| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01231318 ↗ | 110 SACKETT STREET BROOKLYN | Alteration | Permit Issued | 06/09/2025 | 09/30/2026 | Design EAB ENGINEERING PC Filer EAB ENGINEERING PC | REPAIR FRONT AND REAR MASONRY WALL, REPAIR CRACKS IN THE MASORY PARTY WALLS, REINFORCE THE EXISTING FLOOR FRAMING, INSTALL STELL BEAM AND CO… |
| B01450525 ↗ | 247 NEW LOTS AVENUE BROOKLYN | Alteration | Permit Issued | 08/25/2026 | 09/17/2026 | Design Min Liu, P.E. Filer YBL NY INC | JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOO… |
| S01444369 ↗ | 537 LINCOLN AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2026 | 09/16/2026 | Design NEW AIR SOLUTION INC. | PROPOSED INTERIOR RENOVATION AT CELLAR AND FIRST FLOOR, ENLARGE THE DECK AT REAR YARD, INSTALL AWNING AT FRONT YARD AS PER PLAN. NO CHANGE I… |
| B01456461 ↗ | 123 WYCKOFF AVENUE BROOKLYN | — | Permit Issued | — | 09/14/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS, EXHAUST DUCT, AND EXHAUST FAN AT THE FIRST FLOOR AS PER PLANS FILED HEREWITH. NO … |
| Q01402666 ↗ | 41-05 149 PLACE QUEENS | Alteration | Permit Issued | 05/26/2026 | 08/31/2026 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | TO PROPOSE PLUMBING AND GAS WORK FOR EXISTING RESTAURANT AT 1ST FLOOR IN CONJUNCTION WITH ALT-2 JOB NO. Q01402666-I1 AS PER PLANS FILED HERE… |
| X01444586 ↗ | 229 EAST 144 STREET BRONX | Alteration | Permit Issued | 08/18/2026 | 08/26/2026 | Design Min Liu, P.E. Owner NYCHHC LINCOLN Filer YBL NY INC | JOB FILED FOR INTERIOR RENATION WITH MINOR PARTITION, PAINTING AS PER PLAN. NO CHNAGE OF USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| ALAN YANG ARCHITECTURE | 17 | 08/21/2026 |
| ISEED CONSTRUCTION INC | 17 | 07/01/2026 |
| NEW AIR SOLUTION INC. | 7 | 08/18/2026 |
| FACTORY ENGINEERING WORKS PLLC | 5 | 08/18/2026 |
| JD Design Associates Inc | 4 | 07/21/2026 |
| URBAN ARCHITECTURAL DESIGN, PC | 3 | 08/06/2026 |
| A&B WORLD CONSULTING | 2 | 03/06/2026 |
| MADRIAGA ENGINEERING P.C. | 2 | 10/15/2025 |
| Min Liu, P.E. | 2 | 08/25/2026 |
| AYALA ENGINEERING PC | 1 | 06/23/2026 |
| CELIN MUNOZ CONSULTING ENGINEER, PC | 1 | 06/26/2026 |
| EAB ENGINEERING PC | 1 | 06/26/2026 |
| FOCAL POINT ARCHITECTS & ASS. | 1 | 04/19/2026 |
| LNZ, LLC | 1 | 02/22/2026 |
| POLAR ENGINEERING, P.C. | 1 | 07/31/2026 |
| S M TAM ARCHITECT, PLLC | 1 | 09/16/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| CROSSFIELD PLBG.&HTG | 6 | 07/21/2026 |
| AMERICAN STANDARD P&H COR | 4 | 07/02/2026 |
| THOMAS F. CASH & SONS INC | 3 | 07/14/2026 |
| TRI STATE PLBG & HTG INC | 3 | 07/29/2026 |
| CATMAN PLUMBING INC | 2 | 08/18/2026 |
| DYKER SOLUTIONS INC | 2 | 07/23/2026 |
| KALE CONSTRUCTION INC | 2 | 03/13/2026 |
| FLUSHING PLUMBING CORP | 1 | 05/26/2026 |
| G. ROLLINS PLBG & HTG LLC | 1 | 10/03/2024 |
| JIXIANG CONSTRUCTION INC | 1 | 06/10/2026 |
| LINCO USA INC | 1 | 01/29/2026 |
| M. INT'L ENGINEERING PLLC | 1 | 11/10/2023 |
| STRUCTURELINE INC | 1 | 01/27/2026 |
| TLS CONSTRUCTION GROUP I* | 1 | 09/16/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| BLDG MANAGEMENT CO., INC. | 1 | 07/21/2026 |
| ELIFE CORP. | 1 | 05/11/2026 |
| GREYSTAR | 1 | 11/10/2023 |
| HENDERSON HOLDING GROUP LLC | 1 | 08/06/2026 |
| MAR-RICH HOLDING CORP | 1 | 06/20/2026 |
| NYCHHC LINCOLN | 1 | 08/18/2026 |
