← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
121 East 23rd Condominium
119 EAST 23 STREET · Gramercy · BIN 1087070
💬 Discuss this project
2004Year Built
21Stories
RMBuilding Class
C6-4AZoning
96,420 sfGross Floor Area
94Units
LL97 CoveredRent Stabilized34 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 6,160 sf lot · 15.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 11 docs
Floor 203p · 1 filing · 4 docs
Floor 19
Floor 18
Floor 172p · 1 filing · 10 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 1134p · 4 filings · 20 docs
Floor 103p · 1 filing · 4 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction8p · 2 filings · 15 docs
Filed — no permit issued2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KOLANU3103/21/2026
CROSSING 23RD CONDOMINIUM1803/21/2026
121 EAST 23RD CONDO OWNERS1303/21/2026
KOLANU PARTNERS603/21/2026
GREYSTAR507/25/2026
123 EAST 23RD ASSOCIATES203/21/2026
FIRST SERVICE RESIDENTIAL103/21/2026
12 EAST 23RD STREET103/21/2026
BALATON103/21/2026
12 EAST 23RD ST REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY403/21/2026
OUTSOURCE CONSULTANTS, INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOTHAM GC CORPGeneral Contractor507/08/2026
RAPTOR MECHANICAL,INCPlumbing407/08/2026
M. INT'L ENGINEERING PLLCGeneral Contractor303/21/2026
M&T PLBG AND HTG CO., INCPlumbing203/22/2026
PREMIER FLOW PLBG AND HTGPlumbing207/08/2026
PREMIER FLOW PLBG AND HTGFire Protection207/08/2026
PRO-TECH PLBG & HTG CORPFire Protection107/08/2026
GSA ELECTRIC CORP.Electrical103/22/2026
SJ CONSTR DESIGN INCGeneral Contractor107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOWNTOWN ENGINEERS9711203/21/2025
FLUSHING ENGINEERING SERV4373211/10/2023
WAVIC ENGINEERING PLLC1733107/04/2023
CHERNY ARCHITECT PLLC1925211/18/2021
PAUL DENIS ASSOCIATES2472502/16/2021
Building Lifecycle
All (148)Filed (14)Permit Issued (14)Signed Off (7)Facade (FISP) (9)Violation (60)Inspection (2)Objection (12)Special Inspection (30)
07/23/2026
Permit issued — General Construction
M00932041-I1-GC-CX
03/05/2026
Signed off — Alteration
REPLACEMENT AND RELOCATION OF MECHANICAL UNITS IN CONNECTION WITH THE EXISTING CONDOMINIUM APARTEMENT INTERIOR RENOVATION.
M01195563-S1
12/23/2025
Signed off — Alteration
REPLACEMENT AND RELOCATION OF MECHANICAL UNITS IN CONNECTION WITH THE EXISTING CONDOMINIUM APARTEMENT INTERIOR RENOVATION.
M01195563-I1
10/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/04/2025
Permit issued — General Construction
M01195563-I1-GC
04/04/2025
Permit issued — Mechanical Systems
M01195563-S1-MS
03/21/2025
Filed — Alteration
REPLACEMENT AND RELOCATION OF MECHANICAL UNITS IN CONNECTION WITH THE EXISTING CONDOMINIUM APARTEMENT INTERIOR RENOVATION.
M01195563-S1
03/21/2025
Filed — Alteration
REPLACEMENT AND RELOCATION OF MECHANICAL UNITS IN CONNECTION WITH THE EXISTING CONDOMINIUM APARTEMENT INTERIOR RENOVATION.
M01195563-I1
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Raimundo Ramos
03/21/2025
Special inspection requirement — Maintenance information
Ivan Shcherbakov
03/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ivan Shcherbakov
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Ivan Shcherbakov
03/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ivan Shcherbakov
03/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ivan Shcherbakov
03/14/2025
Special inspection requirement — Final
Ivan Shcherbakov
03/14/2025
Special inspection requirement — Mechanical Systems
Raimundo Ramos
11/22/2023
Permit issued — General Construction
M00932041-I1-GC-CX
11/10/2023
Filed — Alteration
JOB FILED EXIST. COMMERCIAL STORE INSTALL NEW COOKING EQUIPMENT AND PLUMBING FIXTURE PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00932041-I1
11/10/2023
Filed — Alteration
JOB FILED EXIST. COMMERCIAL STORE INSTALL NEW COOKING EQUIPMENT AND PLUMBING FIXTURE PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00932041-S1
10/18/2023
Signed off — Alteration
INSTALL NEW FIRE STANDPIPE STORAGE CABINETS AS PER PLANS.
