M08049021-I1Request digital key ↗
08/27/2026M01063066-I1Request digital key ↗
08/27/2026M01063050-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION42
07/17/2025102940294Open ↗
05/05/2025102940294Open ↗
10/29/2024124041232Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION31
12/30/2019140205935Open ↗
09/13/2017122885075Open ↗
12/23/2016121951520Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications119
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
01/24/2020140205935Open ↗
01/24/2020140205935Open ↗
01/24/2020140205935Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/01/2026M08049021-I1Open ↗
08/27/2026M01053791-I1Open ↗
08/26/2026M01075866-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M01209021-S1Open ↗
09/02/2026M01172376-P4Open ↗
09/01/2026M01172376-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M01209021-S1Open ↗
09/02/2026M01172376-P4Open ↗
08/30/2026M01063050-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/18/2016122918931Open ↗
09/22/2016122885075Open ↗
11/24/2015140433467Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/18/2016122918931Open ↗
09/22/2016122885075Open ↗
12/17/2014122124085Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/24/2015140433467Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
11/24/2015140433467Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISApplicant / Owner Signature1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
05/22/2019140205935Open ↗
09/25/2017140205935Open ↗
02/17/2017121951520Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
01/30/2015121951520Open ↗
01/30/2015122089685Open ↗
01/22/2015122089685Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
11/24/2015140433467Open ↗
Showing 1 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/21/2020140205935Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/14/2019122661654Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
10/18/2016122918931Open ↗
09/22/2016122885075Open ↗
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026M00581729-I1Open ↗
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
08/26/2026M01075866-I1Open ↗
08/26/2026M01120088-I1Open ↗
08/25/2026M01172376-P2Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
10/18/2016122918931Open ↗
09/20/2016122885075Open ↗
11/24/2015140433467Open ↗
Showing 3 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
10/07/2014122152829Open ↗
Showing 1 of 3 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
01/24/2020140205935Open ↗
01/24/2020140205935Open ↗
01/21/2020140205935Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
01/21/2020140205935Open ↗
10/16/2019140205935Open ↗
09/26/2018122124085Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/24/2015140433467Open ↗
Showing 1 of 3 on file for this type
▸BISNYCECC ANALYSIS3
11/24/2015140433467Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/24/2015140433467Open ↗
Showing 1 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/24/2015140433467Open ↗
11/13/2014140249675Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER4
09/25/2017140176823Open ↗
Showing 1 of 4 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
02/03/2020140205935Open ↗
01/24/2020140205935Open ↗
01/21/2020140205935Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
04/28/2017121951520Open ↗
10/03/2016140205935Open ↗
10/03/2016140205935Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER3
07/13/2016140176823Open ↗
04/21/2016121951520Open ↗
04/21/2016140205935Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT26
01/21/2020140205935Open ↗
10/16/2019140205935Open ↗
06/04/2019122661654Open ↗
Showing 3 of 26 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms53
▸BISADDITIONAL INFORMATION18
05/22/2019140205935Open ↗
04/28/2017121951520Open ↗
09/29/2016121951520Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM16
02/03/2020140205935Open ↗
01/24/2020140205935Open ↗
01/21/2020140205935Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET13
10/29/2024124041232Open ↗
10/18/2016122918931Open ↗
09/22/2016122885075Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
11/24/2015140433467Open ↗
Showing 1 of 6 on file for this type
▸Other Documents4
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
11/24/2015140433467Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01067799-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026M00581729-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01067799-I1Open ↗