← Back
Two stories - detached, small or mid-size
119 OSGOOD AVENUE
STATEN ISLAND · BIN 5014232
💬 Discuss this project
1915Year Built
2Stories
A1Building Class
R3AZoning
1,180 sfGross Floor Area
1Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,950 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CROSS COUNTY MGNT CONSULTING1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY BONSIGNORE, RA410/04/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICOLOSI BROS INCGeneral Contractor203/21/2026
RITE-FLO P.H.& COOLING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW ENGINEERING, PC1103410/04/2024
Building Lifecycle
All (60)Filed (4)Permit Issued (2)Signed Off (2)Violation (10)Inspection (4)Objection (8)Special Inspection (30)
11/26/2025
Violation issued (HPD, open)
I
05/02/2025
Signed off — Alteration
INTERIOR RENOVATION WORK ON THE 1ST & 2ND FLOORS, REPLACEMENT OF FLOOR JOISTS AND ROOF RAFTERS DUE TO FIRE AND WATER DAMAGE. NEW DUCTLESS A/C UNITS, NEW WINDOWS DOORS AND SIDING, AND ROOF FINISH ALL AS PER PLANS FILED.
S08052814-I1
05/01/2025
Signed off — Alteration
REPLACEMENT AND INSTALL NEW PLUMBING FIXTURES ON THE 1ST, & 2ND FLOORS
S08052816-I1
04/24/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Violation issued (HPD, open)
I
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
11/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
luis wong
11/07/2024
Special inspection requirement — Energy Code Compliance Inspections
luis wong
11/07/2024
Special inspection requirement — Maintenance information
luis wong
11/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
luis wong
11/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
luis wong
11/06/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
luis wong
11/06/2024
Special inspection requirement — Heating Systems
luis wong
11/06/2024
Special inspection requirement — Mechanical Systems
luis wong
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
luis wong
11/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
luis wong
11/06/2024
Special inspection requirement — Final
luis wong
11/06/2024
Special inspection requirement — Structural Wood Frame
luis wong
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
luis wong
11/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
luis wong
11/06/2024
Special inspection requirement — Maintenance information
luis wong
11/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
luis wong
11/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
luis wong
11/06/2024
Special inspection requirement — Interior lighting power
luis wong
11/06/2024
Special inspection requirement — Fenestration air leakage
luis wong
11/06/2024
Special inspection requirement — Fenestration areas
luis wong
11/06/2024
Special inspection requirement — Air barrier - visual inspection
luis wong
11/06/2024
Special inspection requirement — Insulation placement and R values
luis wong
11/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
luis wong
10/30/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Scope
10/04/2024
Filed — Alteration
INTERIOR RENOVATION WORK ON THE 1ST & 2ND FLOORS, REPLACEMENT OF FLOOR JOISTS AND ROOF RAFTERS DUE TO FIRE AND WATER DAMAGE. NEW DUCTLESS A/C UNITS, NEW WINDOWS DOORS AND SIDING, AND ROOF FINISH ALL AS PER PLANS FILED.
S08052814-P4
10/04/2024
Filed — Alteration
REPLACEMENT AND INSTALL NEW PLUMBING FIXTURES ON THE 1ST, & 2ND FLOORS
S08052816-P1
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
10/03/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
luis wong
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
10/03/2024
Special inspection requirement — Heating Systems
luis wong
10/03/2024
Special inspection requirement — Mechanical Systems
luis wong
09/26/2024
Permit issued — Plumbing
S08052816-I1-PL
11/30/2023
Violation issued (HPD, open)
I
01/31/2023
Permit issued — General Construction
S08052814-I1-GC-CX
12/28/2022
Objection raised — Other
12/28/2022
Objection resolved — Addressed
12/28/2022
Objection raised — Other
12/28/2022
Objection resolved — Addressed
12/28/2022
Objection raised — Scope
12/28/2022
Objection resolved — Addressed
12/12/2022
Filed — Alteration
INTERIOR RENOVATION WORK ON THE 1ST & 2ND FLOORS, REPLACEMENT OF FLOOR JOISTS AND ROOF RAFTERS DUE TO FIRE AND WATER DAMAGE. NEW DUCTLESS A/C UNITS, NEW WINDOWS DOORS AND SIDING, AND ROOF FINISH ALL AS PER PLANS FILED.
S08052814-I1
12/12/2022
Filed — Alteration
REPLACEMENT AND INSTALL NEW PLUMBING FIXTURES ON THE 1ST, & 2ND FLOORS
S08052816-I1
11/21/2022
Violation issued (HPD, open)
I
09/14/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/2022
Violation issued (HPD, open)
I
04/22/2021
Violation issued (HPD, open)
I
12/08/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2019
Violation issued (HPD, open)
I
10/30/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR09/26/2024
DOB NOWGeneral ConstructionSigned-offNICOLOSI BROS INC01/31/2023
3 projects · most recent 11/02/2023
General Wiring
FiledStatusContractorScope
11/02/2023CompleteHI VOLTAGE ELECTRIC INC1 meters, 1 new_meters
10/12/2023CompleteHI VOLTAGE ELECTRIC INCGeneral Wiring
11/15/2022CompleteHIGH BEAM ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
11/07/2024Fire-Resistant Penetrations and Jointsluis wongspecial
11/07/2024HVAC-R and service water heating system controlsluis wongenergy_progress
11/07/2024Energy Code Compliance Inspectionsluis wongprogress
11/07/2024Maintenance informationluis wongenergy_progress
11/07/2024HVAC-R and service water piping design and insulationluis wongenergy_progress
11/07/2024HVAC-R and service water heating equipmentluis wongenergy_progress
11/06/2024Construction Operations Influencing Adjacent Structuresluis wongspecial
11/06/2024Heating Systemsluis wongspecial
11/06/2024Mechanical Systemsluis wongspecial
11/06/2024Fire-Resistant Penetrations and Jointsluis wongspecial
11/06/2024Structural Stability – Alterations of existing buildingsluis wongspecial
11/06/2024Fire-Resistance Rated Constructionluis wongprogress
11/06/2024Finalluis wongprogress
11/06/2024Structural Wood Frameluis wongprogress
11/06/2024Energy Code Compliance Inspectionsluis wongprogress
11/06/2024HVAC-R and service water piping design and insulationluis wongenergy_progress
11/06/2024Maintenance informationluis wongenergy_progress
11/06/2024Fenestration and door U-factor and product ratingsluis wongenergy_progress
11/06/2024HVAC-R and service water heating equipmentluis wongenergy_progress
11/06/2024Interior lighting powerluis wongenergy_progress
11/06/2024Fenestration air leakageluis wongenergy_progress
11/06/2024Fenestration areasluis wongenergy_progress
11/06/2024Air barrier - visual inspectionluis wongenergy_progress
11/06/2024Insulation placement and R valuesluis wongenergy_progress
11/06/2024HVAC-R and service water heating system controlsluis wongenergy_progress
Latest 25 of 50.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S08052814-P4Request digital key ↗
08/20/2026S08052816-P1Request digital key ↗
08/20/2026S08052816-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature14
09/24/2026S08052816-I1Open ↗
09/24/2026S08052816-I1Open ↗
09/24/2026S08052816-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S08052814-I1Open ↗
08/23/2026S08052814-P4Open ↗
08/13/2026S08052816-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/24/2026S08052816-I1Open ↗
09/01/2026S08052816-P1Open ↗
08/26/2026S08052814-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026S08052814-P4Open ↗
08/15/2026S08052814-I1Open ↗
08/13/2026S08052816-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S08052814-I1Open ↗
08/13/2026S08052814-P4Open ↗