| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00815170 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 10/08/2024 | 09/10/2026 | Design DORIC CONSULTANTS PC Contractor JJK CONSTRUCTION NY INC | Renovation of the existing store throughout cellar, and 1st floor. No change in use, egress, occupancy. |
| M00815210 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 10/08/2024 | 09/10/2026 | Design DORIC CONSULTANTS PC Contractor JJK CONSTRUCTION NY INC | Structural work as per plans. Chase opening and closing @stair B from 1st to 15th floor. No change in use, egress, or occupancy. |
| Q01442744 ↗ | 45-16 169 STREET QUEENS | Alteration | Permit Issued | 08/17/2026 | 08/21/2026 | Design DORIC CONSULTANTS PC Contractor I DO PLUMBING & HTG INC | Install 2PC bath (Lavatory, Toilet), washing machine and cap and remove gas line for dryer in the cellar. No change in use, egress, occupan… |
| M01239822 ↗ | 242 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 07/07/2025 | 08/14/2026 | Design DORIC CONSULTANTS PC Owner SIR REALTY MANAGEMENT Contractor G D BUILDERS & DESIGN INC | Application filed to resolve Summons #039136171K by removing the existing enclosure tent and lot line door and infilling the opening with a … |
| M00927911 ↗ | 111 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 09/11/2023 | 07/06/2026 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | RENOVATION OF EXISTING RETAIL STORE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01363785 ↗ | 300 EAST 40 STREET MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 05/27/2026 | Design DORIC CONSULTANTS PC Contractor LEO KING CONTRACTING CORP | Interior renovation of apartment unit #30G. Install partitions, door and painting. No change in use, egress, occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| DORIC CONSULTANTS PC | 50 | 08/17/2026 |
| ALL CITY ENGINEERING, P.C. | 9 | 06/30/2025 |
| BOSCHEN DESIGN ARCHITECTURE | 1 | 08/12/2022 |
| DJH ARCHITECTURE. PC | 1 | 01/08/2025 |
| XIAO ENGINEERING PLLC | 1 | 03/29/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| JOA CONSTRUCTION CORP | 15 | 10/09/2025 |
| AVON PLBG & HTG INC | 7 | 12/10/2025 |
| KALIKOW CONSTR SVCS LLC | 5 | 05/11/2026 |
| AP PLUMBING & HVAC LLC | 3 | 06/30/2025 |
| I DO PLUMBING & HTG INC | 3 | 08/17/2026 |
| ALL PRO PLBG & HTG INC | 2 | 11/26/2019 |
| BEYOND COOLING LLC | 2 | 12/02/2024 |
| DC CONSTRUCTION MANAGEMNT | 2 | 10/01/2025 |
| DECO HOME CORP | 2 | 10/09/2025 |
| JJK CONSTRUCTION NY INC | 2 | 05/06/2026 |
| SKYLAND DEVELOPMENT CORP | 2 | 04/05/2022 |
| AMERICAN STANDARD P&H COR | 1 | 10/11/2024 |
| ARCO PLBG AND HTG INC | 1 | 04/11/2022 |
| CASE PLUMBING LLC | 1 | 05/17/2021 |
| G D BUILDERS & DESIGN INC | 1 | 05/04/2026 |
| GOOD NEWS CONTRACTOR INC | 1 | 12/27/2019 |
| HAMA INTERIOR WORKS INC | 1 | 01/09/2026 |
| J&M PLBG OF WESTCHESTER I | 1 | 05/16/2025 |
| LEADER HONG GROUP INC | 1 | 01/08/2025 |
| LEO KING CONTRACTING CORP | 1 | 03/11/2026 |
| NU CREATION MECH INC | 1 | 08/12/2022 |
| NY BUILDING ASSOCIATES IN | 1 | 01/08/2025 |
| PIPESTYLISTS, INC | 1 | 06/19/2020 |
| PLBG INC | 1 | 01/09/2020 |
| RIKARD VUKA | 1 | 03/11/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| BROADWAY 32ND REALTY CORP | 14 | 05/06/2026 |
| 101 PARK AVENUE ASSOCIATES | 3 | 05/11/2026 |
| BROOKFIELD PROPERTIES | 3 | 04/11/2022 |
| NEW YORK UNIVERSITY | 3 | 03/16/2026 |
| COLUMBIA RESIDENTIAL | 2 | 09/12/2023 |
| ORSID REALTY CORP | 2 | 03/29/2022 |
| R.P. CASS, INC. | 2 | 09/28/2020 |
| SIR REALTY MANAGEMENT | 2 | 05/04/2026 |
