| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01108459 ↗ | 225 EAST 67 STREET MANHATTAN | Alteration | Permit Issued | 10/03/2024 | 09/28/2026 | TEMPORARY SPRINKLER HEADS INSTALLATION FOR 3RD FL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | |
| M01408869 ↗ | 1178 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 08/20/2026 | Design JACK GREEN ASSOCIATES | Minor interior partition changes and installation of AC units and associated ductwork, as per plans. No change to use, egress or occupancy. |
| M01435363 ↗ | 5 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 08/03/2026 | 08/12/2026 | Design John Liu Architect Filer PWF | PROVIDE (2) NEW LOUVERED OPENINGS ON EXISTING FACADE FOR PTAC INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M01403700 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 05/22/2026 | 08/10/2026 | Design A2 ARCHITECT, PC Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 30Q ON THE 30TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01415701 ↗ | 411 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 07/21/2026 | 08/06/2026 | Design NEW AGE ENGINEERING PLLC Filer JENNY FLORES EXPEDITING | INSTALL HVAC THROUGH WALL UNITS AS PER PLANS.NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01352162 ↗ | 535 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 05/08/2026 | 07/30/2026 | Design JACK GREEN ASSOCIATES | Installation of thru-wall AC units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| JACK GREEN ASSOCIATES | 53 | 06/03/2026 |
| COSTA ARCH & ENG LLP | 5 | 11/21/2025 |
| CES ENGINEERING LLC | 4 | 09/25/2025 |
| A2 ARCHITECT, PC | 3 | 07/17/2026 |
| ANDREW KATZ ENGINEERS | 3 | 02/04/2020 |
| BENDIX ENGINEERING, P.C. | 3 | 02/05/2026 |
| CHARLES G. MICHEL ENGINEERING, PC. | 3 | 11/20/2025 |
| M.A. RUBIANO, P.E., P.C. | 3 | 08/16/2023 |
| MCSWEENEY ENGINEERING | 3 | 11/18/2025 |
| EDWARD I. SCHACHNER LTD. | 2 | 11/20/2025 |
| EUGENE KHANANOV AIA | 2 | 07/18/2025 |
| KATZ ARCHITECTURE | 2 | 03/02/2021 |
| KAY LEONG AKERLOF ARCHITECTURE | 2 | 05/08/2024 |
| OMER FENIK, RA | 2 | 06/07/2026 |
| PACS ARCHITECTURE | 2 | 03/23/2026 |
| SILMAN | 2 | 01/04/2024 |
| THOMAS TSUE ARCHITECT | 2 | 04/21/2023 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 09/20/2019 |
| ABEJA ENGINEERING PLLC | 1 | 11/16/2020 |
| ADAL ENGINEERING PLLC | 1 | 09/05/2024 |
| ADVANCED PROFESSIONAL ENGINEERING | 1 | 01/09/2026 |
| ALEXANDER WEISS, P.E. | 1 | 10/02/2020 |
| ALVEARY ARCHITECTURE, PC | 1 | 11/10/2021 |
| AMMOR ARCHITECTURE LLP | 1 | 06/25/2020 |
| ANDREW FETHES ARCHITECT | 1 | 09/19/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| EURO GROUP DESIGN GROUP | 4 | 11/21/2025 |
| ABR PLBG&HTG CONTR INC | 3 | 09/17/2025 |
| BENT MECHANICAL CORP | 2 | 03/23/2026 |
| CMP CONTRACTING INC | 2 | 03/23/2026 |
| PROSTAR PLUMBING AND HEAT | 2 | 07/17/2026 |
| A.M.N. CORPORATION | 1 | 01/09/2026 |
| ACCURATE MECHANICAL INC | 1 | 01/29/2025 |
| ALL VISION ENTERPRISES LL | 1 | 04/24/2025 |
| ALMA DESIGN INC | 1 | 10/18/2022 |
| AMN FIRE CORP | 1 | 01/09/2026 |
| AMOK INC | 1 | 07/18/2025 |
| ARI GROUP, INC | 1 | 09/07/2022 |
| ARIEL SERVICES INC | 1 | 04/24/2025 |
| ARTISTIC DETAIL CONTRACT | 1 | 08/21/2024 |
| CELTIC CRAFTS CONSTRUCTIO | 1 | 07/17/2026 |
| CLEAN TECH MECHANICAL INC | 1 | 01/24/2024 |
| D.D.S. MECH PBG&HTG CORP | 1 | 06/11/2022 |
| DELTA-SIGMA MECH CORP | 1 | 03/29/2024 |
| DIAMOND ERA CONSTR. INC | 1 | 08/03/2021 |
| FLINT MECHANICAL CORP | 1 | 11/20/2025 |
| GMG HOME SERVICES INC | 1 | 09/09/2024 |
| GOLDS PLUMBING CORP | 1 | 07/30/2025 |
| GREENTREE CONSTRUCTION IN | 1 | 10/18/2023 |
| GREGG NY PLUMBING, INC | 1 | 04/18/2022 |
| HEIGHTS CONSTRUCTION CORP | 1 | 03/29/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| BROWN HARRIS STEVENS | 4 | 06/12/2024 |
