| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00858480 ↗ | 768 5 AVENUE MANHATTAN | Alteration | Permit Issued | 04/18/2023 | 09/08/2026 | Design IVA FILIPOVIC ARCHITECT Owner FIRSTSERVICE RESIDENTIAL Contractor JOHN FITZGERALD PLBG &HTG Filer IVA FILIPOVIC ARCHITECT | Proposed plumbing work at existing residential condominium units 301 and 305 as per plans, in conjunction with proposed renovation filed und… |
| M01372410 ↗ | 330 WEST 77 STREET MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 08/07/2026 | Design SW ENGINEERING COMPANY Contractor BENNY & SON CONST CORP | CONSTRUCTION OF NEW CONCRETE RETAINING WALL IN FRONT OF EXISTING RETAINING WALL IN THE REAR YARD AS PER PLANS FILED HEREWITH. NO CHANGE IN U… |
| M01116685 ↗ | 300 WEST 108 STREET MANHATTAN | Alteration | Permit Issued | 12/05/2024 | 07/02/2026 | Design BO LEE ARCHITECT PC Contractor DP FLYNN PLBG & HTG INC | RENOVATION OF 2 EXISTING BATHROOMS AND KITCHEN, RELOCATE LAUNDRY AND REMOVE OF ONE BATHROOM INCONJUNCTION WITH INTERIOR RENOVATION OF APARTM… |
| M01170625 ↗ | 1115 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/05/2025 | 06/25/2026 | Design BO LEE ARCHITECT PC Owner BHS Contractor PEDEMONTE WOODWORKING LLC | PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF APARTMENT #15A. REPLACE FIXTURES IN POWDER ROOM AND ONE BATHROOM, RELOCATE FIXTURES IN… |
| B01089383 ↗ | 1429 77 STREET BROOKLYN | Alteration | Permit Issued | 08/21/2024 | 06/22/2026 | Design SIMINO ARCHITECT Owner 1429 77th Street LLC Contractor D.A.C. GENERAL CONTRACTIN Filer SIMINO ARCHITECT | RENOVATION OF EXISTING 2-FAMILY RESIDENCE INCLUDING INTERIOR NON-BEARING PARTITION CHANGES, FENESTRATION CHANGES, NEW INTERIOR STAIRS IN MOD… |
| X00676081 | 2511 MARION AVENUE BRONX | Alteration CO | Permit Issued | 02/17/2022 | 06/10/2026 | Design ZYSCOVICH ARCHITECTS Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | GENERAL CONSTRUCTION WORK TO ADD A MEZZANINE LEVEL TO THE BUILDING AND TO CONVERT OCCUPANCY GROUP FROM RETAIL (C 1968, M 2014) TO OFFICES (E… |
| Name | Projects together | Most recent |
|---|---|---|
| IMC ARCHITECTURE DPC | 18 | 02/27/2023 |
| ENSIGN ENGINEERING, P.C. | 9 | 06/23/2025 |
| KEYOWNER ENGINEERING, P.C. | 9 | 05/08/2026 |
| BO LEE ARCHITECT PC | 7 | 02/09/2026 |
| NODE ENGINEERING & CONSULTING, PC | 4 | 10/29/2021 |
| BICALURO ASSOCIATES PC | 3 | 06/14/2024 |
| KCE CONSULTING ENGINEERING PLLC | 3 | 08/08/2023 |
| ZYSCOVICH ARCHITECTS | 3 | 02/21/2025 |
| 2LS CONSULTING ENGINEERING, DPC | 2 | 10/16/2023 |
| D'ANTONIO CONSULTING ENGINEERS | 2 | 05/28/2025 |
| DESIMONE CONSULTING ENGINEERS | 2 | 09/01/2022 |
| FRED GEREMIA, ARCHITECTS & PLANNERS | 2 | 04/10/2026 |
| JOSEPH K. BLUM CO. LLP | 2 | 09/16/2025 |
| OLD STRUCTURES ENGINEERING | 2 | 10/23/2024 |
| PATRICK E ALLEN ARCHITECT PC | 2 | 02/13/2021 |
| RAZAK ASSOCIATES PLLC | 2 | 09/25/2024 |
| STV INCORPORATED | 2 | 05/21/2026 |
| TOWER ENGINEERING SOLUTIONS, LLC | 2 | 06/06/2024 |
| ZACHARY GIDICH ARCHITECTURE AND DES | 2 | 03/02/2026 |
| AGE ENGINEERING, LLC | 1 | 01/26/2021 |
| AMA CONSULTING ENGINEERS, PC | 1 | 02/24/2026 |
| ARMIR TARAJ PE | 1 | 04/10/2026 |
| ARUSHA CONSULTING AND CONSTRUCTION | 1 | 12/14/2020 |
| AS ENGINEERING SERVICES PC | 1 | 10/13/2025 |
| AUTOMATED DESIGN ENGINEERING, PLLC | 1 | 04/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| MAXWELL PLUMB MECH. CORP | 15 | 02/27/2023 |
| EMPIRE CORE GROUP LLC | 6 | 09/08/2022 |
| FIRST STANDARD CONSTRUCT* | 6 | 02/21/2025 |
| M.N.C. GENERAL CONTR CORP | 4 | 02/29/2024 |
| PIPE RITE CORP | 3 | 12/09/2021 |
| PM MECHANICAL GROUP CORP | 3 | 05/08/2026 |
| ZEFI & CO. LLC | 3 | 08/08/2023 |
| 136 WEST 88 OWNER, LLC | 2 | 11/05/2025 |
