| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01378411 ↗ | 136 EAST 55 STREET MANHATTAN | Alteration | Permit Issued | 04/03/2026 | 09/08/2026 | Design WSP Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENO OF AMENITY SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M01390949 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Permit Issued | 05/11/2026 | 08/26/2026 | Design ASR ENGINEERING PC Filer IDEAL LLC | install new partition wall in apartment 15B AND 11 A |
| M01446106 ↗ | 40 WEST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/18/2026 | 08/25/2026 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENO OF APT 12C AS PER PLANS SUBMITTED HEREWITH. |
| M01426836 ↗ | 434 WEST 19 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/06/2026 | INTERIOR RENOVATION OF APT 1A ON THE 1ST FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE | |
| M01426889 ↗ | 345 WEST 30 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/06/2026 | INTERIOR RENOVATION OF APT 8A ON THE 8TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | |
| M01426911 ↗ | 337 WEST 30 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/06/2026 | MINOR RENOVATION AT APT 8C ON THE 8TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHNAGE IN EGRESS, OCCUPANCY OR USE. |
| Name | Projects together | Most recent |
|---|---|---|
| AKELIUS REAL ESTATE MANAGEMENT | 24 | 05/03/2024 |
| ANTONIO LEO ARCHITECT | 21 | 08/24/2026 |
| DEVOTE ARCH & DESIGN STUDIO, PLLC | 9 | 07/29/2026 |
| JIAN ENGINEERING PLLC | 5 | 10/01/2024 |
| ASR ENGINEERING PC | 3 | 05/11/2026 |
| BENEVOLENTXMACHINE LLC | 3 | 01/08/2026 |
| ANCORA ENGINEERING, PLLC | 2 | 01/07/2025 |
| A2 ARCHITECT, PC | 1 | 05/06/2022 |
| ARC-HI-TECT ASSOCIATE INC | 1 | 05/09/2022 |
| ATELIER NY ARCHITECTURE | 1 | 08/04/2026 |
| BOJIDAR KADIEV ARCHITECT | 1 | 10/10/2022 |
| CHI F. LAU ARCHITECT, P.C. | 1 | 06/29/2023 |
| ETNA CONSULTING STRUCTURAL ENGINEER | 1 | 07/09/2024 |
| LUKE LICALZI, P.E., P.C. | 1 | 07/04/2022 |
| PVE ENGINEERING | 1 | 02/24/2022 |
| RISE ARCHITECTURE | 1 | 01/02/2025 |
| WSP | 1 | 08/24/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| GREGG NY PLUMBING, INC | 24 | 08/24/2026 |
| JMW PLUMBING, INC | 3 | 08/25/2023 |
| SIGNORE & SONS PLBG CORP | 2 | 11/10/2022 |
| CASUR MANAGEMENT & MAINT* | 1 | 03/29/2021 |
| DELTA-SIGMA MECH CORP | 1 | 05/17/2023 |
| KELRON CONTRACTING INC | 1 | 08/24/2026 |
| PROTO CONSTRUCTION CORP | 1 | 05/17/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| RUDIN | 19 | 08/24/2026 |
| LIVINGSTON MANAGEMENT SERVICES | 14 | 07/29/2026 |
| 5523- WASHINGTON AVE AND ST. JAMES | 4 | 11/10/2022 |
| 5501 - 1153 & 1159 PRESIDENT STREET | 3 | 01/07/2025 |
| 5503-805 ST MARKS STREET BROOKLYN L | 2 | 03/19/2021 |
| 5508- 95 LINDEN BLVD BROOKLYN LLC | 2 | 10/06/2021 |
| 5537-225 WEST 23RD AND 220 WEST 24T | 2 | 05/03/2024 |
| 838 WEST END AVENUE MANHATTAN LLC | 2 | 05/17/2023 |
| VANDERBILT PROPERTY MANAGEMENT | 2 | 05/06/2022 |
| 519 5TH STREET BROOKLYN LLC | 1 | 06/07/2021 |
| 5504- 301 E 21ST STREET MANHATTAN L | 1 | 04/09/2021 |
| 5506- 40 LINDEN BLVD BROOKLYN LLC | 1 | 03/11/2021 |
| 5511-777 ST.MARKS AVENUE BROOKLYN L | 1 | 03/30/2021 |
| 5512-415 WASHINGTON AVENUE BROOKLYN | 1 | 09/11/2023 |
| 5536-185 PROSPECT PARK WEST BROOKLY | 1 | 08/10/2022 |
| Akelius Real Estate | 1 | 07/09/2024 |
| PIBLY RESIDENTIAL PROGRAMS INC. | 1 | 06/29/2023 |
| Savino Capital LLC / LeTish Coffee | 1 | 01/08/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| AKELIUS REAL ESTATE MANAGEMENT LLC. | 18 | 05/17/2023 |
| GREEN LIGHT EXPEDITING LLC | 18 | 08/24/2026 |
| IDEAL LLC | 11 | 05/11/2026 |
| ADAM MAISER | 4 | 01/07/2025 |
| JENNY FLORES EXPEDITING | 2 | 05/06/2022 |
| ATELIER NEW YORK ARCHITECTURE | 1 | 08/04/2026 |
