| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00953069 ↗ | 665 CARROLL STREET BROOKLYN | Alteration CO | Permit Issued | 11/10/2023 | 06/09/2026 | Contractor COBURN CONSTRUCTION MANAG | This Alteration CO application is being filed for the interior renovation of the building to convert from 4 family to 2 family. To obtain an… |
| B01302296 ↗ | 35 CLIFTON PLACE BROOKLYN | Alteration | Permit Issued | 10/15/2025 | 10/17/2025 | Contractor COBURN CONSTRUCTION MANAG | INSTALL A TEMPORARY CONSTRUCTION FENCE. FILED IN CONJUNCTION WITH CONSTRUCTION APPLICATION. |
| B01175994 ↗ | 524 2 STREET BROOKLYN | Alteration | Signed-off | 02/13/2025 | 06/25/2025 | Contractor ELITE TECH USA INC | RENOVATE EXISTING APARTMENT AT THE FIRST FLOOR. INTERIOR WORK TO INCLUDE RELOCATION OF KITCHEN, AND THE ADDITION OF A HALF BATHROOM. REPLACE… |
| B01016766 ↗ | 11A 3 PLACE BROOKLYN | Alteration | Signed-off | 05/21/2024 | 01/29/2025 | Contractor COBURN CONSTRUCTION MANAG | Proposed structural work that includes construction of an exterior CMU addition, construction of rear addition and moment frame, and install… |
| Q01084418 ↗ | 63-46 78 STREET QUEENS | Alteration | Signed-off | 10/01/2024 | 10/16/2024 | Contractor ANTHONY DISABATO | LEGALIZATION OF NEW 3 FIXTURE BATHROOM IN CELLAR. PLUMBING AND ELECTRICAL WORK FILED UNDER SEPARATE APPLICATION. |
| Q01099859 ↗ | 68-33 LOUBET STREET QUEENS | Alteration | Signed-off | 08/22/2024 | 08/23/2024 | Contractor COBURN CONSTRUCTION MANAG | Renovate existing detached garage. Remove exterior finishes on walls and roof. Re-apply new finishes. No change to occupancy use or egress. |
| Person | Filings | Most recent |
|---|---|---|
| YULIYA ILIZAROV | 23 | 02/04/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| CHARLES G. MICHEL ENGINEERING, PC. | 1 | 01/14/2025 |
| CWB ARCHITECTS | 1 | 03/27/2026 |
| MARTOS ENGINEERING | 1 | 01/14/2025 |
| RAAD | 1 | 12/01/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| COBURN CONSTRUCTION MANAG | 11 | 03/27/2026 |
| WAWEL PLBG AND HTG CORP | 3 | 08/17/2022 |
| ACCURATE MECHANICAL INC | 2 | 10/01/2024 |
| GW MECHANICAL CORP | 2 | 04/19/2022 |
| MATADOR GROUP INC | 2 | 08/11/2021 |
| ELITE TECH USA INC | 1 | 12/01/2025 |
| ORBIT PLBG & HTG INC | 1 | 01/23/2020 |
| PETRI PBG & HTG INC | 1 | 08/23/2021 |
| RITE WAY HEATING CORP | 1 | 12/01/2025 |
| RJ CONTRACTOR & HOME IMP* | 1 | 04/12/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| THAYER | 2 | 08/17/2022 |
| ASCEND CONSULTING GROUP LLC | 1 | 12/01/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| EC BUILDING CONSULTANTS, INC. | 11 | 03/27/2026 |
| J. CALLAHAN CONSULTING, INC. | 2 | 03/27/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00953069 ↗ | 665 CARROLL STREET BROOKLYN | Alteration CO | Permit Issued | 11/10/2023 | 06/09/2026 | Contractor COBURN CONSTRUCTION MANAG | This Alteration CO application is being filed for the interior renovation of the building to convert from 4 family to 2 family. To obtain an… |
