| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01435843 ↗ | 1540 DEKALB AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/01/2026 | — | Design CNY ENGINEERING P.C Owner FORM & FORGE CORPORATION Filer CNY ENGINEERING PC | — |
| M01340080 ↗ | 371 WEST STREET MANHATTAN | Alteration | Permit Issued | 01/13/2026 | 08/31/2026 | Design PEBBLE STUDIO DESIGN Contractor BUILDOPS INC | PROPOSED PLUMBING WORK WITH THE GC JOB. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00606644 ↗ | 138 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 02/13/2024 | 08/19/2026 | Owner 138-140 EAST 80, LLC Contractor FRANK MOORE | INSTALL FUEL STORAGE TANK, PUMP, PIPING FOR THE BUILDING SUBSEQUENT WITH DOB JOB#M00606644. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| Q01430124 ↗ | 12-47 150 STREET QUEENS | Alteration | Permit Issued | 07/15/2026 | 08/14/2026 | Design AARON MCDONALD ARCHITECT Owner UP N TOP INC Contractor KB PLUMBING & HEATING INC | MODIFY SPRINKLER SYSTEM ON THE 1ST FLOOR IN EXISTING BUILDING SUBSEQUENT WITH A1 JOB #Q01430124.NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| Q01380176 ↗ | 11-49 44 ROAD QUEENS | Alteration CO | Permit Issued | 04/06/2026 | 08/11/2026 | Design CNY ENGINEERING P.C Contractor MPS PLUMBING & HEATING INC Filer CNY ENGINEERING PC | MODIFY EXISTING SPRINKLER & PLUMBING SYSTEM BASED ON NEW FLOOR LAYOUT ON THE PARTIAL 1ST FLOOR SUBSEQUENT WITH A2 JOB DOB NOW#Q01380176.NO C… |
| S01418767 ↗ | 37 PORT RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 07/09/2026 | 07/24/2026 | Design CNY ENGINEERING P.C Contractor SUPER POWER CONSTRUCTION | FILE APPLICATIONS FOR THE EXISTING EMERGENCY GENERATOR AND OBTAIN PERMITS FOR THE EXISTING HVAC UNITS FOR THE EXISTING 8-STORY BUILDING IN C… |
| Name | Projects together | Most recent |
|---|---|---|
| AM ARCHITECT'S STUDIO LLC | 3 | 02/26/2025 |
| CHENG-YI LIN ARCHITECTURE | 2 | 11/08/2022 |
| WQB ARCHITECTURE PLLC | 2 | 07/29/2024 |
| AARON MCDONALD ARCHITECT | 1 | 07/23/2026 |
| ALBERT ARONOV ARCHITECT | 1 | 05/16/2023 |
| ALFRED KARMAN, ARCHITECT | 1 | 02/23/2018 |
| AMERILAND BROOK LLC | 1 | 06/02/2025 |
| CONSTRCTN. MGNT. & SFTY. CON., INC. | 1 | 09/22/2025 |
| DARKROOM ARCHITECTURE DESIGN PLLC | 1 | 02/12/2025 |
| FANG ARCHITECT | 1 | 08/07/2026 |
| MARTOS ENGINEERING | 1 | 02/12/2025 |
| MICHAEL SAVARESE ASSC., ARCHITECTS | 1 | 11/26/2024 |
| MOHAMMAD AHEAD, PE | 1 | 06/16/2026 |
| MW PROFESSIONAL ENGINEERING, P.C. | 1 | 01/21/2026 |
| PEBBLE STUDIO DESIGN | 1 | 01/21/2026 |
| TAEIK KIM ARCHITECT | 1 | 02/03/2026 |
| TERJESEN ASSOCIATES ARCHITECTS PC | 1 | 05/18/2026 |
| WAVIC ENGINEERING PLLC | 1 | 06/11/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| RRP PLUMBING CORP | 8 | 06/02/2025 |
| METROCITY CONSTRUCTION | 7 | 06/16/2025 |
| SUPER POWER CONSTRUCTION | 7 | 07/09/2026 |
| MPS PLUMBING & HEATING INC | 6 | 08/07/2026 |
| DVE CONSTRUCTION INC | 5 | 11/26/2024 |
| EXPERT FIRE SPRINKLER,LLC | 4 | 05/07/2025 |
| H INTERIOR DESIGN CONSTRU | 4 | 04/25/2023 |
| S & S PLUMBING CORP | 4 | 08/08/2023 |
| A&G HOME IMPROVEMENT CONS | 3 | 05/04/2026 |
| MCMANUS MECH MAINT P&H IN | 3 | 10/26/2023 |
| PLUMBING NYC, INC | 3 | 06/30/2020 |
| SPLEN CONSTRUCTION INC | 3 | 09/23/2022 |
| T&T PLUMBING INC | 3 | 04/20/2023 |
| THE DIMENSION GROUP LLC | 3 | 06/16/2026 |
| WZ CONSULTING CORP | 3 | 05/19/2022 |
| ALL BOROUGH GROUP SVC INC | 2 | 10/05/2023 |
| AMERICAN STANDARD PLUMBIN | 2 | 06/02/2023 |
| ATELIER CORE LLC | 2 | 03/05/2026 |
| CREATIVE PLUMBING IN | 2 | 04/11/2025 |
| ERGO AIR MECHANICAL INC | 2 | 09/22/2025 |
| HM BUILD AND UPLIFT CORP | 2 | 02/26/2025 |
| JEM FIRE PREVENTION INC | 2 | 07/19/2021 |
| MES CONSTRUCTION CORP | 2 | 06/02/2023 |
| NEW YORK PARK PLBG&HTG CO | 2 | 08/19/2025 |
| RUGOVA GROUP LLC | 2 | 01/09/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| FLUSHING COMMONS PROPERTY OWNER LLC | 9 | 05/19/2022 |
| FSI | 6 | 09/28/2023 |
| BOSS1 PROPERTIES LLC | 4 | 04/17/2023 |
| MADISON POTENTIAL DEVELIPMENT INC. | 3 | 06/14/2023 |
| AKAM ASSOCIATES, INC. | 2 | 07/29/2024 |
| Fultonex Management | 2 | 04/25/2023 |
| ICHIDAN, LLC | 2 | 05/21/2021 |
| JUSTIN MANAGEMENT | 2 | 06/06/2024 |
| METROCITY CONSTRUCTION GROUP INC | 2 | 09/02/2022 |
| MINDEL ASSOCIATES | 2 | 07/10/2025 |
| OASIS APARTMENT CORP | 2 | 03/30/2023 |
| PENN SOUTH CAPITAL MANAGEMENT LLC | 2 | 01/22/2026 |
| THE DIMENSION GROUP | 2 | 11/03/2025 |
| THE GEORGE UNITS LLC | 2 | 07/14/2026 |
| 138-140 EAST 80, LLC | 1 | 05/18/2026 |
| 1976 CROTONA LLC | 1 | 05/16/2023 |
| 248 PLAZA LLC | 1 | 08/20/2020 |
| 59 VILLAS LLC | 1 | 11/09/2022 |
| A.S.A.MANAGING PARTNERS, LLC. | 1 | 08/04/2025 |
| ACTION CARTING | 1 | 10/26/2023 |
| BRP DEVELOPMENT CORP | 1 | 02/26/2025 |
| CHAND WHITE PLAINS LLC | 1 | 10/05/2023 |
| COMPASS V LLC | 1 | 01/02/2025 |
| Canbow Eldad Realty | 1 | 05/04/2022 |
| FEI LONG MARKET, INC. | 1 | 08/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| CNY ENGINEERING PC | 52 | 09/01/2026 |
| MLS SERVICE GROUP INC | 11 | 06/16/2026 |