| DOMINION EXPEDITING | 1 | 05/09/2022 |
| DYNAMIC BUILDING CONSULTANTS, INC | 1 | 07/04/2022 |
| METRO DESIGN CONSULTANTS INC | 1 | 06/29/2023 |
| WILLIAM VITACCO ASSOCIATES | 1 | 07/25/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01378411 ↗ | 136 EAST 55 STREET MANHATTAN | Alteration | Permit Issued | 04/03/2026 | 09/08/2026 | Design WSP Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENO OF AMENITY SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M01390949 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Permit Issued | 05/11/2026 | 08/26/2026 | Design ASR ENGINEERING PC Filer IDEAL LLC | install new partition wall in apartment 15B AND 11 A |
| M01446106 ↗ | 40 WEST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/18/2026 | 08/25/2026 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENO OF APT 12C AS PER PLANS SUBMITTED HEREWITH. |
| M01426836 ↗ | 434 WEST 19 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/06/2026 | INTERIOR RENOVATION OF APT 1A ON THE 1ST FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE | |
| M01426889 ↗ | 345 WEST 30 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/06/2026 | INTERIOR RENOVATION OF APT 8A ON THE 8TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | |
| M01426911 ↗ | 337 WEST 30 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/06/2026 | MINOR RENOVATION AT APT 8C ON THE 8TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHNAGE IN EGRESS, OCCUPANCY OR USE. | |
| M01401228 ↗ | 345 WEST 30 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 07/01/2026 | INTERIOR RENOVATION OF APT 5B ON THE 5TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | |
| M01392060 ↗ | 530 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 06/15/2026 | 06/25/2026 | Design ATELIER NY ARCHITECTURE | PLUMBING WORK IN APT 7E AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M01401939 ↗ | 434 WEST 19 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 06/25/2026 | INTERIOR RENOVATION OF APT 3C ON THE 3RD FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE | |
| M01368225 ↗ | 313 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 04/13/2026 | 04/22/2026 | MINOR RENOVATION AT APT 3D, 4E, 7A AND 9E ON THE 3RD, 4TH, 7TH AND 9TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPAN… | |
| X00882168 ↗ | EAST 181 STREET BRONX | Alteration | Permit Issued | 06/29/2023 | 04/14/2026 | Design CHI F. LAU ARCHITECT, P.C. | TEMPORARY CONSTRUCTION FENCE FILED HERWITH TO PROTECT VACANT LOT |
| B01338983 | 171 SOUTH 4 STREET BROOKLYN | Alteration | Signed-off | 01/08/2026 | 04/08/2026 | Design BENEVOLENTXMACHINE LLC Filer IDEAL LLC | renovation of existing coffee shop to make bathroom accisble and change bar layout |
| M01359704 ↗ | 544 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 03/02/2026 | 03/16/2026 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENO OF PH-E AS PER PLANS SUBMITTED HEREWITH. |
| M01347156 ↗ | 434 WEST 19 STREET MANHATTAN | Alteration | Signed-off | 01/29/2026 | 02/04/2026 | INTERIOR RENOVATION OF APT 1E ON THE 1ST FLOOR. CONSTRUCT NEW WINDOW. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE… | |
| M01320438 ↗ | 241 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 12/10/2025 | 12/19/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | Filing interior renovation to 9th floor apartment #9A as per plans. No change in use, egress, or occupancy under this application. |
| M01320414 ↗ | 144 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 12/08/2025 | 12/15/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH APT 14C AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01293587 ↗ | 295 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 10/21/2025 | 11/07/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR RENOVATION OF APARTMENT 19A AS PER PLANS SUBMITTED HEREWITH. |
