BuildNYC
Office with commercial, 7-19 stories
115 WEST 29TH STREET
MANHATTAN · BIN 1015145
💬 Discuss this project
1913Year Built
12Stories
O6Building Class
M1-9A/R12Zoning
79,465 sfGross Floor Area
15Units
LL97 Covered7 Active Violations 4 unresolved · 3 paperwork only 9 likely answered 4 old, status unconfirmed ▸FISP: UNSAFE
Office with commercial, 7-19 stories · Owner of record: 115-123 W. 29 St Corp Owners · 6,994 sf lot · 11.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNYTC7p · 2 filings · 20 docs
Floor 12Unit 12012p · 1 filing · 2 docs
Floor 11
Floor 10
Floor 9
Floor 8NYTC3p · 1 filing · 6 docs
Floor 7
Floor 6
Floor 5
Floor 4Tenant space restaurant seating breakdown1 filing · 4 docs
Floor 3
Floor 2
Floor 1
BasementTenant space restaurant seating breakdown1p · 1 filing · 4 docs
Site & exteriorOrange Barrel MediaUnder Construction10p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
115-23 W 29 Street Owner2107/08/2026
Obcm910/04/2026
Yurim Trading Co503/21/2026
Bit by Bit Computer Consultants309/22/2026
835 6th Avenue203/21/2026
Royal Realty203/21/2026
Owners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Thomas C Tung P.E302/23/2026
Roger de Electric Co110/06/2025
Volume Space Consulting109/01/2025
Goldman Copeland Associates102/04/2022
Doric Consultants210/18/2021
McLaren Engineering Group111/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM Arch403/21/2026
Salamon Engineering203/21/2026
Green Studio203/21/2026
Arup103/21/2026
AEC Consulting Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New York Temperature ConGeneral Contractor303/21/2026
Devorah ElectricElectrical203/21/2026
Empac ContractingScaffold208/25/2026
Paolino FrankElectrical203/21/2026
New J.D. Gen. ConstructionGeneral Contractor209/29/2026
Joa ConstructionGeneral Contractor107/08/2026
Shashi ConstructionGeneral Contractor105/23/2026
New York City PrimeScaffold107/08/2026
High Quality Electric ofElectrical103/21/2026
Interboro Sign & Electrical MaintenanceSign hanger107/08/2026
Elgee Electric CoElectrical103/21/2026
Bisantz Electric CoElectrical103/21/2026
Spieler & Ricca Electrical CoElectrical103/21/2026
G D Builders & DesignGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Simon7555111/25/2025
Salamon Engineering1264110/06/2025
Codegreen510102/04/2022
Doric Prof. Engineering1537210/18/2021
M.G. McLaren Engineering2999111/06/2020
Building Lifecycle
All (132)Filed (9)Permit Issued (12)Signed Off (4)Facade (FISP) (11)Violation (60)Objection (14)Special Inspection (22)
09/28/2026
Permit issued — Suspended Scaffold
M01283908-I1-SC
09/28/2026
Permit issued — General Construction
M01086995-I1-GC
08/24/2026
Permit issued — Sidewalk Shed
M01278937-I1-SH
06/05/2026
Signed off — Alteration
AN EXISTING COMMERCIAL SPACE WITH MINOR PARTITION WORK ON HALLWAY AND TOILET ON PARTIAL OF 4TH FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01362406-I1
05/26/2026
Permit issued — Sidewalk Shed
M01278937-I1-SH
05/04/2026
Permit issued — General Construction
M01362406-I1-GC
04/27/2026
Permit issued — General Construction
M01324026-I1-GC
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/10/2026
Objection raised — Admin
03/10/2026
Objection raised — Structural
03/10/2026
Objection raised — Plumbing
03/10/2026
Objection raised — Structural
02/23/2026
Filed — Alteration
AN EXISTING COMMERCIAL SPACE WITH MINOR PARTITION WORK ON HALLWAY AND TOILET ON PARTIAL OF 4TH FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01362406-I1
02/19/2026
Special inspection requirement — Final
CALVIN TRAN
02/13/2026
Special inspection requirement — Final
12/12/2025
Cycle 10 facade report submitted
12/08/2025
Cycle 10 facade inspection completed