| SAMSON MANAGEMENT LLC | 4 | 11/21/2025 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 3 | 05/18/2026 |
| ALLIED PARTNERS | 2 | 10/18/2022 |
| FIRST SERVICE RESIDENTIAL | 2 | 12/01/2022 |
| GRISORO STUDIO | 2 | 04/21/2023 |
| 300 CPW APARTMENTS CORP. | 1 | 08/04/2022 |
| 411 West End Avenue Owners Corp. | 1 | 07/21/2026 |
| 535 East 86th Street Corp. | 1 | 09/04/2024 |
| AKAM ASSOCIATES, INC. | 1 | 10/23/2024 |
| ALVEARY ARCHITECTURE, PC | 1 | 11/10/2021 |
| AUA EQUITY HOLDINGS, LLC | 1 | 08/03/2020 |
| Apt 6A | 1 | 08/21/2024 |
| BHS | 1 | 03/15/2022 |
| Board President | 1 | 12/16/2019 |
| CHARLES H. GREENTHAL MANAGEMENT\ | 1 | 04/24/2021 |
| Carriage House Annex, LLC | 1 | 01/09/2026 |
| DMC BUILDERS INC | 1 | 09/05/2024 |
| HALSTEAD MANAGEMENT | 1 | 08/27/2024 |
| HOFFMAN MANAGEMENT | 1 | 01/24/2024 |
| JOHN B. LOVETT & ASSOC. | 1 | 12/11/2020 |
| MATTHEW ADAM PROPERTIES | 1 | 07/12/2022 |
| MAXWELL-KATES, INC. | 1 | 02/14/2022 |
| MR. | 1 | 07/20/2020 |
| Nouveau Property Management Corp. | 1 | 05/08/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| AM EXPEDITING | 17 | 02/19/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 6 | 01/23/2026 |
| J.A. EXPEDITING, LLC | 5 | 07/17/2026 |
| COSTA ARCHITECTURE & ENGINEERING LL | 4 | 11/21/2025 |
| METROPOLIS GROUP INC | 4 | 05/18/2026 |
| BIG ORANGE EXPEDITING, INC | 3 | 07/22/2025 |
| DOMANI CONSULTING | 3 | 03/21/2025 |
| AM Buildiing Consulatants, Inc. | 2 | 06/03/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 2 | 11/18/2025 |
| JENNY FLORES EXPEDITING | 2 | 07/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 01/09/2026 |
| OEF CONSULTANTS, LLC | 2 | 06/07/2026 |
| QUICK FILING OF NY INC | 2 | 04/21/2023 |
| RESOLUTION EXPEDITING INC | 2 | 05/08/2024 |
| 4444 PPPP CORP | 1 | 01/10/2022 |
| ADAM MAISER | 1 | 12/01/2022 |
| AMERICAN GOTHAM CONSULTANTS LLC | 1 | 02/07/2022 |
| ANTHONY MORALI ARCHITECT PLLC | 1 | 09/07/2022 |
| ANZALONE ARCHITECTURE, PLLC | 1 | 03/02/2021 |
| BERZAK SCHOEN CONSULTANTS LTD. | 1 | 04/24/2021 |
| BUILDING VIOLATION SERVICES INC. | 1 | 08/12/2026 |
| BUILTIN STUDIO | 1 | 04/21/2023 |
| BURNHAM NATIONWIDE INC | 1 | 07/13/2021 |
| CONVERSANO ASSOCIATES, INC. | 1 | 04/24/2025 |
| DY EXPEDITING INC. | 1 | 02/26/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01108459 ↗ | 225 EAST 67 STREET MANHATTAN | Alteration | Permit Issued | 10/03/2024 | 09/28/2026 | TEMPORARY SPRINKLER HEADS INSTALLATION FOR 3RD FL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | |
| M01408869 ↗ | 1178 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 08/20/2026 | Design JACK GREEN ASSOCIATES | Minor interior partition changes and installation of AC units and associated ductwork, as per plans. No change to use, egress or occupancy. |
| M01435363 ↗ | 5 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 08/03/2026 | 08/12/2026 | Design John Liu Architect Filer PWF | PROVIDE (2) NEW LOUVERED OPENINGS ON EXISTING FACADE FOR PTAC INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M01403700 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 05/22/2026 | 08/10/2026 | Design A2 ARCHITECT, PC Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 30Q ON THE 30TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01415701 ↗ | 411 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 07/21/2026 | 08/06/2026 | Design NEW AGE ENGINEERING PLLC Filer JENNY FLORES EXPEDITING | INSTALL HVAC THROUGH WALL UNITS AS PER PLANS.NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01352162 ↗ | 535 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 05/08/2026 | 07/30/2026 | Design JACK GREEN ASSOCIATES | Installation of thru-wall AC units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy. |
