← Back
Elevator cooperative
111 EAST 67 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1085154
💬 Discuss this project
1931Year Built
11Stories
D4Building Class
R8BZoning
166,862 sfGross Floor Area
95Units
LL97 CoveredRent Stabilized22 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: MILLAN HOUSE INC · 25,104 sf lot · 6.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 14 docs
Floor 101p · 1 filing · 12 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 1 filing · 9 docs
Floor 4
Floor 3
Floor 2Under Construction15p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BHS2907/08/2026
J S WATERPROOFING LLC SUITE 21807/08/2026
ALCON BUILDERS GROUP103/21/2026
MILLAN HOUSE INC C O BHS303/21/2026
MILLAN HOUSE INC - BROWN HARRIS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
SANDEEP KAUR103/21/2026
RIZZO GROUP503/21/2026
GILLMAN CONSULTING403/21/2026
OUTSOURCE CONSULTANTS, INC.203/21/2026
SOL BUILDING CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&S WATERPROOFING LLCGeneral Contractor1407/08/2026
FINE CONSTRUCTION SERVICEGeneral Contractor603/21/2026
KKNY DESIGN INCGeneral Contractor603/21/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor504/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor307/08/2026
GO PRO PLUMBING AND HEATINGPlumbing307/08/2026
PAUL QUINN PLBG & HTG INCPlumbing207/08/2026
DENNISON ELECTRIC CORPElectrical203/22/2026
HAMILTON AIR COMPANY, INC.General Contractor203/21/2026
IMPACT PLUMBING INCPlumbing207/08/2026
GRAHAM, EDWARDFire Protection103/21/2026
OLLEN, MATTHEWElectrical103/21/2026
MAYO, EUGENEElectrical103/21/2026
M C M PLBG & HTG, INCPlumbing107/08/2026
LITUEV, ANDREIElectrical103/21/2026
CORBETT, RICHARDElectrical103/21/2026
CONTRACTING BY REJI INCElectrical103/21/2026
ZACCO BUILDING CORPGeneral Contractor107/08/2026
FRED SMITH P&H CO INCPlumbing107/08/2026
CHESTER STRUGATSElectrical103/21/2026
CALIK, MURATElectrical103/21/2026
PATRICK KENNELLYElectrical103/21/2026
THE METRO GROUP ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WINTON GROUP ARCHITECTURE4343208/20/2026
SPECIAL TESTING & CONSULT1688204/27/2026
KZ ENGINEERING, P.C.4665105/08/2024
AP PROFESSIONAL ENGINEERI5974105/03/2024
MCALPINE ARCHITECTURE PC5694110/06/2023
JUDGE ARCHITECTURE PC748503/15/2022
IP GROUP2542205/11/2021
AMHAC4867102/07/2020
Building Lifecycle
All (205)Filed (27)Permit Issued (33)Signed Off (12)Facade (FISP) (20)Violation (60)Inspection (7)Objection (16)Special Inspection (30)
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
08/28/2026
Special inspection requirement — Lighting in dwelling units
Greg Epstein
08/28/2026
Special inspection requirement — Lighting controls
Greg Epstein
08/28/2026
Special inspection requirement — Final
Greg Epstein
08/27/2026
Objection resolved — Addressed
08/25/2026
Objection raised — Other
08/20/2026
Filed — Alteration
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01375391-P1
07/06/2026
Signed off — Alteration
M01008398-I1
06/22/2026
Permit issued — Protection and Mechanical Methods
M01183168-I1-PMM
06/22/2026
Permit issued — Supported Scaffold
M01178277-I1-SF
06/15/2026
Special inspection requirement — Lighting controls
Greg Epstein
06/15/2026
Special inspection requirement — Lighting in dwelling units
Greg Epstein
06/15/2026
Special inspection requirement — Final
Greg Epstein
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
06/11/2026
Permit issued — Plumbing
M01375391-S1-PL
06/08/2026
Permit issued — General Construction
M01375391-I1-GC
05/21/2026
Filed — Alteration
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01375391-I1
05/21/2026
Filed — Alteration
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01375391-S1
