← Back
BuildNYC
Church, synagogue, chapel
12 WEST 12TH STREET
MANHATTAN · Greenwich Village · BIN 1083138
💬 Discuss this project
1958Year Built
4Stories
M1Building Class
R10Zoning
339,320 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Church, synagogue, chapel · Owner of record: First Presbyterian Church · 31,925 sf lot · 10.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFirst Presbyterian Church Nursery School12p · 2 filings · 15 docs
PenthouseFirst Presbyterian Church Nursery School1p · 1 filing · 4 docs
Floor 6First Presbyterian Church Nursery School8p · 1 filing · 4 docs
Floor 5First Presbyterian Church Nursery School8p · 1 filing · 4 docs
Floor 4First Presbyterian Church Nursery School11p · 2 filings · 9 docs
Floor 3First Presbyterian Church Nursery School11p · 2 filings · 11 docs
Floor 2First Presbyterian Church Nursery School3p · 1 filing · 7 docs
Floor 1
Site & exteriorFirst Presbyterian Church Nursery School9p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
First Presbyterian Church in the CI4907/10/2026
45-47 Crosby St Tenants203/21/2026
1 St Pres103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vakota Architecture105/08/2025
Black Sheep Engineering Group111/22/2024
Reuther Bowen211/10/2023
Thornton Tomasetti210/20/2020
Goldman Copeland Associates107/07/2020
Tohfaz Uddin PE205/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode203/21/2026
Renaissance Code Consultants603/21/2026
Spring Scaffolding403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Comfort Zone Mechanicalspecialty_contractor807/08/2026
Spring ScaffoldingScaffold507/08/2026
CS BridgeScaffold407/10/2026
Reem Plumbing & HeatingPlumbing107/08/2026
Westerman Construction CoGeneral Contractor106/28/2026
Nash Electric ServicesElectrical103/21/2026
Nash Electric ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vakota Architecture7281105/08/2025
Keyowner Engineering4817211/10/2023
PSI Agency254210/20/2020
Goldman Copeland Associates2826107/07/2020
Building Lifecycle
All (100)Filed (9)Permit Issued (15)Signed Off (5)Violation (60)Inspection (1)Objection (4)Special Inspection (6)
10/20/2026
Permit issued — Sidewalk Shed
M01145952-I1-SH
07/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2026
Permit issued — Sidewalk Shed
M01145952-I1-SH
04/10/2026
Permit issued — Sidewalk Shed
M01145952-I1-SH
06/26/2025
Permit issued — General Construction
M01217325-I1-GC
05/08/2025
Filed — Alteration
M01217325-I1
11/25/2024
Permit issued — Sidewalk Shed
M01145952-I1-SH
11/22/2024
Filed — Alteration
M01145952-I1
12/12/2023
Signed off — Alteration
STRUCTURAL MODIFICATIONS FOR INSTALLATION OF A GUARDRAIL ON A PORTION OF THE THE PENTHOUSE'S ROOF..
M00341126-I1
11/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KWAMI AVITY
11/14/2023
Special inspection requirement — Post-installed Anchors
KWAMI AVITY
11/14/2023
Special inspection requirement — Final
KWAMI AVITY
11/10/2023
Filed — Alteration
STRUCTURAL MODIFICATIONS FOR INSTALLATION OF A GUARDRAIL ON A PORTION OF THE THE PENTHOUSE'S ROOF..
M00341126-P1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2022
Signed off — Alteration
Respectfully request to remove Post Installed Anchors Inspection from items required list and submit revised plans.
M00354024-I1
02/16/2022
Signed off — Alteration
M00341201-I1
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2020
Permit issued — Structural
M00341126-I1-ST
11/04/2020
Permit issued — Mechanical Systems
M00341201-I1-MS
10/20/2020
Filed — Alteration
Respectfully request to remove Post Installed Anchors Inspection from items required list and submit revised plans.
M00354024-P1
10/15/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/15/2020
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
07/29/2020
Permit issued — Plumbing
M00354024-I1-PL
07/21/2020
Filed — Alteration
STRUCTURAL MODIFICATIONS FOR INSTALLATION OF A GUARDRAIL ON A PORTION OF THE THE PENTHOUSE'S ROOF..
M00341126-I1
07/21/2020
Permit issued — Structural
M00341126-I1-ST
07/07/2020
Filed — Alteration
M00341201-I1
07/07/2020
Permit issued — Mechanical Systems
M00341201-I1-MS
06/24/2020
Objection raised — Other
06/24/2020
Objection resolved — Addressed
06/24/2020
Objection raised — Other
06/24/2020
Objection resolved — Addressed
06/19/2020
Filed — Alteration
Respectfully request to remove Post Installed Anchors Inspection from items required list and submit revised plans.
