DOB11/06/2025Failure to maintain bldg in code compliant manner. Observed exp#1 east elev spall brick damaged mortar joint, step cracks in brick mortar joint. EXP2 s ele bulging crack & loose stucco on parapet & other locations. EXP4 n ele missing/loose brick beneath coping stone. Remedy repair and/or replace all damaged masonry on facade
DOB11/06/2025Ewo due to exp #1 east elev:spalling brick,damaged mortar joints, step cracking in brick mortar joints. EXP2 s ele:bulging/cracked/spalling/ loose stucco on parapet & other locations & vertical crack with shifte bricks. Remedy:immediately install sidewalk shed @ EXP1 east elevation u/direction of a licensed professional
ECB10/08/2025Failure to maintain building walls and appurtenances. The facade at exposures 1, 2, and 4 is in disrepair, with visible cracks at multiple locations. At exposure 2, stucco is displaced and hanging. At exposure$5K due
ECB06/05/2025At time of inspection observed: sidewalk shed vertical members not plumb contrary to accepted drawings. Eq-102.00 missing 1 crimp pipe attached to column steel with â¾ di ameter hilti kwik bolt to slab. Not cNothing owed — awaiting certificate of correction
ECB06/26/2023At time of inspection, observed damages to the facade at exposures #1, #2, #4, still in existing condition. Violation has been mitigated, not resolved due to sidewalk shed being erected under job #B00718760 expNothing owed — awaiting certificate of correction
ECB08/24/2022Failure to comply with dept. Of buildings requirement for permit sign off. Respondent obtained permit# 321930158 which expired on 12/31/2020. Permit not been signed off within one year following its expirationNothing owed — awaiting certificate of correction
ECB04/12/2022At exposure 1,2 and 4 facade in disrepair condition, has cracks at multiple locations. At exposure 2 facade stucco displaced and hanging. At exposure 1 bricks damaged eroded mortar joint., maintain exterior buiNothing owed — awaiting certificate of correction