| 39 W 29TH STREET OWNERS CORP | 1 | 10/18/2021 |
| BEACH LANE MANAGEMENT | 1 | 01/02/2025 |
| DISCOVERY, LLC | 1 | 06/19/2020 |
| DOUGLAS ELLIMAN | 1 | 05/16/2025 |
| MELVIN KAPLAN REAL ESTATE | 1 | 10/01/2025 |
| PND, LLC | 1 | 06/09/2023 |
| RAHMAN NY INC | 1 | 10/07/2021 |
| SDF9 OCEAN PARKWAY OWNER LLC | 1 | 08/07/2020 |
| SEOUL TRADING USA, CO. | 1 | 02/14/2021 |
| SILVER STAR PROPERTIES CORP. | 1 | 07/16/2020 |
| THE RITZ TOWER | 1 | 08/12/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 3 | 04/11/2022 |
| BOSCHEN DESIGN, ARCHITECTURE | 1 | 08/12/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00815170 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 10/08/2024 | 09/10/2026 | Design DORIC CONSULTANTS PC Contractor JJK CONSTRUCTION NY INC | Renovation of the existing store throughout cellar, and 1st floor. No change in use, egress, occupancy. |
| M00815210 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 10/08/2024 | 09/10/2026 | Design DORIC CONSULTANTS PC Contractor JJK CONSTRUCTION NY INC | Structural work as per plans. Chase opening and closing @stair B from 1st to 15th floor. No change in use, egress, or occupancy. |
| Q01442744 ↗ | 45-16 169 STREET QUEENS | Alteration | Permit Issued | 08/17/2026 | 08/21/2026 | Design DORIC CONSULTANTS PC Contractor I DO PLUMBING & HTG INC | Install 2PC bath (Lavatory, Toilet), washing machine and cap and remove gas line for dryer in the cellar. No change in use, egress, occupan… |
| M01239822 ↗ | 242 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 07/07/2025 | 08/14/2026 | Design DORIC CONSULTANTS PC Owner SIR REALTY MANAGEMENT Contractor G D BUILDERS & DESIGN INC | Application filed to resolve Summons #039136171K by removing the existing enclosure tent and lot line door and infilling the opening with a … |
| M00927911 ↗ | 111 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 09/11/2023 | 07/06/2026 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | RENOVATION OF EXISTING RETAIL STORE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01363785 ↗ | 300 EAST 40 STREET MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 05/27/2026 | Design DORIC CONSULTANTS PC Contractor LEO KING CONTRACTING CORP | Interior renovation of apartment unit #30G. Install partitions, door and painting. No change in use, egress, occupancy. |
| M01114319 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 12/02/2024 | 04/07/2026 | Design ALL CITY ENGINEERING, P.C. Contractor CROSSFIELD PLBG.&HTG | Installation of new plumbing fixtures as per plan. No change in use, egress or occupancy. |
| M01114344 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 12/02/2024 | 04/07/2026 | Design ALL CITY ENGINEERING, P.C. Contractor CROSSFIELD PLBG.&HTG.CORP | MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01114507 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 12/02/2024 | 04/07/2026 | Design ALL CITY ENGINEERING, P.C. Contractor CROSSFIELD PLBG.&HTG | INSTALLATION OF NEW BOILER SYSTEM AS PER PLANS AND DECOMMISION OF EXISTING BOILER (67841-03) |
| M01371660 ↗ | 101 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/20/2026 | 03/23/2026 | Design DORIC CONSULTANTS PC Contractor KALIKOW CONSTR SVCS | Removal of existing convenience stairs between 34,35,36 floor and infill of stair opening with new concrete metal deck floor slab as shown o… |
| M01369711 ↗ | 31 3 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 03/16/2026 | — | Design DORIC CONSULTANTS PC Owner NEW YORK UNIVERSITY | — |