| JAM CONSULTANTS, INC. | 7 | 06/04/2025 |
| S&M EXPEDITING | 4 | 02/26/2025 |
| A1 EXPEDITING SERVICE CORP. | 2 | 03/25/2022 |
| AEC CONSULTING & EXPEDITING, INC | 2 | 08/09/2023 |
| BAYSIDE ENGINEERING PC | 1 | 06/16/2026 |
| BMB BUILDING CONSULTING INC. | 1 | 05/18/2026 |
| DESARNO ASSOCIATES, INC. | 1 | 11/26/2024 |
| GILLMAN CONSULTING INC | 1 | 05/22/2026 |
| K & M DOB CONSULTING CORP. | 1 | 02/03/2026 |
| MCMANUS MECHANICAL MAINTENANCE PLUM | 1 | 10/26/2023 |
| MICHAEL KANG ARCHITECT, P.C. | 1 | 10/05/2023 |
| MK ARCHITECTURE PC | 1 | 02/12/2025 |
| MLS SERVICES | 1 | 08/06/2025 |
| NYC DESIGN FILE | 1 | 06/16/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01435843 ↗ | 1540 DEKALB AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/01/2026 | — | Design CNY ENGINEERING P.C Owner FORM & FORGE CORPORATION Filer CNY ENGINEERING PC | — |
| M01340080 ↗ | 371 WEST STREET MANHATTAN | Alteration | Permit Issued | 01/13/2026 | 08/31/2026 | Design PEBBLE STUDIO DESIGN Contractor BUILDOPS INC | PROPOSED PLUMBING WORK WITH THE GC JOB. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00606644 ↗ | 138 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 02/13/2024 | 08/19/2026 | Owner 138-140 EAST 80, LLC Contractor FRANK MOORE | INSTALL FUEL STORAGE TANK, PUMP, PIPING FOR THE BUILDING SUBSEQUENT WITH DOB JOB#M00606644. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| Q01430124 ↗ | 12-47 150 STREET QUEENS | Alteration | Permit Issued | 07/15/2026 | 08/14/2026 | Design AARON MCDONALD ARCHITECT Owner UP N TOP INC Contractor KB PLUMBING & HEATING INC | MODIFY SPRINKLER SYSTEM ON THE 1ST FLOOR IN EXISTING BUILDING SUBSEQUENT WITH A1 JOB #Q01430124.NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| Q01380176 ↗ | 11-49 44 ROAD QUEENS | Alteration CO | Permit Issued | 04/06/2026 | 08/11/2026 | Design CNY ENGINEERING P.C Contractor MPS PLUMBING & HEATING INC Filer CNY ENGINEERING PC | MODIFY EXISTING SPRINKLER & PLUMBING SYSTEM BASED ON NEW FLOOR LAYOUT ON THE PARTIAL 1ST FLOOR SUBSEQUENT WITH A2 JOB DOB NOW#Q01380176.NO C… |
| S01418767 ↗ | 37 PORT RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 07/09/2026 | 07/24/2026 | Design CNY ENGINEERING P.C Contractor SUPER POWER CONSTRUCTION | FILE APPLICATIONS FOR THE EXISTING EMERGENCY GENERATOR AND OBTAIN PERMITS FOR THE EXISTING HVAC UNITS FOR THE EXISTING 8-STORY BUILDING IN C… |
| B01393859 ↗ | 397 MARLBOROUGH ROAD BROOKLYN | Alteration | Signed-off | 05/07/2026 | 07/17/2026 | Design CNY ENGINEERING P.C Contractor PERFECT RESTORATION AND C | Remove non-load bearing partitions on cellar floor to remove ECB violation#35679298N,no change in use,egress and occupancy. |
| M01418761 ↗ | 1360 ST NICHOLAS AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/14/2026 | — | Design CNY ENGINEERING P.C Owner THE GEORGE UNITS LLC Filer CNY ENGINEERING PC | — |
| M01372850 ↗ | 1219 1 AVENUE MANHATTAN | Alteration | Permit Issued | 03/20/2026 | 06/30/2026 | Design CNY ENGINEERING P.C Contractor MODERN DESIGN GEN CONTR Filer CNY ENGINEERING PC | JOB FILED INTERIOR RENOVATION OF 1ST FLOOR COMMERCIAL STORE INCLUDING NEW CEILING,NEW HVAC,NEW PAINTING AND NEW FLOORING AS PER PLAN. NO CHA… |
| Q01105711 ↗ | 36-13 COLLEGE POINT BLVD QUEENS | Alteration | Permit Issued | 09/09/2024 | 06/11/2026 | Design CNY ENGINEERING P.C Contractor L&L CONSTRUCTION DEVELOP Filer CNY ENGINEERING PC | MODIFY SPRINKLER SYSTEM ACCORDING TO NEW LAYOUT ON THE 1ST FLOOR SUBSEQUENT WITH DOB NOW JOB#Q01105711. NO CHANGE IN USE, EGRESS AND OCCUPAN… |
| Q01392312 ↗ | 222-15 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 05/04/2026 | 05/29/2026 | Design CNY ENGINEERING P.C Contractor A&G HOME IMPROVEMENT CONS | INSTALL/REMOVE NEW NON-LOAD BEARING PARTITIONS ON THE PARTIAL 3RD FLOOR PER PLAN INDICATED. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS … |
| Q01401280 ↗ | 43-14 QUEENS STREET QUEENS | Alteration | Filed — no permit on record | 05/22/2026 | — | Design CNY ENGINEERING P.C Owner ROCKROSE DEVELOPMENT Filer GILLMAN CONSULTING INC | — |
| M01346888 ↗ | 16 WEST 39 STREET MANHATTAN | Alteration | Permit Issued | 01/22/2026 | 05/11/2026 | Design CNY ENGINEERING P.C Contractor FRANKIE PLBG & HTG L.L.C | REPLACE TWO EXISTING SMALL GRAVITY TANKS WITH ONE NEW COMBINED GRAVITY TANK FOR FIRE PROTECTION SERVICES FOR THE BUILDING. NO CHANGE IN USE,… |
| B01327365 ↗ | 18 SHERLOCK PLACE BROOKLYN | Alteration | Permit Issued | 12/08/2025 | 04/20/2026 | Design CNY ENGINEERING P.C Contractor M & M PIPING AND HEATING | JOB FILED TO REMOVE (3) GAS BOILERS LOCATED ON THE CELLAR FLOOR AND INSTALL INDIVIDUAL GAS FURNACES FOR EACH APARTMENT FROM THE 1ST FLOOR TO… |
| B01380699 ↗ | 1267 57 STREET BROOKLYN | Alteration | Permit Issued | 03/31/2026 | 04/16/2026 | Design CNY ENGINEERING P.C Contractor TWIN GROUP ASSOCIATES INC Filer CNY ENGINEERING PC | REPLACEMENT OF TWO EXISTING YORK CONDENSING UNITS AND THREE ADDITIONAL EXISTING CONDENSING UNITS WITH ONE GOODMAN, ONE COLEMAN, TWO MITSUBIS… |