| AGGRESSIVE FIRE PROT LLC | 2 | 02/24/2026 |
| AMARO CONSTRUCTION CORP | 2 | 10/13/2025 |
| C&A SENECA CONSTRUCTION L | 2 | 11/30/2020 |
| DESIGNS BY VERRED INC | 2 | 06/12/2026 |
| DIONISOS CONSTRUCTION | 2 | 07/19/2021 |
| DOUG'S PLBG & HTG SERV CO | 2 | 04/10/2026 |
| JOHN FARR P & H CORP | 2 | 12/14/2020 |
| KEYSTONE BUILDERS GROUP* | 2 | 03/15/2023 |
| P&P PROFESSIONAL CONTR IN | 2 | 11/05/2025 |
| STANDARD WIRELESS GP | 2 | 06/06/2024 |
| TRI CITY MECHANICAL GROUP | 2 | 05/08/2026 |
| VILLAGE P & H NY INC | 2 | 01/19/2024 |
| A-MAC OF NEW YORK CONSTRU | 1 | 01/26/2021 |
| ABC MADISON BUILDERS INC | 1 | 04/17/2024 |
| ADVANCED P,MECH & SPRK CO | 1 | 01/25/2021 |
| ALGOL GROUP INC | 1 | 02/04/2026 |
| ALLSTATE SPRINKLER LLC | 1 | 06/12/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| 63 Wall Street Owner, LLC | 18 | 10/16/2023 |
| GINDI CAPITAL | 11 | 02/21/2025 |
| CHURCH OF ST JOHN CHRYSOSTOM | 4 | 09/28/2022 |
| JAK REALTY INC | 4 | 04/10/2025 |
| PARAMOUNT GROUP | 4 | 10/29/2021 |
| AVITYFAM CAPITAL, LLC | 2 | 05/08/2026 |
| FRESH DIRECT | 2 | 06/23/2023 |
| FirstService Residential | 2 | 06/12/2026 |
| PATRICK E ALLEN ARCHITECT PC | 2 | 02/13/2021 |
| 101 PARK AVENUE ASSOCIATES | 1 | 02/24/2026 |
| 1429 77th Street LLC | 1 | 03/04/2025 |
| AKAM ASSOCIATES, INC. | 1 | 05/17/2023 |
| AULDBRASS PARTNERS | 1 | 09/16/2025 |
| BHS | 1 | 04/28/2025 |
| COLLIERS INT. | 1 | 07/02/2026 |
| ENTERLINE TRUST | 1 | 02/10/2026 |
| EQUITY CONCEPTS LP | 1 | 06/30/2025 |
| FIRST PRESBYTERIAN CHURCH IN THE CI | 1 | 11/10/2023 |
| GJONZEF REALTY CORP | 1 | 06/13/2020 |
| MP REALTY HOLDING CORP. | 1 | 06/06/2024 |
| PREMIER EQUITIES | 1 | 03/02/2026 |
| RAGNAROK MANAGING AGENCY, LLC. | 1 | 01/18/2021 |
| ST. MARTIN OF TOURS CHURCH | 1 | 08/19/2020 |
| TEEN CHALLENGE, INC | 1 | 04/12/2024 |
| TH270 LLC | 1 | 01/26/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 14 | 02/10/2026 |
| CORE CONSULTANTS NYC | 11 | 02/27/2023 |
| ENSIGN ENGINEERING,P.C | 7 | 06/23/2025 |
| ANZALONE ARCHITECTURE, PLLC | 4 | 06/24/2025 |
| CONVERSANO ASSOCIATES, INC. | 4 | 05/21/2026 |
| METROPOLIS GROUP INC | 3 | 09/16/2025 |
| GRAND EXPEDITERS NYC | 2 | 02/04/2026 |
| NEW CODE CONSULTING LLC | 2 | 06/14/2024 |
| OUTSOURCE CONSULTANTS, INC. | 2 | 02/24/2026 |
| PEROTTO CONSULTING MGT | 2 | 06/23/2023 |
| AMERICAN GOTHAM CONSULTANTS LLC | 1 | 04/12/2024 |
| BOSCHEN DESIGN, ARCHITECTURE | 1 | 01/17/2024 |
| BURNHAM NATIONWIDE INC | 1 | 01/26/2022 |
| DESARNO ASSOCIATES, INC. | 1 | 05/15/2023 |
| EXPEDIENT CONSULTING LLC | 1 | 06/30/2025 |
| GILLMAN CONSULTING INC | 1 | 03/02/2026 |
| IVA FILIPOVIC ARCHITECT | 1 | 06/12/2026 |
| JENNY FLORES EXPEDITING | 1 | 10/13/2025 |
| KEYOWNER ENGINEERING, P.C. | 1 | 06/06/2024 |
| NEW LINE CONSTRUCTION | 1 | 04/10/2026 |
| NODE ARCHITECTURE,ENGINEERING,CON | 1 | 10/29/2021 |
| RAGNAROK CONSULTANTS, LLC. | 1 | 01/18/2021 |
| SIMINO ARCHITECT | 1 | 03/04/2025 |
| URBAN ENGINEERING, PC | 1 | 03/04/2025 |
| XPDITE GROUP LLC (104) | 1 | 04/10/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00858480 ↗ | 768 5 AVENUE MANHATTAN | Alteration | Permit Issued | 04/18/2023 | 09/08/2026 | Design IVA FILIPOVIC ARCHITECT Owner FIRSTSERVICE RESIDENTIAL Contractor JOHN FITZGERALD PLBG &HTG Filer IVA FILIPOVIC ARCHITECT | Proposed plumbing work at existing residential condominium units 301 and 305 as per plans, in conjunction with proposed renovation filed und… |
| M01372410 ↗ | 330 WEST 77 STREET MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 08/07/2026 | Design SW ENGINEERING COMPANY Contractor BENNY & SON CONST CORP | CONSTRUCTION OF NEW CONCRETE RETAINING WALL IN FRONT OF EXISTING RETAINING WALL IN THE REAR YARD AS PER PLANS FILED HEREWITH. NO CHANGE IN U… |