| M01255437 ↗ | 609 WEST 147 STREET MANHATTAN | Alteration | Permit Issued | 08/01/2025 | 07/28/2026 | Design BENDIX ENGINEERING, P.C. Owner Sharptown Group LLC | Filing Mechanical application for installation of condensing units and associated equipment as per plans submitted. This is associated with … |
| M01409380 ↗ | 101 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 06/07/2026 | 07/27/2026 | Design OMER FENIK, RA Filer OEF CONSULTANTS, LLC | APT. # 14E, REPLACING MS UNITS, PATCH AND MATCH PARTITIONS AS NEEDED. MS WORK TO BE FILED UNDER SUBSEQUENT S1 APPLICATION. NO CHANGE IN EGRE… |
| M01241602 ↗ | 211 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 07/07/2025 | 07/08/2026 | Filer METROPOLIS GROUP INC | New masonry through wall opening for AC unit as per plans filed herewith. No change to use, egress or occupancy. |
| M01162719 ↗ | 37 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 06/17/2025 | 06/17/2026 | Design EDWARD I. SCHACHNER LTD. | RENOVATION OF APT 11A FILED IN CONJUNCTION WITH DOB NOW PL AND MH . NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01345540 ↗ | 143 WEST 27 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 05/20/2026 | Design PACS ARCHITECTURE Filer J.A. EXPEDITING, LLC | HEREBY FILING INTERIOR, NON-STRUCTURAL RENOVATION OF EXISTING APARTMENT 3R LOCATED ON THE THIRD FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01089119 ↗ | 541 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2024 | 05/14/2026 | Design P.A. COLLINS PE Owner HALSTEAD MANAGEMENT | PROPOSED MECHANICAL WORK TO APARTMENT #11C, REPLACEMENT OF AIR CONDITIONING SYSTEM WITH NEW SPLIT UNIT A/C HANDLING UNITS, DUCTWORK, AND AIR… |
| M01348444 ↗ | 157 3 AVENUE MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 05/14/2026 | Design JACK GREEN ASSOCIATES | Installation of thru-wall AC unit and associated GC work, as per plans filed herewith. No change to use, egress or occupancy. |
| M01147485 ↗ | 1217 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 11/27/2024 | 05/05/2026 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install thru-wall AC units and associated GC work, as per plans. No change to use, egress or occupancy. |
| M01325006 ↗ | 127 WEST 79 STREET MANHATTAN | Alteration | Signed-off | 02/19/2026 | 04/21/2026 | Design JACK GREEN ASSOCIATES Owner xxx Filer AM EXPEDITING | Installation of new thru-wall AC units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy. |
| M01060788 ↗ | 604 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 08/06/2024 | 04/17/2026 | Design BECHT ENGINEERING BT, INC. | Respectfully request to file post approval amendment for changes/deletions to approved drawings. No change in use, egress, or occupancy. |
| M01346101 ↗ | 785 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/23/2026 | 04/01/2026 | Design JACK GREEN ASSOCIATES | THRU-WALL UNITS FILED IN 4A. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01353684 ↗ | 962 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/20/2026 | 03/30/2026 | Design JACK GREEN ASSOCIATES | Installation of thru-wall ac units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy. |
| M01137053 ↗ | 153 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 04/07/2025 | 03/27/2026 | Design GT CONSULTING ENGINEERS | Plumbing Modifications as per plans |
| M01341174 ↗ | 780 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 01/01/2026 | 03/26/2026 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install thru-wall AC units, associated GC work and components, as per plans filed herewith. No change to use, egress or occupancy. |
| M01177688 ↗ | 1036 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/13/2025 | 01/14/2026 | mechanical work on 19th floor, apt 19b - A. REPLACE (2) EXISTING PTAC UNITS, REPLACE AND RELOCATE (2) PTAC UNITS AND (1) NEW REPLACE (2) EXI… | |