| B01302296 ↗ | 35 CLIFTON PLACE BROOKLYN | Alteration | Permit Issued | 10/15/2025 | 10/17/2025 | Contractor COBURN CONSTRUCTION MANAG | INSTALL A TEMPORARY CONSTRUCTION FENCE. FILED IN CONJUNCTION WITH CONSTRUCTION APPLICATION. |
| B01175994 ↗ | 524 2 STREET BROOKLYN | Alteration | Signed-off | 02/13/2025 | 06/25/2025 | Contractor ELITE TECH USA INC | RENOVATE EXISTING APARTMENT AT THE FIRST FLOOR. INTERIOR WORK TO INCLUDE RELOCATION OF KITCHEN, AND THE ADDITION OF A HALF BATHROOM. REPLACE… |
| B01016766 ↗ | 11A 3 PLACE BROOKLYN | Alteration | Signed-off | 05/21/2024 | 01/29/2025 | Contractor COBURN CONSTRUCTION MANAG | Proposed structural work that includes construction of an exterior CMU addition, construction of rear addition and moment frame, and install… |
| Q01084418 ↗ | 63-46 78 STREET QUEENS | Alteration | Signed-off | 10/01/2024 | 10/16/2024 | Contractor ANTHONY DISABATO | LEGALIZATION OF NEW 3 FIXTURE BATHROOM IN CELLAR. PLUMBING AND ELECTRICAL WORK FILED UNDER SEPARATE APPLICATION. |
| Q01099859 ↗ | 68-33 LOUBET STREET QUEENS | Alteration | Signed-off | 08/22/2024 | 08/23/2024 | Contractor COBURN CONSTRUCTION MANAG | Renovate existing detached garage. Remove exterior finishes on walls and roof. Re-apply new finishes. No change to occupancy use or egress. |
| B00998020 ↗ | 757 CARROLL STREET BROOKLYN | Alteration | Signed-off | 02/11/2024 | 02/16/2024 | Contractor ANTHONY DISABATO | Modification to plumbing fixtures as shown on drawings. No change to occupancy use or egress. |
| B00998003 ↗ | 757 CARROLL STREET BROOKLYN | Alteration | Signed-off | 02/11/2024 | 02/14/2024 | Contractor COBURN CONSTRUCTION MANAG | INTERIOR SCOPE OF WORK INCLUDES RELOCATION OF INTERIOR PARTITIONS & RELOCATION/REFITTING OF BATHROOMS ON THE 2ND AND 3RD FLOORS. NO CHANGE T… |
| B00903218 ↗ | 128 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 11/02/2023 | 11/09/2023 | Contractor COBURN CONSTRUCTION MANAG | Herewith filing application for Interior renovation, installation of new partitions, doors, floor, and wall finishes. Non-structural demolit… |
| B00492147 ↗ | 68 POPLAR STREET BROOKLYN | Alteration | Permit Issued | 04/12/2021 | 07/19/2023 | Contractor RJ CONTRACTOR & HOME IMP* | NEW FIRE RATED OPENINGS ON THE EAST FACADE OF EXISTING DWELING UNIT IN MULTI-FAMILY BUILDING. OPENINGS TO COMPLY WITH ASTM E119 IN ACCORDANC… |
| B00573070 ↗ | 11 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 08/11/2021 | 10/24/2022 | Contractor COBURN CONSTRUCTION MANAG | Installation of a temporary plywood fence as shown on drawings. Filed in conjunction with construction application number B00479025. |
| B00660193 ↗ | 142 WILLOW STREET BROOKLYN | Alteration | Signed-off | 01/13/2022 | 10/24/2022 | Contractor COBURN CONSTRUCTION MANAG | INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE. FILED IN CONJUNCTION WITH CONSTRUCTION APPLICATION NUMBER B00562714. |