| M01167349 ↗ | 226 EAST 49 STREET MANHATTAN | Alteration | Signed-off | 02/06/2025 | 04/08/2026 | Design MARTOS ENGINEERING Contractor ZITAN BILT INC Filer MK ARCHITECTURE PC | REROOF OF EXISTING BUILDINGS AND MINOR EXTERIOR UPDATES AS SHOWN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. WORK IN CONJ… |
| Q01357151 ↗ | 54 INGRAM STREET QUEENS | Alteration | Permit Issued | 02/09/2026 | 04/06/2026 | Design CNY ENGINEERING P.C Contractor G.M.A. PLUMBING & HEATING | JOB FILED TO INSTALL RELOCATE/NEW PLUMBING FIXTURE AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B01146694 ↗ | 394 BROADWAY BROOKLYN | Alteration | Permit Issued | 11/25/2024 | 03/24/2026 | Design CNY ENGINEERING P.C Contractor THE DIMENSION GROUP LLC Filer MLS SERVICE GROUP INC | Temporary shoring installation during proposed interior work. Remove and replace deteriorated floor joists. Remove and replace deteriorated … |
| B01367155 ↗ | 1659 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 03/05/2026 | 03/10/2026 | Design CNY ENGINEERING P.C Contractor ATELIER CORE LLC Filer CNY ENGINEERING PC | REPLACED ROOF TOP UNIT ON 2ND FLOOR FOR THE BUILDING, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01363537 ↗ | 23 EAST 22 STREET MANHATTAN | Alteration | Permit Issued | 02/25/2026 | 03/10/2026 | Design CNY ENGINEERING P.C Owner LAILNYCINC Contractor JJK BUILDING CONSULTING Filer CNY ENGINEERING PC | INSTALL NEW COMMERCIAL KITCHEN HOOD SYSTEM FOR COMMERCIAL STORE ON THE 1ST FLOOR , NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01355768 ↗ | 709 8 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 03/05/2026 | — | Design CNY ENGINEERING P.C Owner HACELS, LLC Filer CNY ENGINEERING PC | — |
| B01163942 ↗ | 4910 11 AVENUE BROOKLYN | Alteration | Permit Issued | 02/13/2025 | 02/20/2026 | Design CNY ENGINEERING P.C Contractor INFINITI ESC PLUMBING COR Filer MLS SERVICE GROUP INC | JOB FILED INTERIOR RENOVATION RESIDENTIAL UNITS FROM CELLAR TO ROOF FLOOR,REMOVE & REPLACE PLUMBING FIXTURES PER PLAN. NO CHANGE OF USE, EGR… |
| B01277189 ↗ | 1090 EAST 17 STREET BROOKLYN | Alteration | Permit Issued | 08/26/2025 | 02/19/2026 | Design CNY ENGINEERING P.C Contractor TARGET CONSTRUCTION LLC Filer MLS SERVICE GROUP INC | JOB FILED TO REMOVE 40X30 1-STORY NON-LOAD BEARING PARTITIONS AND RELATED CONSTRUCTION FENCE IN THE BACKYARD, AND RESTORE IT TO ITS ORIGINAL… |
| M01341212 ↗ | 169 WEST 83 STREET MANHATTAN | Alteration | Signed-off | 01/22/2026 | 01/29/2026 | Design CNY ENGINEERING P.C Contractor CLEAN TECH MECHANICAL INC Filer CNY ENGINEERING PC | MODIFY PLUMBING SYSTEM ON THE 5TH FLOOR IN EXISTING 5-STORY BUILDING IN CONJUNCTION WITH DOB JOB#M01337794. NO CHANGE IN USE, EGRESS AND OCC… |
| M01341227 ↗ | 169 WEST 83 STREET MANHATTAN | Alteration | Permit Issued | 01/22/2026 | 01/26/2026 | Design CNY ENGINEERING P.C Contractor EXCLUSIVE CARPENTRY INC Filer CNY ENGINEERING PC | This application is being filed for Mechanical work at the subject premises per plans submitted herewith. No change in use, egress or occupa… |
| M01336433 ↗ | 1185 AVENUE OF THE AMER MANHATTAN | Alteration | Filed — no permit on record | 01/15/2026 | — | Design TAEIK KIM ARCHITECT Owner SL GREEN REALTY CORP | — |
| Q01341274 ↗ | 23-51 83 STREET QUEENS | Alteration | Signed-off | 12/31/2025 | 01/07/2026 | Design CNY ENGINEERING P.C Contractor ATELIER CORE LLC Filer CNY ENGINEERING PC | REPLACED ROOF TOP UNIT ON THE ROOF FOR THE EXISTING BUILDING, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00652835 ↗ | 70 ORANGE STREET BROOKLYN | Alteration | Permit Issued | 02/11/2022 | 01/06/2026 | Design CNY ENGINEERING P.C Contractor FORM & FORGE CORPORATION Filer CNY ENGINEERING PC | INSTALL NEW HVAC SYSTEM FOR 3 STORIES RESIDENCE. NO CHANGE OF USE, EGRESS AND OCCUPANCY. |
| B01303709 ↗ | 124 AVENUE F BROOKLYN | Alteration | Filed — no permit on record | 11/17/2025 | — | Design CNY ENGINEERING P.C | — |
| M01267719 ↗ | 840A 9 AVENUE MANHATTAN | Alteration | Permit Issued | 08/18/2025 | 10/24/2025 | Design CNY ENGINEERING P.C Owner Synoptic Management Corp Contractor NEW YORK PARK PLBG&HTG CO | JOB FILED INTERIOR RENOVATION OF 1ST FLOOR COMMERCIAL STORE INCLUDING NEW CEILING,NEW PAINTING,NEW COOLING/HEATING SYSTEM AND NEW FLOORING A… |
| B01291500 ↗ | 323 POWELL STREET BROOKLYN | Alteration | Filed — no permit on record | 10/03/2025 | — | Design CNY ENGINEERING P.C | — |
| B01284243 ↗ | 73 STEUBEN STREET BROOKLYN | Alteration | Filed — no permit on record | 09/30/2025 | — | Design CNY ENGINEERING P.C Owner TOP QUALITY MANAGEMENT Filer MLS SERVICE GROUP INC | — |
| B01260063 ↗ | 1145 59 STREET BROOKLYN | Alteration | Filed — no permit on record | 08/13/2025 | — | Design CNY ENGINEERING P.C Filer MLS SERVICE GROUP INC | — |
| M01152025 ↗ | 1360 ST NICHOLAS AVENUE MANHATTAN | Alteration | Signed-off | 07/15/2025 | 08/13/2025 | Design CNY ENGINEERING P.C Owner THE GEORGE UNITS LLC Contractor TWIN GROUP ASSOCIATES INC Filer MLS SERVICE GROUP INC | COMMERCIAL OFFICE RENOVATION ON PORTIONS OF THE 1ST AND 2ND FLOORS, INCLUDING INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, WOOD FLOORING… |