| M01116685 ↗ | 300 WEST 108 STREET MANHATTAN | Alteration | Permit Issued | 12/05/2024 | 07/02/2026 | Design BO LEE ARCHITECT PC Contractor DP FLYNN PLBG & HTG INC | RENOVATION OF 2 EXISTING BATHROOMS AND KITCHEN, RELOCATE LAUNDRY AND REMOVE OF ONE BATHROOM INCONJUNCTION WITH INTERIOR RENOVATION OF APARTM… |
| M01170625 ↗ | 1115 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/05/2025 | 06/25/2026 | Design BO LEE ARCHITECT PC Owner BHS Contractor PEDEMONTE WOODWORKING LLC | PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF APARTMENT #15A. REPLACE FIXTURES IN POWDER ROOM AND ONE BATHROOM, RELOCATE FIXTURES IN… |
| B01089383 ↗ | 1429 77 STREET BROOKLYN | Alteration | Permit Issued | 08/21/2024 | 06/22/2026 | Design SIMINO ARCHITECT Owner 1429 77th Street LLC Contractor D.A.C. GENERAL CONTRACTIN Filer SIMINO ARCHITECT | RENOVATION OF EXISTING 2-FAMILY RESIDENCE INCLUDING INTERIOR NON-BEARING PARTITION CHANGES, FENESTRATION CHANGES, NEW INTERIOR STAIRS IN MOD… |
| X00676081 | 2511 MARION AVENUE BRONX | Alteration CO | Permit Issued | 02/17/2022 | 06/10/2026 | Design ZYSCOVICH ARCHITECTS Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | GENERAL CONSTRUCTION WORK TO ADD A MEZZANINE LEVEL TO THE BUILDING AND TO CONVERT OCCUPANCY GROUP FROM RETAIL (C 1968, M 2014) TO OFFICES (E… |
| M00690170 ↗ | 230 WEST 139 STREET MANHATTAN | Alteration | Permit Issued | 05/19/2023 | 05/11/2026 | Design ENGINEERING SOLUTIONS Owner AULDBRASS PARTNERS Contractor EMPIREHD, INC Filer METROPOLIS GROUP INC | STRUCURAL WORK AS PER PLANS |
| M01339196 ↗ | 989 EAST 59 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 05/08/2026 | Design BENDIX ENGINEERING, P.C. Owner PREMIER EQUITIES Contractor HUDSON BLACK INC Filer GILLMAN CONSULTING INC | Filing herewith the mechanical work to the existing system as per the plans. No change to use, egress, or occupancy. |
| M01143087 ↗ | 184 DUANE STREET MANHATTAN | Alteration | Permit Issued | 06/30/2025 | 03/23/2026 | Design PARKBENCH ARCHITECTS Owner EQUITY CONCEPTS LP Contractor DBC INTERIOR Filer EXPEDIENT CONSULTING LLC | RENOVATIONS OF EXISTING LOADING DOCK. ADDITION OF 2 STEPS FOR RESIDENTAL ENTRY. NO INTERIOR SCOPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01347015 ↗ | 144 WEST 95 STREET MANHATTAN | Alteration | Permit Issued | 02/10/2026 | 03/20/2026 | Design CONCESSI ENGINEERING, P.C. Owner ENTERLINE TRUST Contractor DEVINE OF AMERICA CONS CO | Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occup… |
| M01362401 ↗ | 75 9 AVENUE MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 03/12/2026 | Design RUSSELL GOSS ARCHITECT, PC Contractor TERRANOVA CONTRACTING COR | Renovation of existing food service kiosk (HOIAN). Demolition and construction of interior non-bearing partitions, interior finishes per pla… |
| M01331540 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Permit Issued | 02/13/2026 | 03/09/2026 | Contractor TULLA CONTRACTING CORP | Structural work in conjunction with 2nd floor core renovation |
| M01349942 ↗ | 693 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/17/2026 | 03/05/2026 | Design MIHAI RADU ARCHITECTS PLLC Owner COLLIERS INT. Contractor SUPERIOR HVAC INC | WORK TO INCLUDE NEW PLUMBING FIXTURES FOR NEW TOILET, EXAM ROOMS, INFUSION SUITES, PANTRY & TOILETS. RELOCATION OF SELECT SPRINKLER HEADS. … |
| M01352288 ↗ | 101 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 02/17/2026 | 03/04/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor BENCHMARK BUILDERS LLC | SPRINKLER WORK ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH AT CONSTRUCTION FLOOR 8/MARKETING FLOOR 10. INCLUDING INSTALL AND REMOV… |