| M08030829 ↗ | 212 EAST 49 STREET MANHATTAN | Alteration | Permit Issued | 12/08/2022 | 01/27/2026 | Design DJH ARCHITECTURE. PC Contractor LEADER HONG GROUP INC | DEMOLITION OF INTERIOR NON BEARING PARTITIONS AND WINDOWS OF EXISTING OFFICES AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY. |
| M01314796 ↗ | 6 MURRAY STREET MANHATTAN | Alteration | Signed-off | 01/09/2026 | 01/21/2026 | Design DORIC CONSULTANTS PC Contractor HAMA INTERIOR WORKS INC | Install a new HVAC system on the 1st floor and the 2nd floor setback roof for the existing eating and drinking establishment. No change in … |
| M00779162 ↗ | 111 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 07/26/2022 | 11/25/2025 | Design ALL CITY ENGINEERING, P.C. Contractor I DO PLUMBING & HTG INC | installation of plumbing fixture, no change of use, occupancy and egress |
| M01291413 ↗ | 25 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 10/31/2025 | 11/13/2025 | Design DORIC CONSULTANTS PC Contractor AVON PLBG & HTG INC | THIS APPLICATION IS FOR THE DOMESTIC WATER AND WASTE LINE WORK ONLY. ALL GAS WORK WAS FILED AND SIGNED OFF UNDER JOB #123585600. |
| M01294570 ↗ | 200 WEST 70 STREET MANHATTAN | Alteration | Signed-off | 10/01/2025 | 10/30/2025 | Design DORIC CONSULTANTS PC Contractor DC CONSTRUCTION MANAGEMNT | Installation of the permanent sound barrier top cover and related structural work as shown on plans. No change in use, egress, or occupancy |
| M01113773 ↗ | 225 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 12/02/2024 | 10/27/2025 | Design ALL CITY ENGINEERING, P.C. Contractor BEYOND COOLING LLC | Installation of new HVAC system for a supermarket, including VRF system, kitchen exhaust and makeup system, refrigeration system, and genera… |
| M01047428 ↗ | 613 9 AVENUE MANHATTAN | Alteration | Signed-off | 08/01/2024 | 09/23/2025 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | Renovation of existing store (Restaurant). Remove counter, install partitions, minor mill work. No change in use, egress, occupancy. |
| M01063262 ↗ | 31 3 AVENUE MANHATTAN | Alteration | Permit Issued | 06/13/2024 | 09/19/2025 | Design DORIC CONSULTANTS PC Owner NEW YORK UNIVERSITY Contractor STONEGATE BUILD INC | STRUCTUCTURE WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OCCUPANCY. |
| M01225847 ↗ | 1210 3 AVENUE MANHATTAN | Alteration | Signed-off | 05/16/2025 | 05/27/2025 | Design DORIC CONSULTANTS PC Owner DOUGLAS ELLIMAN Contractor J&M PLBG OF WESTCHESTER I | Filing sprinkler system within the retail space as per plan. This application is being filed to replace the previous application # 10247646… |
| M01224310 ↗ | 200 WEST 70 STREET MANHATTAN | Alteration | Signed-off | 05/13/2025 | 05/19/2025 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | Installation of the temporary sound barrier(noise silencer) and related structural work as shown on plans. No change in use, egress, occupa… |
| M01049616 ↗ | 31 3 AVENUE MANHATTAN | Alteration | Signed-off | 06/10/2024 | 04/15/2025 | Design DORIC CONSULTANTS PC Owner NEW YORK UNIVERSITY Contractor DECO HOME CORP | Removal of non-bearing walls, partitions, walk-in boxes. No change in use, egress, occupancy. |
| M01173082 ↗ | 101 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/18/2025 | 02/26/2025 | Design DORIC CONSULTANTS PC Contractor KALIKOW CONSTR SVCS | Removal of existing convenience stair between 23fl (M) / 20fl (C) and 24fl (M) / 21fl (C) floors and provide new concrete floor to fill the … |
| M01143619 ↗ | 101 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/17/2024 | 12/20/2024 | Design DORIC CONSULTANTS PC Contractor KALIKOW CONSTR SVCS | Removal of existing convenience stair between 47th (M) / 44th (C) and 48th (M) / 45th (C) floors and provide new concrete floor to fill the … |