05/21/2026
Signed off — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
M01044427-I1
05/20/2026
Signed off — Alteration
M01047327-I1
05/20/2026
Permit issued — Suspended Scaffold
M01047327-I1-SC
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
05/13/2026
Special inspection requirement — Final
Kenneth Santelli
05/13/2026
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
05/07/2026
Violation issued (HPD, closed)
A
04/27/2026
Filed — Alteration
M01008398-P1
04/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
04/09/2026
Special inspection requirement — Final
Kenneth Santelli
04/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
04/09/2026
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
01/29/2026
Cycle 9 facade report submitted
01/28/2026
Cycle 9 facade report signed — SAFE
01/22/2026
Cycle 9 facade report signed — UNSAFE
01/15/2026
Permit issued — Sidewalk Shed
M00989683-I1-SH
01/14/2026
Permit issued — General Construction
M01008398-I1-GC
01/14/2026
Permit issued — Supported Scaffold
M01044427-I1-SF
01/12/2026
Cycle 9 facade inspection completed
01/12/2026
Cycle 9 facade inspection completed
07/02/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00989683-P1
05/30/2025
Permit issued — Suspended Scaffold
M01047327-I1-SC
05/09/2025
Permit issued — General Construction
M01008398-I1-GC
05/09/2025
Permit issued — Supported Scaffold
M01044427-I1-SF
04/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01178277-P1
03/21/2025
Permit issued — Protection and Mechanical Methods
M01183168-I1-PMM
03/21/2025
Permit issued — Supported Scaffold
M01178277-I1-SF
03/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01178277-I1
03/19/2025
Filed — Alteration
M01183168-I1
01/17/2025
Cycle 9 facade report submitted
01/14/2025
Permit issued — Sidewalk Shed
M00989683-I1-SH
01/14/2025
Cycle 9 facade report signed — UNSAFE
01/13/2025
Cycle 9 facade inspection completed
12/19/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
12/16/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/13/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/2024
Permit issued — Suspended Scaffold
M01047327-I1-SC
05/08/2024
Filed — Alteration
M01047327-I1
05/07/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
05/07/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedJ&S WATERPROOFING LLC06/22/2026
DOB NOWSupported ScaffoldPermit IssuedJ&S WATERPROOFING LLC06/22/2026
DOB NOWPlumbingPermit IssuedM C M PLBG & HTG, INC06/11/2026
DOB NOWGeneral ConstructionPermit IssuedZACCO BUILDING CORP06/08/2026
DOB NOWSuspended ScaffoldSigned-offJ&S WATERPROOFING LLC05/20/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP01/15/2026
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC01/14/2026
DOB NOWSupported ScaffoldSigned-offJ&S WATERPROOFING LLC01/14/2026
DOB NOWSuspended ScaffoldSigned-offJ&S WATERPROOFING LLC05/30/2025
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC05/09/2025
DOB NOWSupported ScaffoldSigned-offJ&S WATERPROOFING LLC05/09/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedJ&S WATERPROOFING LLC03/21/2025
DOB NOWSupported ScaffoldPermit IssuedJ&S WATERPROOFING LLC03/21/2025
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP01/14/2025
DOB NOWSuspended ScaffoldSigned-offJ&S WATERPROOFING LLC05/31/2024
DOB NOWSupported ScaffoldSigned-offJ&S WATERPROOFING LLC05/03/2024
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC05/01/2024
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP01/18/2024
DOB NOWPlumbingSigned-offIMPACT PLUMBING INC04/21/2023
DOB NOWGeneral ConstructionSigned-offFINE CONSTRUCTION SERVICE11/30/2022
DOB NOWMechanical SystemsSigned-offHAMILTON AIR COMPANY, INC.05/19/2022