| X01083463 ↗ | 4738 RICHARDSON AVENUE BRONX | New Building | Permit Issued | 07/24/2024 | 02/18/2026 | Contractor BORI CONSTRUCTION CORP Filer NEW LINE CONSTRUCTION | Support of Excavation work associated with a new 2-story private house GC filing X01083463-S3 |
| M01228554 ↗ | 431 WEST 121 STREET MANHATTAN | Alteration | Permit Issued | 05/28/2025 | 02/10/2026 | Design JD Engineering PC Contractor ALGOL GROUP Filer GRAND EXPEDITERS NYC | INTERIOR RENOVATION OF EXISTING FIRST-FLOOR RESTAURANT, INCLUDING NEW EQUIPMENT INSTALLATION, NON-LOAD-BEARING WALLS, LIGHTING UPGRADES, MIL… |
| M01217198 ↗ | 1470 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 05/19/2025 | 01/16/2026 | Contractor SKANSKA USA BUILDING, INC | Herewith filing structural modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy. |
| B01322929 ↗ | 490 MAC DONOUGH STREET BROOKLYN | Alteration | Permit Issued | 11/25/2025 | 12/18/2025 | Design CHONG ENGINEERING, P.C. Contractor PENINSULA CONSTRUCTION IN Filer GRAND EXPEDITERS NYC | REMOVAL, RELOCATION, REPLACEMENT OF KITCHEN, BATHROOM, LAUNDRY FIXTURES THROUGHOUT THE CELLAR, BASEMENT, FIRST AND SECOND FLRS. NEW SUPPLY… |
| X01227740 ↗ | 1500 WESTCHESTER AVENUE BRONX | Alteration | Permit Issued | 05/31/2025 | 07/29/2025 | Design KEYOWNER ENGINEERING, P.C. Contractor PM MECHANICAL GROUP CORP | FILING TO CONVERT EXIST. RETAIL (U.G. 6A) TO EATING AND DRINKING ESTABLISHMENT (U.G. 6A) AND LEGALIZE EXISTING HVAC UNIT ON THE ROOF AS PER … |
| B01227939 ↗ | 316 CUMBERLAND STREET BROOKLYN | Alteration | Signed-off | 06/02/2025 | 07/22/2025 | Design BO LEE ARCHITECT PC Contractor MOHAMED ABDELRAZEK | RENOVATION OF EXISTING BASEMENT & 2ND FLOOR. DEMOLITION WORK TO INCLUDE PARTITIONS, DOORS, MILLWORK &FINISHES. PROPOSED WORK TO INCLUDE NEW … |
| X01017600 ↗ | 821 EAST 215 STREET BRONX | Alteration CO | Permit Issued | 04/06/2024 | 07/08/2025 | Design KEYOWNER ENGINEERING, P.C. Owner AVITYFAM CAPITAL, LLC Contractor PM MECHANICAL GROUP CORP | FILING TO CONVERT FROM EXIST. 2-FAMILY DWELLING UNIT TO 3-FAMILY DWELLING UNIT AND HOME OCCUPATION AS PER PLANS. FILING TO SUPERSEDE JOB #X0… |
| B01156557 ↗ | 904 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 12/23/2024 | 06/30/2025 | Design D2A STUDIO LLC Contractor AMARO CONSTRUCTION CORP Filer JENNY FLORES EXPEDITING | HEREBY FILING FOR REAR YARD DECK, STRUCTURAL FRAMING AND SISTERING AT SECOND FLOOR. , NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| B00581235 ↗ | 187 HICKS STREET BROOKLYN | Alteration | Permit Issued | 09/02/2022 | 06/25/2025 | Design LOCAL PARTI ARCHITECTURE Owner AKAM ASSOCIATES, INC. Contractor ANDRA'S K. CONSTRUCTION C Filer NEW CODE CONSULTING LLC | PROPOSED INTERIOR RENOVATION OF APT 2A. PARTITIONS AS PER PLAN. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| X01190025 ↗ | 1490E SHORE DRIVE BRONX | Alteration | Signed-off | 03/14/2025 | 06/25/2025 | Design KEYOWNER ENGINEERING, P.C. Contractor PM MECHANICAL GROUP CORP | REPAIR OF EXISTING STEEL STAIR 2ND FLOOR LANDING TO MID-THIRD FLOOR LANDING TO ADDRESS VIOLATION 39129160J |
| M01116679 ↗ | 300 WEST 108 STREET MANHATTAN | Alteration | Permit Issued | 12/05/2024 | 06/16/2025 | Design BO LEE ARCHITECT PC Contractor P.S.R. CONSTRUCTION/REN | INTERIOR RENOVATION OF PARTIAL 2ND FLOOR APARTMENT, INCLUDING MINOR DEMOLITION AND CONSTRUCTION OF NON LOAD-BEARING PARTITIONS, FINISHES, AN… |
| B01075690 ↗ | 691 MONROE STREET BROOKLYN | Alteration | Signed-off | 07/17/2024 | 05/28/2025 | Design BO LEE ARCHITECT PC Contractor DYNAMIC CONSTRUCTION OF | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 2-FAMILY RESIDENCE. ENLARGE EXISTING WINDOW OPENING AT REAR FACADE. REINFORCE SELECT… |