| RYCO NYC LLC | 1 | 09/22/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| YBL NY INC | 6 | 08/25/2026 |
| KON HO LEE CONSULTING ENGINEER, PLL | 5 | 08/18/2026 |
| JD DESIGN ASSOCIATES INC | 3 | 07/21/2026 |
| EAB ENGINEERING PC | 1 | 06/26/2026 |
| ISEED CONSTRUCTION INC | 1 | 04/19/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01231318 ↗ | 110 SACKETT STREET BROOKLYN | Alteration | Permit Issued | 06/09/2025 | 09/30/2026 | Design EAB ENGINEERING PC Filer EAB ENGINEERING PC | REPAIR FRONT AND REAR MASONRY WALL, REPAIR CRACKS IN THE MASORY PARTY WALLS, REINFORCE THE EXISTING FLOOR FRAMING, INSTALL STELL BEAM AND CO… |
| B01450525 ↗ | 247 NEW LOTS AVENUE BROOKLYN | Alteration | Permit Issued | 08/25/2026 | 09/17/2026 | Design Min Liu, P.E. Filer YBL NY INC | JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOO… |
| S01444369 ↗ | 537 LINCOLN AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2026 | 09/16/2026 | Design NEW AIR SOLUTION INC. | PROPOSED INTERIOR RENOVATION AT CELLAR AND FIRST FLOOR, ENLARGE THE DECK AT REAR YARD, INSTALL AWNING AT FRONT YARD AS PER PLAN. NO CHANGE I… |
| B01456461 ↗ | 123 WYCKOFF AVENUE BROOKLYN | — | Permit Issued | — | 09/14/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS, EXHAUST DUCT, AND EXHAUST FAN AT THE FIRST FLOOR AS PER PLANS FILED HEREWITH. NO … |
| Q01402666 ↗ | 41-05 149 PLACE QUEENS | Alteration | Permit Issued | 05/26/2026 | 08/31/2026 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | TO PROPOSE PLUMBING AND GAS WORK FOR EXISTING RESTAURANT AT 1ST FLOOR IN CONJUNCTION WITH ALT-2 JOB NO. Q01402666-I1 AS PER PLANS FILED HERE… |
| X01444586 ↗ | 229 EAST 144 STREET BRONX | Alteration | Permit Issued | 08/18/2026 | 08/26/2026 | Design Min Liu, P.E. Owner NYCHHC LINCOLN Filer YBL NY INC | JOB FILED FOR INTERIOR RENATION WITH MINOR PARTITION, PAINTING AS PER PLAN. NO CHNAGE OF USE, EGRESS OR OCCUPANCY. |
| B01438102 ↗ | 1285 PUTNAM AVENUE BROOKLYN | Alteration | Permit Issued | 07/31/2026 | 08/25/2026 | Design POLAR ENGINEERING, P.C. Filer ISEED CONSTRUCTION INC | INSTALL A NEW EXTERIOR DOOR AND STAIR FROM THE EXISTING CELLAR TO THE FRONT YARD, AS SHOWN ON THE PLANS. NO CHANGE IN USE, OCCUPANCY, OR CER… |
| B01449540 ↗ | 3556 NOSTRAND AVENUE BROOKLYN | Alteration | Permit Issued | 08/21/2026 | 08/25/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS O… |
| M01426180 ↗ | 544 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/10/2026 | 08/24/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO PROPOSE PLUMBING WORK FOR EX. STORE IN CONJUNCTION WITH ALT-2 JOB M01426180-I1 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR … |
| Q01353226 ↗ | 63-94 WETHEROLE STREET QUEENS | Alteration | Signed-off | 03/06/2026 | 08/20/2026 | Design A&B WORLD CONSULTING Filer YBL NY INC | JOB FILED TO REMOVE NON-BEARING PARTITIONS TO CORRECT HRP AND ECB VIOLATION 39078936K, 37032803K . NO CHANGE OF USE, EGRESS, OR OCCUPANCY UN… |
| M01430522 ↗ | 39 WEST 27 STREET MANHATTAN | Alteration | Permit Issued | 08/06/2026 | 08/07/2026 | Filer YBL NY INC | INTERIOR RENOVATION OF 2ND - 7TH FLOOR AT EXISTING HOTEL BUIDLING: REPLACE CARPETS IN HALLWAY, REPLACE TILE FRONT OF ELEVATOR AREA, REPLACE … |
| Q01247039 ↗ | 69-21 EXETER STREET QUEENS | Alteration | Signed-off | 07/02/2025 | 08/06/2026 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | Interior and exterior renovation of existing one family, outdoor cement paving, & mechanical work with general construction work as per plan… |
