| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01400478 ↗ | 50 CHEEVER PLACE BROOKLYN | Alteration | Permit Issued | 05/14/2026 | 09/23/2026 | TO FILE PL PLUMBING WORK, INSTALL NEW AND REPLACE PLUMBING AND GAS FIXTURES ON THE BASEMENT, 1ST,2ND & 3RD FLOORS, NO CHANGE IN USE EGRESS O… |
| B00951240 ↗ | 8905 RIDGE BOULEVARD BROOKLYN | Alteration CO | Permit Issued | 10/31/2023 | 08/25/2026 | INTERIOR RENOVATION WORK ON THE CELLAR,1ST & 2ND FLOORS, REPLACE WINDOWS, INSTALL NEW DUCTLESS A/C SYSTEM CONVERT FROM 2 FAMILY TO 1 FAMILY … |
| B01353667 ↗ | 8215 FOSTER AVENUE BROOKLYN | Alteration | Permit Issued | 03/17/2026 | 07/24/2026 | REMOVAL OF ONE STORY STEEL FRAMED ENCLOSURE ON THE 1ST FLOOR IN ORDER TO COMPLY WITH ECB VIOLATION NUMBER 34985712Z. NO CHANGE IN EGRESS USE… |
| S01432546 ↗ | 55 ROE STREET STATEN ISLAND | Alteration | Filed — no permit on record | 07/20/2026 | — | — |
| B01299874 ↗ | 9008 5 AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/05/2025 | 06/26/2026 | PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION ON 1ST FLOOR & CELLAR INCONJUNCTION WITH 1ST FLOOR CHANGE OF USE FROM DRESS FACTO… |
| B01331659 ↗ | 230 7 AVENUE BROOKLYN | Alteration | Signed-off | 01/08/2026 | 06/22/2026 | NEW BOILER ON THE 1ST FLOOR AS PER PLANS FILED |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01400478 ↗ | 50 CHEEVER PLACE BROOKLYN | Alteration | Permit Issued | 05/14/2026 | 09/23/2026 | TO FILE PL PLUMBING WORK, INSTALL NEW AND REPLACE PLUMBING AND GAS FIXTURES ON THE BASEMENT, 1ST,2ND & 3RD FLOORS, NO CHANGE IN USE EGRESS O… |
| B00951240 ↗ | 8905 RIDGE BOULEVARD BROOKLYN | Alteration CO | Permit Issued | 10/31/2023 | 08/25/2026 | INTERIOR RENOVATION WORK ON THE CELLAR,1ST & 2ND FLOORS, REPLACE WINDOWS, INSTALL NEW DUCTLESS A/C SYSTEM CONVERT FROM 2 FAMILY TO 1 FAMILY … |
| B01353667 ↗ | 8215 FOSTER AVENUE BROOKLYN | Alteration | Permit Issued | 03/17/2026 | 07/24/2026 | REMOVAL OF ONE STORY STEEL FRAMED ENCLOSURE ON THE 1ST FLOOR IN ORDER TO COMPLY WITH ECB VIOLATION NUMBER 34985712Z. NO CHANGE IN EGRESS USE… |
| S01432546 ↗ | 55 ROE STREET STATEN ISLAND | Alteration | Filed — no permit on record | 07/20/2026 | — | — |
| B01299874 ↗ | 9008 5 AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/05/2025 | 06/26/2026 | PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION ON 1ST FLOOR & CELLAR INCONJUNCTION WITH 1ST FLOOR CHANGE OF USE FROM DRESS FACTO… |
| B01331659 ↗ | 230 7 AVENUE BROOKLYN | Alteration | Signed-off | 01/08/2026 | 06/22/2026 | NEW BOILER ON THE 1ST FLOOR AS PER PLANS FILED |
| B01207911 ↗ | 1528 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 05/09/2025 | 06/02/2026 | REMOVE SHOWER & SINK, ON THE CELLAR FLOOR IN ORDER TO COMPLY WITH PENDING ECB VIOLATIONS |
| B01066994 ↗ | 230 QUINCY STREET BROOKLYN | Alteration CO | Permit Issued | 08/23/2024 | 05/13/2026 | CONVERT BASEMENT FLOOR INTO 1 APARTMENT, CONVERT FROM 1 FAMILY TO 2 FAMILY DWELLING |