| M01043580 ↗ | 151 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 05/22/2024 | 04/01/2025 | Design BO LEE ARCHITECT PC Owner FIRSTSERVICE RESIDENTIAL Contractor AMARO CONSTRUCTION CORP | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION RENOVATION. RELOCATE & REPLACE BATHROOM & KITCHEN FIXTURES AS SHOWN ON PLANS. NO CHAN… |
| M00644488 ↗ | 136 WEST 88 STREET MANHATTAN | Alteration CO | Permit Issued | 12/13/2021 | 03/04/2025 | Design KEVIN LOUIS PELLON Contractor P&P PROFESSIONAL CONTR IN | THE HVAC CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING,SCAFFOLDING AND SERVICES NECESSARY TO COMPLETE THE S… |
| X00814704 ↗ | 2040 MCGRAW AVENUE BRONX | Alteration | Signed-off | 02/14/2023 | 11/07/2024 | Owner JAK REALTY INC Contractor DOUG'S PLBG & HTG SERV CO Filer XPDITE GROUP LLC (104) | Sprinkler work in conjunction with NB application #220651060 |
| X00725793 ↗ | 2040 MCGRAW AVENUE BRONX | Alteration | Signed-off | 05/04/2022 | 08/13/2024 | Owner JAK REALTY INC Contractor ZEFI & CO. LLC | New 6-story masonry and steel residential building. Filing support of excavation in conjunction with job #220651060 (DOC 1). |
| X00725914 ↗ | 2040 MCGRAW AVENUE BRONX | Alteration | Signed-off | 05/11/2022 | 08/12/2024 | Owner JAK REALTY INC Contractor ZEFI & CO. LLC | New 6-story masonry and steel residential building. Filing foundation in conjunction with job #220651060 (DOC 1). |
| X00725770 ↗ | 2040 MCGRAW AVENUE BRONX | Alteration | Signed-off | 10/17/2022 | 08/06/2024 | Owner JAK REALTY INC Contractor ZEFI & CO. LLC | New 7-story masonry and steel residential building. Filing structure in conjunction with job #220651060 |
| M00833934 ↗ | 327 EAST 26 STREET MANHATTAN | Alteration | Signed-off | 04/26/2023 | 07/15/2024 | Design ENSIGN ENGINEERING, P.C. Contractor AWL INDUSTRIES INC Filer ENSIGN ENGINEERING,P.C | REPLACING TWO EXISTING CHILLERS TOTALING 1400 TONS WITH MODULAR CHILLER SYSTEM TOTALLING 1400 TONS, THREE PUMPS WITH TWO NEW PUMPS AND ASSOC… |
| B01035640 ↗ | 259 BRISTOL STREET BROOKLYN | Alteration | Filed — no permit on record | 07/05/2024 | — | Design STV INCORPORATED | — |
| B00956398 ↗ | 295 FLATBUSH AVENUE EXT BROOKLYN | Alteration | Filed — no permit on record | 05/30/2024 | — | Design RAZAK ASSOCIATES PLLC | — |
| M00956385 ↗ | 158 EAST 115 STREET MANHATTAN | Alteration | Filed — no permit on record | 05/30/2024 | — | Design STV INCORPORATED | — |
| M00921192 ↗ | 465 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/25/2023 | 05/23/2024 | Design OLD STRUCTURES ENGINEERING Owner THE RITZ TOWER Contractor DESIGNS BY VERRED INC | Repair 8th-floor concrete slab in ceiling of bathroom of apartment 7F. Repair area of missing masonry in wall. No change to use, occupancy, … |
| M00829284 ↗ | 136 WEST 88 STREET MANHATTAN | Alteration | Signed-off | 02/17/2023 | 04/05/2024 | Design OLD STRUCTURES ENGINEERING Contractor 136 WEST 88 OWNER, LLC | interior & exterior repairs: Reinforce and replace existing roof and floor joists; Remove interior partitions walls; Repair interior masonr… |
| B00711825 ↗ | 10 GRACE COURT ALLEY BROOKLYN | Alteration | Signed-off | 11/12/2022 | 03/25/2024 | Design BICALURO ASSOCIATES PC Contractor ARCON PLBG SOLUTIONS Filer NEW CODE CONSULTING LLC | Installation and replacement of residential plumbing fixtures filed in conjunction with alteration application # B00711818-I1 |
| X00686054 ↗ | 2511 MARION AVENUE BRONX | Alteration | Signed-off | 06/22/2022 | 03/20/2024 | Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | STRUCTURAL WORK INCLUDES NEW FOUNDATION FOR NEW STAIR AND ELEVATOR SHEAR WALLS, NEW FOUNDATION AND COLUMNS FOR FACADE RENOVATIONS AND FLOOR … |