| Q01253899 ↗ | 222-15 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 07/10/2025 | 08/13/2025 | Design CNY ENGINEERING P.C Owner MINDEL ASSOCIATES Contractor A&G HOME IMPROVEMENT CONS | INSTALL/REMOVE NEW NON-LOAD BEARING PARTITIONS ON THE PARTIAL 3RD FLOOR PER PLAN INDICATED. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS … |
| M01190783 ↗ | 740 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/21/2025 | 08/12/2025 | Design CNY ENGINEERING P.C Owner GFP REAL ESTATE LLC Contractor BELLEROSE PLBG & HEATING Filer CNY ENGINEERING PC | MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW FLOOR LAYOUT ON THE PARTIAL SUB-CELLAR & 1ST FLOOR RETAIL# IN CONJUNCTION WITH A2 JOB DOB NOW#… |
| B01228948 ↗ | 216 HEWES STREET BROOKLYN | Alteration | Signed-off | 06/09/2025 | 08/08/2025 | Design CNY ENGINEERING P.C Contractor PLBG P & H INC | REMOVE TUB AND NON-LOAD BEARING PARTITIONS ON THE CELLAR FLOOR,REMOVE KITCHEN PLUMBING FIXTURES ON BASEMENT,EXTEND FIRE ESCAPE ON 3RD FLOOR … |
| M01258693 ↗ | 415 EAST 75 STREET MANHATTAN | Alteration | Filed — no permit on record | 08/04/2025 | — | Design CNY ENGINEERING P.C Filer CNY ENGINEERING PC | — |
| M01187273 ↗ | 452 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 03/18/2025 | 07/01/2025 | Design CNY ENGINEERING P.C Owner JM REALTY SERVICES Contractor BUCKMILLER AUTO.SPKLR.COR Filer CNY ENGINEERING PC | MODIFY SPRINKLER SYSTEM IN PARTIAL 1ST AND 2ND FLOOR SUBSEQUENT WITH DOB JOB#M01187273.NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SPRINKLER … |
| B01217086 ↗ | 1701 63 STREET BROOKLYN | Alteration | Filed — no permit on record | 06/30/2025 | — | Design CNY ENGINEERING P.C Filer MLS SERVICE GROUP INC | — |
| Q01227928 ↗ | 90-14 51 AVENUE QUEENS | Alteration | Signed-off | 06/11/2025 | 06/26/2025 | Design WAVIC ENGINEERING PLLC Owner TRUSTWORTHY REALTY CORP. Contractor MAXWELL PLUMB MECH. CORP | INSTALL SPRINKLER DRY PIPE VALVE AS PER PLANS |
| X01245097 ↗ | 1122 SOUTHERN BOULEVARD BRONX | Alteration | Signed-off | 06/23/2025 | 06/26/2025 | Design CNY ENGINEERING P.C Contractor DASR CORP Filer CNY ENGINEERING PC | REFILE EMERGENCY GENERATOR IN OPEN SPACE, SUBSEQUENT TO NB JOB #220539594 AND SUPERSEDING PRIOR GENERATOR FILING UNDER JOB #240257663. NO CH… |
| B01187812 ↗ | 1571 42 STREET BROOKLYN | Alteration | Permit Issued | 03/19/2025 | 06/16/2025 | Design CNY ENGINEERING P.C Owner THE DIMENSION GROUP Contractor THE DIMENSION GROUP LLC Filer MLS SERVICES | INTERIOR RENOVATION FOR NEW PAINTING,NEW CEILING & FLOORING IN APT #2FF,#3F & #3BB ON THE PARTIAL 2ND & 3RD FLOOR ,NO CHANGE IN USE,EGRESS A… |
| Q01200498 ↗ | 222-15 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 04/03/2025 | 06/03/2025 | Design CNY ENGINEERING P.C Owner MINDEL ASSOCIATES Contractor A&G HOME IMPROVEMENT CONS | Install new non-load bearing partitions in Suite #LLA on the partial cellar floor .No change in use,egress and occupancy. |
| B01210666 ↗ | 128 21 STREET BROOKLYN | Alteration | Signed-off | 04/16/2025 | 05/21/2025 | Design CNY ENGINEERING P.C Contractor THE STARKSWORK LLC Filer CNY ENGINEERING PC | INSTALL NEW GENERATOR IN 1ST FLOOR OPEN SPACE FOR THE BUILDING AND SUPERSEDE DOB NOW JOB#B00578061 AND JOB#B00578043 UNDER 2014 CODE. NO CHA… |
| M01203043 ↗ | 841 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/08/2025 | 05/13/2025 | Design CNY ENGINEERING P.C Contractor METRO CITY CONSTRUCTION Filer CNY ENGINEERING PC | REPLACED ROOF TOP UNIT IN REAR YARD FOR THE 1ST FLOOR COMMERCIAL USE, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q01174776 ↗ | 138-35 39 AVENUE QUEENS | Alteration | Signed-off | 02/03/2025 | 04/25/2025 | Design CNY ENGINEERING P.C Contractor EXPERT FIRE SPRINKLER,LLC Filer JAM CONSULTANTS, INC. | UNIT 7G. HEREWITH FILING FOR INSTALLATION OF PLUMBING FIXTURES AND MODIFICATION TO EXISTING SPRINKLER SYSTEM |
| Q01158328 ↗ | 163-05 ARCHER AVENUE QUEENS | Alteration | Signed-off | 01/13/2025 | 04/16/2025 | Design AM ARCHITECT'S STUDIO LLC Owner BRP DEVELOPMENT CORP Contractor HM BUILD UPLIFT Filer S&M EXPEDITING | MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW FLOOR LAYOUT ON THE PARTIAL 1ST FLOOR-A1 SUBSEQUENT WITH A2 JOB DOB NOW#Q01158328.NO CHANGE IN… |
| Q01074351 ↗ | 64-16 WEHTEROLE STREET QUEENS | Alteration CO | Permit Issued | 06/29/2024 | 04/03/2025 | Design AMERILAND BROOK LLC Owner TONG HUA CHILDCARE INC Contractor KALE CONSTRUCTION INC Filer CNY ENGINEERING PC | THIS ALT-1 FILED TO ESTABLISHED CHANGING CO DESCRIPTION PER CO#410145613 AND WORK ON CELLAR & 1ST FLOOR ONLY. OBTAIN NEW C OF O. |
| B01073468 ↗ | 119 ROGERS AVENUE BROOKLYN | Alteration | Permit Issued | 07/02/2024 | 03/20/2025 | Design CNY ENGINEERING P.C Owner STATEVIEW MANAGEMENT Contractor WATERFRONT PROPERTY MGMT Filer MLS SERVICE GROUP INC | INTERIOR RENOVATION TO LEGALIZE PARTITION WALL ON THE CELLAR FLOOR,NEW PAINTING AND FLOORING FROM 1ST TO 3RD FLOOR PER PLAN IN ORDER TO REMO… |