12/08/2025
Cycle 10 facade report signed — UNSAFE
11/25/2025
Filed — Alteration
M01324026-I1
11/10/2025
Violation issued (ECB, closed)
Construction
10/10/2025
Permit issued — General Construction
M01086995-I1-GC
10/06/2025
Filed — Alteration
Facade repair
M01086995-I1
09/12/2025
Permit issued — Suspended Scaffold
M01283908-I1-SC
09/10/2025
Filed — Alteration
Suspended Scaffold outrigger installation for Facade restoration and inspections
M01283908-I1
09/02/2025
Permit issued — Sidewalk Shed
M01278937-I1-SH
09/01/2025
Filed — Alteration
M01278937-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2023
Violation issued (ECB, open)
Construction
08/04/2023
Violation issued (ECB, closed)
Construction
08/01/2023
Violation issued (ECB, closed)
Construction
04/29/2023
Cycle 9 facade report submitted
03/02/2023
Cycle 9 facade inspection completed
12/22/2022
Violation issued (ECB, open)
Local Law
10/18/2022
Signed off — Alteration
M00628479-I1
08/26/2022
Permit issued — Mechanical Systems
M00628479-I1-MS
04/12/2022
Violation issued (ECB, closed)
Elevators
04/04/2022
Signed off — Alteration
Direct replacement of outdoor A/C Condensing units on Roof.
M00604578-I1
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/11/2022
Objection raised — Admin
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Scope
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Energy
02/11/2022
Objection resolved — Addressed
02/04/2022
Filed — Alteration
M00628479-I1
12/30/2021
Special inspection requirement — Maintenance information
HATIM ELSAID
12/30/2021
Special inspection requirement — Energy Code Compliance Inspections
HATIM ELSAID
12/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
HATIM ELSAID
12/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
HATIM ELSAID
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2021
Special inspection requirement — Mechanical Systems
HATIM ELSAID
11/10/2021
Special inspection requirement — Final
HATIM ELSAID
10/18/2021
Filed — Alteration
Direct replacement of outdoor A/C Condensing units on Roof.
M00604578-P1
10/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
Sokwon Im
10/18/2021
Special inspection requirement — Mechanical Systems
Sokwon Im
10/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Sokwon Im
10/18/2021
Special inspection requirement — Final
Sokwon Im
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedNew J.D. Gen. Construction09/28/2026
DOB NOWGeneral ConstructionPermit IssuedNew J.D. Gen. Construction09/28/2026
DOB NOWSidewalk ShedPermit IssuedEmpac Contracting08/24/2026
DOB NOWSidewalk ShedPermit IssuedEmpac Contracting05/26/2026
DOB NOWGeneral ConstructionSigned-offG D Builders & Design05/04/2026
DOB NOWGeneral ConstructionPermit IssuedShashi Construction04/27/2026
DOB NOWGeneral ConstructionPermit IssuedNew J.D. Gen. Construction10/10/2025
DOB NOWSuspended ScaffoldPermit IssuedNew J.D. Gen. Construction09/12/2025
DOB NOWSidewalk ShedPermit IssuedNew York City Prime09/02/2025
DOB NOWMechanical SystemsSigned-offNew York Temperature Con08/26/2022
DOB NOWMechanical SystemsSigned-offJoa Construction10/05/2021
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance11/18/2020
BISOTISSUEDSha Home Improvements11/22/2019
BISOTISSUEDLuxury Home Improvement05/25/2018
BISOTISSUEDTishon Contracting Co10/24/2014
BISOTISSUEDIhome Improvement & Windo07/30/2014
BIS—ISSUEDInterboro Sign & Electrical Maintenance08/30/2011
BISOTISSUEDDam Yoon05/24/2011
BISOTISSUEDKim & Cho Carpentry04/09/2010
BISEQISSUEDKim & Cho Carpentry04/09/2010
BISOTISSUEDLuxurious Interiors04/07/2010
BISOTISSUEDKim & Cho Carpentry12/21/2009
BISEQISSUEDKim & Cho Carpentry12/21/2009