| M00215336 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 09/10/2019 | 02/26/2024 | Design IMC ARCHITECTURE DPC Contractor G.M.A. PLUMBING & HEATING | Plumbing Modifications to Kitchen and Bathrooms in conjunction with interior renovation, OT work to be filed separately. |
| Q00927564 ↗ | 7-02 149 STREET QUEENS | Alteration | Signed-off | 09/07/2023 | 11/06/2023 | Contractor STANDARD WIRELESS GP | Structural reinforcement of an existing 65 feet Valmont Monopole Tower. |
| M00872945 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 10/16/2023 | 10/30/2023 | Contractor POWERGEN DEVELOPMENT GROUP Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLATION OF DUCTWORK, FAN AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00862009 ↗ | 9107 4 AVENUE BROOKLYN | Alteration | Permit Issued | 05/15/2023 | 10/16/2023 | Contractor DNP BUILDERS LLC Filer DESARNO ASSOCIATES, INC. | General Construction as indicated on plans; including the replacement of exisitng block columns with LALLY Columns; as well as Saw Cut floo… |
| X00703064 ↗ | 2511 MARION AVENUE BRONX | Alteration | Signed-off | 04/19/2022 | 09/22/2023 | Design THORSON BAKER + ASSOCIATES Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | INSTALLATION OF HVAC SYSTEMS AND ASSOCIATED DUCT AND PIPING AS PER PLANS FILED HEREWITH. FILED IN CONJUNTION WITH ALT1 APPLICATION X00676081… |
| Q00739750 ↗ | 140 BEACH 112 STREET QUEENS | Alteration | Signed-off | 10/19/2022 | 08/02/2023 | Design ENSIGN ENGINEERING, P.C. Contractor ABC MADISON BUILDERS Filer ENSIGN ENGINEERING,P.C | FILING FOR THE INSTALLATION OF EMERGENCY GENERATOR TO SERVE THE CONVENT BUILDING SEGMENT ONLY. |
| X00848063 ↗ | 2 ST. ANN'S AVENUE BRONX | Alteration | Permit Issued | 06/23/2023 | 06/29/2023 | Design BD ENGINEERING Owner FRESH DIRECT Contractor GLACIER INDUSTRIAL REFRIG Filer PEROTTO CONSULTING MGT | #8750 - Installation of refrigeration equipment. No change in egress, use or occupancy. |
| B00846837 ↗ | 412 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 03/23/2023 | 06/16/2023 | Design ENSIGN ENGINEERING, P.C. Owner TEEN CHALLENGE, INC Contractor JEM FIRE PREVENTION INC | APPLICATION FILED TO REMOVE/RELOCATE EXISTING SPRINKLERS /PIPING AND REPLACE WITH NEW - ALL AS PER PLANS FILED HEREWITH |
| S00815946 ↗ | 300 WEST SERVICE ROAD STATEN ISLAND | Alteration | Signed-off | 02/09/2023 | 06/01/2023 | Owner MP REALTY HOLDING CORP. Contractor STANDARD WIRELESS GP | Structural reinforcement of an existing 119 feet Sabre Monopole Tower. |
| X00623438 ↗ | 2511 MARION AVENUE BRONX | Alteration | Permit Issued | 11/22/2021 | 05/09/2023 | Design ZYSCOVICH ARCHITECTS Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH FILED IN CONJUNCTION WITH ALT CO APPLICATION X00686054. |
| M00830764 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 03/15/2023 | 04/20/2023 | Contractor KEYSTONE BUILDERS GROUP* Filer METROPOLIS GROUP INC | REMOVAL OF MECHANICAL DUCT WORK AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00846807 ↗ | 2 ST. ANN'S AVENUE BRONX | Alteration | Filed — no permit on record | 04/13/2023 | — | Design KEYOWNER ENGINEERING, P.C. Owner FRESH DIRECT Filer PEROTTO CONSULTING MGT | — |
| M07997551 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 09/06/2022 | 03/31/2023 | Design IMC ARCHITECTURE DPC Contractor EMPIRE CORE GROUP LLC Filer CORE CONSULTANTS NYC | Plumbing in Conjuction with Architectural #M07997551-I1 |
| M00771081 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 08/24/2022 | 03/30/2023 | Design IMC ARCHITECTURE DPC Contractor EMPIRE CORE GROUP LLC Filer CORE CONSULTANTS NYC | Plumbing in conjuction with Architectural # M00771081-I1 |