| M01121090 ↗ | 31 3 AVENUE MANHATTAN | Alteration | Permit Issued | 10/11/2024 | 12/09/2024 | Design ALL CITY ENGINEERING, P.C. Contractor BEYOND COOLING LLC | RENOVATION OF HVAC SYSTEM FOR EXISTING STORE. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| M01121106 ↗ | 31 3 AVENUE MANHATTAN | Alteration | Permit Issued | 10/11/2024 | 11/19/2024 | Design ALL CITY ENGINEERING, P.C. Contractor AMERICAN STANDARD P&H CORORP. | Renovation of sprinkler system for existing retail space. No change of use, occupancy and egress |
| M01068524 ↗ | 111 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 06/21/2024 | 08/19/2024 | Design ALL CITY ENGINEERING, P.C. Contractor TAEIL ENTERPRISE, INC | PROVIDE HVAC AND KITCHEN EXHAUST FOR INTERIOR RENOVATION OF SUPERMARKET. THERE IS NO CHANGE OF USE, OCCUPANCY, AND EGRESS. |
| M01052829 ↗ | 111 HUDSON STREET MANHATTAN | Alteration | Signed-off | 06/10/2024 | 06/28/2024 | Design ALL CITY ENGINEERING, P.C. Contractor AVON PLBG & HTG INC | SPRINKLER APPLICATION TO BE FILED. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN. FILING INCLUDES THE INSTALLATION O… |
| M00529527 ↗ | 25 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 06/04/2021 | 02/28/2024 | Design DORIC CONSULTANTS PC Contractor SEOUL INTERIOR & BUILD IN | THIS JOB WAS PREVIOUSLY FILED UNDER JOB #122488478 BY ANOTHER APPLICANT IN 2015. THE WORK INCLUDED NEW PARTITIONS, FLOORING, CEILING FINISH… |
| M00935710 ↗ | 39 WEST 31 STREET MANHATTAN | Alteration | Signed-off | 10/07/2023 | 02/22/2024 | Design DORIC CONSULTANTS PC Contractor AVON PLBG & HTG INC | Modification of existing sprinkler heads. No change of egress, occupancy, or use. |
| M00923972 ↗ | 2824 BROADWAY MANHATTAN | Alteration | Signed-off | 09/12/2023 | 09/15/2023 | Design DORIC CONSULTANTS PC Owner COLUMBIA RESIDENTIAL Contractor JOA CONSTRUCTION CORP | We are filing the commercial Kitchen Hood only. The actual work was filed and signed-off under Job#123075126. Due to the Fire Department's o… |
| M00910105 ↗ | 101 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/01/2023 | 08/04/2023 | Design DORIC CONSULTANTS PC Contractor KALIKOW CONSTR SVCS | Removal of existing access stair between 31st & 32nd floor and provide new concrete floor on 32nd floor. New floor opening between 30th & 31… |
| M00878054 ↗ | 16 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 06/09/2023 | 06/27/2023 | Design DORIC CONSULTANTS PC Owner PND, LLC Contractor TEA SAN CORP | Mechanical A/C unit installation work as shown on the plan. |
| M00740604 ↗ | 465 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/12/2022 | 01/06/2023 | Design BOSCHEN DESIGN ARCHITECTURE Owner THE RITZ TOWER Contractor NU CREATION MECH INC | Replacing exist. 4 PTAC units throughout the apt 12B. No change in use, occupancy, egress or floor area. |
| M00803035 ↗ | 101 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/30/2022 | 01/03/2023 | Design DORIC CONSULTANTS PC Contractor KALIKOW CONSTR SVCS | Closure of existing interior access stair openings as shown on the plan. No change in use, egress, or occupancy. |
| M08015315 ↗ | 25 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 12/06/2022 | 12/14/2022 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | INSTALL SPLIT HVAC SYSTEM AS SHOWN ON PLAN |
