City residence, one family
11A 3 PLACE
BROOKLYN · BIN 3005262
💬 Discuss this project
1901Year Built
3Stories
A4Building Class
R6BZoning
2,754 sfGross Floor Area
1Units
City residence, one family · 1,533 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Basement3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/27/2013$2.3M—Private party → Private party$835/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES G. MICHEL ENGINEERING, PC.504/15/2026
YIA201/14/2025
MARTOS ENGINEERING105/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EC BUILDING CONSULTANTS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COBURN CONSTRUCTION MANAGGeneral Contractor407/08/2026
WAWEL PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN496201/14/2025
CHRISTIAN L. MARTOS ENGIN5965301/14/2025
CHARLES G MICHEL ENGINEER2871110/29/2024
Building Lifecycle
All (65)Filed (8)Permit Issued (5)Signed Off (4)Inspection (4)Objection (14)Special Inspection (30)
06/12/2026
Signed off — Alteration
Modification and installation of new plumbing fixtures with related piping as shown on drawings.
B01118300-I1
05/15/2026
Permit issued — Mechanical Systems
B01118300-I1-MS
05/13/2026
Signed off — Alteration
Modification and installation of new plumbing fixtures with related piping as shown on drawings.
B01118300-S1
04/15/2026
Filed — Alteration
Modification and installation of new plumbing fixtures with related piping as shown on drawings.
B01118300-P3
02/25/2026
Objection resolved — Addressed
02/18/2026
Objection raised — Cost
02/17/2026
Filed — Alteration
Modification and installation of new plumbing fixtures with related piping as shown on drawings.
B01118300-P2
11/13/2025
Signed off — Alteration
Proposed structural work that includes construction of an exterior CMU addition, construction of rear addition and moment frame, and installation of new partition walls. Filed in conjunction with construction application number B01016766-I1.
B01016766-S1
11/12/2025
Signed off — Alteration
Proposed structural work that includes construction of an exterior CMU addition, construction of rear addition and moment frame, and installation of new partition walls. Filed in conjunction with construction application number B01016766-I1.
B01016766-I1
10/07/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/16/2025
Filed — Alteration
Modification and installation of new plumbing fixtures with related piping as shown on drawings.
B01118300-P1
08/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/05/2025
Permit issued — Plumbing
B01118300-S1-PL
01/29/2025
Permit issued — General Construction
B01016766-I1-GC
01/27/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Scope
01/14/2025
Filed — Alteration
Proposed structural work that includes construction of an exterior CMU addition, construction of rear addition and moment frame, and installation of new partition walls. Filed in conjunction with construction application number B01016766-I1.
B01016766-P1
01/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
12/13/2024
Special inspection requirement — Lighting in dwelling units
YULIYA ILIZAROV
12/13/2024
Special inspection requirement — Insulation placement and R values
YULIYA ILIZAROV
12/13/2024
Special inspection requirement — Fenestration air leakage
YULIYA ILIZAROV
12/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
YULIYA ILIZAROV
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
12/13/2024
Special inspection requirement — Air barrier - visual inspection
YULIYA ILIZAROV
12/13/2024
Special inspection requirement — Final
YULIYA ILIZAROV
12/13/2024
Special inspection requirement — Energy Code Compliance Inspections
YULIYA ILIZAROV
12/13/2024
Special inspection requirement — Masonry
Christian Martos
12/13/2024
Special inspection requirement — Fenestration areas
YULIYA ILIZAROV
10/29/2024
Filed — Alteration
Modification and installation of new plumbing fixtures with related piping as shown on drawings.
B01118300-I1
10/29/2024
Filed — Alteration
Modification and installation of new plumbing fixtures with related piping as shown on drawings.