| B01309967 ↗ | 9008 5 AVENUE BROOKLYN | Alteration | Signed-off | 11/05/2025 | 04/29/2026 | REMOVE AND RELOCATE/REPLACE 1-LAV, 1-WC, ALL ON THE 1ST FLOOR |
| B01207015 ↗ | 1528 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 05/09/2025 | 04/08/2026 | INTERIOR RENOVATION WORK ON THE CELLAR FLOOR, REMOVE SHOWER AND SINK, IERECT NEW INTERIOR WALLS, PROVIDE NEW STEEL LINTELS OVER MASONRY OPEN… |
| B01222673 ↗ | 1528 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 06/04/2025 | 04/07/2026 | REPAIR FIRE DAMAGED APARTMENST ON THE 1ST,2ND,3RD & 4TH FLOORS (APT 1A,2A,3A,4A) INCLUDING REPLACEMENT OF WINDOWS AND DOORS ALL AS PER PLANS… |
| S01078024 ↗ | 3 BUTTONWOOD ROAD STATEN ISLAND | Alteration CO | Permit Issued | 08/09/2024 | 04/03/2026 | NEW EXTERIOR FRAME WALLS FROM 1ST FLOOR CEILING UP TO THE UNDERSIDE OF THE 2ND FLOOR SOFFIT (NO INCREASE IN FLOOR AREA OR OSP) CREATE NEW AT… |
| B00890989 ↗ | 158 PROSPECT PLACE BROOKLYN | Alteration | Permit Issued | 07/11/2023 | 03/20/2026 | REINFORCEMENT OF EXISTING EXISTING CEILING GIRDER ON THE 1ST FLOOR WITH NEW STEEL CHANNELS ON 2 NEW STEEL POSTS & MASONRY WALL, ALL ON THE 1… |
| B01066942 ↗ | 230 QUINCY STREET BROOKLYN | Alteration | Permit Issued | 09/16/2024 | 03/09/2026 | INSTALL NEW KITCHEN AND WASHER/DRYER AND FLOOR DRAIN ON THE BASEMENT FLOOR |
| B01331607 ↗ | 230 7 AVENUE BROOKLYN | Alteration | Signed-off | 01/08/2026 | 02/18/2026 | CREATE NEW BOILER ROOM ENCLOSURE ON THE 1ST FLOOR AS PER PLANS FILED NO CHANGE IN EGRESS USE OR OCCUPANCY |
| B01292964 ↗ | 200 CONGRESS STREET BROOKLYN | Alteration | Signed-off | 11/05/2025 | 01/26/2026 | RENOVATION OF EXISTING KITCHEN WITH MINOR PARTITION WORKS WITHIN APARTMENT 4D ON THE 4TH FLOOR AS PER PLANS FILED. NO CHANGE IN EGRESS USE O… |
| B00891830 ↗ | 158 PROSPECT PLACE BROOKLYN | Alteration | Permit Issued | 07/11/2023 | 01/21/2026 | REMOVAL & INSTALLATION OF PLUMBNING AND GAS FIXTURES AS PER PLANS FILED. |
| B01220745 ↗ | 560 2 STREET BROOKLYN | Alteration CO | Permit Issued | 07/18/2025 | 11/14/2025 | RELOCATE PREVIUOSLY APPROVED CONDENSSING UNIT CU-1 TO NEW LOCATION BELOW EXISTING UNIT AS PER PLANS FILED |
| B01233535 ↗ | 139 QUINCY STREET BROOKLYN | Alteration CO | Permit Issued | 07/07/2025 | 10/09/2025 | INTERIOR RENOVATION WORK ON THE CELLAR, BASEMENT,1ST, 2ND & 3RD FLOORS, REPLACE WINDOWS, NEW OPEN DECK AT REAR, NEW MECHANICAL EQUIPMENT AND… |
| Q01285838 ↗ | 90-23 161 STREET QUEENS | Alteration | Filed — no permit on record | 10/02/2025 | — | — |
| B01287534 ↗ | 7414 5 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/29/2025 | — | — |
| B01290977 ↗ | 7416 5 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/29/2025 | — | — |
| B01229307 ↗ | 139 QUINCY STREET BROOKLYN | Alteration | Signed-off | 07/07/2025 | 08/20/2025 | replace and install new plumbing fixtures on the cellar, basement, 1 thru 3rd floors as per plans filed |
