RoofUnder Construction64p · 6 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
8936 st - Structural Modifications related to Extending the existing elevator shaft to accommodate a larger Cab. No change to Egress use group or occupancy group.Professional Cert requested.
On file for this project
19 documents · 1 drawing sheet
Filing herewith mechanical work on existing roof. No change in use, occupancy or egress.
On file for this project
3 documents · 2 drawing sheets
Filing herewith structural work on existing roof. No change in use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Bulkhead1p · 1 filing · 5 docs
Equipment
Installation of suspended scaffold for facade work or inspection.
On file for this project
5 documents · 1 drawing sheet
Floor 58Under Construction1 filing · 4 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 57Under Construction1 filing · 4 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 56Under Construction1p · 3 filings · 10 docs
Structural
Issued Permit Scope
Supported Scaffold
Filing herewith structural work on existing roof. No change in use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 55Under Construction2 filings · 7 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 54Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 53Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 52Under Construction23p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 51Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 50Under Construction23p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 49Under Construction21p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 48Under Construction23p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 47Under Construction21p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 46Under Construction32p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 45Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 44Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 43Under Construction21p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 42Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 41Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 40Under Construction23p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 39Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 38Under Construction23p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 37Under Construction22p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 36Under Construction23p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & NEEDLE BEAM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 35Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 34Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 33Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 32Under Construction23p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 31Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 30Under Construction23p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 29Under Construction21p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 28Under Construction23p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 27Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 26Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 25Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 24Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 23Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 22Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 21Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 20Under Construction24p · 3 filings · 20 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
general construction to apartment 20b as per plans filed herewith. no change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Floor 19Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 18Under Construction23p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 17Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 16Under Construction22p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 15Under Construction21p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 14Under Construction23p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 13Under Construction19p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 12Under Construction23p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 11Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 10Under Construction21p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 9Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 8Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 7Under Construction21p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Plumbing work in association with renovation of apartment PHA. No change to use, occupancy or egress.
On file for this project
12 documents · 1 drawing sheet
Floor 6Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 5Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 4Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 3Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 2Under Construction20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 1Under Construction52p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
FIVE BELOW-- MECHANICAL MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH RETAIL RENOVATION.
On file for this project
3 documents
FIVE BELOW-- GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR PARTITIONS MODIFICATIONS FOR RETAIL RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
MezzanineUnder Construction56p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
8936 st - Structural Modifications related to Extending the existing elevator shaft to accommodate a larger Cab. No change to Egress use group or occupancy group.Professional Cert requested.
On file for this project
19 documents
Interior renovations to create a Boiler room on the Mezz level for tenant space (Whole Food Market). No change in occupancy, use or egress.
On file for this project
29 documents · 1 drawing sheet
8785B BL - Installing 2 New Hot Water Condensing boilers as per plans. Gas piping filed under M00952896-S1. No change in egress use group or occupancy. Pro-cert is requested.
On file for this project
47 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
CellarUnder Construction98p · 7 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
8936 st - Structural Modifications related to Extending the existing elevator shaft to accommodate a larger Cab. No change to Egress use group or occupancy group.Professional Cert requested.
On file for this project
19 documents
FIVE BELOW-- MECHANICAL MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH RETAIL RENOVATION.
On file for this project
3 documents · 1 drawing sheet
FIVE BELOW-- GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR PARTITIONS MODIFICATIONS FOR RETAIL RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 7 filings on this floor.
Sub-CellarUnder Construction67p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
GENERAL CONSTRUCTION IN RELATION TO GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION WITH M01101663.
On file for this project
47 documents
8785B BL - Installing 2 New Hot Water Condensing boilers as per plans. Gas piping filed under M00952896-S1. No change in egress use group or occupancy. Pro-cert is requested.
On file for this project
47 documents · 6 drawing sheets