← Back
Special Inspection Agency
TOCCI ENGINEERING PLLC
Special Inspection Agency
BROOKLYN · 3MANHATTAN · 1
4 buildings
8
Total Filings
4
Projects on File
4
Buildings Worked
0
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month4 projects all-time
0123Jun '21 · 1Jul '21 · 2Jul '22 · 1Jun '21Aug '21Oct '21Dec '21Feb '22Apr '22Jun '22Jul '22
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off4100%
By project type
Alteration4
Most active buildings
All buildings →
119 EAST 11 STREETMANHATTAN · latest 09/22/2022
1 projects
81 PIERREPONT STREETBROOKLYN · latest 07/16/2022
1 projects
35 LOVE LANEBROOKLYN · latest 05/12/2022
1 projects
290 6 AVENUEBROOKLYN · latest 02/04/2022
1 projects
Key relationships
Everyone →
Design firms
Filing representatives
Contractors
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00755751 ↗119 EAST 11 STREET
MANHATTAN
AlterationSigned-off07/18/202209/22/2022
Contractor FOLOR INC
Installation of a steel lintel above a proposed 3'-3 door opening in an existing masonry wall. No change to use, egress or occupancy.
B00551737 ↗81 PIERREPONT STREET
BROOKLYN
AlterationSigned-off07/09/202107/16/2022TEMPORARY SHORING AND SUPPORT FOR 1ST FLOOR.
B00551764 ↗35 LOVE LANE
BROOKLYN
AlterationSigned-off07/09/202105/12/2022TEMPORARY SUPPORT FRAMING FOR THE EXISTING SECOND FLOOR AND ROOF
B00539198 ↗290 6 AVENUE
BROOKLYN
AlterationSigned-off06/14/202102/04/2022STRUCTURAL LINTEL FOR NEW MASONRY OPENING AND STRUCTURAL WORK FOR DECK EXPANSION.
Counts cover all 4 projects (4 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
THE VILNITS GROUP106/13/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
STEERING HOUSE CONSTRUCT306/13/2022
EH PLUMBING & HEATING COR106/13/2022
FOLOR INC107/18/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SCHULTE ROTH & ZABEL LLP210/15/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BIG ORANGE EXPEDITING, INC306/13/2022
4 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 4Signed off 4
4 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00755751 ↗119 EAST 11 STREET
MANHATTAN
AlterationSigned-off07/18/202209/22/2022
Contractor FOLOR INC
Installation of a steel lintel above a proposed 3'-3 door opening in an existing masonry wall. No change to use, egress or occupancy.
B00551737 ↗81 PIERREPONT STREET
BROOKLYN
AlterationSigned-off07/09/202107/16/2022TEMPORARY SHORING AND SUPPORT FOR 1ST FLOOR.
B00551764 ↗35 LOVE LANE
BROOKLYN
AlterationSigned-off07/09/202105/12/2022TEMPORARY SUPPORT FRAMING FOR THE EXISTING SECOND FLOOR AND ROOF
B00539198 ↗290 6 AVENUE
BROOKLYN
AlterationSigned-off06/14/202102/04/2022STRUCTURAL LINTEL FOR NEW MASONRY OPENING AND STRUCTURAL WORK FOR DECK EXPANSION.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
119 EAST 11 STREET ↗107/18/2022
290 6 AVENUE ↗306/13/2022
35 LOVE LANE ↗310/15/2021
81 PIERREPONT STREET ↗107/09/2021
▾Special Inspection Requirements — 39
DateRequirementBuildingInspectorRole
06/14/2022Fenestration air leakage290 6 AVENUEILYA VILNITSenergy_progress
06/14/2022Lighting controls290 6 AVENUEILYA VILNITSenergy_progress
06/14/2022Lighting in dwelling units290 6 AVENUEILYA VILNITSenergy_progress
06/14/2022Fenestration and door U-factor and product ratings290 6 AVENUEILYA VILNITSenergy_progress
06/14/2022Fenestration areas290 6 AVENUEILYA VILNITSenergy_progress
06/14/2022Energy Code Compliance Inspections290 6 AVENUEILYA VILNITSprogress
