← Back
BuildNYC
MANHATTAN
12 EAST 48TH STREET
MANHATTAN · BIN 1090691
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active ViolationsFISP: No Report FiledFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed Mezzanine Level for Eating and Drinking Establishme1p · 1 filing · 20 docs
Floor 1New bathroom fixtures and electric HWH, 1st floor67p · 4 filings · 20 docs
MezzanineProposed Mezzanine Level for Eating and Drinking Establishme13p · 1 filing · 20 docs
Cellar1248 Property LLC4p · 3 filings · 20 docs
Site & exteriorHidrock Properties73p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1248 Property5303/21/2026
37 East Rest4210/13/2026
East 47th Street4003/21/2026
1248 Associates1803/22/2026
Hidrock Properties1207/08/2026
Hilton Resorts1007/08/2026
Christophers203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2016$84.2M—1248 PROPERTY LLC → 1248 ASSOCIATES LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Scarano Architect3203/21/2026
Metropolis Group603/21/2026
Building Brothers203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Everest ScaffoldingScaffold707/08/2026
Season BuildersGeneral Contractor407/08/2026
Structure ToneGeneral Contractor207/08/2026
Active SignsSign hanger107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Orbit SprinklerFire Protection107/08/2026
JP & Son ElectricElectrical103/22/2026
Pace PlumbingPlumbing107/08/2026
Star Electrical ContractorsElectrical103/22/2026
Season BuildersScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica17951309/01/2026
Delta Testing Labs687209/06/2023
Desimone Consulting Engineering5942103/13/2023
Building Lifecycle
All (176)Filed (24)Permit Issued (17)Signed Off (12)Facade (FISP) (3)Violation (60)Inspection (8)Objection (22)Special Inspection (30)
09/08/2026
Special inspection requirement — Lighting controls
MICHAEL KARANTINIDIS, P.E.
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
09/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
09/08/2026
Special inspection requirement — Interior lighting power
MICHAEL KARANTINIDIS, P.E.
09/01/2026
Filed — Alteration CO
Proposed conversion from vacate Retail Store to Eating and Drinking Establishment, including accessory use Mezzanine.
M01178516-P4
08/28/2026
Special inspection requirement — Lighting controls
MICHAEL KARANTINIDIS, P.E.
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
08/28/2026
Special inspection requirement — Interior lighting power
MICHAEL KARANTINIDIS, P.E.
08/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
08/10/2026
Objection resolved — Resolved
07/29/2026
Objection raised — Other
07/21/2026
Objection raised — Other
07/21/2026
Objection resolved — Resolved
07/09/2026
Filed — Alteration CO
Proposed conversion from vacate Retail Store to Eating and Drinking Establishment, including accessory use Mezzanine.
M01178516-P3
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
07/08/2026
Special inspection requirement — Interior lighting power
MICHAEL KARANTINIDIS, P.E.
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
07/08/2026
Special inspection requirement — Lighting controls
MICHAEL KARANTINIDIS, P.E.
03/24/2026
Signed off — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-S1
03/23/2026
Signed off — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-S3
03/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Filed — Alteration CO
Proposed conversion from vacate Retail Store to Eating and Drinking Establishment, including accessory use Mezzanine.
M01178516-P2
01/28/2026
Signed off — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-I1
01/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
01/27/2026
Special inspection requirement — Lighting controls
MICHAEL KARANTINIDIS, P.E.
01/27/2026
Special inspection requirement — Interior lighting power
MICHAEL KARANTINIDIS, P.E.
01/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
01/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
01/16/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
01/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/12/2026
Signed off — Alteration CO
Proposed conversion from vacate Retail Store to Eating and Drinking Establishment, including accessory use Mezzanine.
M01178516-S1
01/12/2026
Signed off — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-S4
01/09/2026
Objection resolved — Addressed
01/08/2026
Signed off — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-S2
01/06/2026
Objection raised — Admin
12/30/2025
Filed — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-P7
12/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/31/2025
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
10/31/2025
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL KARANTINIDIS, P.E.
10/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
10/31/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
10/31/2025
Special inspection requirement — Shutoff dampers
MICHAEL KARANTINIDIS, P.E.
10/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
10/31/2025
Special inspection requirement — Ventilation and air distribution system
MICHAEL KARANTINIDIS, P.E.
10/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
10/27/2025
Filed — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-P4
10/09/2025
Filed — Alteration CO
Proposed conversion from vacate Retail Store to Eating and Drinking Establishment, including accessory use Mezzanine.