B01118300-S1
09/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YULIYA ILIZAROV
09/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charles Michel
09/27/2024
Special inspection requirement — Heating Systems
Charles Michel
09/27/2024
Special inspection requirement — Mechanical Systems
Charles Michel
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
YULIYA ILIZAROV
09/27/2024
Special inspection requirement — Final
Charles Michel
09/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
YULIYA ILIZAROV
09/27/2024
Special inspection requirement — Maintenance information
YULIYA ILIZAROV
09/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
YULIYA ILIZAROV
09/16/2024
Permit issued — General Construction
B01016766-I1-GC
08/26/2024
Permit issued — Structural
B01016766-S1-ST
07/18/2024
Objection raised — Scope
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection raised — Scope
07/18/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Scope
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Scope
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Scope
05/29/2024
Objection resolved — Addressed
05/23/2024
Filed — Alteration
Proposed structural work that includes construction of an exterior CMU addition, construction of rear addition and moment frame, and installation of new partition walls. Filed in conjunction with construction application number B01016766-I1.
B01016766-S1
05/21/2024
Filed — Alteration
Proposed structural work that includes construction of an exterior CMU addition, construction of rear addition and moment frame, and installation of new partition walls. Filed in conjunction with construction application number B01016766-I1.
B01016766-I1
03/28/2024
Special inspection requirement — Structural Steel - Details
Christian Martos
03/28/2024
Special inspection requirement — Masonry
Christian Martos
03/28/2024
Special inspection requirement — Structural Cold-Formed Steel
Christian Martos
03/28/2024
Special inspection requirement — Structural Wood Frame
Christian Martos
03/28/2024
Special inspection requirement — Structural Steel - Welding
Christian Martos
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCOBURN CONSTRUCTION MANAG05/15/2026
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP05/05/2025
DOB NOWGeneral ConstructionSigned-offCOBURN CONSTRUCTION MANAG01/29/2025
DOB NOWGeneral ConstructionSigned-offCOBURN CONSTRUCTION MANAG09/16/2024
DOB NOWStructuralSigned-offCOBURN CONSTRUCTION MANAG08/26/2024
BISPLISSUEDPRIME PIPING & HEATING IN04/12/2022
BIS—ISSUEDRMBA BUILDERS LLC12/28/2021
BISMHISSUEDRMBA BUILDERS LLC06/15/2017
BISPLISSUEDM. FARBMAN & SONS, INC01/15/2015
BIS—ISSUEDRMBA BUILDERS LLC12/11/2014
1 project · most recent 01/14/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/14/2025Signed-offCOBURN CONSTRUCTION MANAGAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×3
MXZ-SM36NAM2 36,000 BTU · Condensing Unit ×1
Heating
Weil-Mclain EVG 155 155,000 BTU · Boiler ×1
2 projects · most recent 04/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/15/2026Signed-offWAWEL PLBG AND HTG CORPGas, Water/Sanitary
01/14/2025——Gas, Water/Sanitary
1 project · most recent 05/12/2022
FiledStatusContractorScope
05/12/2022CompleteJASON SALOME ELEC'L CONTG1 meters
1 project · most recent 01/14/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
01/14/2025Signed-offCOBURN CONSTRUCTION MANAGSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/07/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
01/13/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
12/13/2024Lighting in dwelling unitsYULIYA ILIZAROVenergy_progress
12/13/2024Insulation placement and R valuesYULIYA ILIZAROVenergy_progress
12/13/2024Fenestration air leakageYULIYA ILIZAROVenergy_progress
12/13/2024Fenestration and door U-factor and product ratingsYULIYA ILIZAROVenergy_progress
12/13/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
12/13/2024Air barrier - visual inspectionYULIYA ILIZAROVenergy_progress
12/13/2024FinalYULIYA ILIZAROVprogress
12/13/2024Energy Code Compliance InspectionsYULIYA ILIZAROVprogress
12/13/2024MasonryChristian Martosspecial
12/13/2024Fenestration areasYULIYA ILIZAROVenergy_progress
09/27/2024HVAC-R and service water piping design and insulationYULIYA ILIZAROVenergy_progress
09/27/2024Fire-Resistant Penetrations and JointsCharles Michelspecial
09/27/2024Heating SystemsCharles Michelspecial
09/27/2024Mechanical SystemsCharles Michelspecial
09/27/2024Energy Code Compliance InspectionsYULIYA ILIZAROVprogress
09/27/2024FinalCharles Michelprogress
09/27/2024HVAC-R and service water heating system controlsYULIYA ILIZAROVenergy_progress
09/27/2024Maintenance informationYULIYA ILIZAROVenergy_progress
09/27/2024HVAC-R and service water heating equipmentYULIYA ILIZAROVenergy_progress
03/28/2024Structural Steel - DetailsChristian Martosspecial
03/28/2024MasonryChristian Martosspecial