M00898939-I1
09/28/2023
Special inspection requirement — Shutoff dampers
KY FU
09/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
09/28/2023
Special inspection requirement — Maintenance information
KY FU
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
KY FU
09/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
09/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
09/28/2023
Special inspection requirement — Interior lighting power
KY FU
09/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
09/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
09/11/2023
Special inspection requirement — Final
NANIK MASSAND
09/11/2023
Special inspection requirement — Mechanical Systems
KY FU
08/15/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/11/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/31/2023
Permit issued — Standpipe
M00898939-I1-EW-SD
07/04/2023
Filed — Alteration
INSTALL NEW FIRE STANDPIPE STORAGE CABINETS AS PER PLANS.
M00898939-I1
07/04/2023
Special inspection requirement — Tenant Protection Plan Compliance
DARIUSZ LUCZAK
07/01/2023
Special inspection requirement — Standpipe Systems
DARIUSZ LUCZAK
05/03/2022
Filed — Alteration
REMOVAL OF NON BEARING WALLS IN APARTMENT 5D, REPLACE KITCHEN CABINETS AND COUNTER TOP, REPLACE BATH TUB WITH STANDING SHOWER IN MASTER BATHROOM.
M00714124-I1
04/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/06/2022
Special inspection requirement — Final
01/10/2022
Signed off — Alteration
REPLACE EXISTING KITCHEN SINK AND DISHWASHER WITH NEW ON NEW ROUGHING, REPLACE EXISTING: 4 LAVATORIES, 3 WATER CLOSETS, 1 GAS RANGE WITH NEW ON EXISTING ROUGHING.
M00294523-I1
12/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Lukyanov-Cherny
12/10/2021
Objection resolved — Addressed
11/23/2021
Objection raised — Scope
11/18/2021
Filed — Alteration
REPLACE EXISTING KITCHEN SINK AND DISHWASHER WITH NEW ON NEW ROUGHING, REPLACE EXISTING: 4 LAVATORIES, 3 WATER CLOSETS, 1 GAS RANGE WITH NEW ON EXISTING ROUGHING.
M00294523-P1
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Lukyanov-Cherny
07/09/2021
Permit issued — Plumbing
M00294523-I1-PL
06/14/2021
Cycle 9 facade report submitted
06/14/2021
Cycle 9 facade report signed — SAFE
06/11/2021
Cycle 9 facade inspection completed
06/08/2021
Signed off — Alteration
Renovation of already combined apartments 11A/b to include 11C work to include partition, ceiling and door work . No change in use egress or occupancy.
M00238822-I1
06/04/2021
Special inspection requirement — Mechanical Systems
PAUL DENIS
06/04/2021
Special inspection requirement — Duct leakage testing
PAUL DENIS
06/04/2021
Special inspection requirement — HVAC insulation and sealing
PAUL DENIS
06/04/2021
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
05/07/2021
Filed — Alteration
Renovation of already combined apartments 11A/b to include 11C work to include partition, ceiling and door work . No change in use egress or occupancy.
M00238822-P1
04/16/2021
Signed off — Alteration
Plumbing modifications on the 11th floor. No change in use, egress or occupancy.