| B00859978 ↗ | 135 FT GREENE PLACE BROOKLYN | Alteration CO | Permit Issued | 04/26/2023 | 08/06/2025 | REPLACEMENT AND INSTALATION OF NEW PLUMBING AND GAS FIXTURES ON THE CELLAR, BASEMENT,1ST 2ND & 3RD FLOORS |
| B01223806 ↗ | 34 COLONIAL COURT BROOKLYN | Alteration | Signed-off | 05/21/2025 | 07/11/2025 | REPLACE AND INSTALL NEW PLUMBING AND GAS FIXTURES ON THE 1ST & 2ND FLOORS |
| B00937211 ↗ | 8 REMSEN STREET BROOKLYN | Alteration | Signed-off | 10/13/2023 | 06/30/2025 | REPLACEMENT OF PLUMBING AND GAS FIXTURES ON THE 3,4,5 & 6 FLOORS DUE TO WATER, SMOKE AND FIRE DAMAGE AS PER PLANS FILED |
| B00951907 ↗ | 8905 RIDGE BOULEVARD BROOKLYN | Alteration | Signed-off | 10/31/2023 | 04/29/2025 | RELOCATE AND INSTALL NEW PLUMBING FIXTURES ON THE CELLAR,1ST & 2ND FLOORS |
| B01169744 ↗ | 588 HENRY STREET BROOKLYN | Alteration | Signed-off | 02/18/2025 | 03/26/2025 | REPLACEMENT OF PLUMBING AND GAS KITCHEN FIXTURES ON THE BASEMENT FLOOR |
| B01169719 ↗ | 588 HENRY STREET BROOKLYN | Alteration | Signed-off | 02/18/2025 | 03/10/2025 | INTERIOR RENOVATION WORK WITHIN APARTMENT, REPLACEMENT OF FRONT & REAR WINDOWS ALL DUE TO FIRE/WATER DAMAGE ON THE BASEMENT FLOOR AS PER PLA… |
| B01079553 ↗ | 1863 78 STREET BROOKLYN | Alteration | Signed-off | 08/02/2024 | 02/11/2025 | CREATE NEW OFF STREET PARKING PAD FOR 1 CAR, RENOVATE MASONRY STAIR AND PLATFORM FROM GRADE TO 1ST FLOOR LEVEL |
| B01122988 ↗ | 1366 EAST 36 STREET BROOKLYN | Alteration | Signed-off | 10/07/2024 | 01/15/2025 | REMOVE FRAME WALL AND WINDOWS AND FINISHED CEILING, INSTALL NEW GAGARE DOOR, INSTALL NEW GWB CEILING ALL WITHIN THE GARAGE AS PER PLANS FILE… |
| B01145345 ↗ | 7812 14 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 01/14/2025 | — | — |
| B01147172 ↗ | 7812 14 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 01/14/2025 | — | — |
| Q01086642 ↗ | 5-46 BEACH 135 STREET QUEENS | Alteration | Permit Issued | 08/09/2024 | 11/20/2024 | REPLACE/RELOCATE GAS AND PLUMBING FIXTURES ON THE CELLAR & 1ST FLOORS, REPLACE AND INSTALL NEW PLUMBING FIXTURES ON THE 2ND FLOOR |
| Q01061664 ↗ | 5-46 BEACH 135 STREET QUEENS | Alteration CO | Permit Issued | 08/09/2024 | 11/19/2024 | INTERIOR RENOVATION WORK ON THE CELLAR 1ST & 2ND FLOORS, NEW A/C SYSTEM REPLACEMENT OF WINDOWS OBTAIN NEW CO FOR EXISTING 1 FAMILY DWELLING |
| S00987327 ↗ | 77 ARDSLEY STREET STATEN ISLAND | Alteration | Signed-off | 01/23/2024 | 11/08/2024 | INSTALL NEW TEMPORARY 8'-0 HIGH PLYWOOD CONSTRUCTION FENCE, FACING ON ARDSLEY STREET AND WILDER AVENUE (CORNER PROPERTY) |
| B01079529 ↗ | 1863 78 STREET BROOKLYN | Alteration | Signed-off | 08/02/2024 | 10/10/2024 | INSTALL NEW YARD DRAIN IN THE FRONT YARD |
| B01079516 ↗ | 1863 78 STREET BROOKLYN | Alteration | Signed-off | 08/02/2024 | 10/01/2024 | CREATE NEW 8'-6 CURB CUT WITH 2 - -1-6 SPLAYS |