M01178516-P1
10/09/2025
Objection raised — Admin
10/09/2025
Objection resolved — Addressed
09/30/2025
Filed — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-P6
09/30/2025
Filed — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-P5
09/24/2025
Filed — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-P3
09/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2025
Filed — Alteration
Modification to existing sprinkler system on 1st floor building. No change to use, occupancy or egress under this application.
M01176935-P2
08/04/2025
Permit issued — Construction Fence
M01176935-S4-FN
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offSeason Builders08/04/2025
DOB NOWGeneral ConstructionPermit IssuedSeason Builders07/09/2025
DOB NOWStructuralSigned-offSeason Builders06/26/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating05/22/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler05/22/2025
DOB NOWGeneral ConstructionSigned-offSeason Builders05/06/2025
DOB NOWMechanical SystemsSigned-offSeason Builders05/06/2025
DOB NOWPlumbingSigned-offPace Plumbing10/23/2023
DOB NOWGeneral ConstructionSigned-offStructure Tone10/20/2023
DOB NOWStructuralSigned-offStructure Tone03/20/2023
DOB NOWSidewalk ShedSigned-offEverest Scaffolding10/19/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding10/15/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/27/2020
DOB NOWSignSigned-offActive Signs02/19/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding10/18/2019
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding10/17/2019
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding10/19/2018
BISPLISSUEDHeadquarters Mechanical09/15/2022
BISFSISSUEDNeal M. Rudikoff03/02/2021
BIS—ISSUEDAnthony T. Rinaldi03/01/2021
BISSPISSUEDRCI Fire Protection01/25/2021
BISEQISSUEDEverest Scaffolding12/23/2020
BIS—ISSUEDAnthony T. Rinaldi12/22/2020
BISOTISSUEDAnthony T. Rinaldi11/12/2020
BISEQISSUEDDoria10/05/2020
BISPLISSUEDPro Star Plumbing, Heating & Mechanical09/15/2020
BISSDISSUEDPro Star Plumbing, Heating & Mechanical09/15/2020
BISEQISSUEDEverest Scaffolding08/26/2020
BISEQISSUEDAnthony T. Rinaldi08/13/2020
BISFSISSUEDNeal M. Rudikoff03/10/2020
BISSDISSUEDRCI Fire Protection01/21/2020
BISBLISSUEDPro Star Plumbing, Heating & Mechanical12/04/2019
BISPLISSUEDPro Star Plumbing, Heating & Mechanical09/13/2019
BISEQISSUEDEverest Scaffolding09/05/2019
BISFSISSUEDNeal M. Rudikoff05/30/2019
BIS—ISSUEDAnthony T. Rinaldi03/11/2019
BISPLISSUEDPro Star Plumbing, Heating & Mechanical02/01/2019
BISSDISSUEDPro Star Plumbing, Heating & Mechanical01/25/2019
BISEQISSUEDEverest Scaffolding01/09/2019
BISEQISSUEDEverest Scaffolding01/08/2019
+ 27 more permits on file
9 projects · most recent 06/05/2026
General Wiring Lighting
FiledStatusContractorScope
06/05/2026CompleteCiti-Wide ElectricGeneral Wiring, Lighting
03/13/2024CompleteJP & Son Electric1 meters, 1 new_meters
08/15/2022CompleteAnthony G Ferry—
07/25/2022CompleteAnthony G FerryGeneral Wiring
02/04/2021CompleteStar Electrical Contractors—
01/25/2019CompleteR.C.M. ElectricGeneral Wiring
08/30/2018CompleteAnthony G FerryGeneral Wiring
03/02/2018CompleteBorowide Elect'l Contractors—
02/16/2018CompleteStar Electrical Contractors—
1 project · most recent 09/01/2026
FiledStatusContractorScope
09/01/2026Permit IssuedSeason Builders1 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
09/08/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
09/08/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
09/08/2026Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
09/08/2026Lighting controlsMICHAEL KARANTINIDIS, P.E.energy_progress
09/08/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
08/28/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
08/28/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
08/28/2026Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
08/28/2026Lighting controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/28/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
07/08/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
07/08/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
07/08/2026Lighting controlsMICHAEL KARANTINIDIS, P.E.energy_progress
07/08/2026Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
07/08/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
01/27/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
01/27/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
01/27/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
01/27/2026Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
01/27/2026Lighting controlsMICHAEL KARANTINIDIS, P.E.energy_progress
01/16/2026HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
01/16/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
10/31/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
10/31/2025Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
10/31/2025Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
Latest 25 of 81.
