← Back
Concert hall
Webster Hall and Annex
119 EAST 11 STREET · East Village · BIN 1008983
💬 Discuss this project
1920Year Built
3.5Stories
P1Building Class
C6-2AZoning
26,574 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
Concert hall · Owner of record: UNITY GALLEGA EAST 11TH STREET LLC · 9,000 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Floor 36p · 2 filings · 5 docs
Floor 2Under Construction8p · 4 filings · 8 docs
Floor 19p · 5 filings · 11 docs
Cellar1p · 1 filing · 3 docs
Basement9p · 7 filings · 20 docs
Sub-Basement38p · 11 filings · 20 docs
Site & exterior4p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITY GALLEGA EAST 11TH STREET2103/22/2026
Bowery presents709/03/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDY ENGLER ROTH108/31/2026
NATHAN RICH, RA711/22/2022
ABS ENGINEERING, PLLC508/18/2022
TOCCI ENGINEERING PLLC107/18/2022
GARY MARTINEZ204/15/2019
DIRECT ACCESS EXPEDITING, INC308/23/2018
SAFWAY ATLANTIC LLC102/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.3003/21/2026
DIRECT ACCESS EXPEDITING, INC.603/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KING HOIST & SCAFFOLDINGGeneral Contractor507/08/2026
FOLOR INCGeneral Contractor403/21/2026
DAL ELECTRICAL CORP.Electrical203/22/2026
SAFWAY ATLANTIC, LLCGeneral Contractor207/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
A&A PLUMBING CORPPlumbing107/08/2026
WINICK PRODUCTIONS, LLCGeneral Contractor109/03/2026
PSI PARTNERS, LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABS ENGINEERING, PLLC4835508/18/2022
TOCCI ENGINEERING PLLC3842107/18/2022
Building Lifecycle
All (163)Filed (20)Permit Issued (11)Signed Off (8)Violation (30)Inspection (5)Objection (74)Special Inspection (15)
09/02/2026
Permit issued — General Construction
M01453334-I1-GC
08/31/2026
Filed — No Work
M01453186-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/05/2022
Signed off — Alteration
Removal and installation of plumbing fixtures.
M00324401-I1
12/01/2022
Signed off — Alteration
Modification of existing sprinkler system.
M00324421-I1
11/22/2022
Filed — No Work
M08043937-I1
11/21/2022
Signed off — Alteration
Modification to existing mechanical system.
M00324438-I1
10/28/2022
Filed — No Work
M08029697-I1
10/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/18/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/12/2022
Objection raised — Inspections
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Structural
10/12/2022
Objection resolved — Addressed
10/11/2022
Filed — No Work
M08018728-I1
09/30/2022
Filed — No Work
M08013792-I1
09/26/2022
Signed off — Alteration
M00755751-I1
09/23/2022
Filed — No Work
M08007629-I1
09/22/2022
Permit issued — Structural
M00755751-I1-ST
09/13/2022
Filed — No Work
M08002634-I1
09/13/2022
Objection raised — Fire_Protection
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Scope
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Inspections
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Inspections
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Inspections
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Structural
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Fire_Protection
09/13/2022
Objection resolved — Addressed
09/09/2022
Filed — No Work
M07995553-I1
08/30/2022
Special inspection requirement — Public Assembly Emergency Lighting
Nathan Rich
08/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
08/29/2022
Special inspection requirement — Sprinkler Systems
Alex Schwartz
08/23/2022
Objection raised — Admin
08/23/2022
Objection resolved — Addressed
08/18/2022
Filed — Alteration
Modification of existing sprinkler system.
M00324421-P1
08/18/2022
Filed — Alteration
Removal and installation of plumbing fixtures.
M00324401-P1
08/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
07/18/2022
Filed — Alteration
M00755751-I1
06/10/2022
Special inspection requirement — Structural Steel - Welding
Nat Tocci
06/10/2022
Special inspection requirement — Final
Nat Tocci
06/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nat Tocci
06/10/2022
Special inspection requirement — Structural Steel - Details
Nat Tocci
04/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2022
Permit issued — Sprinklers
M00324421-I1-EW-SP
02/18/2022
Permit issued — Plumbing
M00324401-I1-PL
02/16/2022
Permit issued — Mechanical Systems
M00324438-I1-MS
12/18/2020
Objection raised — Other
12/18/2020
Objection resolved — Addressed
12/17/2020
Filed — Alteration
Removal and installation of plumbing fixtures.
M00324401-I1
12/17/2020
Filed — Alteration
Modification of existing sprinkler system.