| Q01174723 ↗ | 138-35 39 AVENUE QUEENS | Alteration | Signed-off | 02/03/2025 | 03/18/2025 | Design CNY ENGINEERING P.C Contractor ZAQ CONSTRUCTION INC Filer JAM CONSULTANTS, INC. | UNIT 7G. HEREWITH FILING FOR INSTALLATION OF NON LOAD BEARING PARTITIONS AND MODIFICATION TO EXISITING HVAC SYSTEM |
| M01130432 ↗ | 154 GRAND STREET MANHATTAN | Alteration | Permit Issued | 01/03/2025 | 03/03/2025 | Design CNY ENGINEERING P.C Contractor METRO CITY CONSTRUCTION Filer CNY ENGINEERING PC | JOB FILED EXIST. COMMERCIAL STORE TO INSTALL NEW PLUMBING FIXTURES AND EQUIPMENT PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THI… |
| B01032220 ↗ | 1571 42 STREET BROOKLYN | Alteration | Signed-off | 05/17/2024 | 02/20/2025 | Design CNY ENGINEERING P.C Owner THE DIMENSION GROUP Contractor AMERICAN STANDARD P&H CORORP. | INTERIOR RENOVATION TO REPLACE PLUMBING FIXTURES IN APT #3FF & 3EE ON THE PARTIAL 3RD FLOOR IN ORDER TO REMOVE ECB VIOLATION#39105071L,NO CH… |
| B01152747 ↗ | 1772 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 12/09/2024 | 02/18/2025 | Design CNY ENGINEERING P.C Contractor SUPER POWER CONSTRUCTION | REPLACE (1) ROOF TOP UNIT AND GET EQUIPMENT USE CARD ON THE ROOF FLOOR, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01152748 ↗ | 45-20 ASTORIA BOULEVARD S QUEENS | Alteration | Signed-off | 12/09/2024 | 02/18/2025 | Design CNY ENGINEERING P.C Contractor SUPER POWER CONSTRUCTION Filer CNY ENGINEERING PC | REPLACE (1) ROOF TOP UNIT AND GET EQUIPMENT USE CARD ON THE ROOF FLOOR, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01167179 ↗ | 331 EAST 52 STREET MANHATTAN | Alteration | Signed-off | 01/16/2025 | 01/27/2025 | Design CNY ENGINEERING P.C Contractor WE BUILD BEST LLC Filer CNY ENGINEERING PC | INSTALL NEW HVAC SYSTEM FOR THE EXISTING 5-STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH DOB NOW JOB#M00594657, NO CHANGE IN USE, EGRESS AN… |
| M01126699 ↗ | 11 WEST 42 STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 12/13/2024 | Design CNY ENGINEERING P.C Contractor NEPTUNE MECHANICAL INC | JOB FILED INTERIOR RENOVATION OF 1ST FLOOR COMMERCIAL STORE#GFM1 INCLUDING NEW CEILING,NEW PAINTING AND NEW FLOORING AS PER PLAN. NO CHANGE… |
| B01113684 ↗ | 490 KOSCIUSZKO STREET BROOKLYN | Alteration | Permit Issued | 10/07/2024 | 12/06/2024 | Design CNY ENGINEERING P.C Owner ROGERS BUILDERS & DEVEL Contractor ROGERS DEVELOPERS GRP LLC Filer MLS SERVICE GROUP INC | INTERIOR RENOVATION TO INSTALL/REMOVE NON-LOAD BEARING PARTITIONS AND METAL STAIR PER PLAN ON THE CELLAR FLOOR IN ORDER TO REMOVE ECB VIOLAT… |
| B01031666 ↗ | 627 UNION AVENUE BROOKLYN | Alteration | Signed-off | 06/24/2024 | 12/05/2024 | Contractor DVE CONSTRUCTION INC Filer CNY ENGINEERING PC | MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW FLOOR LAYOUT ON THE PARTIAL 2ND FLOOR SUBSEQUENT WITH A2 JOB DOB NOW#B01031666. |
| Q01136865 ↗ | 222-15 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 11/05/2024 | 11/20/2024 | Design CNY ENGINEERING P.C Contractor ICOR SOLUTIONS INC | INSTALL NEW NON-LOAD BEARING PARTITIONS ON THE 3RD FLOOR PER PLAN INDICATED. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UND… |
| B01109757 ↗ | 127 MONTROSE AVENUE BROOKLYN | Alteration | Signed-off | 09/25/2024 | 11/12/2024 | Design CNY ENGINEERING P.C Contractor PIPE SOLUTIONS ADVIS INC | INTERIOR RENOVATION TO REPLACE PLUMBING FIXTURES FROM 1ST TO 4TH FLOOR INORDER TO REMOVE ECB VIOLATION#39121453R,AND NEW (4)ELECTRICAL HWH O… |
| M01134519 ↗ | 701 8 AVENUE MANHATTAN | Alteration | Permit Issued | 11/01/2024 | 11/08/2024 | Design CNY ENGINEERING P.C Contractor NY BUILDING ASSOCIATES IN | INTERIOR RENOVATION TO INSTALL NEW NON-LOAD BEARING PARTITIONS ON THE CELLAR AND 1ST FLOOR ,NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| B01136250 ↗ | 1136 59 STREET BROOKLYN | Alteration | Filed — no permit on record | 11/06/2024 | — | Design CNY ENGINEERING P.C Filer MLS SERVICE GROUP INC | — |
| X01105381 ↗ | 1903 WEST FARMS ROAD BRONX | Alteration | Signed-off | 09/24/2024 | 11/06/2024 | Design AM ARCHITECT'S STUDIO LLC Owner COMPASS V LLC Contractor EXPERT FIRE SPRINKLER,LLC Filer S&M EXPEDITING | MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW FLOOR LAYOUT ON THE PARTIAL 1ST FLOOR SUBSEQUENT WITH A2 JOB DOB NOW#X01105381.NO CHANGE IN US… |
| Q01064562 ↗ | 200-29 26 AVENUE QUEENS | Alteration | Signed-off | 06/11/2024 | 10/02/2024 | Design CNY ENGINEERING P.C Contractor METRO CITY CONSTRUCTION | REGISTER (1) AIR CONDITIONER UNIT IN THE BACK YARD IN ORDER TO REMOVE ECB VIOLATION#39114350Z. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01064202 ↗ | 127 ROGERS AVENUE BROOKLYN | Alteration | Signed-off | 07/09/2024 | 09/20/2024 | Design CNY ENGINEERING P.C Contractor AB PLUMBING INC | INTERIOR RENOVATION TO LEGALIZE (2) 2PC RESTROOMS AND REMOVE SHOWER ON THE CELLAR FLOOR IN ORDER TO REMOVE ECB VIOLATION#35071890R.NO CHANGE… |