DOB NOWPlumbingSigned-offIMPACT PLUMBING INC11/29/2021
DOB NOWGeneral ConstructionSigned-offFINE CONSTRUCTION SERVICE11/03/2021
DOB NOWMechanical SystemsSigned-offKKNY DESIGN INC08/02/2021
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI04/07/2021
DOB NOWPlumbingSigned-offPAUL QUINN PLBG & HTG INC04/02/2021
DOB NOWPlumbingSigned-offPAUL QUINN PLBG & HTG INC02/26/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC12/08/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC12/08/2020
DOB NOWPlumbingSigned-offFRED SMITH P&H CO INC10/21/2020
DOB NOWMechanical SystemsSigned-offKKNY DESIGN INC07/13/2020
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI04/30/2020
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI01/14/2020
BISOTISSUEDKKNY DESIGN INC04/05/2021
BISOTISSUEDMACRO CONSTRUCTION INC02/26/2021
BISOTISSUEDKKNY DESIGN INC03/05/2020
BISPLISSUEDDONATO PLUMBING, INC10/16/2018
BISMHISSUEDMANHATTAN RENOVATIONS INC.07/17/2018
BISOTISSUEDMANHATTAN RENOVATIONS INC.07/16/2018
BISPLISSUEDBROOK PLUMBING & HTG CORP01/31/2018
+ 43 more permits on file
12 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedDAVEN ELECTRIC CORPGeneral Wiring
06/30/2026Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
06/16/2026Permit IssuedMKU ELECTRIC CORPGeneral Wiring
01/12/2024Permit IssuedANTHONY G FERRY INC—
12/09/2022CompleteTHE METRO GROUP ELECTRICGeneral Wiring
11/28/2022CompleteTHE METRO GROUP ELECTRICGeneral Wiring
12/10/2021CompleteM&T ELECTRICAL LLC—
09/28/2021CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
01/14/2020CompleteTOWER ELECTRIC INC.General Wiring
04/19/2019CompleteRESPONSE ELECTRIC INC.General Wiring
03/07/2019CompleteDENNISON ELECTRIC CORPGeneral Wiring
09/05/2018CompleteDENNISON ELECTRIC CORPGeneral Wiring
2 projects · most recent 07/02/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/02/2025Permit IssuedROCKLEDGE SCAFFOLD CORPSidewalk Shed
04/08/2025Permit IssuedJ&S WATERPROOFING LLCScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/19/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/16/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/13/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/28/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
08/28/2026Lighting in dwelling unitsGreg Epsteinenergy_progress
08/28/2026Lighting controlsGreg Epsteinenergy_progress
08/28/2026FinalGreg Epsteinprogress
06/15/2026Lighting controlsGreg Epsteinenergy_progress
06/15/2026Lighting in dwelling unitsGreg Epsteinenergy_progress
06/15/2026FinalGreg Epsteinprogress
06/15/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
05/13/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
05/13/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
05/13/2026FinalKenneth Santelliprogress
05/13/2026MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
04/09/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
04/09/2026FinalKenneth Santelliprogress
04/09/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
04/09/2026MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
05/07/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
05/07/2024Post-installed AnchorsKarol Zdancewiczspecial
05/01/2024Post-installed AnchorsGURVINDER SINGHspecial
05/01/2024Alternative Materials - OTCR Buildings Bulletin NumberGURVINDER SINGHspecial
10/06/2023Air barrier - visual inspection—energy_progress
10/06/2023Fire-Resistant Penetrations and JointsDavid McAlpinespecial
09/25/2023Tenant Protection Plan ComplianceDavid McAlpinespecial
09/25/2023Fenestration and door U-factor and product ratings—energy_progress
09/21/2023FinalDavid McAlpineprogress
Latest 25 of 46.