M00324421-I1
12/17/2020
Filed — Alteration
Modification to existing mechanical system.
M00324438-I1
03/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC09/02/2026
DOB NOWStructuralSigned-offFOLOR INC09/22/2022
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC04/28/2022
DOB NOWPlumbingSigned-offA&A PLUMBING CORP02/18/2022
DOB NOWMechanical SystemsSigned-offFOLOR INC02/16/2022
DOB NOWSupported ScaffoldSigned-offKING HOIST & SCAFFOLDING01/11/2019
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC09/26/2018
DOB NOWSupported ScaffoldSigned-offKING HOIST & SCAFFOLDING08/23/2018
DOB NOWSidewalk ShedSigned-offKING HOIST & SCAFFOLDING08/17/2018
DOB NOWConstruction FenceSigned-offKING HOIST & SCAFFOLDING08/16/2018
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC02/26/2018
BISOTISSUEDFOLOR INC06/16/2022
BISOTISSUEDFOLOR INC03/29/2022
BISOTISSUEDFOLOR INC01/12/2022
BIS—ISSUEDSHAWMUT WOODWORKING & SUPPLY10/25/2019
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY12/18/2018
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY12/18/2018
BIS—ISSUEDSHAWMUT WOODWORKING & SUPPLY10/19/2018
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY10/19/2018
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY10/19/2018
BISMHISSUEDSHAWMUT WOODWORKING & SUPPLY10/19/2018
BISPLISSUEDENOBRAC PLUMBING, INC06/29/2018
BISMHISSUEDSHAWMUT WOODWORKING & SUPPLY06/28/2018
BISSPISSUEDENOBRAC PLUMBING, INC06/20/2018
BISEQISSUEDKING HOIST & SCAFFOLDING05/21/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC05/14/2018
BIS—ISSUEDSHAWMUT WOODWORKING & SUPPLY05/04/2018
BIS—ISSUEDSHAWMUT WOODWORKING & SUPPLY04/27/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC04/13/2018
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY03/06/2018
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY03/06/2018
BISOTISSUEDNACCARATO CONTRACTING INC03/01/2012
BISOTISSUEDWEBSTER HALL ENTERTAINMEN08/18/2010
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR10/30/2008
BISOTISSUEDUNITY GALLEGA OF THE US02/23/2007
BISFSISSUEDACE-ATLAS PLBG & HTG LLC01/10/2007
BISOTISSUEDDAVID TURNER ARCHITECT,PC12/26/2006
BISOTISSUEDURBAN HOLDINGS LLC06/23/2006
BISOTISSUEDCY CNOSTR. INC.02/28/2005
BISOTISSUEDWEBSTER HALL ENTERTAINMENT07/21/2004
+ 11 more permits on file
8 projects · most recent 01/14/2022
General Wiring Lighting
FiledStatusContractorScope
01/14/2022CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
12/08/2021CompleteDENMAR ELECTRIC CORPGeneral Wiring
02/07/2020CompleteJAM ELECTRICAL CORP—
08/16/2018CompleteV. VASS ELECTRIC CORP—
08/06/2018CompleteV. VASS ELECTRIC CORP—
06/12/2018CompleteDAL ELECTRICAL CORP.General Wiring, Lighting
03/16/2018CompleteDAL ELECTRICAL CORP.—
02/20/2018CompleteSTAR-DELTA ELECTRIC, LLC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/30/2022Public Assembly Emergency LightingNathan Richprogress
08/29/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
08/29/2022Sprinkler SystemsAlex Schwartzspecial
08/01/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
06/10/2022Structural Steel - WeldingNat Toccispecial
06/10/2022FinalNat Tocciprogress
06/10/2022Structural Stability – Alterations of existing buildingsNat Toccispecial
06/10/2022Structural Steel - DetailsNat Toccispecial
03/06/2020Fire-Resistant Penetrations and JointsAlex Schwartzspecial
03/06/2020Post-installed AnchorsAlex Schwartzspecial
02/28/2020Mechanical SystemsAlex Schwartzspecial
02/28/2020FinalAlex Schwartzprogress
01/24/2019Public Assembly Emergency LightingChristopher O'Malleyprogress
08/15/2018FinalANN HICKEYprogress
08/15/2018FinalANN HICKEYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Webster HallOtherBasement
Project M08018728 No Work · TA Certificate of Operation Issued · 10/11/2022
EV Events CenterOther—
Project M00154334 No Work · TA Certificate of Operation Issued · 04/15/2019
Project M00123113 No Work · PA Certificate of Operation Issued · 02/01/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 418 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch - Temporary Place of Assembly8
09/15/2026M01453186-I1Request digital key ↗
09/05/2026M00154334-I1Request digital key ↗
09/01/2026M08002634-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch5
09/06/2026M00021763-I1Request digital key ↗
09/06/2026M00071104-I1Request digital key ↗
09/06/2026M00071097-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026M00324421-I1Request digital key ↗
08/15/2026M00324421-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/15/2026M07995553-I1Request digital key ↗