| Q01435436 ↗ | 60-11 39 AVENUE QUEENS | Alteration | Permit Issued | 07/27/2026 | 08/03/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS O… |
| S01415596 ↗ | 103 ZOE STREET STATEN ISLAND | Alteration | Signed-off | 06/23/2026 | 07/29/2026 | Design AYALA ENGINEERING PC Filer YBL NY INC | JOB FILED TO RESOLVE ECB VIOLATION 39190732Z FULL HOUSE EIFS INSTALLATION SECTION #1,3 AND 4. NO CHNAGE OS USE, EGRESS OR OCCUPANCY. |
| B01082048 ↗ | 690 WASHINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 07/25/2024 | 07/23/2026 | Design A&B WORLD CONSULTING Filer YBL NY INC | JOB FILED INSTALL NON-BEARING PARTITION TO SEPARATE PREP. AREA WITH CUSTOMER SPACE AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDE… |
| M00932041 ↗ | 119 EAST 23 STREET MANHATTAN | Alteration | Permit Issued | 11/10/2023 | 07/23/2026 | Owner GREYSTAR Filer YBL NY INC | JOB FILED TO FIT-OUT EXIST RETAIL STORE INCLUDING NEW COUNTER AND EQUIPMENT, NEW KITCHEN HOOD AND FIRESUPPRESSION SYSTEM AS PER PLAN. NO C… |
| M01010171 ↗ | 39 WEST 27 STREET MANHATTAN | Alteration | Permit Issued | 03/14/2024 | 07/23/2026 | INTERIOR REPAIR OF FIRST FLOOR CEILING AT EXISTING FRONT TO ADDRESS VIOLATION 23-00535. INTERIOR RENOVATION OF 1ST FLOOR REMOVE NON-BEARING … | |
| B01429648 ↗ | 6221 18 AVENUE BROOKLYN | Alteration | Permit Issued | 07/14/2026 | 07/21/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS O… |
| Q01423964 ↗ | 52-65 65 PLACE QUEENS | Alteration | Permit Issued | 07/02/2026 | 07/07/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO PROPOSE PLUMBING AND GAS WORK FOR EX. STORE IN CONJUNCTION WITH ALT-2 JOB Q01423964-I1 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EG… |
| Q01416618 ↗ | 95-37 SUTPHIN BOULEVARD QUEENS | Alteration | Permit Issued | 06/24/2026 | 07/06/2026 | — | INTERIOR RENOVATION OF EXISTING STORE AND TO REGISTER THE NEW COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN WITH GENERAL CONS… |
| Q01345124 ↗ | 61-12 LAUREL HILL BLVD QUEENS | Alteration | Permit Issued | 03/26/2026 | 06/25/2026 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | To resolve ECB Violation #35198791J, the existing shed and related electrical work will be removed. General interior and exterior work, incl… |
| M01407977 ↗ | 163 RIVINGTON STREET MANHATTAN | Alteration | Permit Issued | 06/18/2026 | 06/24/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | INTERIOR RENOVATION AT 001 FLOOR STORE WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF… |
| M01389573 ↗ | 4 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 06/20/2026 | 06/23/2026 | Design ALAN YANG ARCHITECTURE Owner MAR-RICH HOLDING CORP Filer ISEED CONSTRUCTION INC | TO REGISTER THE NEW COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CER… |
| B01411832 ↗ | 338 FRANKLIN AVENUE BROOKLYN | Alteration | Signed-off | 06/04/2026 | 06/08/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS O… |
| Q01372532 ↗ | 86-34 GRAND AVENUE QUEENS | Alteration | Permit Issued | 03/25/2026 | 06/03/2026 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | TO PROPOSE PLUMBING & GAS WORK AT EXISTING 2-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB Q01372532-I1 AS PER PLAN FILLED HEREWITH, NO CHANGE … |
