| Owner | Filings | Most Recent |
|---|---|---|
| Mount Sinai Hospital | 439 | 09/13/2026 |
| Icahn School of Med at Mount SI | 56 | 03/21/2026 |
| Mount Sinai Health Care System | 18 | 07/08/2026 |
| Mount Sinai | 3 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Loring Consulting Engineers | 15 | 10/20/2026 |
| Mostafa Osman | 7 | 10/20/2026 |
| AKF Engineers | 32 | 10/12/2026 |
| S/L/A/M Architects, Landscape Architects | 3 | 08/28/2026 |
| R.G. Vanderweil Engineers | 58 | 06/30/2026 |
| Simple Architecture | 1 | 06/29/2026 |
| Levin Engineering | 5 | 04/17/2026 |
| The Vsa Group | 1 | 03/19/2026 |
| Wavic Engineering | 1 | 02/23/2026 |
| HKS Architects | 1 | 01/12/2026 |
| Reuther Bowen | 1 | 12/23/2025 |
| Efh Architecture | 6 | 12/19/2025 |
| Stratford | 4 | 06/17/2025 |
| Perkins Eastman | 4 | 02/20/2025 |
| David Schwartz RA | 1 | 05/21/2024 |
| Environmental Engineering Solutions | 1 | 01/29/2024 |
| Severud Associates | 3 | 01/09/2024 |
| Ewingcole | 2 | 08/31/2023 |
| Jensen Hughes | 2 | 06/28/2023 |
| Lilker Associates Consulting Engineering | 11 | 03/29/2023 |
| Severud Associates Consulting Engineering | 1 | 03/01/2023 |
| Syska Hennessy Group | 3 | 08/03/2022 |
| Jack L. Gordon Architects | 4 | 07/27/2022 |
| Halsey McCormack Helmer | 1 | 06/23/2022 |
| Arianna Braun Architects | 1 | 03/16/2022 |
| McLaren Engineering Group | 1 | 03/02/2022 |
| Gilsanz Murray Steficek | 2 | 03/10/2021 |
| WSP | 5 | 10/21/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| Outsource Consultants | 129 | 03/21/2026 |
| Metropolis Group | 68 | 03/21/2026 |
| Environmental Engineering Solutions | 5 | 03/21/2026 |
| Clarke Construction Consultants | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Unity Construction Services | General Contractor | 19 | 07/08/2026 |
| Alliance Plumbing | Plumbing | 16 | 08/14/2026 |
| Interstate Mechanical Services | General Contractor | 15 | 07/08/2026 |
| Caldwell & Walsh Building Construction | General Contractor | 14 | 07/08/2026 |
| Cardoza Plumbing | Plumbing | 13 | 07/08/2026 |
| Talisen Construction | General Contractor | 13 | 07/08/2026 |
| Hunter Roberts Construction | General Contractor | 11 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 9 | 07/08/2026 |
| Consigli Construction Co | General Contractor | 8 | 07/08/2026 |
| Paul M Maintenance | General Contractor | 7 | 07/08/2026 |
| Aggressive Fire Protection | Fire Protection | 6 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 6 | 07/29/2026 |
| Cauldwell Wingate Co | General Contractor | 5 | 07/08/2026 |
| Tishman Interiors | General Contractor | 5 | 07/08/2026 |
| NYC Fire Sprinkler | Fire Protection | 4 | 07/08/2026 |
| Med-Tek Contracting | General Contractor | 4 | 07/08/2026 |
| I.M.P. Plumbing & Heating | Plumbing | 3 | 07/08/2026 |
| Welsbach Electric | Electrical | 3 | 03/21/2026 |
| Manengeering Bureau | Fire Protection | 3 | 07/08/2026 |
| J & N Remodeling | General Contractor | 2 | 08/27/2026 |
| Empire General Contracting | General Contractor | 2 | 08/16/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 2 | 07/08/2026 |
| George Breslaw Plumbing | Plumbing | 2 | 07/08/2026 |
| I.M.P. Plumbing & Heating | Fire Protection | 2 | 07/08/2026 |
| Mac Felder | Plumbing | 2 | 07/08/2026 |
| United Plumbing Mechanical | Fire Protection | 2 | 07/08/2026 |
| Preferred Sprinkler and Mechanical | Fire Protection | 2 | 07/08/2026 |
| PSI Plumbing | Plumbing | 2 | 07/08/2026 |
| Commercial Electric Cont | Electrical | 1 | 03/22/2026 |
| Lippolis Electric | Electrical | 1 | 03/21/2026 |
| Blake Electric Contracting Co., I | Electrical | 1 | 03/21/2026 |