08/15/2026M00123113-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026M00324401-I1Request digital key ↗
09/02/2026M00324401-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00324438-I1Request digital key ↗
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION66
03/09/2023101768044Open ↗
02/27/2023123265901Open ↗
02/22/2023123265901Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION23
01/12/2022140953270Open ↗
10/25/2019123265901Open ↗
02/06/2019123575194Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026M00324401-P1Open ↗
08/13/2026M00324438-I1Open ↗
08/13/2026M00324401-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY (PA) SIGNOFF1
02/22/2023140953270Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/12/2019123265901Open ↗
▸BISPRIOR TO FINAL COFO AMEND SECT.18 ON THE PW1. CHECK YES IN THE PROPOSED COLUMN FOR ALL APPLICABLE REGARDLESS WHETHER OR NOT INSTALLED UNDER CURRENT APPLICATION.1
05/30/2023123265901Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/05/2019123265901Open ↗
▸Seals & Professional Certifications92
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
05/10/2019140764037Open ↗
04/24/2019123575194Open ↗
04/24/2019123575194Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/15/2026M01453186-I1Open ↗
09/06/2026M00071104-I1Open ↗
09/06/2026M00073450-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00324401-P1Open ↗
08/28/2026M00324438-I1Open ↗
08/24/2026M00755751-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00071097-I1Open ↗
08/31/2026M07995553-I1Open ↗
08/29/2026M00071104-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2020140953270Open ↗
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
02/13/2019123381633Open ↗
02/07/2019123381633Open ↗
02/06/2019123575194Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/12/2019123381633Open ↗
04/12/2019123381633Open ↗
04/12/2019123381633Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
09/06/2019123575318Open ↗
08/19/2019123575318Open ↗
▸BISEQUIPMENT USE PERMITS2
04/12/2019123381633Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
06/05/2019123158885Open ↗
04/19/2019123158885Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
12/19/2018123265901Open ↗
12/17/2018123265901Open ↗
Showing 2 of 4 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026M00324421-I1Open ↗
09/02/2026M00324401-P1Open ↗
09/02/2026M00324401-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/19/2020140953270Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
12/18/2018123549918Open ↗
12/18/2018123549918Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance2
▸BISNYCECC EXEMPTION1
11/19/2020140953270Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/19/2020140953270Open ↗
11/19/2020140953270Open ↗
Showing 2 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
10/11/2022140953270Open ↗
10/11/2022140953270Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/11/2022140953270Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/24/2019123575318Open ↗
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
03/20/2023101768044Open ↗
02/22/2023140953270Open ↗
02/18/2021123265901Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
01/29/2020120956180Open ↗
01/29/2020120441968Open ↗
06/24/2019123381633Open ↗
Showing 3 of 14 on file for this type
▸BISLANDMARKS APPROVAL12
11/19/2020140953270Open ↗
05/03/2019123265901Open ↗
04/12/2019123381633Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
10/07/2022123265901Open ↗
08/26/2022123265901Open ↗
03/01/2019123265901Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF2
02/22/2023140953270Open ↗
12/05/2019123265901Open ↗
▸BISFINAL1
10/11/2022140953270Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
11/19/2020140953270Open ↗
09/06/2019123575318Open ↗
05/06/2019123575194Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/22/2023123265901Open ↗
02/22/2023140953270Open ↗
▸Filing & Intake Forms70
▸BISBOROUGH INTAKE FORM40
12/09/2021140953270Open ↗
03/17/2020123265901Open ↗
01/29/2020120956180Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING COVER SHEET15
12/28/2018123158885Open ↗
Showing 1 of 15 on file for this type
▸BISADDITIONAL INFORMATION12
09/12/2022123265901Open ↗
08/29/2022140953270Open ↗
08/22/2022140953270Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/19/2020140953270Open ↗
Showing 1 of 3 on file for this type
▸Other Documents3
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
04/12/2019123381633Open ↗
▸BIS* FIRE STOPS 27-3451
03/17/2023101768044Open ↗