← Back
BuildNYC
Predominantly retail with other uses
12-45 150TH STREET
QUEENS · BIN 4102700
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R3-2Zoning
10,440 sfGross Floor Area
2Units
0 Active Violations
Predominantly retail with other uses · Owner of record: Pride of Ownership Holding · 11,048 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Site & exteriorConstruction fence and Siamese connection1p · 1 filing · 2 docs
Filed — no permit issuedUp N Top9p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pride of Ownership Holding2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aaron McDonald Architect309/17/2026
CNY Engineering107/23/2026
Dings Engineering101/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Design Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yilin ConstructionScaffold303/21/2026
Mercury Building AssociatesGeneral Contractor108/01/2026
KB Plumbing & HeatingFire Protection108/16/2026
W.R. Plumbing and HeatingPlumbing108/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aaron McDonald Architect5118309/17/2026
CNY Engineering3304107/23/2026
Building Lifecycle
All (49)Filed (5)Permit Issued (4)Signed Off (3)Violation (3)Inspection (5)Objection (6)Special Inspection (23)
10/20/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING DAYCARE ON 1ST FLOOR AND INSTALL NEW ACUNITS. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NOCHANGE IN EGRESS, USE OR OCCUPANCY.
Q01430124-I1
10/20/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING DAYCARE ON 1ST FLOOR AND INSTALL NEW ACUNITS. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NOCHANGE IN EGRESS, USE OR OCCUPANCY.
Q01430124-S1
10/15/2026
Objection raised — Other
10/15/2026
Objection raised — Other
10/15/2026
Objection raised — Other
10/15/2026
Objection raised — Other
10/15/2026
Objection raised — Other
10/15/2026
Objection raised — Other
09/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/23/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/17/2026
Filed — Alteration CO
FILE ALT-CO APPLICATION TO OBTAIN NEW C OF O. COVERT EXISTING OFFICE INTO DAYCARE CLASSROOMS ON 1ST FLOOR AS PER PLAN.
Q01444425-I1
09/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
08/25/2026
Special inspection requirement — Lighting controls
Aaron McDonald
08/25/2026
Special inspection requirement — Interior lighting power
Aaron McDonald
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
08/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
Aaron McDonald
08/14/2026
Permit issued — Sprinklers
Q01430124-S2-EW-SP
08/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/31/2026
Permit issued — Mechanical Systems
Q01430124-I1-GC-CX
07/31/2026
Permit issued — Plumbing
Q01430124-S1-PL
07/23/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING DAYCARE ON 1ST FLOOR AND INSTALL NEW ACUNITS. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NOCHANGE IN EGRESS, USE OR OCCUPANCY.
Q01430124-S2
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
07/22/2026
Special inspection requirement — Sprinkler Systems
YUE ZHOU
07/16/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING DAYCARE ON 1ST FLOOR AND INSTALL NEW ACUNITS. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NOCHANGE IN EGRESS, USE OR OCCUPANCY.
Q01430124-S1
07/15/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING DAYCARE ON 1ST FLOOR AND INSTALL NEW ACUNITS. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NOCHANGE IN EGRESS, USE OR OCCUPANCY.
Q01430124-I1
07/13/2026
Special inspection requirement — Interior lighting power
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
07/13/2026
Special inspection requirement — Maintenance information
Aaron McDonald
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
07/13/2026
Special inspection requirement — Maintenance information
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
07/13/2026
Special inspection requirement — Mechanical Systems
Aaron McDonald
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Aaron McDonald
07/13/2026
Special inspection requirement — Final
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
09/04/2020
Signed off — Alteration
Q00121906-I1
03/15/2019
Permit issued — Construction Fence
Q00121906-I1-FN
01/22/2019
Filed — Alteration
Q00121906-I1
07/24/2000
Violation issued (ECB, closed)
Boilers
04/01/1998
Violation issued (ECB, closed)
Construction
06/14/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedKB Plumbing & Heating08/14/2026
DOB NOWMechanical SystemsSigned-offMercury Building Associates07/31/2026
DOB NOWPlumbingSigned-offW.R. Plumbing and Heating07/31/2026
DOB NOWConstruction FenceSigned-offYilin Construction03/15/2019
BISOTISSUEDLocati Delevlopment07/11/2019
BISMHISSUEDLocati Delevlopment06/26/2019
BISSPISSUEDKB Plumbing & Heating02/01/2019
BISMHISSUEDHongtai Construction01/16/2019
BISFSISSUEDDuo Colony Fuel12/21/2018
BISPLISSUEDRRP Plumbing10/30/2018
BIS—ISSUEDHongtai Construction10/02/2018
BISMHISSUEDDuo Colony Fuel Oil02/14/2007
BISPLISSUEDN/A10/21/1994
BIS—ISSUEDN/A09/27/1994
BISOTISSUEDPride of Ownership Holding09/05/1991
BISPLISSUEDL.J. MC Cusker Plumbing & Heating02/08/1991
BIS—ISSUEDMillstone Construction01/31/1991
BIS—ISSUEDInterboro Sign & Maintenance11/09/1990
BIS—ISSUEDMillstone Construction05/22/1990
1 project · most recent 07/23/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2026Signed-offMercury Building AssociatesAir Conditioning Systems
Cooling
Daikin RXL24UMVJUA 24,000 BTU · Condensing Unit ×3
3MXL24RMVJUA 24,000 BTU · Condensing Unit ×1
4MXM36AVJU9 34,600 BTU · Condensing Unit ×1
RXL09QMVJUA 10,900 BTU · Condensing Unit ×1
RXL18UMVJUA 21,600 BTU · Condensing Unit ×1
1 project · most recent 07/23/2026
FiledStatusContractorScope
07/23/2026Permit IssuedKB Plumbing & Heating20 heads
1 project · most recent 07/23/2026
Water/Sanitary
FiledStatusContractorScope
07/23/2026Signed-offW.R. Plumbing and HeatingWater/Sanitary
7 projects · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedW 8 ElectricGeneral Wiring
01/24/2020CompleteBalance Electric Cont'gGeneral Wiring
10/28/2019CompleteMaximum ElectricGeneral Wiring