M00240165-I1
03/08/2021
Permit issued — Plumbing
M00294523-I1-PL
02/24/2021
Permit issued — Mechanical Systems
M00238822-I1-MS
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSJ CONSTR DESIGN INC07/23/2026
DOB NOWGeneral ConstructionSigned-offGOTHAM GC04/04/2025
DOB NOWMechanical SystemsSigned-offGOTHAM GC04/04/2025
DOB NOWGeneral ConstructionPermit IssuedM. INT'L ENGINEERING PLLC11/22/2023
DOB NOWStandpipeSigned-offPRO-TECH PLBG & HTG CORP07/31/2023
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC07/09/2021
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC03/08/2021
DOB NOWMechanical SystemsSigned-offGOTHAM GC02/24/2021
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC02/05/2021
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP06/18/2020
DOB NOWSprinklersSigned-offGALICJA PLBG AND HTG CORP06/17/2020
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC02/25/2020
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP01/14/2020
DOB NOWSprinklersSigned-offGALICJA PLBG AND HTG CORP01/13/2020
BISOTISSUEDMINNCHIFINN INC12/30/2020
BISOTISSUEDGOTHAM GC CORP10/26/2020
BISOTISSUEDMINNCHIFINN INC02/11/2020
BISOTISSUEDGOTHAM GC CORP11/13/2019
BISOTISSUEDZAP INTERIORS INC05/25/2018
BISPLISSUEDBYPASS MECHANICAL CORP04/10/2018
BISSPISSUEDPLUMBING WORKS CORP04/10/2018
BISOTISSUEDZAP INTERIORS INC03/13/2018
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR02/13/2017
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP02/13/2017
BISMHISSUEDSMJ CONSTRUCTION TECH,LLC02/02/2017
BISEQISSUEDSMJ CONSTRUCTION TECH,LLC02/02/2017
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC02/02/2017
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC01/26/2017
BISOTISSUEDL.A.S CONSTRUCTION & SERV01/26/2016
BISEQISSUEDEVEREST SCAFFOLDING INC10/26/2015
BISPLISSUEDVILLAGE P & H NY INC09/29/2015
BIS—ISSUEDMAUCERI SIGN CO., INC09/09/2015
BIS—ISSUEDMAUCERI SIGN CO., INC09/09/2015
BIS—ISSUEDMAUCERI SIGN CO., INC09/09/2015
BISOTISSUEDPINE STREET CARPENTERS IN08/10/2015
BISOTISSUEDSKYLINE RESTORATION INC07/22/2015
BISEQISSUEDSKYLINE RESTORATION INC03/02/2015
BISEQISSUEDEVEREST SCAFFOLDING INC10/22/2014
BISPLISSUEDORBIT PLBG & HTG INC08/26/2014
BISMHISSUEDCM CONSTRUCTION GROUP INC04/25/2013
+ 24 more permits on file
1 project · most recent 03/21/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/21/2025Signed-offGOTHAM GC CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric FXY-02 13,500 BTU · Fan Coil Indoor ×2
FXY-03 17,000 BTU · Fan Coil Indoor ×1
MXZ-SM48NAM2 49,000 BTU · Heat Pump Outdoor ×1
PEFY-P08NMAU-E 9,000 BTU · Vrf Indoor ×1
PEFY-P12NMAU-E 13,500 BTU · Vrf Indoor ×1
PEFY-P18NMAU-E 17,000 BTU · Vrf Indoor ×1
2 projects · most recent 03/21/2025
Water/Sanitary Gas
FiledStatusContractorScope
03/21/2025——Water/Sanitary
11/10/2023——Gas, Water/Sanitary
6 projects · most recent 09/15/2021
General Wiring
FiledStatusContractorScope
09/15/2021CompleteGSA ELECTRIC CORP.General Wiring
07/23/2020Permit IssuedTOWER ELECTRIC INC.General Wiring
04/25/2020Permit IssuedJAM ELECTRICAL CORP—
12/12/2019CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
07/17/2019Permit IssuedNOBLE ELECL CONTRG CO INCGeneral Wiring
10/26/2018CompleteGT ELECTRICAL COMPANY INCGeneral Wiring
1 project · most recent 05/03/2022
FiledStatusContractorScope
05/03/2022——1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/15/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/11/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/21/2025Fire-Resistant Penetrations and JointsRaimundo Ramosspecial
03/21/2025Maintenance informationIvan Shcherbakovenergy_progress
03/21/2025HVAC-R and service water heating system controlsIvan Shcherbakovenergy_progress
03/21/2025Energy Code Compliance InspectionsIvan Shcherbakovprogress
03/21/2025HVAC-R and service water heating equipmentIvan Shcherbakovenergy_progress
03/21/2025HVAC-R and service water piping design and insulationIvan Shcherbakovenergy_progress
03/14/2025FinalIvan Shcherbakovprogress
03/14/2025Mechanical SystemsRaimundo Ramosspecial
09/28/2023Shutoff dampersKY FUenergy_progress
09/28/2023HVAC-R and service water heating system controlsKY FUenergy_progress
09/28/2023Maintenance informationKY FUenergy_progress
09/28/2023Energy Code Compliance InspectionsKY FUprogress
09/28/2023Tenant Protection Plan ComplianceKY FUspecial
09/28/2023HVAC-R and service water heating equipmentKY FUenergy_progress
09/28/2023Interior lighting powerKY FUenergy_progress
09/28/2023HVAC-R and service water piping design and insulationKY FUenergy_progress
09/28/2023Tenant Protection Plan ComplianceKY FUspecial
09/28/2023Fire-Resistant Penetrations and JointsKY FUspecial
09/11/2023FinalNANIK MASSANDprogress
09/11/2023Mechanical SystemsKY FUspecial
07/04/2023Tenant Protection Plan ComplianceDARIUSZ LUCZAKspecial
07/01/2023Standpipe SystemsDARIUSZ LUCZAKspecial
04/06/2022Structural Stability – Alterations of existing buildings—special
04/06/2022Final—progress
12/14/2021Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
Latest 25 of 41.