| Tristate Plumbing Services | Plumbing | 1 | 06/27/2026 |
| Integral Electrical PWR & CNTR | Electrical | 1 | 03/21/2026 |
| J.M. Botto | Plumbing | 1 | 07/08/2026 |
| Maccarone Plumbing | Plumbing | 1 | 07/08/2026 |
| Manhattan Business Interiors | General Contractor | 1 | 07/08/2026 |
| Striano Electric Co | Electrical | 1 | 03/22/2026 |
| Five Star Electric | Electrical | 1 | 03/21/2026 |
| Noto Joseph | Electrical | 1 | 03/21/2026 |
| Mr. Electric of NYC | Electrical | 1 | 03/22/2026 |
| Axon Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Platinum Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Schlesinger Elect'l Contracting | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Alan Margolin & Associates | 423 | 92 | 10/12/2026 |
| Outsource Special Inspection | 2827 | 55 | 06/30/2026 |
| Wavic Engineering | 1733 | 1 | 02/23/2026 |
| Stratford Engineering | 997 | 1 | 03/30/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | J & N Remodeling | 08/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J & N Remodeling | 08/26/2026 |
| DOB NOW | General Construction | Permit Issued | Empire General Contracting | 08/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Empire General Contracting | 08/14/2026 |
| DOB NOW | Plumbing | Permit Issued | Alliance Plumbing | 08/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 07/28/2026 |
| DOB NOW | Plumbing | Permit Issued | Alliance Plumbing | 06/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 04/29/2026 |
| DOB NOW | Plumbing | Signed-off | Cardoza Plumbing Wmbe | 04/08/2026 |
| DOB NOW | Plumbing | Permit Issued | Cardoza Plumbing Wmbe | 04/02/2026 |
| DOB NOW | Sprinklers | Signed-off | Ashlar Mechanical | 02/25/2026 |
| DOB NOW | Sprinklers | Signed-off | Sirina Fire Protection | 02/12/2026 |
| DOB NOW | Sprinklers | Signed-off | Sirina Fire Protection | 02/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Consigli Construction Co | 01/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Consigli Construction Co | 01/08/2026 |
| DOB NOW | Structural | Permit Issued | Consigli Construction Co | 01/08/2026 |
| DOB NOW | General Construction | Permit Issued | Consigli Construction Co | 01/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 01/07/2026 |
| DOB NOW | General Construction | Permit Issued | Consigli Construction Co | 01/07/2026 |
| DOB NOW | Plumbing | Signed-off | Tristate Plumbing Services | 01/07/2026 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 01/06/2026 |
| DOB NOW | Plumbing | Permit Issued | Cardoza Plumbing Wmbe | 12/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Consigli Construction Co | 12/05/2025 |
| DOB NOW | General Construction | Signed-off | Consigli Construction Co | 12/04/2025 |
| DOB NOW | Plumbing | Signed-off | Cardoza Plumbing Wmbe | 12/02/2025 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 11/28/2025 |
| DOB NOW | Plumbing | Permit Issued | Cardoza Plumbing Wmbe | 11/18/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Interstate Mechanical Services | 11/14/2025 |
| DOB NOW | Plumbing | Permit Issued | Cardoza Plumbing Wmbe | 11/12/2025 |
| DOB NOW | Plumbing | Signed-off | Cardoza Plumbing Wmbe | 11/05/2025 |
| DOB NOW | Structural | Signed-off | Paul M Maintenance | 06/24/2025 |
| DOB NOW | Plumbing | Permit Issued | Cardoza Plumbing Wmbe | 05/29/2025 |
| DOB NOW | Sprinklers | Signed-off | Ashlar Mechanical | 05/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Paul M Maintenance | 05/23/2025 |
| DOB NOW | General Construction | Signed-off | Paul M Maintenance | 05/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Services | 04/15/2025 |