| Q01340769 ↗ | 7-14 124 STREET QUEENS | Alteration | Signed-off | 12/30/2025 | 06/01/2026 | Design ISEED CONSTRUCTION INC | TO RESOLVE ECB VIOLATION NO. 39171060L, THIS APPLICATION IS FILED TO LEGALIZE WORK PREVIOUSLY PERFORMED WITHOUT A PERMIT, AS PER PLANS FILE… |
| Q01403299 ↗ | 52 STREET QUEENS | Alteration | Permit Issued | 05/21/2026 | 05/26/2026 | Design NEW AIR SOLUTION INC. | PROPOSED INTERIOR RENOVATION FOR A RETAIL STORE ON THE FIRST FLOOR AS PER PLAN. NO CHANGE INUSE, EGRESS AND CO. |
| Q01378488 ↗ | 32-14 204 STREET QUEENS | Alteration | Signed-off | 03/30/2026 | 05/13/2026 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | To resolve ECB Violation #39179898L. Thanks. |
| Q01376493 ↗ | 144-02 38 AVENUE QUEENS | Alteration | Signed-off | 03/26/2026 | 05/05/2026 | Design NEW AIR SOLUTION INC. | PROPOSED RENOVATION OF THE CELLAR AND WIDEN THE STAIR IN REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| Q01371478 ↗ | 28-30 JACKSON AVENUE QUEENS | Alteration | Permit Issued | 03/31/2026 | 04/29/2026 | Design ISEED CONSTRUCTION INC | minor renovation of existing restaurant, install new cooking equipment in kitchen area, install new hood in existing commercial kitchen (1st… |
| Q01387053 ↗ | 133-18 39 AVENUE QUEENS | Alteration | Signed-off | 04/21/2026 | 04/27/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS O… |
| X01360033 ↗ | 1045 SOUTHERN BOULEVARD BRONX | Alteration | Signed-off | 02/22/2026 | 04/24/2026 | Design LNZ, LLC | Proposed interior renovation in existing UG6 Drug Store /Pharmacy on First Floor with finish work as per plan. NO CHANGE IN USE, NO CHANGE T… |
| M01382748 ↗ | 413 EAST 12 STREET MANHATTAN | Alteration | Permit Issued | 04/08/2026 | 04/21/2026 | Design ISEED CONSTRUCTION INC | INTERIOR RENOVATION OF EXISTING APT.#8 AS PER PLAN FILED HEREWITH |
| M01372239 ↗ | 164 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 03/24/2026 | 04/16/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | TO PROPOSE PLUMBING WORK FOR EX. STORE IN CONJUNCTION WITH ALT-2 JOB M01372239-I1 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR … |
| Q01332339 ↗ | 41-10 MAIN STREET QUEENS | Alteration | Permit Issued | 12/19/2025 | 04/14/2026 | Design JD Design Associates Inc | FILE TO ADDRESS SUMMON#039169605J, REMOVE WOOD FRAME AT REAR YARD. |
| M01241416 ↗ | 47 BAYARD STREET MANHATTAN | Alteration | Permit Issued | 08/29/2025 | 04/10/2026 | Design JD Design Associates Inc Filer JD DESIGN ASSOCIATES INC | MECHANICAL WORK FOR THE COMMERCIAL SPACE ON 1ST FLOOR. MECHANICAL WORK FOR KITCHEN EXHAUST SYSTEM. MECHANICAL WORK IN COMMERCIAL KITCHEN FOR… |
| M01380802 ↗ | 64 WEST 3 STREET MANHATTAN | Alteration | Signed-off | 04/06/2026 | 04/10/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | INTERIOR RENOVATION AT 001 FLOOR STORE WITH GENERAL CONSTRUCTIONWORK ASPERPLANFILEDHEREWITH . NO CHANGE OF USE, EGRESS ORCERTIFICATE OF OCCU… |
| Q01376471 ↗ | 144-02 38 AVENUE QUEENS | Alteration | Signed-off | 03/26/2026 | 03/31/2026 | Design NEW AIR SOLUTION INC. | PROPOSED INSTALLATION OF AIR CONDITIONER SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01182443 ↗ | 3522 AVENUE M BROOKLYN | Alteration | Permit Issued | 02/20/2025 | 03/24/2026 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | INTERIOR RENOVATION OF EXISTING CELLAR FOR EX. 1-FAMILY HOUSE WITH GENERAL CONSTRUCTION AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRE… |