09/27/2019CompleteMaximum ElectricGeneral Wiring
09/12/2019CompleteStellmann ElectricalGeneral Wiring
01/29/2019CompleteP.L. Electrical ContractingGeneral Wiring
11/07/2018CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/23/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/25/2026Energy Code Compliance InspectionsAaron McDonaldprogress
08/25/2026Lighting controlsAaron McDonaldenergy_progress
08/25/2026Interior lighting powerAaron McDonaldenergy_progress
08/25/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
08/25/2026Fire-Resistance Rated ConstructionAaron McDonaldprogress
07/22/2026Fire-Resistant Penetrations and JointsYUE ZHOUspecial
07/22/2026Sprinkler SystemsYUE ZHOUspecial
07/13/2026Interior lighting powerAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
07/13/2026Maintenance informationAaron McDonaldenergy_progress
07/13/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
07/13/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
07/13/2026Maintenance informationAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
07/13/2026Energy Code Compliance InspectionsAaron McDonaldprogress
07/13/2026Mechanical SystemsAaron McDonaldspecial
07/13/2026Energy Code Compliance InspectionsAaron McDonaldprogress
07/13/2026Fire-Resistance Rated ConstructionAaron McDonaldprogress
07/13/2026FinalAaron McDonaldprogress
07/13/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
07/13/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Up N TopOther—
Project Q01444425 Alteration CO · Objections · 09/17/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
10/04/2026Q01444425-I1Request digital key ↗
08/16/2026Q01430124-S1Request digital key ↗
08/16/2026Q01430124-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00121906-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION16
07/31/2019440518879Open ↗
06/21/2019440519770Open ↗
05/02/2019421580266Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION7
08/09/2019421889558Open ↗
07/30/2019421889558Open ↗
07/18/2019421889558Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
08/03/2020421580266Open ↗
06/05/2019421580266Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
09/11/2020421580266Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/16/2020421580266Open ↗
▸Seals & Professional Certifications40
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
10/22/2019421580266Open ↗
08/30/2019440518879Open ↗
08/30/2019440518879Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/04/2026Q01444425-I1Open ↗
08/28/2026Q01430124-I1Open ↗
08/28/2026Q01430124-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/04/2026Q01444425-I1Open ↗
08/28/2026Q01430124-I1Open ↗
08/23/2026Q01430124-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
10/04/2026Q01444425-I1Open ↗
08/28/2026Q00121906-I1Open ↗
08/16/2026Q01430124-S2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/05/2018440519770Open ↗
10/30/2018440518879Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/10/2018440526192Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/10/2018440526192Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/10/2018440526192Open ↗
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/01/2020421889558Open ↗
08/30/2019440518879Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/30/2019421889558Open ↗
02/15/2018421580266Open ↗
▸BISSCHEDULE B - PLUMBING2
04/02/2019440519770Open ↗
11/05/2018440519770Open ↗
▸BISEQUIPMENT USE PERMITS2
07/16/2020421889558Open ↗
08/30/2019440518879Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
07/19/2020421580266Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/10/2018440526192Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/12/2019421639926Open ↗
▸BISFIRE ALARM TEST1
07/29/2020421580266Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
02/15/2018421580266Open ↗
▸DOB NOWStreet Tree Checklist1
10/04/2026Q01444425-I1Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
03/30/2019421889558Open ↗
01/28/2019421580266Open ↗
12/10/2018440526192Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/04/2026Q01444425-I1Open ↗
08/16/2026Q01430124-S2Open ↗
08/16/2026Q01430124-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
10/22/2019421580266Open ↗
07/18/2019421889558Open ↗
04/11/2019440518879Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
06/01/2020421889558Open ↗
08/02/2019440518879Open ↗
07/31/2019421580266Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/01/2020421889558Open ↗
01/14/2019440518879Open ↗
10/30/2018440518879Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/10/2018440526192Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/01/2020421889558Open ↗
01/14/2019440518879Open ↗
12/10/2018440526192Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
11/15/2018440519770Open ↗
▸BISHYDRO FLOW TEST LETTER1
11/15/2018440519770Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
09/16/2020421580266Open ↗
08/12/2020421580266Open ↗
07/14/2020421580266Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
05/02/2019421580266Open ↗
05/02/2019421580266Open ↗
02/15/2019421580266Open ↗
Showing 3 of 6 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
03/14/2019440526192Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/14/2019440526192Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT13
06/01/2020421889558Open ↗
10/22/2019421580266Open ↗
09/27/2019421639926Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/11/2020421580266Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION10
09/15/2020421580266Open ↗
03/11/2020421889558Open ↗
08/27/2019440519770Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/10/2018440526192Open ↗
11/05/2018440519770Open ↗
10/30/2018440518879Open ↗
▸BISEFILING COVER SHEET3
03/30/2019421889558Open ↗
07/24/2018421639926Open ↗
02/15/2018421580266Open ↗
▸BISBOROUGH INTAKE FORM2
12/05/2019421580266Open ↗
08/28/2019440518879Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
01/28/2019421580266Open ↗
▸DOB NOWProperty Ownership Certification1
10/04/2026Q01444425-I1Open ↗
▸DOB NOWFinal Survey1
10/04/2026Q01444425-I1Open ↗