| M00452422 ↗ | 25 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 02/17/2021 | 06/03/2022 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | REMOVE EXISTING ROOF WATER TANK AND ITS SUPPORT FRAMING AND INSTALL NEW STEEL SUPPORT FRAMING ON ROOF. NO CHANGE OF USE, OCCUPANCY, EGRESS … |
| M00717163 ↗ | 39 WEST 31 STREET MANHATTAN | Alteration | Signed-off | 04/19/2022 | 06/03/2022 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | Enlargement of existing sidewalk Hatch door according to DOT approved plan. |
| M00453142 ↗ | 25 WEST 32 STREET MANHATTAN | Alteration | Permit Issued | 02/03/2021 | 05/10/2022 | Design DORIC CONSULTANTS PC Contractor AVON PLBG & HTG INC | FIRE PROTECTION AND PLUMBING INFRASTRUCTURE UPGRADE |
| M00487805 ↗ | 253 WEST 109 STREET MANHATTAN | Alteration | Signed-off | 04/13/2021 | 02/14/2022 | Design DORIC CONSULTANTS PC Owner COLUMBIA RESIDENTIAL Contractor JOA CONSTRUCTION CORP | INSTALL ADDITIONAL STEEL BEAMS ON EXISTING DUNNAGE ON ROOF IN CONJUNCTION WITH REPLACEMENT OF CONDENSER AND A/C UNITS (TO BE FILED SEPARATEL… |
| M00393532 ↗ | 329 WEST 77 STREET MANHATTAN | Alteration | Signed-off | 09/25/2020 | 01/07/2022 | Design XIAO ENGINEERING PLLC Owner ORSID REALTY CORP. Contractor SAULUX INTERIORS CORP Filer DORIC CONSULTANTS PC | Install PTAC Units and radiators. No Change in Use, Egress, Occupancy. |
| M00390242 ↗ | 329 WEST 77 STREET MANHATTAN | Alteration | Signed-off | 09/23/2020 | 01/04/2022 | Design DORIC CONSULTANTS PC Owner ORSID REALTY CORP. Contractor VILIMAS MECHANICAL CORP | REPLACE EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00525218 ↗ | 43 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 09/23/2021 | 11/15/2021 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | ADMINISTRATIVELY FILING THIS JOB TO OBTAIN THE CERTIFICATE OF COMPLIANCE (EUP) ONLY. NO WORK UNDER THIS APPLICATION. THIS JOB WAS FILED ON 0… |
| M00545351 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/17/2021 | 10/21/2021 | Design DORIC CONSULTANTS PC Owner Brookfield Properties Contractor ARCO PLBG AND HTG INC | Sprinkler work as shown on plans. |
| M00604578 ↗ | 115 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 10/05/2021 | 10/05/2021 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | Direct replacement of outdoor A/C Condensing units on Roof. |
| M00545312 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/17/2021 | 08/23/2021 | Design DORIC CONSULTANTS PC Owner Brookfield Properties Contractor MIDCITY CORP | Interior buildout of a vacant store. No change to use, egress, occupancy. |
| M00545326 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/17/2021 | 08/23/2021 | Design DORIC CONSULTANTS PC Owner Brookfield Properties Contractor MIDCITY CORP | Mechanical work for interior buildout of a vacant store. |
| M00566065 ↗ | 263 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 08/10/2021 | 08/16/2021 | Design DORIC CONSULTANTS PC Owner RAHMAN NY INC Contractor JOA CONSTRUCTION CORP | Renovation of existing restaurant. Remove and install GYP. Board partitions, install frozen box within the existing walk-in box, minor millw… |
| Q00433772 ↗ | 31-85 32 AVENUE QUEENS | Alteration | Signed-off | 02/14/2021 | 07/28/2021 | Design DORIC CONSULTANTS PC Owner SEOUL TRADING USA, CO. Contractor JOA CONSTRUCTION CORP | INSTALL ROOF DUNNAGE BEAMS FOR MECHANICAL EQUIPMENT. |
| X00394000 ↗ | 3025 YOUNG AVENUE BRONX | Alteration | Signed-off | 12/02/2020 | 01/14/2021 | Design DORIC CONSULTANTS PC Contractor S & L PLUMBING INC | Remove existing boiler and hot water heaters and Install (2) new residential combination of boiler and hot water heater in the Cellar. No c… |