▾Documents — 506 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch7
09/02/2026M00714124-I1Request digital key ↗
08/30/2026M00898939-I1Request digital key ↗
08/28/2026M00932041-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00240165-I1Request digital key ↗
08/15/2026M00294523-P1Request digital key ↗
08/15/2026M00240165-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00239521-I1Request digital key ↗
08/15/2026M00239521-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00238822-I1Request digital key ↗
08/15/2026M00238822-P1Request digital key ↗
▸Applications & Permits96
▸BISWORK PERMIT APPLICATION50
12/31/2020140884327Open ↗
12/30/2020140884327Open ↗
02/11/2020140884327Open ↗
Showing 3 of 50 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION45
01/23/2020140884327Open ↗
10/25/2019123881549Open ↗
08/31/2018123127151Open ↗
Showing 3 of 45 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications137
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
01/17/2020140600721Open ↗
01/17/2020140600721Open ↗
10/25/2019123881549Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00239521-P1Open ↗
09/05/2026M00239521-I1Open ↗
09/05/2026M00294523-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
01/22/2016140447773Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/18/2026M00294523-P1Open ↗
08/31/2026M00240165-P1Open ↗
08/30/2026M00238822-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/29/2015122519783Open ↗
09/29/2015122519765Open ↗
09/29/2015122519774Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/30/2026M00238822-P1Open ↗
08/30/2026M00238822-P1Open ↗
08/27/2026M00932041-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
01/22/2016140447773Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
01/22/2016140447773Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/23/2020140884327Open ↗
▸Trade Schedules & Equipment52
▸BISSELF-CERT PLUMBING NOTICE19
12/29/2015122454487Open ↗
Showing 1 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING13
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
01/22/2016140447773Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/26/2018123189183Open ↗
01/11/2018123189183Open ↗
01/11/2018123189183Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS6
01/15/2020140600721Open ↗
01/15/2020140600721Open ↗
01/14/2019123127151Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
01/14/2019123127151Open ↗
08/31/2018123127151Open ↗
Showing 2 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸DOB NOWTenant Protection Plan8
08/15/2026M00294523-P1Open ↗
08/15/2026M00294523-I1Open ↗
08/13/2026M00240165-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES5
01/23/2020140884327Open ↗
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/05/2026M00239521-I1Open ↗
09/05/2026M00239521-P1Open ↗
09/04/2026M00240165-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/23/2020140884327Open ↗
10/28/2019123881549Open ↗
08/31/2018123127151Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/15/2020140600721Open ↗
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
01/17/2020140600721Open ↗
01/17/2020140600721Open ↗
10/25/2019123881549Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
01/13/2022140884327Open ↗
04/06/2021123881549Open ↗
01/17/2020140600721Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/13/2022140884327Open ↗
04/06/2021123881549Open ↗
01/23/2020140884327Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
01/22/2016140447773Open ↗
▸BISNYCECC ANALYSIS2
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
01/13/2022140884327Open ↗
01/13/2022140884327Open ↗
04/06/2021123881549Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
01/14/2022140884327Open ↗
04/06/2021123881549Open ↗
01/17/2020140600721Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSUPERSEDING LETTER1
02/02/2017140447773Open ↗
▸BISSHED LETTER1
11/12/2015140270908Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership47
▸BISCOST AFFIDAVIT47
01/13/2022140884327Open ↗
04/06/2021123881549Open ↗
01/23/2020140884327Open ↗
Showing 3 of 47 on file for this type
▸Filing & Intake Forms37
▸BISEFILING COVER SHEET17
10/25/2019123881549Open ↗
08/31/2018123127151Open ↗
01/11/2018123189183Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION10
01/15/2020140600721Open ↗
07/24/2018123189183Open ↗
Showing 2 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
01/23/2020140884327Open ↗
01/31/2017140600721Open ↗
01/31/2017140600641Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
01/17/2020140600721Open ↗
01/14/2019123127151Open ↗
01/04/2019123189183Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type