| Q01100115 ↗ | 53-01 GRAND AVENUE QUEENS | Alteration | Signed-off | 08/23/2024 | 09/03/2024 | Design CNY ENGINEERING P.C Owner WEI MING USA INC Contractor SUPER POWER CONSTRUCTION Filer CNY ENGINEERING PC | INSTALL NEW COOLER EQUIPMENT FOR THE BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01042559 ↗ | 102 WEST 85 STREET MANHATTAN | Alteration | Signed-off | 07/29/2024 | 08/29/2024 | Design WQB ARCHITECTURE PLLC Owner AKAM ASSOCIATES, INC. Contractor M&M PLUMBING & HEATING IN Filer S&M EXPEDITING | Modification of plumbing fixtures in unit 10C as shown on submitted plans. No change in occupancy, use or egress. |
| B01093877 ↗ | 980 WYCKOFF AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2024 | 08/28/2024 | Design CNY ENGINEERING P.C Owner KRISHNA HOSPITALITY, LLC Contractor SUPER POWER CONSTRUCTION Filer CNY ENGINEERING PC | REPLACE THE ROOF TOP UNIT ON ROOF IN ORDER TO GET EQUIPMENT USE PERMIT AND REMOVE FDNY VIALTION #014116728N. NO CHANGE IN USE,EGRESS AND OCC… |
| M01042554 ↗ | 102 WEST 85 STREET MANHATTAN | Alteration | Signed-off | 07/29/2024 | 08/28/2024 | Design WQB ARCHITECTURE PLLC Owner AKAM ASSOCIATES, INC. Contractor NEW AMSTERDAM BUILDERS LL Filer S&M EXPEDITING | Interior renovation of unit 10C as shown on submitted plans. No change in occupancy, use or egress. |
| Q01003476 ↗ | 138-35 39 AVENUE QUEENS | Alteration | Signed-off | 02/12/2024 | 07/31/2024 | Design CNY ENGINEERING P.C Contractor H.J. FLOOD INC. Filer JAM CONSULTANTS, INC. | HEREWITH FILING FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM FOR UNIT 2C. SPRINKLER PERMIT WAS NOT ISSUED UNDER APP # 421929051 AND WAS WIT… |
| B01055400 ↗ | 382 METROPOLITAN AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/27/2024 | — | Design CNY ENGINEERING P.C Owner RANCO MANAGEMENT Filer MLS SERVICE GROUP INC | — |
| B01027597 ↗ | 460 EAST 95 STREET BROOKLYN | Alteration | Signed-off | 04/08/2024 | 05/14/2024 | Design CNY ENGINEERING P.C Contractor JSB WORKS INC | REMOVE/INSTALL NON-LOAD BEARING PARTITION FROM 1ST TO 3RD FLOOR,NEW FLOORING/CEILING FROM CEL TO 3RD FLOOR IN ORDER TO REMOVE ECB VIOLATION#… |
| X00843411 ↗ | 1970 CROTONA PARKWAY BRONX | Alteration | Signed-off | 03/14/2023 | 03/11/2024 | Design ALBERT ARONOV ARCHITECT Owner 1976 CROTONA LLC Contractor DVE CONSTRUCTION INC | Plumbing and Sprinkler Work for 5th floor dental office |
| M00962178 ↗ | 864 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 11/24/2023 | 01/24/2024 | Design CNY ENGINEERING P.C Owner JUSTIN MANAGEMENT Contractor C PLUS DESIGN GROUP INC Filer CNY ENGINEERING PC | INSTALL NEW KITCHEN HOOD SYSTEM AND HVAC SYSTEM FOR CELLAR & 1ST FLOOR IN CONJUNCTION WITH DOB JOB#M00964272, NO CHANGE IN USE,EGRESS AND OC… |
| M00961989 ↗ | 864 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 11/22/2023 | 01/05/2024 | Design CNY ENGINEERING P.C Owner JUSTIN MANAGEMENT Contractor I DO PLUMBING & HTG INC | JOB FILED EXIST. COMMERCIAL BUILDING TO INSTALL NEW PLUMBING FIXTURES AND EQUIPMENT PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER TH… |
| X00943178 ↗ | 4600 WHITE PLAINS ROAD BRONX | Alteration | Signed-off | 10/05/2023 | 10/31/2023 | Design CNY ENGINEERING P.C Owner CHAND WHITE PLAINS LLC Contractor ALL BOROUGH GROUP SVC INC | Apply equipment use permit only for (1) HVAC unit on the roof floor in conjunction with A2 job#220632689,no change in use, egress and occupa… |
| M00916362 ↗ | 135 JOHN STREET MANHATTAN | Alteration | Signed-off | 09/28/2023 | 10/13/2023 | Design CNY ENGINEERING P.C Contractor NEW YORK PARK PLBG&HTG CO | JOB FILED EXIST. COMMERCIAL BUILDING TO INSTALL NEW PLUMBING FIXTURES AND EQUIPMENT PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER TH… |
| M00940027 ↗ | 167 CANAL STREET MANHATTAN | Alteration | Filed — no permit on record | 09/28/2023 | — | Design CNY ENGINEERING P.C Owner FSI Filer CNY ENGINEERING PC | — |
| M00788204 ↗ | 452 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 08/10/2022 | 08/09/2023 | Design CNY ENGINEERING P.C Owner FSI Contractor NYC REMODELING INC Filer CNY ENGINEERING PC | INSTALL NEW OUTDOOR UNITS FOR OFFICE ON THE ROOF FLOOR ,NO CHANGE IN USE,EGRESS OR OCCUPANCY. |
| B00665324 ↗ | 971 56 STREET BROOKLYN | Alteration | Signed-off | 04/13/2022 | 07/07/2023 | Design CNY ENGINEERING P.C Contractor NEW YORK STANDARD MECH CO Filer CNY ENGINEERING PC | INSTALL NEW SPRINKLER AND PLUMBING WATER SERVICE SYSTEM FOR CEL & 1ST FLOOR IN 4-STORY EXIST MIX-USE BUILDING IN CONJUNCTION WITH A1#3215993… |
| B08024735 ↗ | 3860 NAUTILUS AVENUE BROOKLYN | Alteration | Permit Issued | 10/26/2022 | 07/05/2023 | Design CNY ENGINEERING P.C Contractor GREEN PORTAL INC | REMOVE NON-LOAD BEARING PARTITIONS AND KITCHEN FIXTURES ON THE CELLAR FLOOR;REMOVE UR. ON THE 1ST FLOOR;REPAIR GARAGE WALL IN THE OPEN SPACE… |
| B00678328 ↗ | 6301 8 AVENUE BROOKLYN | Alteration | Signed-off | 02/11/2022 | 06/01/2023 | Design CNY ENGINEERING P.C Owner FEI LONG MARKET, INC. Contractor S & L PLUMBING INC | REMOVE SPRINKLER HEADS UNDER KITCHEN HOOD AND ASSOCIATE PIPING PER PLAN, REMAIN EXISTING SPRINKLER SYSTEM ON THE 1ST FLOOR IN CONJUNCTION WI… |