| M01309736 ↗ | 340 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 11/18/2025 | 12/12/2025 | Design MCSWEENEY ENGINEERING | Filing herewith mechanical plans. Work to include mechanical ductwork and installation of hvac. There will be no change of use, occupancy or… |
| M01261676 ↗ | 108 EAST 82 STREET MANHATTAN | Alteration | Signed-off | 07/30/2025 | 10/02/2025 | Application filed for interior apartment partition modifications; new through wall A/C sleeves; related MS equipment. No change to use, egr… | |
| M01260705 ↗ | 40 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/29/2025 | 09/24/2025 | Design RJD ENGINEERING LLC Filer METROPOLIS GROUP INC | Renovation of apartment including removal and installation of non bearing partitions and related finishes, and new thought wall opening at s… |
| M01126514 ↗ | 340 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 08/11/2025 | 08/15/2025 | Design MCSWEENEY ENGINEERING | Filing herewith mechanical plans. Work to include mechanical ductwork. There will be no change of use, occupancy or egress under this applic… |
| M00295285 ↗ | 430 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 01/24/2020 | 05/28/2025 | Install 5 Electric PTAC units , (1) thru window ac unit & new recirculating kitchen exhaust hood.No change to egress, occupancy or use. | |
| M01161293 ↗ | 1148 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/10/2025 | 05/20/2025 | Design SHADOW ARCHITECT PC Filer J.A. EXPEDITING, LLC | RENOVATION OF EXISTING APARTMENT 10B ON THE 10TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01182166 ↗ | 220 WEST 93 STREET MANHATTAN | Alteration | Signed-off | 04/07/2025 | 05/20/2025 | Design COSTA ARCH & ENG LLP Owner SAMSON MANAGEMENT LLC | Herewith filing for removal, replacement and new plumbing fixtures in apt 7D. |
| M00935293 ↗ | 1 BEEKMAN PLACE MANHATTAN | Alteration | Signed-off | 10/03/2023 | 05/13/2025 | Filer JM ZONING, LLC. | MH WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| M01180360 ↗ | 101 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/21/2025 | 05/13/2025 | Design BENDIX ENGINEERING, P.C. Filer DOMANI CONSULTING | Herewith file plans for the installation of HVAC equipment with associated piping, filed in conjunction with GC application #M01037122-I1. |
| M01183082 ↗ | 1296 2 AVENUE MANHATTAN | Alteration | Signed-off | 03/27/2025 | 05/07/2025 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install thru-wall AC unit and associated GC work, as per plans. No change to use, egress or occupancy. |
| M01174910 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 02/12/2025 | 04/10/2025 | PLUMBING FIXTURES OF APT 20G FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | |
| M01168375 ↗ | 60 WEST 68 STREET MANHATTAN | Alteration | Permit Issued | 01/30/2025 | 03/12/2025 | Design JACK GREEN ASSOCIATES | Install thru-wall AC units and associated GC work. No change to use, egress or occupancy. |
| M01178462 ↗ | 40 UNIVERSITY PLACE MANHATTAN | Alteration | Signed-off | 02/12/2025 | 03/07/2025 | Design EUGENE KHANANOV AIA | Plumbing Work in conjunction with interior renovation of existing dwelling unit 4B. No change of Use, Egress or Occupancy. |
| M01178223 ↗ | 1060 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2025 | 02/20/2025 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Replace existing AC unit and associated components, as per plans filed herewith. No change to use, egress or occupancy. |
| M01114752 ↗ | 1150 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/24/2025 | 02/18/2025 | Design COSTA ARCH & ENG LLP Owner SAMSON MANAGEMENT LLC | Herewith filing renovation of Mechanical systems for apt 9C. |
| M00955419 ↗ | 59 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 11/28/2023 | 02/14/2025 | Mechanical work for renovation of apartment 5G | |
