← Back
Professional building / stand-alone funeral home
1190 HYLAN BOULEVARD
STATEN ISLAND · BIN 5091141
💬 Discuss this project
1987Year Built
1Stories
O7Building Class
R3-2Zoning
3,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 1190 HYLAN REALTY, LLC · 2,569 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1190 HYLAN REALTY1507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE101/10/2023
PERMANENT ENGINEERING P.C.310/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR203/21/2026
KAS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCARAN OIL SERVICE INCGeneral Contractor107/08/2026
SCARAN PLUMBING INCPlumbing107/08/2026
R G M SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RELIANCE ENGINEERING, P.C322210/25/2022
Building Lifecycle
All (21)Filed (4)Permit Issued (3)Signed Off (2)Violation (10)Inspection (1)Special Inspection (1)
07/11/2023
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - HEROLD & LANTERN INVESTMENTS, INC. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S00800085-I1
01/12/2023
Permit issued — Sign
S00800085-I1-SG
01/10/2023
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - HEROLD & LANTERN INVESTMENTS, INC. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S00800085-I1
01/10/2023
Special inspection requirement — Final
MOHAMMAD AHEAD
11/18/2022
Signed off — Alteration
DIRECT REPLACEMENT OF 2 HVAC UNIT AT EX. ROOFON EX. STEEL DUNNAGE. REPLACEMENT OF 2 INDOOR AIR-HANDLER AT CELLAR AND 1ST FLOOR MECHANICAL ROOM.FILING TO OBTAIN Certificate of Compliance.NO CHANGE IN USE EGRESS AND OR OCCUPANCY.
S00603087-S1
10/25/2022
Filed — Alteration
DIRECT REPLACEMENT OF 2 HVAC UNIT AT EX. ROOFON EX. STEEL DUNNAGE. REPLACEMENT OF 2 INDOOR AIR-HANDLER AT CELLAR AND 1ST FLOOR MECHANICAL ROOM.FILING TO OBTAIN Certificate of Compliance.NO CHANGE IN USE EGRESS AND OR OCCUPANCY.
S00603087-P1
11/04/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/01/2021
Permit issued — Mechanical Systems
S00603087-I1-MS
10/22/2021
Permit issued — Plumbing
S00603087-S1-PL
10/21/2021
Filed — Alteration
DIRECT REPLACEMENT OF 2 HVAC UNIT AT EX. ROOFON EX. STEEL DUNNAGE. REPLACEMENT OF 2 INDOOR AIR-HANDLER AT CELLAR AND 1ST FLOOR MECHANICAL ROOM.FILING TO OBTAIN Certificate of Compliance.NO CHANGE IN USE EGRESS AND OR OCCUPANCY.
S00603087-S1
10/20/2021
Filed — Alteration
DIRECT REPLACEMENT OF 2 HVAC UNIT AT EX. ROOFON EX. STEEL DUNNAGE. REPLACEMENT OF 2 INDOOR AIR-HANDLER AT CELLAR AND 1ST FLOOR MECHANICAL ROOM.FILING TO OBTAIN Certificate of Compliance.NO CHANGE IN USE EGRESS AND OR OCCUPANCY.
S00603087-I1
12/13/1999
Violation issued (ECB, closed)
Construction
12/12/1997
Violation issued (ECB, closed)
Construction
06/17/1996
Violation issued (ECB, closed)
Construction
10/19/1993
Violation issued (ECB, closed)
Construction
09/30/1993
Violation issued (ECB, closed)
Construction
08/30/1993
Violation issued (ECB, closed)
Construction
07/13/1992
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
11/02/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/1988
Violation issued (ECB, closed)
Construction
07/01/1988
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offR.G.M. SIGNS INC01/12/2023
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC11/01/2021
DOB NOWPlumbingSigned-offSCARAN PLUMBING INC10/22/2021
1 project · most recent 10/25/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/25/2022Signed-offSCARAN OIL SERVICE INCAir Conditioning Systems, Heating Systems
Cooling
Carrier 24ANB642A003 42,000 BTU · Heat Pump Outdoor ×2
24ANB660A003 60,000 BTU · Heat Pump Outdoor ×2
Heating
Carrier 58TN0A110C21-20 120,000 BTU · Furnace ×4
1 project · most recent 10/25/2022
Gas
FiledStatusContractorScope
10/25/2022Signed-offSCARAN PLUMBING INCGas
2 projects · most recent 02/21/2023
General Wiring
FiledStatusContractorScope
02/21/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
02/20/2023CompleteD.R.P. ELEC'L CONTRG INC—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/04/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
01/10/2023FinalMOHAMMAD AHEADprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026S00603087-I1Request digital key ↗
08/25/2026S00603087-P1Request digital key ↗
08/25/2026S00603087-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026S00603087-P1Open ↗
08/25/2026S00603087-S1Open ↗
08/25/2026S00603087-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026S00800085-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026S00603087-P1Open ↗
08/25/2026S00603087-S1Open ↗
08/25/2026S00603087-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00603087-I1Open ↗