| X00498453 ↗ | 285 EAST 163 STREET BRONX | Alteration | Signed-off | 05/11/2021 | 04/28/2023 | Design CNY ENGINEERING P.C Contractor A M B MECHANICAL INC Filer CNY ENGINEERING PC | INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED.; IN CONJUNCTION WITH NB JOB# 240300535. |
| Q00845517 ↗ | 37-12 PRINCE STREET QUEENS | Alteration | Signed-off | 04/17/2023 | 04/21/2023 | Design CNY ENGINEERING P.C Owner BOSS1 PROPERTIES LLC Contractor H INTERIOR DESIGN CONSTRU Filer CNY ENGINEERING PC | The no work job is to filed to get equipment use permit only, the construction work filed under DOB NOW#Q00759591-I1 |
| Q08013153 ↗ | 138-35 39 AVENUE QUEENS | Alteration | Signed-off | 11/28/2022 | 04/13/2023 | Design CNY ENGINEERING P.C Contractor H.J. FLOOD INC. Filer JAM CONSULTANTS, INC. | INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK AT 4TH FLOOR FOR 4G. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00807147 ↗ | 315 CASANOVA STREET BRONX | Alteration | Signed-off | 01/09/2023 | 03/20/2023 | Design CNY ENGINEERING P.C Owner ACTION CARTING Contractor MCMANUS MECH MAINT P&H IN | INSTALL NEW GAS HEATERS FOR THE EXISTING 1-STORY WAREHOUSE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00840512 ↗ | 136 WEST 24 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/13/2023 | — | Design CNY ENGINEERING P.C Owner FSI Filer CNY ENGINEERING PC | — |
| B00535772 ↗ | 6402 9 AVENUE BROOKLYN | Alteration | Signed-off | 10/29/2021 | 03/06/2023 | Design CNY ENGINEERING P.C Contractor S & L PLUMBING INC | DISCONNECT EXISTING SPRINKLER SYSTEM FROM OTHER BUILDINGS AND TO INSTALL NEW SPRINKLER SYSTEM & WATER SERVICE FOR 1ST FLOOR TO CONNECT WITH … |
| B00404663 ↗ | 158 NEWTON STREET BROOKLYN | Alteration | Signed-off | 10/05/2020 | 02/07/2023 | Design CNY ENGINEERING P.C Contractor METRO CITY CONSTRUCTION | INSTALL NEW (2) RTU FOR COMMERICIAL AREA IN THE 1ST FLOOR IN CONJUNCTION WITH A1 JOB#321152685. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| B08038250 ↗ | 637 41 STREET BROOKLYN | Alteration | Signed-off | 11/14/2022 | 01/17/2023 | Design CNY ENGINEERING P.C Contractor T & T PLUMBING INC | REPLACE KITCHEN PLUMBING FIXTURES AND RELOCATE GAS STOVE IN UNIT #2A ON THE 2ND FLOOR PER LAYOUT TO SUPERSEDE THE DOB NOW JOB#B00207907 DUE … |
| B00290290 ↗ | 304 STOCKHOLM STREET BROOKLYN | Alteration | Signed-off | 01/07/2020 | 01/12/2023 | Design CNY ENGINEERING P.C Owner OASIS APARTMENT CORP Contractor RUGOVA GROUP LLC Filer CNY ENGINEERING PC | INSTALL NEW PLUMBING SYSTEM IN 4-STORY BUILDING IN CONJUNCTION WITH A1 JOB#321230191. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| B08027238 ↗ | 3860 NAUTILUS AVENUE BROOKLYN | Alteration | Signed-off | 10/26/2022 | 12/16/2022 | Design CNY ENGINEERING P.C Contractor LIQUID PLBG & HTNG SCS IN | REMOVE NON-LOAD BEARING PARTITIONS AND KITCHEN FIXTURES ON THE CELLAR FLOOR;REMOVE UR. ON THE 1ST FLOOR IN ORDER TO REMOVE ECB VIOLATION#343… |
| Q08013159 ↗ | 138-35 39 AVENUE QUEENS | Alteration | Signed-off | 11/28/2022 | 12/12/2022 | Design CNY ENGINEERING P.C Contractor DVE CONSTRUCTION INC | INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK AT 4TH FLOOR FOR 4G. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q08013152 ↗ | 37-12 PRINCE STREET QUEENS | Alteration | Signed-off | 11/16/2022 | 12/06/2022 | Design CNY ENGINEERING P.C Owner Fultonex Management Contractor MPS PLUMBING & HEATING INC Filer CNY ENGINEERING PC | #6D,Dr. Song Clinic, Modify sprinkler and plumbing system for #6D on the 5th floor in conjunction with A2 job# Q08040217. No change in use,e… |
| Q08013150 ↗ | 37-12 PRINCE STREET QUEENS | Alteration | Signed-off | 11/21/2022 | 12/05/2022 | Design CNY ENGINEERING P.C Owner Fultonex Management Contractor H INTERIOR DESIGN CONSTRU Filer CNY ENGINEERING PC | #6D,Dr. Song Clinic, INSTALL NEW MECHANICAL UNITS IN UNIT #6D ON THE 5TH FLOOR IN CONJUNCTION WITH A2 JOB# Q08040217. NO CHANGE IN USE,EGRES… |
| B00728421 ↗ | 1170 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 05/04/2022 | 12/03/2022 | Design CNY ENGINEERING P.C Contractor T & T PLUMBING INC | REMOVE NON-LOAD BEARING PARTITION AND INSTALL NEW PARTITIONS FOR APT#4D & 4E ON THE 4TH FLOOR. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| X00429625 ↗ | 3362 BOSTON ROAD BRONX | Alteration | Permit Issued | 01/06/2021 | 11/26/2022 | Design CNY ENGINEERING P.C Contractor AVALANCHE BUILDER LLC Filer CNY ENGINEERING PC | INSTALL NEW GENERATOR ON THE OPEN SPACE IN CONJUNCTION WITH NB JOB#210178680. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| B08036473 ↗ | 132 MESEROLE STREET BROOKLYN | Alteration | Signed-off | 11/09/2022 | 11/16/2022 | Design CNY ENGINEERING P.C Owner 59 VILLAS LLC Contractor BVC CONTRACTING LLC Filer CNY ENGINEERING PC | INSTALL NEW VENTILATION SYSTEM FOR CELLAR AND 1ST FLOOR IN THE BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q00795454 ↗ | 71-66 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 10/03/2022 | 11/09/2022 | Design CNY ENGINEERING P.C Contractor AMERICAN STANDARD PLUMBIN Filer CNY ENGINEERING PC | MODIFY PLUMBING AND SPRINKLER SYSTEM FOR THE BUILDING ON THE 2ND FLOOR IN CONJUNCTION WITH JOB#Q00795087.NO CHANGE IN USE,EGRESS AND OCCUPAN… |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/10/2026 | Sprinkler Systems | 11-49 44 ROAD | YUE ZHOU | special |