| M01073073 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2024 | 02/13/2025 | Design MUNYC ARCHITECTURE PLLC Owner Apt 6A | RENOVATION OF APARTMENT 6A ON THE 6TH FLOOR. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M01103046 ↗ | 535 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 09/04/2024 | 02/13/2025 | Design RISE PROJECTS Filer STECC CORP | mechanical work in apt 5F & 5E |
| M01117757 ↗ | 65 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 10/07/2024 | 02/12/2025 | Owner PARK 65 REALTY CORP. Filer NDKAZALAS ARCHITECTURE | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK AS PER PLANS |
| M00928766 ↗ | 1140 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/11/2024 | 02/06/2025 | Design JIM THOMAS ARCHITECT PLLC | Wall Sleeve in order to install new hardwired AC-unit appliance |
| M01064998 ↗ | 317 WEST 89 STREET MANHATTAN | Alteration | Signed-off | 12/30/2024 | 01/28/2025 | Design COSTA ARCH & ENG LLP Owner SAMSON MANAGEMENT LLC | INTERIOR RENOVATION OF NON-STRUCTURAL WALLS OF EXISTING APARTMENT |
| M01157671 ↗ | 140 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 12/20/2024 | 01/16/2025 | Design OGAWA DEPARDON Filer JUST ARCHITECTURE | General Construction to create opening for new AC Sleeve at apt #11E at the 11th floor indicated on drawings filed herewith. No change in Us… |
| M00963236 ↗ | 1150 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/29/2024 | 12/11/2024 | Design COSTA ARCH & ENG LLP Owner SAMSON MANAGEMENT LLC | RENOVATION OF THIRD FLOOR APARTMENT MECHANICAL SYSTEMS |
| M01125977 ↗ | 969 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/22/2024 | 12/10/2024 | Design PACS ARCHITECTURE Owner AKAM ASSOCIATES Filer PROCESS WERKSHOP LLC | Provide split system unit with through-wall type condensing section to service space cooling load. No change in occupancy, use or egress. |
| M01097571 ↗ | 333 EAST 68 STREET MANHATTAN | Alteration | Signed-off | 08/19/2024 | 11/19/2024 | Design MIRIAM DANIEL, INC. Filer J.A. EXPEDITING, LLC | INTERIOR RENOVATION OF APARTMENT 8D ON THE FIRST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01130979 ↗ | 780 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 10/24/2024 | 11/15/2024 | Design JACK GREEN ASSOCIATES | Install thru-wall AC units, associated GC work and components, as per plans filed herewith. No change to use, egress or occupancy. |
| M00964372 ↗ | 890 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 01/23/2024 | 09/27/2024 | Owner HOFFMAN MANAGEMENT | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01080315 ↗ | 751 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/22/2024 | 09/24/2024 | Design JACK GREEN ASSOCIATES | ISNTALLATION OF AIR CONDITIONING SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OSSCUPANCY. |
| M01052795 ↗ | 137 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 05/17/2024 | 07/18/2024 | Design JACK GREEN ASSOCIATES | Install thru-wall AC units and associated GC work, as per plans. No change to use, egress or occupancy. |
| M01042077 ↗ | 953 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/12/2024 | 06/25/2024 | Design JACK GREEN ASSOCIATES Owner BROWN HARRIS STEVENS Filer AM EXPEDITING | Modification of existing mechanical systems and associated components, as per plans. No change to use, egress or occupancy. |
| M01058877 ↗ | 1225 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 06/03/2024 | 06/14/2024 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install new thru-wall AC unit and associated GC work, as per plans. No change to use, egress or occupancy. |
| M00818162 ↗ | 1246 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 04/27/2023 | 04/25/2024 | Mechanical work filed in conjunction with the renovation of a dwelling unit. Architectural and plumbing work filed under separate applicatio… | |