| M00739705 ↗ | 97 AVENUE B MANHATTAN | Alteration | Signed-off | 05/24/2022 | 10/24/2022 | Contractor COBURN CONSTRUCTION MANAG | RENOVATION OF A COMMERCIAL SPACE TO ACCOMMODATE A NEW CAFE. EXTERIOR SCOPE OF WORK IS LIMITED TO ADA GUARDRAIL UPDATE AND PAINT. RELOCATION … |
| M00739728 ↗ | 97 AVENUE B MANHATTAN | Alteration | Signed-off | 05/24/2022 | 10/24/2022 | Owner THAYER Contractor COBURN CONSTRUCTION MANAG | NEW MECHANICAL COOLING, HEATING AND EXHAUST SPLIT SYSTEM. |
| M00739722 ↗ | 97 AVENUE B MANHATTAN | Alteration | Permit Issued | 05/24/2022 | 08/10/2022 | Owner THAYER Contractor WAWEL PLBG AND HTG CORP | PROPOSED TO REMOVE, RELOCATE, AND INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. |
| B00334990 ↗ | 702 PUTNAM AVENUE BROOKLYN | Alteration | Signed-off | 03/19/2020 | 09/21/2021 | Contractor WAWEL PLBG AND HTG CORP | Proposed to remove, relocate, and install new plumbing fixtures and related piping as shown on drawings. |
| B00558779 ↗ | 23 PROSPECT PLACE BROOKLYN | Alteration | Signed-off | 07/15/2021 | 08/04/2021 | Contractor PETRI PBG & HTG INC | Replacement of gas piping and installation of new boiler with related piping as shown on drawings. |
| B00515149 ↗ | 256 CUMBERLAND STREET BROOKLYN | Alteration | Filed — no permit on record | 05/07/2021 | — | — | |
| B00515161 ↗ | 256 CUMBERLAND STREET BROOKLYN | Alteration | Filed — no permit on record | 05/07/2021 | — | — | |
| B00378545 ↗ | 702 PUTNAM AVENUE BROOKLYN | Alteration | Signed-off | 08/24/2020 | 04/29/2021 | Contractor MATADOR GROUP INC | INSTALLATION OF MECHANICAL SYSTEM AND RELATED DUCT WORK AS SHOWN ON DRAWINGS. |
| M00443378 ↗ | 15 JAY STREET MANHATTAN | Alteration | Signed-off | 02/12/2021 | 02/23/2021 | Contractor WAWEL PLBG AND HTG CORP | INSTALL ONE OUTDOOR GAS FIRED FIREPLACE AS SHOWN ON DRAWINGS. |
| B00295783 ↗ | 237 WARREN STREET BROOKLYN | Alteration | Signed-off | 01/23/2020 | 06/18/2020 | Contractor ORBIT PLBG & HTG INC | REMOVE AND RELOCATE 2 EXISTING PLUMBING FIXTURES. INSTALL TWO NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. |
| S00321650 ↗ | 150 SILVER LAKE ROAD STATEN ISLAND | Alteration | Signed-off | 02/27/2020 | 06/17/2020 | Contractor GW MECHANICAL CORP | INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. INSTALL 6 NEW FIXTURES AND RELOCATE 5 FIXTURES. |
| Building | Filings | Most Recent |
|---|---|---|
| 524 2 STREET ↗ | 1 | 02/04/2025 |
| 11A 3 PLACE ↗ | 2 | 12/13/2024 |
| 665 CARROLL STREET ↗ | 1 | 08/26/2024 |
| 757 CARROLL STREET ↗ | 3 | 08/01/2024 |
| 63-46 78 STREET ↗ | 2 | 07/22/2024 |
| 128 PACIFIC STREET ↗ | 1 | 07/12/2023 |
| 97 AVENUE B ↗ | 4 | 08/03/2022 |
| 142 WILLOW STREET ↗ | 1 | 01/11/2022 |
| 15 JAY STREET ↗ | 3 | 10/18/2021 |
| 23 PROSPECT PLACE ↗ | 4 | 08/23/2021 |
| 702 PUTNAM AVENUE ↗ | 10 | 07/15/2021 |
| 256 CUMBERLAND STREET ↗ | 2 | 05/03/2021 |
| 150 SILVER LAKE ROAD ↗ | 2 | 10/12/2020 |
| 237 WARREN STREET ↗ | 1 | — |
| 68 POPLAR STREET ↗ | 1 | — |
| 11 CLIFTON PLACE ↗ | 1 | — |
| 35 CLIFTON PLACE ↗ | 1 | — |
| 68-33 LOUBET STREET ↗ | 1 | — |