116 PROSPECT PLACE
BROOKLYN · BIN 3018941
💬 Discuss this project
1920Year Built
3Stories
C3Building Class
R7AZoning
2,835 sfGross Floor Area
4Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Four families · Owner of record: 114-116 PROSPECT PL, LLC · 2,100 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 2 filings · 20 docs
Floor 41p · 1 filing · 3 docs
Floor 333p · 3 filings · 20 docs
Floor 228p · 1 filing · 20 docs
Floor 129p · 2 filings · 20 docs
Cellar32p · 4 filings · 20 docs
Basement30p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS2107/08/2026
114-116 PROSPECT PL, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/07/2021$3.2M—— → —$1,146/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS NEW YORK PLLC209/23/2025
CPENGINEERING PC212/30/2024
RAAD611/26/2024
ASR ENGINEERING PC107/21/2024
STRUCTURAL ENGINEERING TECHNOLOGIES107/31/2023
MATTHEW CORDONE ARCHITECT PLLC101/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NERIS203/21/2026
CASA GROUP203/21/2026
METROPOLIS GROUP INC403/21/2026
EAST COAST EXPEDITING203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TECHCREW INCGeneral Contractor1007/08/2026
TOPLINE NYC INCGeneral Contractor407/08/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor203/21/2026
DENNISON ELECTRIC CORPElectrical103/22/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254909/23/2025
RAAD7727212/01/2023
Building Lifecycle
All (112)Filed (13)Permit Issued (9)Signed Off (6)Violation (20)Inspection (8)Objection (26)Special Inspection (30)
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/01/2025
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
10/01/2025
Special inspection requirement — Interior lighting power
MAURICIO ANDRADE
10/01/2025
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
10/01/2025
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
09/23/2025
Filed — Alteration CO
FILING TO CHANGE THE USE AS WELL AS RENOVATE THE ENTIRE BUILDING AS PER PLANS FILED HEREWITH.
B00793451-P3
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
09/22/2025
Special inspection requirement — Interior lighting power
MAURICIO ANDRADE
09/22/2025
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
09/22/2025
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/17/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/15/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/28/2025
Signed off — Alteration
Filing herewith plans indicating interior demo only. Removal of non load bearing walls and plumbing/lighting fixtures,including bathroom and kitchen cabinets.
B00663220-I1
02/26/2025
Signed off — Alteration CO
FILING TO CHANGE THE USE AS WELL AS RENOVATE THE ENTIRE BUILDING AS PER PLANS FILED HEREWITH.
B00793451-S1
02/26/2025
Signed off — Alteration
Installation of Mechanical Systems.
B00851726-I1
02/26/2025
Signed off — Alteration
Installation of Sprinkler System.
B00851765-I1
02/26/2025
Signed off — Alteration
Installation of Plumbing Fixtures.
B00851743-I1
12/30/2024
Filed — Alteration CO
FILING TO CHANGE THE USE AS WELL AS RENOVATE THE ENTIRE BUILDING AS PER PLANS FILED HEREWITH.
B00793451-P2
12/12/2024
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
12/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
12/12/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/12/2024
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
12/12/2024
Special inspection requirement — Interior lighting power
MAURICIO ANDRADE
11/26/2024
Filed — Alteration
Installation of Plumbing Fixtures.
B00851743-P3
11/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
11/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
11/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
11/05/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
11/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
11/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
11/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
10/09/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/07/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01083382-I1
07/22/2024
Permit issued — Sidewalk Shed
B01083382-I1-SH
07/22/2024
Permit issued — Sidewalk Shed
B01083382-I1-SF
07/21/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01083382-I1
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2024
Filed — Alteration CO
FILING TO CHANGE THE USE AS WELL AS RENOVATE THE ENTIRE BUILDING AS PER PLANS FILED HEREWITH.
B00793451-P1
04/10/2024
Permit issued — General Construction
B00793451-I1-GC
04/03/2024
Objection resolved — Addressed
02/29/2024
Objection resolved — Addressed
02/21/2024
Objection raised — Scope
02/14/2024
Objection resolved — Addressed
12/29/2023
Permit issued — Sprinklers
B00851765-I1-EW-SP
12/27/2023
Permit issued — Mechanical Systems
B00851726-I1-MS
12/27/2023
Permit issued — Plumbing
B00851743-I1-PL
12/08/2023
Permit issued — Structural
B00793451-S1-ST
12/01/2023
Filed — Alteration
Installation of Plumbing Fixtures.
B00851743-P1
11/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC07/22/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC07/22/2024
DOB NOWGeneral ConstructionPermit IssuedTECHCREW INC04/10/2024
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP12/29/2023
DOB NOWMechanical SystemsSigned-offTECHCREW INC12/27/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/27/2023
DOB NOWStructuralSigned-offTECHCREW INC12/08/2023
DOB NOWGeneral ConstructionSigned-offTECHCREW INC10/11/2023
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP05/05/2022
4 projects · most recent 07/23/2024
General Wiring
FiledStatusContractorScope
07/23/2024CompleteRICHARD NEU—
03/26/2024CompleteDENNISON ELECTRIC CORP9 meters, 9 new_meters
12/28/2023CompleteDENNISON ELECTRIC CORPGeneral Wiring
10/12/2023CompleteDENNISON ELECTRIC CORP—
1 project · most recent 09/23/2025
Wood
FiledStatusContractorScope
09/23/2025Permit IssuedTECHCREW INCWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
10/01/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/01/2025Fenestration air leakageMAURICIO ANDRADEenergy_progress
10/01/2025Interior lighting powerMAURICIO ANDRADEenergy_progress
10/01/2025Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
10/01/2025Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
10/01/2025Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
09/22/2025Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
09/22/2025Interior lighting powerMAURICIO ANDRADEenergy_progress
09/22/2025Fenestration air leakageMAURICIO ANDRADEenergy_progress
09/22/2025Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
09/22/2025Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
09/22/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/12/2024Fenestration air leakageMAURICIO ANDRADEenergy_progress
12/12/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/12/2024Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
12/12/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
12/12/2024Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
12/12/2024Interior lighting powerMAURICIO ANDRADEenergy_progress
11/26/2024HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
11/26/2024HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
11/26/2024HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
11/26/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
11/26/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
11/05/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
11/05/2024HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
Latest 25 of 48.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026B00851765-I1Request digital key ↗
08/27/2026B00851743-P1Request digital key ↗
08/27/2026B00851743-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/14/2026B00793451-I1Open ↗
08/13/2026B00793451-P3Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature22
09/20/2026B00851726-P1Open ↗
09/20/2026B00851726-P1Open ↗
09/20/2026B00851726-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/31/2026B00663220-I1Open ↗
08/27/2026B00851765-I1Open ↗
08/27/2026B00851726-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/20/2026B00851726-P1Open ↗
08/27/2026B00851726-I1Open ↗
08/24/2026B00851743-P1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/27/2026B00793451-P1Open ↗
08/27/2026B00793451-P3Open ↗
08/27/2026B00793451-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026B00851765-I1Open ↗
08/27/2026B00851726-P1Open ↗
08/27/2026B00851726-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026B00663220-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification4
08/27/2026B00793451-P1Open ↗
08/27/2026B00793451-P3Open ↗
08/27/2026B00793451-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWaiver Document2
08/14/2026B00793451-I1Open ↗
08/13/2026B00793451-P3Open ↗