| M00944693 ↗ | 926 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/16/2023 | 04/17/2024 | Design E.G. ARCHITECTURE PLLC | RENOVATION OF APT 14A FILED IN CONJUNCTION WITH DOB NOW PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00940670 ↗ | 49 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 03/19/2024 | 04/16/2024 | Design JACK GREEN ASSOCIATES | Install thru-wall AC units and associated GC work, as per plans. No change to use, egress or occupancy. |
| M00987914 ↗ | 710 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/01/2024 | 04/08/2024 | Design DMAD PC | Subsequent filing to modify plumbing fixtures throughout. |
| M00994950 ↗ | 1217 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2024 | 03/20/2024 | Design JACK GREEN ASSOCIATES | Install thru-wall AC units and associated GC work, as per plans. No change to use, egress or occupancy. |
| M00948660 ↗ | 261 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 12/11/2023 | 03/01/2024 | Mechanical work filed in conjunction with the renovation of apartment 14E. Architectural and plumbing work filed under separate application… | |
| M00990256 ↗ | 65 EAST 96 STREET MANHATTAN | Alteration | Signed-off | 01/23/2024 | 02/16/2024 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install thru-wall AC units and associated GC work as per plans. No change to use, egress or occupancy. |
| M00972365 ↗ | 1225 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/02/2024 | 01/18/2024 | Design JACK GREEN ASSOCIATES | Install new thru-wall AC units and associated GC work, as per plans. No change to use, egress or occupancy. |
| M00961395 ↗ | 4 EAST 88 STREET MANHATTAN | Alteration | Signed-off | 11/13/2023 | 12/01/2023 | Owner YYY REALTY Filer DY EXPEDITING INC. | PROPOSED MECHANICAL WORK IN VACATE APARTMENT # 5C OF AN EXIST 9 STORY RESIDENTIAL BUILDING. MECHANICAL WORK TYPE IS IN CONJUNCTION WITH DOB … |
| M00801445 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 08/16/2023 | 10/17/2023 | Design M.A. RUBIANO, P.E., P.C. Filer GARO GUMUSYAN | AT UNIT #18N INSTALLATION OF CONDENSING UNITS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M00877596 ↗ | 127 WEST 79 STREET MANHATTAN | Alteration | Signed-off | 08/10/2023 | 09/26/2023 | Design S.M. BERGER ARCHITECTURE PC Filer JAM CONSULTANTS, INC. | Creating through wall sleeve openings for future A/C units. |
| M00606383 ↗ | 1220 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2021 | 09/12/2023 | Design OMER FENIK, RA Filer OEF CONSULTANTS, LLC | This ST application is to remove an interior staircase and to infill the existing stair opening in apt. 10C-11C . There will be no change in… |
| M00920437 ↗ | 2849 BROADWAY MANHATTAN | Alteration | Signed-off | 08/18/2023 | 09/12/2023 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install thru-wall AC units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy. |
| M00883063 ↗ | 1150 5 AVENUE MANHATTAN | Alteration | Permit Issued | 06/06/2023 | 09/07/2023 | Design JACK GREEN ASSOCIATES | Install thu-wall AC units and associated GC work, as per plans filed herewith. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M00744768 ↗ | 240 RIVERSIDE BOULEVARD MANHATTAN | Alteration | Signed-off | 05/27/2022 | 08/28/2023 | Design A2 ARCHITECT, PC Owner TRUMP ORGANIZATION Filer J.A. EXPEDITING, LLC | MECHANICAL WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT S2 ON THE 31ST FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE… |
| M00801438 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 02/06/2023 | 06/12/2023 | Design GARO GUMUSYAN Filer LMS-ACE SERVICES | AT UNIT #9B INSTALLATION OF THRU-THE-WALL PTAC UNITS UNITS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M00774676 ↗ | 1036 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 08/02/2022 | 05/31/2023 | Filer HUNT ARCHITECTS | CREATE THREE MASONRY OPENINGS FOR THE INSTALLATION OF THREE (3) THROUGH THE WALL COOLING UNITS; REMOVE AND REPLACE ALL FINISHES, FIXTURES A… |