| M00422736 ↗ | 25 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 11/03/2020 | 11/18/2020 | Design DORIC CONSULTANTS PC Contractor I DO PLUMBING & HTG INC | INSTALL WATER CLOSET AND LAVATORY ON 6TH FLOOR. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. |
| M00265263 ↗ | 7 CARMINE STREET MANHATTAN | Alteration | Signed-off | 12/20/2019 | 09/25/2020 | Design DORIC CONSULTANTS PC Owner DISCOVERY, LLC Contractor AVON PLBG & HTG INC | INSTALLATION OF PLUMBING FIXTURES |
| M00367162 ↗ | 27 ST MARKS PLACE MANHATTAN | Alteration | Signed-off | 08/07/2020 | 08/27/2020 | Design DORIC CONSULTANTS PC Contractor NICHOLAS SUIDA | Installation and relocation of Plumbing fixture. |
| B00259527 ↗ | 1570 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 12/27/2019 | 06/04/2020 | Design DORIC CONSULTANTS PC Owner R.P. CASS, INC. Contractor T & T PLUMBING INC | REPLACEMENT, RELOCATION AND NEW INSTALLATION OF PLUMBING FIXTURES. NO CHANGE OF USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICAITON. |
| B00259572 ↗ | 1570 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 12/27/2019 | 06/04/2020 | Design DORIC CONSULTANTS PC Owner R.P. CASS, INC. Contractor SMVP MGMT INC | INSTALLATION OF AC UNIT ON ROOF. NO CHANGE OF USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICATION. |
| Q00325048 ↗ | 155-14 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 03/12/2020 | 03/17/2020 | Design DORIC CONSULTANTS PC Contractor JOA CONSTRUCTION CORP | Replacement of one (1) rooftop HVAC condensing unit only. NO CHANGE OF USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICATION |
| B00190440 ↗ | 88 COURT STREET BROOKLYN | Alteration | Permit Issued | 07/12/2019 | 03/03/2020 | Design DORIC CONSULTANTS PC Contractor J. CAIAZZO PLBG & HTG COR | AMENDED PLAN A-101.01: CHANGE LOCATION OF THE KITCHEN. |
| M00265347 ↗ | 7 CARMINE STREET MANHATTAN | Alteration | Permit Issued | 12/27/2019 | 02/21/2020 | Design DORIC CONSULTANTS PC Contractor GOOD NEWS CONTRACTOR INC | INSTALLATION OF KITCHEN EXHAUST SYSTEM, INSTALL HVAC SYSTEM |
| M00265935 ↗ | 2108 2 AVENUE MANHATTAN | Alteration | Signed-off | 01/10/2020 | 02/06/2020 | Design DORIC CONSULTANTS PC Contractor SAMUEL & SONS P & H INC | Amended plumbing scope of work - Proposed gas stove has been changed to an electric stove. Amended plan P-101.01 under this PAA. |
| Q00290502 ↗ | 41-27 162 STREET QUEENS | Alteration | Signed-off | 01/09/2020 | 01/13/2020 | Design DORIC CONSULTANTS PC Contractor PLBG P & H INC | Existing Store renovation,new dishwasher and hand sink installation |
| M00216894 ↗ | 141 WEST 24 STREET MANHATTAN | Alteration | Permit Issued | 09/06/2019 | 12/28/2019 | Design DORIC CONSULTANTS PC Owner SIR REALTY MANAGEMENT Contractor J. CAIAZZO PLBG & HTG COR | AMEND PLAN |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/16/2026 | Fire-Resistance Rated Construction | 242 WEST 14 STREET | Sokwon Im | progress |
| 07/16/2026 | Final | 242 WEST 14 STREET | Sokwon Im | progress |
| 07/16/2026 | Tenant Protection Plan Compliance | 242 WEST 14 STREET | Sokwon Im | special |
| 07/16/2026 | Masonry | 242 WEST 14 STREET | Sokwon Im | special |
| 05/13/2026 | Final | 101 PARK AVENUE | Sokwon Im | progress |
| 05/13/2026 | Sprayed fire-resistant materials | 101 PARK AVENUE | Sokwon Im | special |
| 05/13/2026 | Structural Cold-Formed Steel | 101 PARK AVENUE | Sokwon Im | special |
| 05/13/2026 | Structural Stability – Alterations of existing buildings | 101 PARK AVENUE | Sokwon Im | special |
| 05/13/2026 | Structural Steel - Details | 101 PARK AVENUE | Sokwon Im | special |