| DOB NOW | Plumbing | Signed-off | Cardoza Plumbing Wmbe | 04/09/2025 |
| DOB NOW | Sprinklers | Signed-off | Aggressive Fire Protection | 03/26/2025 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 03/26/2025 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 03/05/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/12/2026 | Signed-off | Unity Construction Services | Ventilation Systems | |
| 08/31/2026 | Permit Issued | Consigli Construction Co | Air Conditioning Systems, Ventilation Systems | Ventilation Greenheck ×2 Loren Cook ×1 |
| 11/05/2025 | Permit Issued | Interstate Mechanical Services | Air Conditioning Systems, Heating and Air Conditioning Systems | Cooling Nortek CSU-22KCHW 22,000 CFM · Ahu ×3 CSU-30KCHW 22,000 CFM · Ahu ×3 CSU-50KHW/CHW 50,000 CFM · Ahu ×1 Heat / Cool Armstrong Air WS-1610-200 10,000,000 BTU · Heat Exchanger ×2 |
| 06/17/2025 | Signed-off | Paul M Maintenance | Ventilation Systems | Ventilation Titus DESV 1,200 CFM · Vav Box ×4 |
| 09/13/2022 | Permit Issued | Talisen Construction | Air Conditioning Systems, Ventilation Systems | |
| 08/03/2022 | Permit Issued | Hunter Roberts Construction | Air Conditioning Systems, Ventilation Systems | |
| 10/16/2019 | Signed-off | Caldwell & Walsh Building | Associated Ducts and Piping | Ducts & Piping N/A n/a ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/31/2026 | Permit Issued | Sirina Fire Protection | 506 heads |
| 04/17/2026 | Signed-off | Sirina Fire Protection | 108 heads |
| 03/17/2026 | Signed-off | Sirina Fire Protection | 82 heads |
| 03/13/2026 | Permit Issued | Sirina Fire Protection | 39 heads |
| 03/12/2026 | Permit Issued | Ashlar Mechanical | 123 heads |
| 12/12/2025 | Permit Issued | Ashlar Mechanical | 94 heads |
| 11/05/2025 | — | — | 6 heads |
| 10/23/2025 | Permit Issued | Sirina Fire Protection | 2,668 heads |
| 06/17/2025 | Signed-off | Ashlar Mechanical | 9 heads |
| 09/13/2022 | Permit Issued | Aggressive Fire Protection | 24 heads |
| 08/04/2022 | Signed-off | Ashlar Mechanical | 29 heads |
| 07/13/2022 | Permit Issued | Manengeering Bureau | 2 heads |
| 03/04/2022 | Signed-off | I.M.P. Plumbing & Heating | 12 heads |
| 11/03/2020 | — | — | 2 heads |
| 04/29/2020 | Signed-off | NYC Fire Sprinkler | 80 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/20/2026 | — | — | Gas, Water/Sanitary |
| 10/12/2026 | Signed-off | Cardoza Plumbing | Water/Sanitary |
| 08/31/2026 | Signed-off | Tristate Plumbing Services | Water/Sanitary |
| 06/30/2026 | — | — | Medical Gas, Water/Sanitary |
| 04/17/2026 | — | — | — |
| 03/17/2026 | — | — | — |
| 03/13/2026 | Permit Issued | Cardoza Plumbing | Water/Sanitary |
| 03/12/2026 | Permit Issued | Cardoza Plumbing | Medical Gas, Water/Sanitary |
| 12/12/2025 | Signed-off | Cardoza Plumbing Wmbe | Medical Gas, Water/Sanitary |
| 11/05/2025 | Permit Issued | Cardoza Plumbing Wmbe | Water/Sanitary |
| 10/23/2025 | — | — | — |
| 06/17/2025 | Permit Issued | Cardoza Plumbing | Medical Gas |
| 07/22/2024 | Permit Issued | Cardoza Plumbing | Gas, Water/Sanitary |
| 08/04/2022 | Signed-off | George Breslaw Plumbing | Water/Sanitary |
| 07/14/2022 | Permit Issued | Alliance Plumbing | Medical Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/15/2026 | Complete | Welsbach Electric | General Wiring |
| 03/27/2026 | Complete | Egg Electric | General Wiring, Lighting |
| 04/19/2024 | Complete | Nead Electric | General Wiring |
| 11/21/2023 | Complete | Commercial Electric Cont | General Wiring |
| 06/09/2023 | Complete | Albin Gustafson Company | General Wiring |
| 11/29/2022 | Permit Issued | Schlesinger Elect'l Contracting | General Wiring |