▾Documents — 633 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch20
09/06/2026M01375391-P1Request digital key ↗
09/06/2026M01375391-I1Request digital key ↗
09/03/2026M00523392-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00282354-I1Request digital key ↗
09/04/2026M00370960-P1Request digital key ↗
09/04/2026M00370960-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00437606-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00437607-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00298792-I1Request digital key ↗
▸Applications & Permits129
▸BISPLAN / WORK APPROVAL APPLICATION55
08/28/2025102504693Open ↗
08/14/2025102504693Open ↗
07/23/2025102504693Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION54
02/26/2021140975194Open ↗
03/09/2020123791147Open ↗
12/23/2019123791147Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWLPC Approval/Permit20
09/06/2026M01375391-P1Open ↗
09/06/2026M01375391-I1Open ↗
09/04/2026M00370960-I1Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications140
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION54
12/05/2019123791147Open ↗
12/05/2019123791147Open ↗
09/11/2019121228386Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/05/2026M00298792-I1Open ↗
09/04/2026M00370960-P1Open ↗
09/04/2026M00370960-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026M00523494-I1Open ↗
09/01/2026M00523494-I1Open ↗
09/01/2026M00370960-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M00523494-I1Open ↗
09/01/2026M00523494-I1Open ↗
09/01/2026M01375391-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
05/15/2017123094267Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/10/2017140704254Open ↗
10/06/2017140704236Open ↗
08/17/2017140683268Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/10/2017140704254Open ↗
10/06/2017140704236Open ↗
08/17/2017140683268Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/10/2017140704254Open ↗
10/06/2017140704236Open ↗
08/17/2017140683268Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
01/28/2021140975194Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
12/18/2017121228386Open ↗
07/03/2017122953606Open ↗
05/19/2017121228386Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION3
09/11/2019121228386Open ↗
07/17/2018122565198Open ↗
07/17/2018122565198Open ↗
▸BISPLUMBING (PL) SIGNOFF1
10/06/2021123791147Open ↗
▸Safety & Tenant Protection20
▸BISTenant Protection Plan and Notes10
12/05/2019123791147Open ↗
05/19/2017121228386Open ↗
01/28/2021140975194Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan9
09/04/2026M00370960-P1Open ↗
09/04/2026M00370960-I1Open ↗
09/04/2026M00437607-I1Open ↗
Showing 3 of 9 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/22/2018122953615Open ↗
▸Environmental & Asbestos41
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/06/2026M01375391-I1Open ↗
09/06/2026M01375391-P1Open ↗
09/04/2026M00370960-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
12/23/2019123791147Open ↗
05/19/2017121228386Open ↗
05/15/2017123094267Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/15/2026M00298792-I1Open ↗
08/13/2026M00394138-I1Open ↗
08/13/2026M00282354-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
01/28/2021140975194Open ↗
12/05/2019123791147Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
12/10/2018123094267Open ↗
05/15/2017123094267Open ↗
03/17/2017122836066Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
12/10/2018123094267Open ↗
03/17/2017122836066Open ↗
Showing 2 of 6 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/06/2017140704236Open ↗
08/17/2017140683268Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/28/2021140975194Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00523494-I1Open ↗
08/13/2026M00523392-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
08/15/2022140975194Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/15/2022140975194Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/15/2022140975194Open ↗
▸BISLIGHTING CONTROLS1
08/15/2022140975194Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY13
02/18/2025102703111Open ↗
10/06/2021123791147Open ↗
10/06/2021123791147Open ↗
Showing 3 of 13 on file for this type
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-012
09/05/2025102504693Open ↗
02/18/2025102703111Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
09/05/2025102504693Open ↗
02/18/2025102703111Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/15/2022140975194Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/15/2022140975194Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
04/23/2018140704236Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/15/2022140975194Open ↗
▸Approvals, Objections & Sign-offs71
▸BISLANDMARKS APPROVAL24
01/28/2021140975194Open ↗
12/23/2019123791147Open ↗
10/10/2017140704254Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
09/08/2025102504693Open ↗
02/24/2025102703111Open ↗
01/26/2024140683268Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/20/2019123791147Open ↗
12/10/2018123094267Open ↗
04/23/2018140704236Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS SIGNOFF6
09/08/2025102504693Open ↗
02/24/2025102703111Open ↗
08/16/2022140975194Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
01/25/2024140683268Open ↗
08/15/2022140975194Open ↗
▸BISSUPERSEDING LETTER1
01/31/2018122953606Open ↗
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT42
02/21/2025102703111Open ↗
01/28/2021140975194Open ↗
12/05/2019123791147Open ↗
Showing 3 of 42 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/15/2022140975194Open ↗
10/06/2021123791147Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms64
▸BISADDITIONAL INFORMATION27
08/12/2025102504693Open ↗
07/26/2025102504693Open ↗
01/22/2019121228386Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING COVER SHEET23
12/05/2019123791147Open ↗
05/19/2017121228386Open ↗
05/19/2017121228386Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM9
09/11/2019121228386Open ↗
12/10/2018123094267Open ↗
10/31/2018122953606Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
01/28/2021140975194Open ↗
10/10/2017140704254Open ↗
10/06/2017140704236Open ↗
Showing 3 of 5 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7792
09/05/2025102504693Open ↗
02/18/2025102703111Open ↗
▸DOB NOWProof of Historic Building2
08/27/2026M01008398-P1Open ↗
08/13/2026M01008398-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01047327-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01047327-I1Open ↗