| M01296150 ↗ | 211 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 10/06/2025 | 10/21/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF SUITE 1A FOR HAMPTON BIOMED AS PER PLANS SUBMITTED HEREWITH. |
| M01278452 ↗ | 40 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/29/2025 | 10/08/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF FIRST FLOOR MEDICAL SUITE AS PER PLAN SUBMITTED HEREWITH. |
| M01258299 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Signed-off | 07/31/2025 | 10/01/2025 | MINOR RENOVATION AT APT 4F ON THE 4TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | |
| M01260454 ↗ | 241 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 08/01/2025 | 08/20/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | Filing plumbing modifications associated with Interior renovation at Apartment #11D as per plans. No change in use, egress, or occupancy un… |
| M01257585 ↗ | 144 WEST 86 STREET MANHATTAN | Alteration | Permit Issued | 07/28/2025 | 08/06/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF BUILDING LOBBY AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01238491 ↗ | 27 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 06/30/2025 | 07/07/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT 10C AS PER PLANS SUBMITTED HEREWITH. |
| M01218285 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Signed-off | 05/08/2025 | 06/20/2025 | Design BENEVOLENTXMACHINE LLC Filer IDEAL LLC | install new partition wall in apartment 7b and 10 b and 12a |
| M01232968 ↗ | 31 EAST 31 STREET MANHATTAN | Alteration | Signed-off | 06/03/2025 | 06/17/2025 | Design BENEVOLENTXMACHINE LLC Filer IDEAL LLC | RELOCATE APT ENTRANCE door AND ADD A NEW WASHER DRYER CLOSET AND WASHER AND DRYER |
| M01201330 ↗ | 241 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 04/24/2025 | 05/01/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENO OF APT 13C AS PER PLANS SUBMITTED HEREWITH. |
| M01207562 ↗ | 345 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 04/25/2025 | 05/01/2025 | MINOR INTERIOR RENOVATION AT APT 2C & 5C ON THE 2ND AND 5TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | |
| M01145883 ↗ | 313 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 01/02/2025 | 04/08/2025 | Design RISE ARCHITECTURE | INTERIOR RENOVATION AT PARTIAL FIRST FLOOR APT 1B, AND CELLAR, TO RESOLVE VIOLATION, AS PER PLANS FILED HEREWITH. |
| M01191723 ↗ | 241 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/18/2025 | 03/26/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT 3D AS PER PLANS SUBMITTED HEREWITH. |
| B01149927 ↗ | 1153 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 01/07/2025 | 02/24/2025 | Design ANCORA ENGINEERING, PLLC Filer ADAM MAISER | STRUCTURAL WORK IN CONJUNCTION WITH BATHROOM REPAIR IN UNIT 2D ON FLOOR 002. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00864528 ↗ | 434 EAST 76 STREET MANHATTAN | Alteration | Signed-off | 04/26/2023 | 11/26/2024 | Design JIAN ENGINEERING PLLC Filer IDEAL LLC | relocation of 1 bathroom, and new kitchen plumbing fixtures |
| M01120088 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Signed-off | 10/01/2024 | 11/26/2024 | Design JIAN ENGINEERING PLLC | install new partition wall in apartment 14A |
| M01053791 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Signed-off | 05/22/2024 | 09/19/2024 | Design JIAN ENGINEERING PLLC Filer IDEAL LLC | renovation of apartment 2c and 2d to disconnect the 2 unites and return to 2 separate units |
| M01063050 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Signed-off | 06/11/2024 | 09/11/2024 | Design ASR ENGINEERING PC Filer IDEAL LLC | install new partition wall in apartment 6a & 7a |