| M00771108 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 09/01/2022 | 03/29/2023 | Design IMC ARCHITECTURE DPC Contractor EMPIRE CORE GROUP LLC Filer CORE CONSULTANTS NYC | Plumbing in Conjuction with Architectural # M00771108-I1 |
| M00797409 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 08/24/2022 | 03/28/2023 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP Filer CORE CONSULTANTS NYC | Plumbing in Conjuction with Alteration Job Number #M00797409-I1 |
| M00771111 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 08/24/2022 | 03/24/2023 | Design IMC ARCHITECTURE DPC Contractor EMPIRE CORE GROUP LLC Filer CORE CONSULTANTS NYC | Plumbing in conjuction with Architectural Job Number #M00771111-I1 |
| M00797377 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 08/24/2022 | 03/24/2023 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP Filer CORE CONSULTANTS NYC | Plumbing in Conjuction with Architectural # M00797377-I1 |
| X08048041 ↗ | 2511 MARION AVENUE BRONX | Alteration | Signed-off | 12/06/2022 | 03/06/2023 | Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | TEMPORARY SHORING OF COLUMN 2G TO ALLOW FOR THE REMOVAL AND REPAIR OF THE EXISTING FOOTING. |
| M08042289 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 01/13/2023 | 02/09/2023 | Design IMC ARCHITECTURE DPC Contractor KEYSTONE BUILDERS GROUP* | REMOVAL OF PARTITIONS, CEILINGS, DOORS, AND FINISHES AS SHOWN ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00704705 ↗ | 2511 MARION AVENUE BRONX | Alteration | Signed-off | 06/02/2022 | 02/08/2023 | Design SYSKA HENNESSY GROUP Owner GINDI CAPITAL Contractor VILLAGE P & H NY INC | SUBSEQUENT APPLICATION FOR INSTALLATION OF STANDPIPE SYSTEM. |
| X08019859 ↗ | 2511 MARION AVENUE BRONX | Alteration | Signed-off | 10/28/2022 | 02/08/2023 | Design EP ENGINEERING LLC Owner GINDI CAPITAL Contractor VILLAGE P & H NY INC | Temporary standpipe system as per plans filed herewith. Temp SD coverage will be provided in 2 phases. Phase 1 will convert the existing wet… |
| M00309663 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 02/25/2020 | 01/30/2023 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP Filer CORE CONSULTANTS NYC | HEREWITH FILING PLUMBING MODIFICATION IN UNIT 3005 IN CONJUNCTION WITH INTERIOR RENOVATIONS. |
| M00296970 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 02/25/2020 | 01/04/2023 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP | Herewith filing Plumbing Modifications in units 2203, 3601, 3605 as per plans filed. All related OT Work will be filed at the Borough Office… |
| M00309688 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 02/25/2020 | 01/04/2023 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP | Herewith filing plumbing modification to units 309 and 416 in conjunction with interior renovations. |
| M00309701 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 02/25/2020 | 01/04/2023 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP | HEREWITH FILING PLUMBING MODIFICATIONS IN CONJUNCTION WITH INTERIOR RENOVATIONS. |
| X00801060 ↗ | 821 EAST 215 STREET BRONX | Alteration | Permit Issued | 12/18/2022 | 12/21/2022 | Design KEYOWNER ENGINEERING, P.C. Contractor KWAMI AVITY | REPAIR OF FLOOR JOISTS ON THIRD FLOOR (TOP FLOOR). SECOND FLOOR (MIDDLE FLOOR) AND THIRD FLOOR (TOP FLOOR) MUST BE VACANT DURING CONSTRUCTIO… |
| M00788307 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 08/25/2022 | 11/07/2022 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP Filer CORE CONSULTANTS NYC | Plumbing in Conjuction with Architectural # 140733874 |