M00354024-I1
04/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Signed off — Alteration
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
M00044197-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2019
Signed off — Alteration
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00044204-I1
01/30/2019
Permit issued — Supported Scaffold
M00044204-I1-SF
12/26/2018
Permit issued — Sidewalk Shed
M00044197-I1-SH
12/26/2018
Permit issued — Supported Scaffold
M00044204-I1-SF
05/17/2018
Permit issued — Sidewalk Shed
M00044197-I1-SH
05/17/2018
Permit issued — Supported Scaffold
M00044204-I1-SF
05/16/2018
Filed — Alteration
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
M00044197-I1
05/15/2018
Filed — Alteration
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00044204-I1
05/15/2018
Special inspection requirement — Final
MD TOHFAZ UDDIN
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2018
Violation issued (ECB, closed)
Construction
03/06/2018
Violation issued (ECB, closed)
Construction
03/06/2018
Violation issued (ECB, closed)
Construction
03/06/2018
Violation issued (ECB, closed)
Construction
03/01/2018
Violation issued (ECB, closed)
Construction
02/02/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2017
Violation issued (ECB, closed)
Unknown
05/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCS Bridge10/20/2026
DOB NOWSidewalk ShedPermit IssuedCS Bridge07/08/2026
DOB NOWSidewalk ShedPermit IssuedCS Bridge04/10/2026
DOB NOWGeneral ConstructionPermit IssuedWesterman Construction Co06/26/2025
DOB NOWSidewalk ShedPermit IssuedCS Bridge11/25/2024
DOB NOWStructuralSigned-offComfort Zone Mechanical11/04/2020
DOB NOWMechanical SystemsSigned-offComfort Zone Mechanical11/04/2020
DOB NOWPlumbingSigned-offReem Plumbing & Heating07/29/2020
DOB NOWStructuralSigned-offComfort Zone Mechanical07/21/2020
DOB NOWMechanical SystemsSigned-offComfort Zone Mechanical07/07/2020
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding01/30/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/26/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding12/26/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding05/17/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding05/17/2018
BIS—ISSUEDComfort Zone Mechanical02/10/2022
BISOTISSUEDHenry Restoration10/05/2020
BISOTISSUEDHenry Restoration09/24/2020
BISOTISSUEDComfort Zone Mechanical07/28/2020
BISOTISSUEDD.B.J. Contracting07/21/2020
BISOTISSUEDXhema of N.Y02/28/2019
BISOTISSUEDHenry Restoration09/27/2018
BISOTISSUEDHenry Restoration05/04/2018
BISEQISSUEDWest New York Restoration of CT06/06/2017
BISPLISSUEDHydronic Concepts NY P&H09/28/2016
BISOTISSUEDB&B Contracting Group06/22/2016
BISEQISSUEDWest New York Restoration of CT06/10/2016
BISPLISSUEDG.N.T. Mechanical05/19/2014
BISSPISSUEDG.N.T. Mechanical05/19/2014
BISPLISSUEDG.N.T. Mechanical08/15/2013
BISMHISSUEDOestreicher Construction07/25/2013
BISBLISSUEDChamp Plumbing & Heating07/02/2013
BISPLISSUEDChamp Plumbing & Heating07/02/2013
BISSPISSUEDG.N.T. Mechanical05/28/2013
BISPLISSUEDG.N.T. Mechanical05/28/2013
BISPLISSUEDG.N.T. Mechanical08/09/2012
BISMHISSUEDOestreicher Construction07/19/2012
BIS—ISSUEDOestreicher Construction05/22/2012
BISSPISSUEDG.N.T. Mechanical05/17/2012
BISPLISSUEDG.N.T. Mechanical05/17/2012
+ 20 more permits on file
5 projects · most recent 08/24/2026
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
08/24/2026Permit IssuedPower Surge ElectricGeneral Wiring
11/26/2024Permit IssuedNash Electric Services—
07/23/2020CompleteJer ElectricGeneral Wiring, Lighting
07/10/2020CompleteAlba ElectricHVAC Wiring
05/15/2018CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/14/2023Structural Stability – Alterations of existing buildingsKWAMI AVITYspecial
11/14/2023Post-installed AnchorsKWAMI AVITYspecial
11/14/2023FinalKWAMI AVITYprogress
10/15/2020Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/15/2020Post-installed AnchorsMAURICIO ANDRADEspecial
05/15/2018FinalMD TOHFAZ UDDINprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
First Presbyterian Church Nursery SchoolEducationEntire building
Project M01217325 Alteration · Permit Entire · 05/08/2025
Project M01145952 Alteration · Permit Entire · 11/22/2024
Project M00341126 Alteration · LOC Issued · 07/21/2020
Project M00341201 Alteration · LOC Issued · 07/07/2020
Project M00354024 Alteration · LOC Issued · 06/19/2020
Project M00044197 Alteration · LOC Issued · 05/16/2018
Project M00044204 Alteration · LOC Issued · 05/15/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 473 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch4
09/06/2026M00044197-I1Request digital key ↗
09/06/2026M00044204-I1Request digital key ↗
08/25/2026M01145952-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00354024-P1Request digital key ↗
08/15/2026M00354024-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/04/2026M00341126-I1Request digital key ↗
09/04/2026M00341126-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00341201-I1Request digital key ↗
▸Applications & Permits103