| M01063066 ↗ | 1147 1 AVENUE MANHATTAN | Alteration | Signed-off | 06/11/2024 | 09/10/2024 | Design ASR ENGINEERING PC Filer IDEAL LLC | install new partition wall in apartment 17c |
| B01053597 ↗ | 427 DEAN STREET BROOKLYN | Alteration | Signed-off | 07/09/2024 | 09/06/2024 | Owner Akelius Real Estate Filer ADAM MAISER | STRUCTURAL REINFORCEMENT TO DAMAGED EXISTING WOOD JOISTS LOCATED ON THE CEILING OF THE FIRST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01083193 ↗ | 241 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 08/16/2024 | 08/23/2024 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF APT 2D AS PER PLANS SUBMITTED HEREWITH. |
| M01077489 ↗ | 241 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 07/18/2024 | 08/01/2024 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR RENOVATION OF APT 10G AS PER PLANS SUBMITTED HEREWITH. |
| M01045187 ↗ | 295 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 06/07/2024 | 06/20/2024 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR RENOVATION OF APT 18A AS PER PLANS SUBMITTED HEREWITH. |
| M01045010 ↗ | 220 WEST 24 STREET MANHATTAN | Alteration | Signed-off | 05/03/2024 | 05/29/2024 | Filer ADAM MAISER | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APARMENT 4T LOCATED ON THE FOURTH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M01039089 ↗ | 144 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 05/07/2024 | 05/13/2024 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF 14B AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01010115 ↗ | 241 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 02/28/2024 | 03/07/2024 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF APT 10A AND 11A AS PER PLANS SUBMITTED HEREWITH. |
| B00919495 ↗ | 415 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 09/11/2023 | 01/11/2024 | Filer ADAM MAISER | PLUMBING WORK RELATED TO INTERIOR RENOVATION OF EXISTING UNIT 12A ON FIRST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| 321592978BIS | 10019 AVENUE N BROOKLYN | — | ISSUED | 06/30/2021 | 09/30/2023 | — | — |
| M00885434 ↗ | 153 NORFOLK STREET MANHATTAN | Alteration | Signed-off | 06/15/2023 | 08/30/2023 | Design JIAN ENGINEERING PLLC Filer IDEAL LLC | REPLACEMENT OF BATHROOM PLUMBING FIXTURES AND KITCHEN IN A DUPLEX RENOVATION NO CHANGE OR USE OR EGRESS |
| M00841408 ↗ | 40 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/25/2023 | 08/03/2023 | Design ANTONIO LEO ARCHITECT Owner RUDIN | Renovation of the ground floor lobby and amenity spaces, as shown on plans. No change to egress, use, or occupancy. |
| M00860548 ↗ | 945 5 AVENUE MANHATTAN | Alteration | Signed-off | 05/04/2023 | 05/08/2023 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF APT 15B AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M00851024 ↗ | 945 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/03/2023 | 04/12/2023 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF APT 16D AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M08013666 ↗ | 832 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 10/03/2022 | 01/11/2023 | Renovation of of existing apartment 12C located on the 012 floor. Plumbing work. No change in use, occupancy or egress. | |
| M00647938 ↗ | 317 WEST 74 STREET MANHATTAN | Alteration | Permit Issued | 12/28/2021 | 12/14/2022 | Design JIAN ENGINEERING PLLC Filer IDEAL LLC | Plumbing work on 2 bathrooms and 1 kitchen |
| B08037998 ↗ | 379 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 11/10/2022 | 12/13/2022 | Renovation of existing apartment 2C located on the 002 floor. General Construction work. No change of use, occupancy or egress. | |
| M00760500 ↗ | 118 EAST 91 STREET MANHATTAN | Alteration | Signed-off | 07/05/2022 | 11/03/2022 | Design BOJIDAR KADIEV ARCHITECT Filer IDEAL LLC | Gut renovation of Apt 1D to be combine withspace below to create a duplex apartment. No change to use or egress |