| M00874270 ↗ | 411 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 05/16/2023 | 05/30/2023 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install thru-wall AC units and associated GC work, as per plans. |
| M00775205 ↗ | 5 WEST 65 STREET MANHATTAN | Alteration | Signed-off | 09/30/2022 | 05/19/2023 | Design JACK GREEN ASSOCIATES Filer ADAM MAISER | Addition of one air-handler including required piping & ductwork for this new zone. Existing Condenser location to be replaced with new cond… |
| M00812681 ↗ | 55 HUDSON STREET MANHATTAN | Alteration | Signed-off | 01/24/2023 | 05/02/2023 | Installing 2.5 ton HVAC condenser, air handler and associated piping. | |
| M00800322 ↗ | 331 WEST 89 STREET MANHATTAN | Alteration | Permit Issued | 02/27/2023 | 03/20/2023 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Install new thru-wall AC unit and associated components, as per plans. No change to use, egress or occupancy. |
| M07999337 ↗ | 710 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/28/2022 | 12/20/2022 | Design ZPROEKT ARCHITECTURE Filer NYC APPROVED LLC | Interior renovation to apartment 5D located on the 5th floor , remove and construct partitions and install finishes |
| M00660485 ↗ | 26 WEST 69 STREET MANHATTAN | Alteration | Signed-off | 01/28/2022 | 11/07/2022 | Design BENDIX ENGINEERING, P.C. Filer DOMANI CONSULTING | Install a/c units with associated accessories, install new air cooled condensers with associated accessories, furnish and install all shee… |
| M08015556 ↗ | 1 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/18/2022 | 10/27/2022 | Design EVAN CHAN ARCHITECT, PC Owner ALLIED PARTNERS Filer METROPOLIS GROUP INC | FILING APPLICATION FOR APARTMENT 12K ON 12TH FLOOR. WORK INCLUDES INSTALLATION OF TWO NEW THROUGH-WALL HVAC UNITS. NO CHANGE IN USE, EGRESS … |
| M00551523 ↗ | 415 EAST 52 STREET MANHATTAN | Alteration | Signed-off | 07/02/2021 | 10/24/2022 | Design THE VILNITS GROUP | INTALL (3) NEW PTAC UNITS IN APT 5HC |
| M00735787 ↗ | 129 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 06/02/2022 | 10/24/2022 | Design COSTA ARCH & ENG LLP | Herewith filing Mechanical, Ventilation adn removal |
| M00721007 ↗ | 911 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 05/23/2022 | 10/14/2022 | Design EDWARD I. SCHACHNER LTD. | RENOVATION IN APT 2C FILED IN CONJUNCTION WITH DOB NOW MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00727579 ↗ | 1197 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/02/2022 | 10/14/2022 | Owner BROWN HARRIS STEVENS | Related mechanical work for lobby renovation. New HVAC air conditioning equipment as per plans filed herewith. No change to use, egress or o… |
| M08002570 ↗ | 880 5 AVENUE MANHATTAN | Alteration | Signed-off | 09/19/2022 | 10/11/2022 | Design JACK GREEN ASSOCIATES | Install 1 new thru-wall AC unit and associated General Construction work, as per plans. |
| M00748237 ↗ | 1148 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/01/2022 | 10/06/2022 | Design PORTER CLAPP ARCHITECTS, PC | Replace existing AC split air conditioning system. |
| M00791328 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 09/29/2022 | 10/05/2022 | Design JACK GREEN ASSOCIATES | MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00795421 ↗ | 455 EAST 57 STREET MANHATTAN | Alteration | Permit Issued | 08/23/2022 | 09/20/2022 | Design JACK GREEN ASSOCIATES | Install AC units and associated GC work, as per plans. |
| M00755193 ↗ | 300 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 08/04/2022 | 09/09/2022 | Design JACK GREEN ASSOCIATES Owner 300 CPW APARTMENTS CORP. Filer AM EXPEDITING | Installation of AC units and associated components as per plans filed herewith. No change to use, egress or occupancy. |