| Q01348085 ↗ | 152-16 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 01/20/2026 | 03/19/2026 | Design ISEED CONSTRUCTION INC | INTERIOR RENOVATION OF EX. CELLAR AND BUILD A NEW STAIRCASE FROM CELLAR TO THE BACKYARD WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HER… |
| Q01330130 ↗ | 136-43 ROOSEVELT AVENUE QUEENS | Alteration | Permit Issued | 12/08/2025 | 03/09/2026 | Design NEW AIR SOLUTION INC. Owner ELIFE CORP. | PROPOSED RENOVATION OF THE EXISTING STORE AND INSTALL THE NEW AIR CONDITIONER AND KTICHEN EXHAUST HOOD AT FIRST FLOOR. NO CHANGE IN USE, EGR… |
| Q01365748 ↗ | 120-03 LIBERTY AVENUE QUEENS | Alteration | Signed-off | 03/03/2026 | 03/06/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | THE EXISTING SHOP IS LOCATED ON FLOOR 002, AND AN INTERIOR RENOVATION PLAN IS PROPOSED. THE PLAN INCLUDES CREATING A NEW DOORWAY IN THE SIDE… |
| B01343595 ↗ | 190 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 01/13/2026 | 03/03/2026 | Filer ISEED CONSTRUCTION INC | TO PROPOSE PLUMBING WORK FOR EX. STORE IN CONJUNCTION WITH ALT-2 JOB B01343595 -I1 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR… |
| B01349466 ↗ | 53 EAST 59 STREET BROOKLYN | Alteration | Permit Issued | 01/28/2026 | 02/02/2026 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | INTERIOR RENOVATION OF EXISTING ONE FAMILY WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICAT… |
| M01319531 ↗ | 48 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 11/21/2025 | 01/30/2026 | Design JD Design Associates Inc Owner BLDG Management Co. Filer JD DESIGN ASSOCIATES INC | INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON 1ST FLOOR AND CELLAR. |
| B01319007 ↗ | 625 68 STREET BROOKLYN | Alteration | Signed-off | 11/19/2025 | 01/28/2026 | Remove partition wall in the Cellar. To remedy ECB violation #35724804R. No change in use, occupancy or egress. | |
| M01325272 | 333 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 12/17/2025 | 01/14/2026 | Design ISEED CONSTRUCTION INC | INTERIOR RENOVATION AT 1ST FLOOR. INSTALL NEW NON-STRUCTURAL PARTITIONS ONLY. NO CEILING OR FLOOR WORK. NO CHANGE OF USE, EGRESS, OR CO. |
| B01332889 ↗ | 1857 84 STREET BROOKLYN | Alteration | Signed-off | 12/31/2025 | 01/06/2026 | — | INTERIOR RENOVATIONS. REMOVAL OF NON LOAD-BEARING DRY WALL ON FIRST ANDSECOND FLOORS. CONSTRUCTION OF NEW NON-LOAD BEARING DRY WALL ON SECON… |
| Q01329638 ↗ | 188-08 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 12/11/2025 | 01/06/2026 | Design ISEED CONSTRUCTION INC | TO PROPOSE INTERIOR RENOVATION FOR EXISTING STORE AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGR… |
| B01333897 ↗ | 88 BAY 32 STREET BROOKLYN | Alteration | Permit Issued | 12/18/2025 | 12/26/2025 | Remove (1) boiler, (1) H.W.H. in the Cellar. Relocate (3) gas meters in the Cellar. Install (1) dryer, (3) boiler, (3) H.W.H. (1) lavatory, … | |
| B01315201 ↗ | 1002 65 STREET BROOKLYN | Alteration | Signed-off | 11/10/2025 | 12/22/2025 | Remove business sign awning and install two canopies at front of building; Install two roll down gate at garage. To remedy ECB violations #3… | |
| Q01283190 ↗ | 42-45 MAIN STREET QUEENS | Alteration | Permit Issued | 10/10/2025 | 12/22/2025 | Design NEW AIR SOLUTION INC. | PROPOSED RENOVATION OF THE EXISTING RESTAURANT AND LEGALIZE THE EXISTING KITCHEN HOOD EXHAUST SYSTEM AND INSTALL THE NEW AIRCONDITIONER AT F… |