| S08052816 ↗ | 119 OSGOOD AVENUE STATEN ISLAND | Alteration | Signed-off | 12/12/2022 | 09/26/2024 | REPLACEMENT AND INSTALL NEW PLUMBING FIXTURES ON THE 1ST, & 2ND FLOORS |
| B01096900 ↗ | 641 BALTIC STREET BROOKLYN | Alteration | Signed-off | 08/19/2024 | 08/27/2024 | ERECT TEMP. PLYWOOD. 8'-0 HIGH CONSTRUCTION FENCE IN THE REAR AND SIDES OF THE BUILDING |
| B00854574 ↗ | 560 2 STREET BROOKLYN | Alteration | Signed-off | 04/13/2023 | 08/23/2024 | REMOVAL AND INSTALLATION OF NEW PLUMBING AND GAS FIXTURES AS PER PLANS FILED |
| B00937134 ↗ | 8 REMSEN STREET BROOKLYN | Alteration | Signed-off | 10/13/2023 | 08/21/2024 | PARTIAL REMOVAL AND RECONSTRUCTION OF PARTITIONS,FLOORS AND CEILING FINISHES ON THE 3,4 & 6 FLOORS, REMOVAL AND RECONSTRUCTION OF PARTITIONS… |
| S00987334 ↗ | 77 ARDSLEY STREET STATEN ISLAND | Alteration CO | Permit Issued | 01/25/2024 | 07/15/2024 | INTERIOR RENOVATION WORK ON THE CELLAR,1ST & 2ND FLOORS, REMOVE ROOF, CREATE NEW ATTIC. SMALL PARTIAL 2 STORY ADDITION AT BOTH FRONTS OF BUI… |
| B08053829 ↗ | 261 15 STREET BROOKLYN | Alteration CO | Permit Issued | 12/21/2022 | 07/11/2024 | INTERIOR RENOVATION WORK ON THE CELLAR, 1ST & 2ND FLOORS, REMOVE PORTION OF EXISTING ONE-STORY AT REAR, RECONSTRUCT AND EXPAND ONE STORY ADD… |
| B08046633 ↗ | 236 AMHERST STREET BROOKLYN | Alteration | Signed-off | 12/12/2022 | 06/13/2024 | REMOVE AND INSTALL NEW PLUMBING AND GAS FIXTURES ON THE CELLAR, 1ST & 2ND FLOORS. |
| B00701446 ↗ | 1620 KINGS HIGHWAY BROOKLYN | Alteration | Signed-off | 04/25/2022 | 05/31/2024 | DISCONNET GAS LINE AND RISER FROM GAS METER TO ROOF, INSTALL NEW 1-1/4 GAS RISER FROM THE EXISTING GAS METER AT CELLAR TO NEW ROOF TOP HVAC … |
| S00989913 ↗ | 77 ARDSLEY STREET STATEN ISLAND | Alteration | Signed-off | 01/23/2024 | 04/30/2024 | REMOVE AND INSTALL NEW PLUMBING AND GAS FIXTURES ON THE CELLAR, 1ST & 2ND & ATTIC FLOORS AS PER PLANS FILED. |
| B00451661 ↗ | 164 HALL STREET BROOKLYN | Alteration | Signed-off | 01/13/2021 | 03/15/2024 | REPLACEMENT AND INSTALLATION OF PLUMBING AND GAS FIXTURES ON THE CELLAR BASEMENT,1ST,2ND & 3RD FLOORS ALL AS PER PLANS FILED |
| B00701626 ↗ | 1620 KINGS HIGHWAY BROOKLYN | Alteration | Permit Issued | 04/25/2022 | 03/07/2024 | REMOVE STOREFRONT, SECURY GATE AND AWNING, INSTALL NEW STOREFRONT AND NEW ROLL DOWN SECURITY GATE AS PER PLANS FILED |
| B00946237 ↗ | 445 PUTNAM AVENUE BROOKLYN | Alteration | Signed-off | 12/04/2023 | 02/07/2024 | PARTIAL RENOVATION OF EXISTING APARTMENT ON THE 1ST FLOOR, RELOCATE KITCHEN AND BED ROOMS, REMODEL BATH ROOM ALL AS PER PLANS FILED. |
| B00947140 ↗ | 445 PUTNAM AVENUE BROOKLYN | Alteration | Signed-off | 12/04/2023 | 02/06/2024 | REMOVAL AND INSTALLATION OF PLUMBING AND GAS FIXTURES ON THE FIRST FLOOR APARTMENT. |
| B00496657 ↗ | 1464 80TH STREET BROOKLYN | Alteration | Permit Issued | 04/06/2021 | 02/02/2024 | INTERIOR RENOVATION WORK THROUGHOUT BUILDING, REPLACE WINDOWS WITH NEW, NEW SIDING EXTERIOR FINISH ON THE 2ND FLOOR LEVEL ALL AS PER PLANS F… |