BISEQISSUEDUniversal Builders Supply10/07/2009
BISEQISSUEDUniversal Builders Supply09/24/2008
BISOTISSUEDUrban D.C01/30/2008
BISEQISSUEDRockledge Scaffold12/20/2007
BIS—ISSUEDEmpire Erectors & Electric11/14/2007
BISSPISSUEDPat Sementa P&H Co08/21/2007
BISEQISSUEDRockledge Scaffold02/09/2007
BISPLISSUEDJay Ell Plumbing & Heating Co11/13/2006
BISMHISSUEDTecny Group07/21/2006
BISOTISSUEDTecny Group07/21/2006
BISPLISSUEDJay Ell Plumbing & Heating Co05/02/2006
BISFPISSUEDGebhardt04/03/2006
BISOTISSUEDUrban D.C11/07/2001
BISEQISSUEDRockledge Scaffold05/31/2001
BISFBISSUEDAgee Heating Service06/10/1998
BISPLISSUEDWagner-Weintraub Plumbing & Heating05/08/1997
BISBLISSUEDJohnny's P&H Contracting05/07/1997
+ 1 more permits on file
4 projects · most recent 09/23/2025
General Wiring Lighting
FiledStatusContractorScope
09/23/2025Permit IssuedHigh Quality Electric of NYC—
04/04/2019CompleteShuir Electrical ContractorsGeneral Wiring
05/30/2018Permit IssuedY.S. ElectricGeneral Wiring, Lighting
12/18/2017CancelledElectrotec of NY Electrical—
1 project · most recent 09/10/2025
Suspended Scaffold
FiledStatusContractorScope
09/10/2025Permit IssuedNew J.D. Gen. ConstructionSuspended Scaffold
1 project · most recent 09/10/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/10/2025Permit IssuedNew J.D. Gen. ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/19/2026FinalCALVIN TRANprogress
02/13/2026Final—progress
12/30/2021Maintenance informationHATIM ELSAIDenergy_progress
12/30/2021Energy Code Compliance InspectionsHATIM ELSAIDprogress
12/30/2021HVAC-R and service water heating equipmentHATIM ELSAIDenergy_progress
12/30/2021HVAC-R and service water heating system controlsHATIM ELSAIDenergy_progress
11/10/2021Mechanical SystemsHATIM ELSAIDspecial
11/10/2021FinalHATIM ELSAIDprogress
10/18/2021HVAC-R and service water heating equipmentSokwon Imenergy_progress
10/18/2021Mechanical SystemsSokwon Imspecial
10/18/2021Energy Code Compliance InspectionsSokwon Improgress
10/18/2021FinalSokwon Improgress
10/18/2021Maintenance informationSokwon Imenergy_progress
10/18/2021HVAC-R and service water piping design and insulationSokwon Imenergy_progress
10/15/2021Mechanical SystemsSokwon Imspecial
10/15/2021Energy Code Compliance InspectionsSokwon Improgress
10/15/2021FinalSokwon Improgress
10/15/2021Maintenance informationSokwon Imenergy_progress
10/15/2021HVAC-R and service water heating equipmentSokwon Imenergy_progress
10/15/2021HVAC-R and service water piping design and insulationSokwon Imenergy_progress
08/18/2020Post-installed AnchorsJeremy Billigspecial
08/18/2020FinalJeremy Billigprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYTCOfficeFloor 8, Roof
Project M00628479 Alteration · LOC Issued · 02/04/2022
Orange Barrel MediaAdvertising / signage—
Project M00386353 Alteration · LOC Issued · 11/06/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 204 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/06/2026M01359848-I1Request digital key ↗
09/03/2026M00604578-P1Request digital key ↗
09/03/2026M00604578-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00386353-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION15
11/21/2019140878450Open ↗
05/29/2018123421118Open ↗
10/30/2014122175671Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
03/28/2022140878450Open ↗
11/21/2019140878450Open ↗
05/29/2018123421118Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/20/2013121844371Open ↗
▸Seals & Professional Certifications66
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
03/18/2019123421118Open ↗
05/29/2018123421118Open ↗
10/30/2014122175671Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/30/2026M00604578-I1Open ↗