| B08007303 ↗ | 379 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 09/23/2022 | 10/24/2022 | Renovation of existing apartment 1A located on the 001 floor. No change of use, occupancy or egress. | |
| B00617870 ↗ | 1153 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 10/29/2021 | 10/21/2022 | Replacement of existing 2 bathrooms with a single bathroom. Work performed to address violation 35506729K. No change in use, occupancy or eg… | |
| B08010356 ↗ | 379 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 09/26/2022 | 10/07/2022 | Renovation of existing apartment 3C located on the 003 floor. No change in use, occupancy or egress. | |
| B00789064 ↗ | 185 PROSPECT PARK WEST BROOKLYN | Alteration | Signed-off | 08/10/2022 | 08/28/2022 | Renovation of existing apartment 4L located on the 004 floor. General Construction work. No change in use, occupancy or egress. | |
| B00768781 ↗ | 10019 AVENUE N BROOKLYN | Alteration | Signed-off | 07/04/2022 | 07/22/2022 | Design LUKE LICALZI, P.E., P.C. | Respectfully request to install construction fence inside property line. |
| M00733131 ↗ | 431 WEST 48 STREET MANHATTAN | Alteration | Signed-off | 05/09/2022 | 06/15/2022 | Design ARC-HI-TECT ASSOCIATE INC Filer DOMINION EXPEDITING | NTERIOR RENOVATION. INCLUDE CEILING ANDFLOOR REPAIR AND COSMETIC PAINTING,ALSOCOMPLY ECB VIOLATION 35578878R & STOPWORK ORDER NO CHANGE IN U… |
| B00704985 ↗ | 379 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 03/23/2022 | 04/26/2022 | Renovation of existing apartment 1F located on the 001 floor. No change in use, occupancy or egress. | |
| 140873632BIS | 220 WEST 24 STREET MANHATTAN | — | ISSUED | 11/14/2019 | 04/20/2022 | — | OT |
| 140881160BIS | 225 WEST 23 STREET MANHATTAN | — | ISSUED | 02/18/2020 | 04/20/2022 | — | OT |
| M00665652 ↗ | 203 WEST 91 STREET MANHATTAN | Alteration | Signed-off | 02/24/2022 | 03/09/2022 | Design PVE ENGINEERING Filer JENNY FLORES EXPEDITING | HEREBY FILING STRUCTURAL WORK WHICH INCLUDES NEW WOOD MEMBERS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| 340728671BIS | 777 ST MARKS AVENUE BROOKLYN | — | ISSUED | 11/08/2021 | 01/19/2022 | — | OT |
| B00651764 ↗ | 805 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 12/22/2021 | 01/04/2022 | Renovation of existing apartment C3E located on the 003 floor. General Construction and Plumbing work. No change in use, occupancy or egress… | |
| 220716802BIS | 4036GAR GRACE AVE BRONX | — | ISSUED | 11/04/2020 | 11/10/2021 | — | — |
| M00599074 ↗ | 203 WEST 91 STREET MANHATTAN | Alteration | Signed-off | 10/20/2021 | 11/01/2021 | Design A2 ARCHITECT, PC Filer JENNY FLORES EXPEDITING | HEREBY FILING FOR THE COMBINATION OF APARTMENTS 3B AND 3C TO FORM NEW APARTMENT 3R. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| B00611643 ↗ | 379 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 10/14/2021 | 10/21/2021 | Renovation of existing apartment 3F located on the 003 floor. No Change in use, occupancy or egress. | |
| B00600179 ↗ | 93 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 10/06/2021 | 10/13/2021 | Renovation of existing apartment 31A located on the 003 floor. No change in use, occupancy or egress. | |
| B00572169 ↗ | 93 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 08/13/2021 | 08/19/2021 | Renovation of existing apartment 42B located on the 002 floor. No change in use, occupancy or egress. | |
| B00548630 ↗ | 93 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 06/29/2021 | 07/20/2021 | Renovation of existing apartments 11B & 56C located on the 001 and 005 floors. Architectural work. No change in use, occupancy or egress. | |
