← Back
City residence, one family
1184 UNION STREET
BROOKLYN · BIN 3033196
💬 Discuss this project
1915Year Built
2Stories
A4Building Class
R6Zoning
2,750 sfGross Floor Area
1Units
City residence, one family · 2,555 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Cellar3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/18/2020$1.4M—Private party → Private party$509/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERIC SAFYAN ARCHITECT PC308/27/2021
BARRY STRUCTURAL ENGINEERING, PLLC207/07/2021
NS ENGINEERS, P.C.105/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER503/21/2026
HALF SQUARE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TUMEN, INCGeneral Contractor1007/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing807/08/2026
POWER SURGE ELECTRIC INC 004009General Contractor203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY STRUCTURAL ENGINEER749307/07/2021
ERIC SAFYAN ARCHITECTPC3248105/06/2021
Building Lifecycle
All (52)Filed (6)Permit Issued (7)Signed Off (3)Inspection (6)Special Inspection (30)
06/08/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/18/2022
Signed off — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-I1
02/18/2022
Signed off — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-S1
01/28/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/20/2022
Signed off — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-S2
11/29/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2021
Permit issued — General Construction
B00509118-I1-GC-CX
10/06/2021
Permit issued — Construction Fence
B00515604-I1-FN
10/06/2021
Permit issued — General Construction
B00509118-I1-GC-CX
09/03/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/03/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/03/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/27/2021
Filed — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-P2
08/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
Eric Safyan
08/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
08/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
Eric Safyan
08/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
Eric Safyan
08/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Safyan
08/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
08/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
Eric Safyan
08/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Safyan
07/09/2021
Permit issued — Structural
B00509118-S2-ST
07/08/2021
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
07/08/2021
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
07/08/2021
Special inspection requirement — Structural Cold-Formed Steel
MICHAEL BARRY
07/08/2021
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
07/08/2021
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
07/08/2021
Special inspection requirement — Final
MICHAEL BARRY
07/07/2021
Filed — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-P1
07/07/2021
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
07/07/2021
Special inspection requirement — Structural Cold-Formed Steel
MICHAEL BARRY
07/07/2021
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
07/07/2021
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
07/07/2021
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
07/07/2021
Special inspection requirement — Final
MICHAEL BARRY
07/02/2021
Filed — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-S2
06/09/2021
Permit issued — Plumbing
B00509118-S1-PL
05/21/2021
Filed — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-S1
05/14/2021
Permit issued — Construction Fence
B00515604-I1-FN
05/12/2021
Permit issued — General Construction
B00509118-I1-GC-CX
05/10/2021
Filed — Alteration
INSTALL 8' HIGH PLYWOOD TEMORARY FENCE AT INFRONT OF THE HOUSE WITHIN LOTLINE AS PER PLAN.
B00515604-I1
05/06/2021
Filed — Alteration
Structural work filed in conjunction with the renovation of one family residence. Replace beams and columns in the cellar. Structure for rebuilding front porch and new rear porch. Replace framing at the 2nd floor. Framing for new skylight.
B00509118-I1
05/05/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
05/04/2021
Special inspection requirement — HVAC-R and service water heating equipment
Eric Safyan
05/04/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Safyan
05/04/2021
Special inspection requirement — Fenestration areas
Eric Safyan
05/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
Eric Safyan
05/04/2021
Special inspection requirement — Fenestration air leakage
Eric Safyan
05/04/2021
Special inspection requirement — Lighting in dwelling units
Eric Safyan
05/04/2021
Special inspection requirement — Permanent certificate
Eric Safyan
05/04/2021
Special inspection requirement — Insulation placement and R values
Eric Safyan
05/04/2021
Special inspection requirement — Maintenance information
Eric Safyan
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTUMEN, INC11/01/2021
DOB NOWConstruction FencePermit IssuedTUMEN, INC10/06/2021
DOB NOWGeneral ConstructionSigned-offTUMEN, INC10/06/2021
DOB NOWStructuralSigned-offTUMEN, INC07/09/2021
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR06/09/2021
DOB NOWConstruction FencePermit IssuedTUMEN, INC05/14/2021
DOB NOWGeneral ConstructionSigned-offTUMEN, INC05/12/2021
BISPLISSUEDPREMIER PLBG INC07/16/2003
BISOTISSUEDTWS DESIGN INC06/20/2003
1 project · most recent 09/26/2025
General Wiring
FiledStatusContractorScope
09/26/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 05/10/2021
Fence
FiledStatusContractorScope
05/10/2021Permit IssuedTUMEN, INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/08/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/28/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/03/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/03/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/27/2021HVAC-R and service water heating system controlsEric Safyanenergy_progress
08/27/2021Energy Code Compliance InspectionsEric Safyanprogress
08/27/2021HVAC-R and service water heating equipmentEric Safyanenergy_progress
08/27/2021HVAC-R and service water heating system controlsEric Safyanenergy_progress
08/27/2021HVAC-R and service water piping design and insulationEric Safyanenergy_progress
08/27/2021Energy Code Compliance InspectionsEric Safyanprogress
08/27/2021HVAC-R and service water heating equipmentEric Safyanenergy_progress
08/27/2021HVAC-R and service water piping design and insulationEric Safyanenergy_progress
07/08/2021Structural Steel - WeldingMICHAEL BARRYspecial
07/08/2021Structural Steel - High Strength BoltingMICHAEL BARRYspecial
07/08/2021Structural Cold-Formed SteelMICHAEL BARRYspecial
07/08/2021Concrete - Cast-In-PlaceMICHAEL BARRYspecial
07/08/2021Structural Steel - DetailsMICHAEL BARRYspecial
07/08/2021FinalMICHAEL BARRYprogress
07/07/2021Concrete - Cast-In-PlaceMICHAEL BARRYspecial
07/07/2021Structural Cold-Formed SteelMICHAEL BARRYspecial
07/07/2021Structural Steel - DetailsMICHAEL BARRYspecial
07/07/2021Structural Steel - High Strength BoltingMICHAEL BARRYspecial
07/07/2021Structural Steel - WeldingMICHAEL BARRYspecial
07/07/2021FinalMICHAEL BARRYprogress
05/05/2021Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
05/04/2021HVAC-R and service water heating equipmentEric Safyanenergy_progress
05/04/2021HVAC-R and service water piping design and insulationEric Safyanenergy_progress
05/04/2021Fenestration areasEric Safyanenergy_progress
05/04/2021HVAC-R and service water heating system controlsEric Safyanenergy_progress
Latest 25 of 37.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00509118-I1Request digital key ↗
09/01/2026B00509118-P2Request digital key ↗
09/01/2026B00509118-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
09/01/2026B00509118-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026B00509118-I1Open ↗
08/31/2026B00509118-I1Open ↗
08/31/2026B00509118-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026B00509118-I1Open ↗
08/31/2026B00509118-I1Open ↗
08/28/2026B00509118-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00509118-P2Open ↗
09/01/2026B00509118-P1Open ↗
09/01/2026B00509118-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00509118-P2Open ↗
09/01/2026B00509118-P1Open ↗
09/01/2026B00509118-S2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00509118-I1Open ↗
08/13/2026B00509118-S1Open ↗