| B00964681 ↗ | 1529 39 STREET BROOKLYN | Alteration | Signed-off | 11/29/2023 | 01/04/2024 | ERECT NEW TEMPORARY, 8'-0 HIGH PLYWOOD CONSTRUCTION FENCE AT COMMON DRIVEWAY IN THE OPEN SPACE AS PER PLAN FILED |
| B00932307 ↗ | 1529 39 STREET BROOKLYN | Alteration | Signed-off | 11/29/2023 | 01/02/2024 | REMOVE AND REPLACE EXTERIOR FACING MASONRY WALL FROM THE 1ST FLOOR WINDOW SILL LEVEL UP TO THE 2ND STORY AND SOFFIT LEVEL, RECONNECT ROOF TO… |
| B00925983 ↗ | 1528 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2023 | 12/04/2023 | REPAIR CORNER, AND BRICK WALL FROM GRADE TO 1ST FLOOR LEVEL, REPAIR IRON FENCE AT GRADE DUE TO CAR IMPACT, SHORE AND REPAIR PORTION OF CELLA… |
| B00926003 ↗ | 1528 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2023 | 12/04/2023 | INSTALL NEW TEMPORARY, PLYWOOD, 8'-0 HIGH PROTECTION FENCE AT CORNER OF BUILDING |
| B00853525 ↗ | 811 CORTELYOU ROAD BROOKLYN | Alteration | Signed-off | 05/12/2023 | 11/03/2023 | ERECT INTERIOR PARTITIONS AND DOORS WITHIN APARTMENT 4-C AS PER PLANS FILED |
| B00887639 ↗ | 8 SIDNEY PLACE BROOKLYN | Alteration | Signed-off | 07/06/2023 | 10/31/2023 | REMOVE PORTIONS OF BRICK VENEER REPAIR REPLACE PORTIONS OF DAMAGED MASONRY BEARING WALLS, INSTALL NEW 4 BRICK VENEER FINISH, ALL ON THE SIDE… |
| S00829116 ↗ | 139 FAIRVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 03/07/2023 | 10/11/2023 | 9'-0 CURB CUT WITH 2-1'-6 SPLAYS |
| B00707959 ↗ | 75 82 STREET BROOKLYN | Alteration | Signed-off | 04/06/2022 | 09/25/2023 | NEW TEMPORARY PLYWOOD, 8'-0 HIGH CONSTRUCTION FENCE IN THE REAR YARD |
| B00707964 ↗ | 75 82 STREET BROOKLYN | Alteration | Signed-off | 04/06/2022 | 09/25/2023 | REMOVE DAMAGED 36 HIGH RETAINING WALL AND OPEN WOOD DECK IN THE REAR YARD, ERECT NEW 36 HIGH RETAINING WALL AND NEW OPEN MASONRY DECK, PRIVA… |
| B00710077 ↗ | 75 82 STREET BROOKLYN | Alteration | Signed-off | 04/06/2022 | 09/12/2023 | INSTALL NEW INGROUND WITH SPA SWIMING POOL, RELOCATE YARD DRAINS AND INSTALL NEW POOL HEATER ALL IN THE REAR YARD AS PER PLANS FILED |
| B00496734 ↗ | 1464 80TH STREET BROOKLYN | Alteration | Signed-off | 04/06/2021 | 08/31/2023 | INSTALL NEW AND RELOCATE PLUMBING FIXTURES ON THE CELLAR,1ST & 2ND FLOORS |
| B08053892 ↗ | 261 15 STREET BROOKLYN | Alteration | Signed-off | 12/21/2022 | 08/25/2023 | REMOVE AND INSTALL NEW PLUMBING FIXTURES ON THE CELLARM 1ST $ 2ND FLOORS, NEW ELECTRICAL HWH, DRYER AND RANGE ALL AS PER PLANS FILED |
| B00701671 ↗ | 1620 KINGS HIGHWAY BROOKLYN | Alteration | Permit Issued | 04/25/2022 | 08/18/2023 | REMOVE EXISTING HVAC UNIT ON ROOF, REPLACE WITH NEW HVAC UNIT ONTO EXISTING STEEL DUNNAGE BEAMS AS PER PLANS FILED |
| B00766731 ↗ | 184 LINCOLN PLACE BROOKLYN | Alteration CO | Permit Issued | 07/18/2022 | 08/04/2023 | REMOVAL OF EXISTING ENTIRE FIRE ESCAPE ON THE REAR FACADE, ERECT NEW NON-COMBUSTABLE DECK AND STAIR, INSTALL NEW WINDOW AND DOOR ON THE 1ST … |