| B00459273 ↗ | 805 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 02/25/2021 | 07/19/2021 | PLUMBING WORK IN APARTMENTS A1A AND A1B ON THE FIRST FLOOR | |
| B00533930 ↗ | 1153 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 06/14/2021 | 06/25/2021 | Renovation of existing apartment 3C located on the 003 floor. Architectural work. No change in use, occupancy or egress. | |
| M00520242 ↗ | 220 WEST 24 STREET MANHATTAN | Alteration | Permit Issued | 05/12/2021 | 05/25/2021 | Renovation of existing apartment 6A located on the 006 floor. No change in use, occupancy or egress. | |
| M00519882 ↗ | 832 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 05/13/2021 | 05/19/2021 | Renovation of existing apartment at basement level. No change in use, occupancy or egress. | |
| M00495500 ↗ | 362 2 AVENUE MANHATTAN | Alteration | Signed-off | 03/30/2021 | 04/27/2021 | PLUMBING WORK RELATED TO INTERIOR RENOVATION OF APARTMENT 12C ON THE TWELFTH FLOOR ALTERING INTERIOR NON LOADBEARING PARTITIONS. | |
| B00469575 ↗ | 519 5 STREET BROOKLYN | Alteration | Signed-off | 03/15/2021 | 04/15/2021 | PLUMBING WORK RELATED TO INTERIOR RENOVATION AND RECONFIGURATION OF APARTMENTS 1L, 1R, 2L, 3L, 4L ON THE FIRST- FOURTH FLOOR. | |
| B00479264 ↗ | 777 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 03/30/2021 | 04/13/2021 | interior removals in apartments 3B and 4F on the 3rd and 4th floors. Filed in relation to Alt 1 application 321588108. | |
| B00485040 ↗ | 1153 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 03/29/2021 | 04/13/2021 | Design ANCORA ENGINEERING, PLLC | INTERIOR WORK REPAIRING EXISTING WOOD JOIST SUPPORTING FLOOR IN UNIT 3C ON THE 3RD FLOOR. |
| B00482610 ↗ | 805 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 03/11/2021 | 03/29/2021 | INTERIOR RENOVATION OF APARTMENT C5A ON THE 5TH FLOOR, APARTMENT C6E ON THE SIXTH FLOOR, AND APARTMENT D2A ON THE 2ND FLOOR | |
| B00481876 ↗ | 93 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 03/11/2021 | 03/22/2021 | INTERIOR RENOVATION OF APARTMENT 31B ON THE 3RD FLOOR ALTERING INTERIOR NON-LOADBEARING PARTITIONSWITHIN THE EXISTING RESIDENTIAL UNIT. | |
| B00481597 ↗ | 40 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 03/11/2021 | 03/18/2021 | interior renovation of apartment 5B on the 5th floor altering interior non-loadbearing partitions within the existing residential unit. | |
| 340730524BIS | 805 ST MARKS AVENUE BROOKLYN | — | ISSUED | 01/05/2021 | 02/10/2021 | — | OT |
| 340766727BIS | 93 LINDEN BOULEVARD BROOKLYN | — | ISSUED | 09/29/2020 | 09/29/2020 | — | OT |
| 340721678BIS | 130 MARTENSE STREET BROOKLYN | — | ISSUED | 07/07/2020 | 07/07/2020 | — | OT |
| 340726156BIS | 93 LINDEN BOULEVARD BROOKLYN | — | ISSUED | 06/11/2020 | 06/11/2020 | — | OT |
| 340718398BIS | 40 LINDEN BOULEVARD BROOKLYN | — | ISSUED | 02/21/2020 | 02/21/2020 | — | OT |
| 340718405BIS | 40 LINDEN BOULEVARD BROOKLYN | — | ISSUED | 02/21/2020 | 02/21/2020 | — | OT |
| 340718414BIS | 40 LINDEN BOULEVARD BROOKLYN | — | ISSUED | 02/21/2020 | 02/21/2020 | — | OT |
| 340718423BIS | 40 LINDEN BOULEVARD BROOKLYN | — | ISSUED | 02/21/2020 | 02/21/2020 | — | OT |
| 140857534BIS | 832 WEST END AVENUE MANHATTAN | — | ISSUED | 11/12/2019 | 11/12/2019 | — | OT |
| 123510593BIS | 336 WEST 95 STREET MANHATTAN | — | ISSUED | 01/09/2019 | 02/05/2019 | — | OT, PL |
| 321700968BIS | 1212 OCEAN AVENUE BROOKLYN | — | ISSUED | 06/01/2018 | 09/07/2018 | — | OT |
| 321707603BIS | 7720 10 AVE BROOKLYN | — | ISSUED | 08/14/2018 | 08/14/2018 | — | OT |
| 220288980BIS | 663 BRITTON ST BRONX | — | ISSUED | 09/20/2013 | 06/28/2018 | — | OT, PL |
| 220620736BIS | 2 EAST 167 STREET BRONX | — | ISSUED | 10/31/2017 | 11/03/2017 | — | OT, PL |
| 220554772BIS | 655 SOUNDVIEW AVE BRONX | — | ISSUED | 10/18/2016 | 10/28/2016 | — | OT, PL |