09/30/2026M00604578-I1Open ↗
09/30/2026M00604578-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M01359848-I1Open ↗
09/03/2026M00604578-I1Open ↗
08/21/2026M01278937-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
05/29/2018123421118Open ↗
10/30/2014122175671Open ↗
11/20/2013121844371Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/21/2019140878450Open ↗
05/29/2018123421118Open ↗
10/30/2014122175671Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/09/2011120803826Open ↗
05/19/2011120694098Open ↗
12/16/2009120224337Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/30/2026M00604578-I1Open ↗
08/29/2026M00604578-P1Open ↗
08/25/2026M00628479-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/21/2019140878450Open ↗
07/29/2014140227528Open ↗
05/02/2014140193895Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/21/2019140878450Open ↗
▸BISPC FULL REPORT1
10/23/2007110003497Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/19/2011120694098Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
11/21/2019140878450Open ↗
05/29/2018123421118Open ↗
10/30/2014122175671Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/06/2026M01359848-I1Open ↗
09/03/2026M00604578-I1Open ↗
08/20/2026M01324026-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
09/09/2011120803826Open ↗
05/19/2011120694098Open ↗
02/23/2010120274354Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/07/2008110159694Open ↗
10/23/2007110003497Open ↗
▸Energy Compliance14
▸BISAS-BUILT ENERGY ANALYSIS4
03/16/2022140878450Open ↗
10/03/2014140227528Open ↗
09/05/2014140193895Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/16/2022140878450Open ↗
11/21/2019140878450Open ↗
05/02/2014140193895Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/30/2014122175671Open ↗
09/05/2014140193895Open ↗
▸BISTECHNICAL REPORT: ENERGY2
12/12/2011120694098Open ↗
05/19/2011120694098Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00604578-I1Open ↗
08/13/2026M00628479-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/21/2019140878450Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/29/2022140878450Open ↗
03/29/2022140878450Open ↗
03/16/2022140878450Open ↗
Showing 3 of 7 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/18/2019123421118Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
03/31/2022140878450Open ↗
03/18/2019123421118Open ↗
10/21/2015121844371Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
09/09/2011120803826Open ↗
05/19/2011120694098Open ↗
02/23/2010120274354Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/03/2014140227528Open ↗
12/12/2011120694098Open ↗
04/14/2011120224337Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
10/21/2015121844371Open ↗
10/07/2015121844371Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT17
03/16/2022140878450Open ↗
11/21/2019140878450Open ↗
03/18/2019123421118Open ↗
Showing 3 of 17 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/21/2015121844371Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET8
05/29/2018123421118Open ↗
10/30/2014122175671Open ↗
11/20/2013121844371Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION3
01/28/2015121844371Open ↗
01/28/2015122175671Open ↗
11/03/2014121844371Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
11/21/2019140878450Open ↗
07/29/2014140227528Open ↗
05/02/2014140193895Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
10/21/2015121844371Open ↗
11/20/2013121844371Open ↗
▸BISBOROUGH INTAKE FORM1
03/18/2019123421118Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/21/2015121844371Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01283908-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01283908-I1Open ↗