| B00868963 ↗ | 620 EAST 2 STREET BROOKLYN | Alteration | Signed-off | 05/17/2023 | 07/27/2023 | REMOVE EXISTING WOOD KING BEAM AND REPLACE WITH NEW STEEL GIRDER, AND COLUMNS WITH RELATED CONCRETE PIERS, MINOR PARTITION WORKS, PATCHING O… |
| B00719202 ↗ | 952 EAST 18 STREET BROOKLYN | Alteration | Signed-off | 05/17/2022 | 06/21/2023 | REMOVE DAMAGED MASONRY GARAGE SIDE WALL AND PARTIAL REAR GARAGE WALL, ERECT NEW MASONRY WALLS, INSTALL NEW ROOF RAFTERS AND ROOF SHINGLES, C… |
| B08053883 ↗ | 261 15 STREET BROOKLYN | Alteration | Signed-off | 12/21/2022 | 06/15/2023 | INSTALL TEMPORARY 8'-0 HIGH, PLYWOOD CONSTRUCTION FENCE AS PER PLAN FILED |
| B00817150 ↗ | 560 2 STREET BROOKLYN | Alteration CO | Permit Issued | 03/27/2023 | 06/06/2023 | INTERIOR RENOVATION WORK ON THE CELLAR, BASEMENT, 1ST, 2ND & 3RD FLOORS, CONVERT BUILDING FROM A 5 FAMILY TO A ONE FAMILY DWELLING, INCLUDIN… |
| B00878784 ↗ | 8408 7 AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 06/06/2023 | — | — |
| B00882096 ↗ | 8408 7 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 06/06/2023 | — | — |
| B00798443 ↗ | 445 PUTNAM AVENUE BROOKLYN | Alteration | Permit Issued | 12/02/2022 | 05/19/2023 | REMOVE AND INSTALL NEW PLUMBING AND GAS FIXTURES ON THE BASEMENT APARTMENT FLOOR, RE-CONNECT YARD DRAIN AT CELLAR FLOOR |
| B08048937 ↗ | 236 AMHERST STREET BROOKLYN | Alteration CO | Permit Issued | 12/13/2022 | 05/16/2023 | MINOR INTERIOR RENOVATION WORK ON THE 1ST & 2ND FLOORS, CONVERT FROM A 2 FAMILY TO A ONE FAMILY BUILDING AS PER PLANS FILED. |
| B00872014 ↗ | 8408 7 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/10/2023 | — | — |
| B00872200 ↗ | 8408 7 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/10/2023 | — | — |
| B00660588 ↗ | 1155 82 STREET BROOKLYN | Alteration | Permit Issued | 05/02/2022 | 05/04/2023 | INTERIOR PLUMBING RENOVATION WORK THROUGHT THE BUILDING, REPLACE AND INSTALL NEW PLUMBING & GAS FIXTURES ON THE CELLAR,1ST,2ND & OSP AS PER … |
| B00856775 ↗ | 445 PUTNAM AVENUE BROOKLYN | Alteration | Signed-off | 04/13/2023 | 05/03/2023 | INTERIOR RENOVATION WORK WITHIN APARTMENT ON THE BASEMENT FLOOR, MINOR WORKS AT CELLAR AS PER PLANS FILED |
| B00662028 ↗ | 122 GATES AVENUE BROOKLYN | Alteration | Signed-off | 01/13/2022 | 02/09/2023 | INSTALL NEW TEMPORARY, 8'-0 HIGH PLYWOOD CONSTRUCTION FENCE IN THE REAR YARD |
| S08052814 ↗ | 119 OSGOOD AVENUE STATEN ISLAND | Alteration | Signed-off | 12/12/2022 | 01/31/2023 | INTERIOR RENOVATION WORK ON THE 1ST & 2ND FLOORS, REPLACEMENT OF FLOOR JOISTS AND ROOF RAFTERS DUE TO FIRE AND WATER DAMAGE. NEW DUCTLESS A/… |
| B00798483 ↗ | 445 PUTNAM AVENUE BROOKLYN | Alteration | Filed — no permit on record | 12/02/2022 | — | — |
| B00482710 ↗ | 289 WASHINGTON AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/23/2021 | 11/21/2022 | NO WORK TO BE PERFORMED UNDER THIS APPLICATION. EXISTING TWO FAMILY DWELLING TO REMAIN. CHANGE TO CONFIGURATION ONLY FROM 2 DUPLEX APARTMENT… |