| 05/13/2026 | Post-installed Anchors | 101 PARK AVENUE | Sokwon Im | special |
| 05/13/2026 | Concrete - Cast-In-Place | 101 PARK AVENUE | Sokwon Im | special |
| 05/13/2026 | Structural Steel - High Strength Bolting | 101 PARK AVENUE | Sokwon Im | special |
| 05/08/2026 | Final | 225 EAST 86 STREET | Hung Pui Ho | progress |
| 05/08/2026 | Concrete - Cast-In-Place | 225 EAST 86 STREET | Hung Pui Ho | special |
| 05/08/2026 | Structural Cold-Formed Steel | 225 EAST 86 STREET | Hung Pui Ho | special |
| 05/08/2026 | Structural Steel - High Strength Bolting | 225 EAST 86 STREET | Hung Pui Ho | special |
| 05/08/2026 | Masonry | 225 EAST 86 STREET | Hung Pui Ho | special |
| 05/08/2026 | Post-installed Anchors | 225 EAST 86 STREET | Hung Pui Ho | special |
| 05/08/2026 | Structural Steel - Details | 225 EAST 86 STREET | Hung Pui Ho | special |
| 05/08/2026 | Tenant Protection Plan Compliance | 225 EAST 86 STREET | Sokwon Im | special |
| 05/08/2026 | Structural Stability – Alterations of existing buildings | 225 EAST 86 STREET | Hung Pui Ho | special |
| 05/08/2026 | Structural Steel - Welding | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Post-installed Anchors | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Structural Cold-Formed Steel | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Structural Steel - Welding | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Tenant Protection Plan Compliance | 225 EAST 86 STREET | Sokwon Im | special |
| 04/28/2026 | Final | 225 EAST 86 STREET | Hung Pui Ho | progress |
| 04/28/2026 | Structural Stability – Alterations of existing buildings | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Structural Steel - Details | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Masonry | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Concrete - Cast-In-Place | 225 EAST 86 STREET | Hung Pui Ho | special |
| 04/28/2026 | Structural Steel - High Strength Bolting | 225 EAST 86 STREET | Hung Pui Ho | special |
| 03/10/2026 | Post-installed Anchors | 31 3 AVENUE | Sokwon Im | special |
| 03/10/2026 | Tenant Protection Plan Compliance | 31 3 AVENUE | Sokwon Im | special |
| 03/10/2026 | Final | 31 3 AVENUE | Sokwon Im | progress |
| 12/11/2025 | Fire-Resistant Penetrations and Joints | 25 WEST 32 STREET | Sokwon Im | special |
| 12/09/2025 | Fire-Resistant Penetrations and Joints | 25 WEST 32 STREET | Sokwon Im | special |
| 10/09/2025 | Interior lighting power | 31 3 AVENUE | Sokwon Im | energy_progress |
| 10/09/2025 | Fenestration and door U-factor and product ratings | 31 3 AVENUE | Sokwon Im | energy_progress |
| 10/09/2025 | Lighting controls | 31 3 AVENUE | Sokwon Im | energy_progress |
| 10/09/2025 | Final | 31 3 AVENUE | Sokwon Im | progress |
| 10/09/2025 | Tenant Protection Plan Compliance | 31 3 AVENUE | Sokwon Im | special |
| 10/09/2025 | Fire-Resistant Penetrations and Joints | 31 3 AVENUE | Sokwon Im | special |
| 10/09/2025 | Energy Code Compliance Inspections | 31 3 AVENUE | Sokwon Im | progress |
| 10/09/2025 | Fire-Resistance Rated Construction | 31 3 AVENUE | Sokwon Im | progress |
| 10/09/2025 | Insulation placement and R values | 31 3 AVENUE | Sokwon Im | energy_progress |
| 10/09/2025 | Air barrier - visual inspection | 31 3 AVENUE | Sokwon Im | energy_progress |
| 10/02/2025 | Fenestration air leakage | 25 WEST 32 STREET | Sokwon Im | energy_progress |
| 10/02/2025 | Air barrier - visual inspection | 25 WEST 32 STREET | Sokwon Im | energy_progress |
| 10/02/2025 | Interior lighting power | 25 WEST 32 STREET | Sokwon Im | energy_progress |