03/28/2024Structural Cold-Formed SteelChristian Martosspecial
03/28/2024Structural Wood FrameChristian Martosprogress
03/28/2024Structural Steel - WeldingChristian Martosspecial
Latest 25 of 30.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01016766-S1Request digital key ↗
08/23/2026B01016766-P1Request digital key ↗
08/23/2026B01016766-S3Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION18
05/23/2023321160266Open ↗
04/13/2023321160266Open ↗
04/12/2023321160266Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION4
04/19/2022321160266Open ↗
01/03/2022321160266Open ↗
06/19/2017321582006Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/06/2016321160266Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01016766-P1Open ↗
08/13/2026B01016766-I1Open ↗
▸BISVERIFY TAX LOT1
09/26/2022321160266Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/27/2022321160266Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/26/2022321160266Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026B01016766-P1Open ↗
08/23/2026B01016766-S3Open ↗
08/23/2026B01016766-S1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/27/2020321160266Open ↗
03/27/2020321160266Open ↗
08/02/2019321160266Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01118300-I1Open ↗
09/01/2026B01118300-I1Open ↗
09/01/2026B01118300-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01118300-I1Open ↗
09/01/2026B01016766-S1Open ↗
09/01/2026B01016766-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/16/2017321582006Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/16/2017321582006Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING5
02/21/2023321160266Open ↗
12/21/2022321160266Open ↗
07/13/2022321160266Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/16/2016321160266Open ↗
03/27/2015321160266Open ↗
08/05/2014321160266Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
01/30/2023321582006Open ↗
01/17/2023321582006Open ↗
06/15/2022321582006Open ↗
▸BISEQUIPMENT USE PERMITS2
01/30/2023321582006Open ↗
01/17/2023321582006Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/21/2022321582006Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/01/2022321160266Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/16/2022321160266Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/08/2015321160266Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/21/2022321582006Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
10/17/2017321160266Open ↗
08/05/2014321160266Open ↗
▸BISTenant Protection Plan and Notes1
06/16/2017321582006Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026B01016766-S3Open ↗
08/23/2026B01016766-S2Open ↗
08/20/2026B01118300-P3Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/16/2017321582006Open ↗
08/05/2014321160266Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/20/2022321582006Open ↗
07/18/2020321160266Open ↗
07/18/2020321160266Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/19/2020321160266Open ↗
06/16/2017321582006Open ↗
12/15/2014321160266Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/20/2022321582006Open ↗
02/01/2022321160266Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/21/2022321582006Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/16/2014321160266Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/21/2022321582006Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/26/2022321582006Open ↗
04/26/2022321582006Open ↗
04/26/2022321582006Open ↗
Showing 3 of 5 on file for this type
▸BISMECHANICAL SYSTEMS1
07/21/2022321582006Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE4
04/13/2023321160266Open ↗
04/12/2023321160266Open ↗
02/15/2022321160266Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/24/2015321160266Open ↗
01/24/2015321160266Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/19/2023321582006Open ↗
08/01/2019321160266Open ↗
▸BISSUPERSEDING LETTER1
04/19/2022321160266Open ↗
▸BISFINAL1
07/21/2022321582006Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/05/2014321160266Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT2
06/16/2017321582006Open ↗
08/05/2014321160266Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
07/24/2023321160266Open ↗
04/20/2022321582006Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION6
05/07/2020321160266Open ↗
09/18/2019321160266Open ↗
08/22/2017321160266Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
05/19/2020321160266Open ↗
03/27/2020321160266Open ↗
08/01/2019321160266Open ↗
▸BISEFILING COVER SHEET2
06/14/2017321582006Open ↗
08/05/2014321160266Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026B01016766-I1Open ↗
08/13/2026B01016766-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01016766-I1Open ↗
08/13/2026B01016766-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B01016766-P1Open ↗
08/13/2026B01016766-I1Open ↗
▸BISPlot Diagram1
12/08/2014321160266Open ↗