| 11/17/2022 | Permit Issued | Corporate Electric Group | — |
| 06/28/2022 | Complete | Lowy & Donnath | General Wiring |
| 04/05/2022 | Complete | Nead Electric | General Wiring |
| 12/08/2021 | Permit Issued | Striano Electric Co | General Wiring |
| 08/24/2020 | Complete | Litespeed Electric | General Wiring |
| 02/06/2020 | Complete | Nead Electric | General Wiring |
| 12/10/2019 | Complete | Nead Electric | General Wiring |
| 10/28/2019 | Permit Issued | Striano Electric Co | General Wiring |
| 08/22/2019 | Complete | Ennell Group Electric | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/19/2026 | — | — | Steel |
| 03/13/2026 | Permit Issued | Empire General Contracting | 1 scope_items |
| 03/12/2026 | Permit Issued | Cardoza Plumbing | Steel |
| 06/17/2025 | Permit Issued | Cardoza Plumbing | Steel, Concrete |
| 03/01/2023 | — | — | Steel, Concrete |
| 03/29/2022 | Signed-off | Paul M Maintenance | 1 scope_items |
| 02/17/2021 | — | — | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/28/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/04/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 07/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/13/2026 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 06/22/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/23/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 04/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/25/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/20/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/19/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 10/19/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 10/02/2026 | Final | — | progress |
| 10/02/2026 | Final | Mostafa Osman | progress |
| 10/02/2026 | Mechanical Systems | — | special |
| 09/29/2026 | Final | Young Suh | progress |
| 09/29/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 09/29/2026 | Interior lighting power | Young Suh | energy_progress |
| 09/29/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 09/29/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 09/29/2026 | Lighting controls | Young Suh | energy_progress |
| 09/29/2026 | Mechanical Systems | Young Suh | special |
| 06/26/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 06/26/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 06/26/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 06/26/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 06/26/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 06/25/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 06/25/2026 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 06/25/2026 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 06/25/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 06/24/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 06/24/2026 | Final | JONAR MADRIAGA | progress |
| 06/23/2026 | Final | JONAR MADRIAGA | progress |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Mount Sinai Health System | Medical / Healthcare | Sub-cellar, Cellar, Floors 1–28, Mezzanine, Roof | Project M01421313 Project M01289675 Project M01359454 Project M01352130 Project M01354677 Project M01308502 Project M01298548 Project M01297455 Project M01212099 Project M01298576 Project M01287848 Project M01214956 |
| Annenberg | Laboratory | Sub-cellar, Floors 8, 22–24 | Project M00931480 Project M08019786 Project M08016170 Project M00633946 Project M00633952 Project M00218467 Project M00218544 Project M00218779 |
| ISMMS Annenberg | Laboratory | Floor 15 | Project M00516315 Project M00516319 Project M00516323 |