| B08025619 ↗ | 1720 AVENUE Z BROOKLYN | Alteration | Filed — no permit on record | 11/17/2022 | — | — |
| B08022302 ↗ | 290 14 STREET BROOKLYN | Alteration | Signed-off | 10/19/2022 | 11/03/2022 | ERECT TEMPORARY 8'-0 HIGH, PLYWOOD CONSTRUCTION FENCE ON THE FRONT AND REAR YARDS ALL AS PER PLAN FILED |
| B00323539 ↗ | 316 BAY RIDGE PARKWAY BROOKLYN | Alteration | Signed-off | 03/11/2020 | 10/18/2022 | RELOCATE AND INSTALL NEW PLUMBING FIXTURES ON THE 1ST & 2ND FLOOR AS PER PLANS FILED IN CONJUNCTION WITH ALL 1 # 321969018 |
| S00551075 ↗ | 119 WESTERVELT AVENUE STATEN ISLAND | Alteration | Signed-off | 07/27/2021 | 09/28/2022 | REMOVE EXISTING OPEN WOOD DECKS AND POSTS ON THE 1ST & 2ND FLOOR LEVELS, REBUILD OPEN DECKS ON BOTH THE 1ST & 2ND FLOORS, INCLUDING NEW FOOT… |
| B00701592 ↗ | 1620 KINGS HIGHWAY BROOKLYN | Alteration | Signed-off | 04/25/2022 | 09/13/2022 | INSTALL NEW 8'-0 HIGH, PLYWOOD TEMPORARY CONSTRUCTION FENCE AND DOOR, 3'-0 MAX. FROM THE FRONT PROPERTY LINE AS PER PLAN FILED. |
| B00798387 ↗ | 445 PUTNAM AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/07/2022 | — | — |
| B00777083 ↗ | 605 JEFFERSON AVENUE BROOKLYN | Alteration | Signed-off | 07/26/2022 | 08/22/2022 | REMOVAL OF BOILER AND GAS HOT WATER HEATERS, INSTALL 2 NEW WALL HUNG GAS COMBINATION UNITS (HEAT & HW COILS AND 2 HOT WATER STORAGE TANKS ON… |
| B00719669 ↗ | 952 EAST 18 STREET BROOKLYN | Alteration | Signed-off | 05/17/2022 | 08/15/2022 | REPLACE/RELOCATE AND INSTALL NEW PLUMBING AND GAS FIXTURES ON THE CELLAR,1ST,2ND & ATTIC FLOORS. |
| B00689354 ↗ | 1072 82 STREET BROOKLYN | Alteration | Signed-off | 03/07/2022 | 08/01/2022 | REMOVE DAMAGED CONCRETE REAR YARD AND DRIVEWAY SLAB, NEW PAVED DRIVEWAY AND REAR YARD AREA, NEW OPEN CAR PORT, NEW MASONRY PRIVACY FENCE WAL… |
| B00474557 ↗ | 441 76 STREET BROOKLYN | Alteration | Signed-off | 03/11/2021 | 07/27/2022 | INSTALL NEW, AND RELOCATE PLUMBING AND GAS FIXTURES ON THE CELLAR, 1ST, 2ND & OSP AS PER PLANS FILED |
| B00719780 ↗ | 952 EAST 18 STREET BROOKLYN | Alteration CO | Permit Issued | 05/17/2022 | 07/01/2022 | INTERIOR RENOVATION WORK FROM CELLAR TO 1ST, 2ND & ATTIC FLOORS, NEW WINDOWS REPAIR PORTIONS OF EXTERIOR SIDING AND NEW SPLIT DUCLESS A/C SY… |
| B00474945 ↗ | 441 76 STREET BROOKLYN | Alteration | Signed-off | 03/12/2021 | 06/28/2022 | INTERIOR RENOVATION WORK ON THE CELLAR,1ST & 2ND FLOORS, REMOVE ONE STORY FRAME AND DECK AT REAR, NEW ONE STORY AND CELLAR ADDITION WITH OPE… |
| B00719283 ↗ | 952 EAST 18 STREET BROOKLYN | Alteration | Signed-off | 05/17/2022 | 06/23/2022 | ERECT TEMPORARY, 8'-0 HIGH, PLYWOOD FENCE IN THE REAR YARD |
| B00489384 ↗ | 214 BERGEN STREET BROOKLYN | Alteration CO | Permit Issued | 04/08/2021 | 06/07/2022 | INTERIOR RENOVATION WORK THROUGHOUT BUILDING, REMOVE 1 STORY FRAME PORTION AT REAR, REPLACE ALL WINDOWS AND NEW DECK AR REAR, MECHANICAL WOR… |