▸BISPLAN / WORK APPROVAL APPLICATION65
01/17/2024110475557Open ↗
01/27/2023121171285Open ↗
09/15/2022110475557Open ↗
Showing 3 of 65 on file for this type
▸BISWORK PERMIT APPLICATION28
02/11/2022110475557Open ↗
09/24/2020140930866Open ↗
07/28/2020140912984Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit6
09/04/2026M00341126-I1Open ↗
08/13/2026M00341126-P1Open ↗
08/13/2026M00354024-I1Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
07/10/2015120990534Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications81
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
01/21/2020123726030Open ↗
01/21/2020123726030Open ↗
12/23/2019123726030Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
12/23/2019123726030Open ↗
04/12/2018123442907Open ↗
01/19/2018123209205Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/04/2026M00341201-I1Open ↗
09/04/2026M00341126-I1Open ↗
08/25/2026M01145952-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
09/08/2020140930866Open ↗
07/07/2020140912984Open ↗
12/23/2019123726030Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M00341126-I1Open ↗
08/29/2026M00341126-I1Open ↗
08/28/2026M00354024-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/08/2020140930866Open ↗
07/07/2020140912984Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/08/2020140930866Open ↗
07/07/2020140912984Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026M00341126-I1Open ↗
08/24/2026M00044204-I1Open ↗
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/23/2021110475557Open ↗
09/24/2015110475557Open ↗
09/24/2015110475557Open ↗
▸BISEQUIPMENT USE PERMITS2
11/18/2021110475557Open ↗
09/24/2015110475557Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBO-9 DOB Boiler Inspection Report/ DEP Boiler Renewal Request1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
01/19/2018123209205Open ↗
06/22/2016122807686Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos24
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/08/2020140930866Open ↗
07/07/2020140912984Open ↗
12/23/2019123726030Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/04/2026M00341201-I1Open ↗
09/04/2026M00341126-I1Open ↗
08/23/2026M01217325-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
09/24/2020140930866Open ↗
07/14/2020140913411Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00354024-I1Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/22/2016122807686Open ↗
Showing 1 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/06/2021140930866Open ↗
10/19/2021140930866Open ↗
12/11/2018122807686Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/12/2021140930866Open ↗
09/24/2020140930866Open ↗
09/08/2020140930866Open ↗
▸BISNYCECC EXEMPTION2
07/07/2020140912984Open ↗
06/23/2020140913411Open ↗
▸BISELECTRIC MOTORS1
09/05/2023110475557Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/08/2020140930866Open ↗
▸BISEXTERIOR LIGHTING POWER1
09/05/2023110475557Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY13
02/15/2022140912984Open ↗
03/12/2021140930866Open ↗
10/30/2020140913411Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs72
▸BISSCHEDULE A - OCCUPANCY / USE19
06/13/2022110475557Open ↗
06/10/2022110475557Open ↗
06/08/2022110475557Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
02/17/2022140912984Open ↗
12/06/2021140930866Open ↗
10/30/2020140913411Open ↗
Showing 3 of 15 on file for this type
▸BISLANDMARKS APPROVAL13
09/08/2020140930866Open ↗
07/07/2020140912984Open ↗
07/07/2020140913411Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/04/2026M00341201-I1Open ↗
09/04/2026M00341126-I1Open ↗
08/23/2026M01217325-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/18/2015121171285Open ↗
Showing 1 of 4 on file for this type
▸BISLANDMARKS SIGNOFF4
03/30/2022110475557Open ↗
02/17/2022140912984Open ↗
10/19/2021140930866Open ↗
Showing 3 of 4 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
02/10/2022110475557Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT25
02/15/2022140912984Open ↗
12/06/2021140930866Open ↗
10/30/2020140913411Open ↗
Showing 3 of 25 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
12/23/2019123726030Open ↗
09/28/2015121171285Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
06/23/2020140913411Open ↗
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION20
09/26/2022110475557Open ↗
10/23/2020140913411Open ↗
07/07/2020140913411Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET15
12/23/2019123726030Open ↗
04/12/2018123442907Open ↗
01/19/2018123209205Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM8
01/27/2020110475557Open ↗
01/21/2020123726030Open ↗
11/26/2019123442907Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/08/2020140930866Open ↗
07/07/2020140912984Open ↗
06/23/2020140913411Open ↗
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
02/26/2024110475557Open ↗
02/26/2024110475557Open ↗
04/12/2018123442907Open ↗
Showing 3 of 8 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
09/08/2020140930866Open ↗
07/07/2020140912984Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01217325-I1Open ↗