06/14/2022Final290 6 AVENUEILYA VILNITSprogress
06/14/2022Fire-Resistant Penetrations and Joints290 6 AVENUEILYA VILNITSspecial
06/14/2022Structural Stability – Alterations of existing buildings290 6 AVENUENat Toccispecial
06/10/2022Final119 EAST 11 STREETNat Tocciprogress
06/10/2022Structural Steel - Welding119 EAST 11 STREETNat Toccispecial
06/10/2022Structural Steel - Details119 EAST 11 STREETNat Toccispecial
06/10/2022Structural Stability – Alterations of existing buildings119 EAST 11 STREETNat Toccispecial
10/20/2021Structural Steel - Details35 LOVE LANENat Toccispecial
10/20/2021Structural Cold-Formed Steel35 LOVE LANENat Toccispecial
10/20/2021Final35 LOVE LANENat Tocciprogress
10/13/2021Final35 LOVE LANENat Tocciprogress
10/13/2021Structural Steel - Details35 LOVE LANENat Toccispecial
10/13/2021Structural Cold-Formed Steel35 LOVE LANENat Toccispecial
09/20/2021Fire-Resistant Penetrations and Joints290 6 AVENUEILYA VILNITSspecial
09/20/2021Structural Stability – Alterations of existing buildings290 6 AVENUENat Toccispecial
09/20/2021Energy Code Compliance Inspections290 6 AVENUEILYA VILNITSprogress
09/20/2021Final290 6 AVENUEILYA VILNITSprogress
09/20/2021Lighting controls290 6 AVENUEILYA VILNITSenergy_progress
09/20/2021Fenestration air leakage290 6 AVENUEILYA VILNITSenergy_progress
09/20/2021Lighting in dwelling units290 6 AVENUEILYA VILNITSenergy_progress
09/20/2021Fenestration and door U-factor and product ratings290 6 AVENUEILYA VILNITSenergy_progress
09/20/2021Fenestration areas290 6 AVENUEILYA VILNITSenergy_progress
08/25/2021Final35 LOVE LANENat Tocciprogress
08/25/2021Structural Steel - Details35 LOVE LANENat Toccispecial
08/25/2021Structural Cold-Formed Steel35 LOVE LANENat Toccispecial
08/02/2021Masonry290 6 AVENUENat Toccispecial
08/02/2021Structural Steel - Details290 6 AVENUENat Toccispecial
08/02/2021Structural Steel - Welding290 6 AVENUENat Toccispecial
08/02/2021Structural Stability – Alterations of existing buildings290 6 AVENUENat Toccispecial
08/02/2021Final290 6 AVENUENat Tocciprogress
07/02/2021Final81 PIERREPONT STREETNat Tocciprogress
07/02/2021Structural Cold-Formed Steel81 PIERREPONT STREETNat Toccispecial
07/02/2021Structural Steel - Details81 PIERREPONT STREETNat Toccispecial
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00551764-I1 · 35 LOVE LANERequest digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/13/2026B00551764-P1 · 35 LOVE LANEOpen ↗
08/13/2026B00551764-I1 · 35 LOVE LANEOpen ↗
08/13/2026M00755751-I1 · 119 EAST 11 STREETOpen ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature16
08/29/2026B00551764-P2 · 35 LOVE LANEOpen ↗
08/28/2026B00539198-S2 · 290 6 AVENUEOpen ↗
08/28/2026B00539198-S2 · 290 6 AVENUEOpen ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026B00551764-P2 · 35 LOVE LANEOpen ↗
08/28/2026B00539198-S2 · 290 6 AVENUEOpen ↗
08/27/2026B00539198-I1 · 290 6 AVENUEOpen ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026B00551764-P1 · 35 LOVE LANEOpen ↗
08/13/2026M00755751-I1 · 119 EAST 11 STREETOpen ↗
08/13/2026B00551737-I1 · 81 PIERREPONT STREETOpen ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026B00551737-I1 · 81 PIERREPONT STREETOpen ↗
08/13/2026M00755751-I1 · 119 EAST 11 STREETOpen ↗
Showing 2 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00551764-I1 · 35 LOVE LANEOpen ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type