| B00231944 | 1601 AVENUE Z BROOKLYN | — | Signed-off | — | 05/11/2022 | CONSTRUCT NEW TEMPORARY, 8'-0 PLYWOOD CONSTRUCTION FENCE FRONTING ON AVENUE Z & EAST 16TH STREET |
| B00660676 ↗ | 1155 82 STREET BROOKLYN | Alteration CO | Filed — no permit on record | 05/03/2022 | — | — |
| B00660566 ↗ | 1155 82 STREET BROOKLYN | Alteration | Filed — no permit on record | 05/02/2022 | — | — |
| B00393101 ↗ | 4916 6 AVENUE BROOKLYN | Alteration | Permit Issued | 03/03/2021 | 04/27/2022 | INSTALL NEW PLUMBING FIXTURES AND 5 SPRINKLER HEADS OFF THE DOMESTIC WATER SERVICE LINE ON THE CELLAR FLOOR, APPLICATION IS ALSO FILED TO CO… |
| Person | Filings | Most recent |
|---|---|---|
| Anthony Bonsignore | 225 | 07/17/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| GSTRUCTION CORP | 12 | 06/04/2025 |
| HAPPY CARPENTERS INC | 12 | 05/11/2026 |
| 7421 LORENZO & SONS CONST | 6 | 04/25/2022 |
| PLUMBING WORKS NYC INC | 6 | 05/14/2026 |
| EXCLUSIVE HOME DESIGN INC | 5 | 10/23/2023 |
| NOCE CONSTRUCTION CORP | 5 | 08/09/2024 |
| J. CAIAZZO PLBG & HTG COR | 4 | 03/07/2024 |
| JNR PLUMBING INC DBA | 4 | 03/04/2021 |
| MAXIMUM CONTRACTING INC | 4 | 02/26/2025 |
| PROCRAFT DS LLC | 4 | 07/20/2026 |
| FC & PC CONSTRUCTION CORP | 3 | 04/01/2024 |
| N & F FRASCA CONTRACTING | 3 | — |
| QBK PLUMBING & HTNG INC | 3 | 05/13/2024 |
| RELIABLE PLBG & HTG CORP | 3 | 01/01/2025 |
| BTR INNOVATIVE BUILDERS I | 2 | 08/02/2024 |
| PRIMO DESIGN & CONSTRUCTI | 2 | 07/30/2021 |
| RITE-FLO P.H.& COOLING IN | 2 | 10/04/2024 |
| A&H EXPRESS PLBG&HTG CORP | 1 | 10/04/2024 |
| A.D.S. PLBG AND HTG INC | 1 | — |
| ABOUT THE FINISH LLC | 1 | 05/07/2026 |
| ABR PLBG&HTG CONTR INC | 1 | 09/16/2024 |
| B-EZ PLUMBING & HTG CORP | 1 | 04/03/2024 |
| B36 SERVICES INC | 1 | 04/17/2025 |
| BENNETT PLBG & MECH LLC | 1 | 01/20/2026 |
| BIG APPLE SEWER & DRAIN I | 1 | — |
| Name | Jobs together | Most recent |
|---|---|---|
| 1528 BEDFORD AVENUE REALTY CORP | 5 | 06/04/2025 |
| WALDORF REALTY CO INC | 4 | 06/14/2023 |
| JLN CONSTRUCTION | 3 | 02/26/2025 |
| AFA REALTY LLC | 2 | 09/01/2022 |
| CROSS COUNTY MGMT & CONSULTING CORP | 2 | — |
| CROSS COUNTY MGNT &CONSULTING CORP | 2 | 10/04/2024 |
| EDNOJO REALTY CORP | 2 | 05/18/2026 |
| FORCES OF NATURE | 2 | — |
| MARIANNA DELFINO LLC | 2 | 07/20/2026 |
| 50 Cheever Place Management LLC | 1 | 05/14/2026 |
| AVAM REALTY LLC | 1 | 09/29/2025 |
| BARTMAR LLC | 1 | 09/29/2025 |
| BEGUELIN CORP. | 1 | 07/06/2023 |
| CAPTAIN HOLDINGS CORP. | 1 | 03/17/2026 |
| FEMALE | 1 | 02/25/2021 |
| OWNER REPRESENTATIVE | 1 | 11/17/2020 |
| THE UNIVERSITY CLUB | 1 | — |
| The Salvation Army | 1 | 10/02/2025 |
| WASHAVE LLC | 1 | 06/13/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| CITY BUILDING NY ARCHITECT P.C. | 8 | 11/18/2025 |
| O R A C | 7 | 02/05/2026 |
| AVT ENGINEERING | 2 | 11/29/2023 |
| GREEN LIGHT EXPEDITING LLC | 2 | 05/18/2026 |
| VIP EXPEDITING | 1 | 02/26/2025 |