▾Documents — 776 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
09/06/2026M00089138-I1Request digital key ↗
08/31/2026M00841309-I1Request digital key ↗
08/29/2026M00911810-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00408882-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00287052-I1Request digital key ↗
▸Applications & Permits159
▸BISPLAN / WORK APPROVAL APPLICATION94
01/24/2023121190816Open ↗
01/23/2023121190816Open ↗
01/20/2023121190816Open ↗
Showing 3 of 94 on file for this type
▸BISWORK PERMIT APPLICATION58
09/15/2022121190816Open ↗
11/12/2020123206459Open ↗
10/05/2020140958239Open ↗
Showing 3 of 58 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/11/2022140554068Open ↗
10/30/2020140554068Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
02/18/2021121190816Open ↗
01/19/2021121190816Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram5
10/14/2026M01178516-P4Open ↗
08/21/2026M01178516-P1Open ↗
08/15/2026M01178516-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/21/2026M01178516-P1Open ↗
08/13/2026M01178516-P2Open ↗
08/13/2026M01178516-I1Open ↗
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications185
▸DOB NOWProgress Inspector Seal & Signature63
10/14/2026M01178516-P4Open ↗
10/14/2026M01178516-P4Open ↗
10/14/2026M01178516-P4Open ↗
Showing 3 of 63 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
10/14/2026M01178516-P4Open ↗
09/04/2026M00408882-I1Open ↗
08/31/2026M00841309-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/14/2026M01178516-P4Open ↗
09/19/2026M01178516-I1Open ↗
09/02/2026M01176935-S2Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
09/25/2020140958239Open ↗
Showing 1 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
09/25/2020140958239Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
09/25/2020140958239Open ↗
Showing 1 of 6 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING14
01/23/2023121190816Open ↗
04/30/2021140573617Open ↗
04/30/2021140573617Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
04/09/2020140619784Open ↗
04/06/2020140619846Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
06/28/2022122939776Open ↗
06/08/2022123603458Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
09/14/2021121190816Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
10/14/2026M01178516-P4Open ↗
08/21/2026M01178516-P2Open ↗
08/21/2026M01178516-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00287052-I1Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00287052-I1Open ↗
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY23
01/13/2023121190816Open ↗
01/12/2023121190816Open ↗
11/22/2021121190816Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
06/30/2022122939776Open ↗
02/10/2022121190816Open ↗
03/05/2021121232567Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION3
07/22/2022121190816Open ↗
06/14/2022121190816Open ↗
06/14/2022121190816Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports59
▸BISTECHNICAL REPORT: RESPONSIBILITY50
01/13/2023121190816Open ↗
01/13/2023121190816Open ↗
01/12/2023121190816Open ↗
Showing 3 of 50 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* EXIT SIGNS1
02/11/2022121190816Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/11/2022121190816Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/23/2022121190816Open ↗
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/30/2022122939776Open ↗
06/21/2022123603458Open ↗
03/30/2022140573617Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
01/24/2023121190816Open ↗
01/20/2023121190816Open ↗
12/15/2022121190816Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
09/15/2022121190816Open ↗
07/22/2022121190816Open ↗
08/26/2020140699091Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSHED LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT18
10/07/2021140619846Open ↗
06/01/2021123001606Open ↗
Showing 2 of 18 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
09/14/2021121190816Open ↗
Showing 1 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
06/30/2022122939776Open ↗
06/20/2022123603458Open ↗
03/30/2022140573617Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms94
▸BISADDITIONAL INFORMATION47
11/14/2022121190816Open ↗
02/11/2022140554068Open ↗
09/30/2021140554068Open ↗
Showing 3 of 47 on file for this type
▸BISEFILING COVER SHEET27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
09/25/2020140958239Open ↗
Showing 1 of 10 on file for this type
▸BISBOROUGH INTAKE FORM9
08/26/2020140699091Open ↗
Showing 1 of 9 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents36
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
09/14/2021121190816Open ↗
08/26/2020140699091Open ↗
08/26/2020140699091Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
10/14/2026M01178516-P4Open ↗
08/21/2026M01178516-P1Open ↗
08/15/2026M01178516-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
10/14/2026M01178516-P4Open ↗
08/21/2026M01178516-P1Open ↗
08/15/2026M01178516-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
10/14/2026M01178516-P4Open ↗
08/21/2026M01178516-P2Open ↗
08/21/2026M01178516-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
03/02/2021140554068Open ↗
03/02/2021140554068Open ↗
Showing 2 of 3 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSITE SURVEY: INITIAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type