| M00478184 ↗ | 160 WEST 77 STREET MANHATTAN | Alteration | Signed-off | 06/17/2021 | 09/02/2022 | Design LR LERNER ARCHITECTURE PC Filer LUKE LICALZI, P.E., P.C. | interior renovation of apartment 7A see application M00529526 for plumbing |
| M00667169 ↗ | 50 EAST 72 STREET MANHATTAN | Alteration | Permit Issued | 03/04/2022 | 08/02/2022 | Design CTA ARCHITECTS P.C. | WINDOW REPLACEMENT AND THROUGH-WALL AIR CONDITIONING UNIT SLEEVE INSTALLATION AT THE NORTH AND COURTYARD BUILDING ELEVATIONS AS PER PLANS FI… |
| M00415790 ↗ | 49 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/11/2020 | 08/01/2022 | Design JOAN HUMPHREYS Owner JOHN B LOVETT | INSTALLATION OF THROUGH-THE-WALL HVAC UNITS; NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00771918 ↗ | 80 WARREN STREET MANHATTAN | Alteration | Signed-off | 07/12/2022 | 07/18/2022 | Design JACK GREEN ASSOCIATES Owner MATTHEW ADAM PROPERTIES Filer AM EXPEDITING | Install new AC units and associated components as per plans. |
| M00581567 ↗ | 28 EAST 10 STREET MANHATTAN | Alteration | Permit Issued | 09/30/2021 | 07/15/2022 | Design THOMAS TSUE ARCHITECT Owner GRISORO STUDIO Filer QUICK FILING OF NY INC | shoring plans for the creation of stairs to combine apt 8D and 9D |
| M00742461 ↗ | 340 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 05/23/2022 | 06/27/2022 | Design YAO W GUO ARCHITECT, PC Owner ORSID NY | RENOVATE APT. 10C. MODIFICATION OF EXISTING PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPACY. |
| M00640727 ↗ | 545 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 04/18/2022 | 06/17/2022 | Design VICTOR RUIZ ARCHITECTURE | Installation of 6 through-wall air conditioning systems in Apartment#14A. |
| M00667890 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/28/2022 | 06/16/2022 | Design M.A. RUBIANO, P.E., P.C. | AT UNIT #16R-15S, INSTALLATION OF CONDENSING UNIT AND AC UNITS AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY… |
| M00656328 ↗ | 1185 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2022 | 06/14/2022 | Design JACK GREEN ASSOCIATES | installation of new mechanical ventilation, air conditioning and duct work. |
| M00523494 ↗ | 111 EAST 67 STREET MANHATTAN | Alteration | Signed-off | 11/24/2021 | 05/19/2022 | Design JUDGE ARCHITECTURE PC Owner BHS Filer RIZZO GROUP | 5TH FL APT 5B - REPLACEMENT OF 4 EXISTING PTAC UNITS, INSTALLATION OF 2 NEW THRU WALL AC UNITS, |
| M00537670 ↗ | 630 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2021 | 05/17/2022 | Design JACK GREEN ASSOCIATES Owner BROWN HARRIS STEVENS Filer BURNHAM NATIONWIDE INC | Mechanical modifications to an existing apartment located on the 2nd fl , apt#2B |
| M00707632 ↗ | 5 WEST 65 STREET MANHATTAN | Alteration | Signed-off | 04/13/2022 | 05/03/2022 | Design CWS ARCHITECTURE PC | PLUMBING FIXTURES IN APT 31A. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00671429 ↗ | 419 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 04/06/2022 | 04/28/2022 | Design JACK GREEN ASSOCIATES Filer AM EXPEDITING | Installation 2 PTAC units, thru-wall sleeves and associated components, as per plans. No change to use, egress or occupancy. |
| M00608260 ↗ | 164 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 03/24/2022 | 04/12/2022 | Design ADAL ENGINEERING PLLC Owner DMC BUILDERS INC | REPLACEMENT OF THE ROOF TOP UNIT FOR THE MECHANICAL SYSTEM AS PER PLANS, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00557412 ↗ | 950 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/14/2022 | 04/04/2022 | Design JACK GREEN ASSOCIATES Owner MAXWELL-KATES, INC. | Installation of 3 new thru-wall condensing units, 3 new DX fan coil units & associated piping & ductwork. New dryer exhaust ductwork. New to… |