| Q01311817 ↗ | 32-28 208 STREET QUEENS | Alteration | Permit Issued | 10/31/2025 | 12/16/2025 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | INTERIOR RENOVATION OF EX. CELLAR AND BUILD A NEW STAIRCASE FROM CELLAR TO THE BACKYARD WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HER… |
| Q01329221 ↗ | 160-13 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 12/15/2025 | 12/16/2025 | Design ALAN YANG ARCHITECTURE | TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS O… |
| S01298572 ↗ | 566 HUNTER AVENUE STATEN ISLAND | Alteration | Signed-off | 10/15/2025 | 12/16/2025 | Design MADRIAGA ENGINEERING P.C. | PLUMBING WORK IS FILED TO CONJUNCT TO CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01329285 ↗ | 541 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/05/2025 | 12/09/2025 | Design ALAN YANG ARCHITECTURE Filer ISEED CONSTRUCTION INC | INTERIOR RENOVATION AND HVAC INSTALLATION AT AT 003 FLOOR OFFICE WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE… |
| Q01228018 ↗ | 136-46 41 AVENUE QUEENS | Alteration | Signed-off | 05/27/2025 | 12/04/2025 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | TO PROPOSE INTERIOR RENOVATION FOR EXISTING OFFICE #1B AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE… |
| Q01298120 ↗ | 63-28 108 STREET QUEENS | Alteration | Signed-off | 10/06/2025 | 12/04/2025 | Design ISEED CONSTRUCTION INC | INTERIOR RENOVATION OF EXISTING STORE WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF … |
| B01318900 ↗ | 949 56 STREET BROOKLYN | Alteration | Permit Issued | 11/17/2025 | 11/20/2025 | Remove partition wall in the Cellar and 2nd floor. No change in use, occupancy or egress. | |
| B01310770 ↗ | 7614 10 AVENUE BROOKLYN | Alteration | Signed-off | 11/11/2025 | 11/18/2025 | Remove partition wall in Cellar. Install awning at front of building. To remedy ECB violation #35719389M and #35719390J. No change in use oc… | |
| B01297857 ↗ | 1428 67 STREET BROOKLYN | Alteration | Signed-off | 10/11/2025 | 11/17/2025 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | TO INSTALL A CHAIN LINK FENCE GATE IN THE EXISTING SIDE YARD OF THE CONDO, WITH GENERAL CONSTRUCTION AS PER THE PLANS FILED HEREWITH. NO CHA… |
| M01271337 ↗ | 129 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/22/2025 | 11/17/2025 | Design JD Design Associates Inc Owner RYCO NYC LLC Filer JD DESIGN ASSOCIATES INC | INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PARTITION AND MECHANCIAL WORK ON 1ST FLOOR. INSTALL EXHAUST HOOD SYSTEM IN COMMERCIAL KIT… |
| Q01305780 ↗ | 23-28 STEINWAY STREET QUEENS | Alteration | Signed-off | 10/24/2025 | 11/03/2025 | Design NEW AIR SOLUTION INC. | PROPOSED PLUMBING WORK FOR A NAIL SPA ON THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01061352 ↗ | 1335 71 STREET BROOKLYN | Alteration CO | Permit Issued | 07/09/2024 | 10/17/2025 | Design S M TAM ARCHITECT, PLLC Filer A & D BUILDING SOLUTIONS | Subsequent Filing for exterior plumbing work. |
| B01255889 ↗ | 1221 TABOR COURT BROOKLYN | Alteration | Signed-off | 07/17/2025 | 10/15/2025 | Design ISEED CONSTRUCTION INC Filer ISEED CONSTRUCTION INC | TO RESOLVE ECB VIOLATION # 39152876K 39152828X 39152875Z 39152874R BY LEGALIZING PARTITIONS AND PLUMBING, GAS, AND ELECTRICAL WORK. AND WITH… |