116-17 ROCKAWAY BEACH BLVD · BIN 4304786
💬 Discuss this project
1971Year Built
1Stories
P8Building Class
R4AZoning
7,000 sfGross Floor Area
1Units
5 Open Violations ▸FDNY Report ↗
Library · 10,000 sf lot · 0.7 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbingCivil
Roof3p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITY OF NEW YORK- DDC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PE AND CONSULTANTS NY LLC105/27/2026
COSENTINI ASSOCIATES603/10/2025
SEVERUD ASSOCIATES102/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TERENCE HAIRSTON ARCHITECT1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K.O. TECHNOLOGIES INCGeneral Contractor603/21/2026
RPC MECHANICAL INCGeneral Contractor207/08/2026
MAC CONTRACTOR INCGeneral Contractor107/08/2026
VARSITY PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902301/17/2025
Building Lifecycle
All (58)Filed (8)Permit Issued (6)Signed Off (3)Violation (18)Inspection (2)Objection (4)Special Inspection (17)
06/05/2026
Permit issued — General Construction
Q01403593-I1-GC
05/27/2026
Filed — Alteration
Scope of work is limited to the design of the anchors for banners only. There will be no change in use, egress, or occupancy.
Q01403593-I1
12/15/2025
Signed off — Alteration
THE INTENT OF THIS PROJECT IS TO REPLACE THE EXISTING AC UNIT AND INSTALL BNEW BASE BUILDING MANAGEMENT SYSTEM (BMS) TO SERVER THE LIBRARY SPACE. THE NEW ROOFTOP AC UNIT IS TO BE LOCATED ON THE ROOF WITHIN A NEW ACOUSTICAL SCREEN ENCLOSURE.
Q08006290-I1
11/20/2025
Signed off — Alteration
PROPOSED GAS PIPING IN CONJUNCTION WITH HVAC UPGRADE TO EXISTING FACILITY FROM 1ST FLOOR TO ROOF LEVELS.
Q08006296-I1
10/01/2025
Signed off — Alteration
STRUCTURAL DUNNAGE IN CONJUNCTION WITH NEW ROOFTOP AC UNIT
Q08006306-I1
07/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2025
Permit issued — Mechanical Systems
Q08006290-I1-MS
06/24/2025
Permit issued — Structural
Q08006306-I1-ST
03/20/2025
Objection raised — Other
03/20/2025
Objection resolved — Addressed
03/10/2025
Filed — Alteration
PROPOSED GAS PIPING IN CONJUNCTION WITH HVAC UPGRADE TO EXISTING FACILITY FROM 1ST FLOOR TO ROOF LEVELS.
Q08006296-P3
02/27/2025
Objection raised — Other
02/27/2025
Objection resolved — Addressed
02/19/2025
Filed — Alteration
PROPOSED GAS PIPING IN CONJUNCTION WITH HVAC UPGRADE TO EXISTING FACILITY FROM 1ST FLOOR TO ROOF LEVELS.
Q08006296-P2
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Final
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Permanent certificate
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Ventilation and air distribution system
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Electrical motors and elevators
IBRAHIM MOURAD
02/04/2025
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
02/03/2025
Filed — Alteration
PROPOSED GAS PIPING IN CONJUNCTION WITH HVAC UPGRADE TO EXISTING FACILITY FROM 1ST FLOOR TO ROOF LEVELS.
Q08006296-P1
01/17/2025
Filed — Alteration
THE INTENT OF THIS PROJECT IS TO REPLACE THE EXISTING AC UNIT AND INSTALL BNEW BASE BUILDING MANAGEMENT SYSTEM (BMS) TO SERVER THE LIBRARY SPACE. THE NEW ROOFTOP AC UNIT IS TO BE LOCATED ON THE ROOF WITHIN A NEW ACOUSTICAL SCREEN ENCLOSURE.
Q08006290-P1
01/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2024
Permit issued — Plumbing
Q08006296-I1-PL
06/21/2024
Permit issued — Mechanical Systems
Q08006290-I1-MS
06/21/2024
Permit issued — Structural
Q08006306-I1-ST
02/17/2023
Filed — Alteration
STRUCTURAL DUNNAGE IN CONJUNCTION WITH NEW ROOFTOP AC UNIT
Q08006306-I1
02/07/2023
Filed — Alteration
THE INTENT OF THIS PROJECT IS TO REPLACE THE EXISTING AC UNIT AND INSTALL BNEW BASE BUILDING MANAGEMENT SYSTEM (BMS) TO SERVER THE LIBRARY SPACE. THE NEW ROOFTOP AC UNIT IS TO BE LOCATED ON THE ROOF WITHIN A NEW ACOUSTICAL SCREEN ENCLOSURE.