| 08/10/2026 | Fire-Resistant Penetrations and Joints | 11-49 44 ROAD | YUE ZHOU | special |
| 08/10/2026 | Energy Code Compliance Inspections | 11-49 44 ROAD | YUE ZHOU | progress |
| 08/10/2026 | HVAC-R and service water heating system controls | 11-49 44 ROAD | YUE ZHOU | energy_progress |
| 08/10/2026 | HVAC-R and service water piping design and insulation | 11-49 44 ROAD | YUE ZHOU | energy_progress |
| 08/10/2026 | HVAC-R and service water heating equipment | 11-49 44 ROAD | YUE ZHOU | energy_progress |
| 08/05/2026 | HVAC-R and service water piping design and insulation | 11-49 44 ROAD | YUE ZHOU | energy_progress |
| 08/05/2026 | HVAC-R and service water heating system controls | 11-49 44 ROAD | YUE ZHOU | energy_progress |
| 08/05/2026 | HVAC-R and service water heating equipment | 11-49 44 ROAD | YUE ZHOU | energy_progress |
| 08/05/2026 | Energy Code Compliance Inspections | 11-49 44 ROAD | YUE ZHOU | progress |
| 08/05/2026 | Sprinkler Systems | 11-49 44 ROAD | YUE ZHOU | special |
| 08/05/2026 | Fire-Resistant Penetrations and Joints | 11-49 44 ROAD | YUE ZHOU | special |
| 07/27/2026 | Tenant Protection Plan Compliance | 1219 1 AVENUE | YUE ZHOU | special |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | 1219 1 AVENUE | YUE ZHOU | special |
| 07/27/2026 | Energy Code Compliance Inspections | 1219 1 AVENUE | YUE ZHOU | progress |
| 07/23/2026 | Mechanical Systems | 1540 DEKALB AVENUE | YUE ZHOU | special |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | 1540 DEKALB AVENUE | YUE ZHOU | special |
| 07/23/2026 | Tenant Protection Plan Compliance | 1540 DEKALB AVENUE | YUE ZHOU | special |
| 07/23/2026 | Final | 1540 DEKALB AVENUE | YUE ZHOU | progress |
| 07/23/2026 | Energy Code Compliance Inspections | 1540 DEKALB AVENUE | YUE ZHOU | progress |
| 07/23/2026 | Fire-Resistance Rated Construction | 1540 DEKALB AVENUE | YUE ZHOU | progress |
| 07/23/2026 | HVAC-R and service water heating system controls | 1540 DEKALB AVENUE | YUE ZHOU | energy_progress |
| 07/23/2026 | Maintenance information | 1540 DEKALB AVENUE | YUE ZHOU | energy_progress |
| 07/23/2026 | HVAC-R and service water heating equipment | 1540 DEKALB AVENUE | YUE ZHOU | energy_progress |
| 07/23/2026 | HVAC-R and service water piping design and insulation | 1540 DEKALB AVENUE | YUE ZHOU | energy_progress |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | 1219 1 AVENUE | YUE ZHOU | special |
| 07/23/2026 | Tenant Protection Plan Compliance | 1219 1 AVENUE | YUE ZHOU | special |
| 07/23/2026 | Energy Code Compliance Inspections | 1219 1 AVENUE | YUE ZHOU | progress |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | 12-47 150 STREET | YUE ZHOU | special |
| 07/22/2026 | Sprinkler Systems | 12-47 150 STREET | YUE ZHOU | special |
| 06/23/2026 | Sprinkler Systems | 36-13 COLLEGE POINT BLVD | YUE ZHOU | special |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | 36-13 COLLEGE POINT BLVD | YUE ZHOU | special |
| 06/18/2026 | Final | 37 PORT RICHMOND AVENUE | YUE ZHOU | progress |
| 06/18/2026 | Fire-Resistant Penetrations and Joints | 37 PORT RICHMOND AVENUE | YUE ZHOU | special |
| 06/18/2026 | Tenant Protection Plan Compliance | 37 PORT RICHMOND AVENUE | YUE ZHOU | special |
| 06/18/2026 | Mechanical Systems | 37 PORT RICHMOND AVENUE | YUE ZHOU | special |
| 06/17/2026 | HVAC-R and service water heating system controls | 394 BROADWAY | YUE ZHOU | energy_progress |
| 06/17/2026 | HVAC-R and service water heating equipment | 394 BROADWAY | YUE ZHOU | energy_progress |
| 06/17/2026 | HVAC-R and service water piping design and insulation | 394 BROADWAY | YUE ZHOU | energy_progress |
| 06/17/2026 | Energy Code Compliance Inspections | 394 BROADWAY | YUE ZHOU | progress |
| 06/17/2026 | Fire-Resistant Penetrations and Joints | 394 BROADWAY | YUE ZHOU | special |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | 394 BROADWAY | YUE ZHOU | special |
| 06/02/2026 | Energy Code Compliance Inspections | 394 BROADWAY | YUE ZHOU | progress |
| 06/02/2026 | HVAC-R and service water piping design and insulation | 394 BROADWAY | YUE ZHOU | energy_progress |
| 06/02/2026 | HVAC-R and service water heating equipment | 394 BROADWAY | YUE ZHOU | energy_progress |
| 06/02/2026 | HVAC-R and service water heating system controls | 394 BROADWAY | YUE ZHOU | energy_progress |
| 05/15/2026 | Interior lighting power | 43-14 QUEENS STREET | YUE ZHOU | energy_progress |
| 05/13/2026 | Energy Code Compliance Inspections | 43-14 QUEENS STREET | YUE ZHOU | progress |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | 43-14 QUEENS STREET | YUE ZHOU | special |
| 05/12/2026 | Tenant Protection Plan Compliance | 43-14 QUEENS STREET | YUE ZHOU | special |