Q08006290-I1
02/07/2023
Filed — Alteration
PROPOSED GAS PIPING IN CONJUNCTION WITH HVAC UPGRADE TO EXISTING FACILITY FROM 1ST FLOOR TO ROOF LEVELS.
Q08006296-I1
10/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
10/14/2022
Special inspection requirement — Structural Steel - Details
IBRAHIM MOURAD
10/14/2022
Special inspection requirement — Structural Steel - High Strength Bolting
IBRAHIM MOURAD
10/14/2022
Special inspection requirement — Structural Steel - Welding
IBRAHIM MOURAD
09/19/2022
Special inspection requirement — Final
IBRAHIM MOURAD
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMAC CONTRACTOR INC06/05/2026
DOB NOWMechanical SystemsSigned-offRPC MECHANICAL INC06/27/2025
DOB NOWStructuralSigned-offK.O. TECHNOLOGIES INC06/24/2025
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC07/01/2024
DOB NOWMechanical SystemsSigned-offRPC MECHANICAL INC06/21/2024
DOB NOWStructuralSigned-offK.O. TECHNOLOGIES INC06/21/2024
BISPLISSUEDVILLAGE P & H NY INC04/23/2010
BISMHISSUEDJMK CONSTRUCTION GROUP LT04/06/2010
BISOTISSUEDJMK CONSTRUCTION GROUP LT04/06/2010
BISMHISSUEDRP COOLING COP02/15/2006
BISOTISSUEDAWL INDUSTRIES INC05/10/2001
BISPLISSUEDGJ PLUMBING LLC05/10/2001
BISOTISSUEDFOUNDATION CONSTRUCTION CONSULT.09/11/1997
BISOTISSUEDUNIVERSAL STEEPLE JACK INC.03/19/1997
1 project · most recent 07/08/2024
General Wiring
FiledStatusContractorScope
07/08/2024CompleteZENA ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/04/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
02/04/2025Mechanical SystemsIBRAHIM MOURADspecial
02/04/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
02/04/2025FinalIBRAHIM MOURADprogress
02/04/2025Duct leakage testing, insulation and designIBRAHIM MOURADenergy_progress
02/04/2025Permanent certificateIBRAHIM MOURADenergy_progress
02/04/2025Ventilation and air distribution systemIBRAHIM MOURADenergy_progress
02/04/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
02/04/2025Maintenance informationIBRAHIM MOURADenergy_progress
02/04/2025HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
02/04/2025Electrical motors and elevatorsIBRAHIM MOURADenergy_progress
02/04/2025Shutoff dampersIBRAHIM MOURADenergy_progress
10/14/2022Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/14/2022Structural Steel - DetailsIBRAHIM MOURADspecial
10/14/2022Structural Steel - High Strength BoltingIBRAHIM MOURADspecial
10/14/2022Structural Steel - WeldingIBRAHIM MOURADspecial
09/19/2022FinalIBRAHIM MOURADprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Department of Public LibrariesOtherGround, Roof
Project Q08006290 Alteration · LOC Issued · 02/07/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026Q08006296-P1Request digital key ↗
08/25/2026Q08006296-I1Request digital key ↗
08/25/2026Q08006290-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
06/08/2013420143286Open ↗
06/08/2013420143286Open ↗
05/11/2010420142599Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
04/08/2010420142599Open ↗
04/08/2010420142599Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026Q08006296-I1Open ↗
08/25/2026Q08006296-P2Open ↗
08/25/2026Q08006296-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/11/2013420142599Open ↗
02/11/2013420142599Open ↗
02/22/2010420142599Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026Q08006290-I1Open ↗
08/31/2026Q08006290-I1Open ↗
08/28/2026Q08006306-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q08006290-I1Open ↗
08/28/2026Q08006306-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE4
04/27/2011420142599Open ↗
04/05/2011420142599Open ↗
02/24/2011420142599Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
05/11/2010420142599Open ↗
02/22/2010420142599Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/25/2014420143286Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026Q08006306-I1Open ↗
08/13/2026Q08006290-I1Open ↗
08/13/2026Q08006296-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/22/2010420142599Open ↗
02/22/2010420143286Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01403593-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/25/2026Q08006296-I1Open ↗
08/25/2026Q08006296-P1Open ↗
08/25/2026Q08006290-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/11/2013420142599Open ↗
04/27/2011420142599Open ↗
04/27/2011420142599Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/19/2014420143286Open ↗
02/11/2013420142599Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/22/2010420142599Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/16/2026Q01403593-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/16/2026Q01403593-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/19/2014420143286Open ↗
02/11/2013420142599Open ↗
02/22/2010420143286Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
02/22/2010420142599Open ↗
02/22/2010420143286Open ↗
02/22/2010420142599Open ↗