| M08026571 ↗ | 63 WALL STREET MANHATTAN | Alteration | Filed — no permit on record | 10/27/2022 | — | Design IMC ARCHITECTURE DPC Filer CORE CONSULTANTS NYC | — |
| M00788309 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 08/25/2022 | 10/17/2022 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP Filer CORE CONSULTANTS NYC | Plumbing in Conjuction with Architectural # 123056076. (Also superseding plumbing was previously approved under # 123056076) - Units: 312, 4… |
| M00797391 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 08/24/2022 | 10/17/2022 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP Filer CORE CONSULTANTS NYC | Plumbing in Conjuction with Architectural Job Number #M00797391-I1 |
| X00722241 ↗ | 2511 MARION AVENUE BRONX | Alteration | Signed-off | 08/02/2022 | 09/27/2022 | Design RA ENGINEERING LLP Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | PROVIDE SUPPORT OF EXCAVATION PER PLANS FILED HEREWITH. SOE WORK CONSISTS OF ROCK REMOVAL, LINE & CHANNEL ROCK DRILLING, AND ROCK BOLT/STABI… |
| M00748223 ↗ | 180 EAST 95 STREET MANHATTAN | Alteration | Permit Issued | 06/13/2022 | 08/17/2022 | Design LAHITA ENGINEERING LLC Contractor CIAR ARANN CORP | Structural repairs consisting of Partial Central Beam, Column & Footing Replacement as per plans filed herewith. No change in use, egress or… |
| M00205205 ↗ | 63 WALL STREET MANHATTAN | Alteration | Signed-off | 09/10/2019 | 07/05/2022 | Design IMC ARCHITECTURE DPC Contractor MAXWELL PLUMB MECH. CORP | Herewith filing Plumbing Modifications to existing Bathrooms in units 316, 1113, 1810 as per plans filed.. all related OT Work will be filed… |
| M00742353 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 06/13/2022 | 06/28/2022 | Design IMC ARCHITECTURE DPC Contractor MPS PLUMBING & HEATING IN Filer CORE CONSULTANTS NYC | Apartment Renovation Unit 2M & 2N to Modify non-load bearing Partitions, Ceiling Modification, New Doors, Millwork, FInishes, Plumbing Modif… |
| B00441324 ↗ | 332 LAFAYETTE AVENUE BROOKLYN | Alteration | Permit Issued | 01/26/2021 | 04/11/2022 | Design AGE ENGINEERING, LLC Contractor A-MAC OF NEW YORK CONSTRU | Underpinning, shoring, new stairs and new partitions as per plan. |
| B00624398 ↗ | 1326 NEWKIRK AVENUE BROOKLYN | Alteration | Permit Issued | 11/19/2021 | 02/14/2022 | Design SERDAR CEYLAN ARCHITECT, PC Contractor KINGS BAY CONSTRUCTION* | INTERIOR RENOVATION OFEXISTIONG APARTMENTS ON SECOND AND THIRD FLOORS AS PERPLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00459385 ↗ | 803 EAST 163 STREET BRONX | Alteration | Signed-off | 02/13/2021 | 02/07/2022 | Design PATRICK E ALLEN ARCHITECT PC Contractor KEVIN PAINTING & HOME IMP | FILING FOR APPROVAL TO INSTALL NEW PARTITION WALLS AND RELOCATE DOORS TO ADD SHOWER STALLS TO EXISTING TOILET ROOMS AT FIRST THRU THIRD FLOO… |
| M00275008 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 01/27/2021 | 01/12/2022 | Design GNK ENGINEERING, P.C Owner VORNADO REALTY TRUST Contractor GW MECHANICAL CORP Filer RIP CC INC | Removal and installation of plumbing fixtures at 1st Floor and Roof as per plans. No change to use, occupancy or egress under this applicati… |
| X00607381 ↗ | 350 EAST FORDHAM ROAD BRONX | Alteration | Permit Issued | 11/18/2021 | 12/23/2021 | Owner GINDI CAPITAL Contractor MNC GENERAL CONTR CORP | STRUCTURAL AND FOUNDATION WORK AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION X00570765. |
| X00570765 ↗ | 350 EAST FORDHAM ROAD BRONX | Alteration | Permit Issued | 09/22/2021 | 11/29/2021 | Design ZYSCOVICH ARCHITECTS Owner GINDI CAPITAL Contractor MNC GENERAL CONTR CORP | EXTERIOR FACADE ALTERATION INCLUDING RECESSED STOREFRONT, PATIO SPACE, INCREASED STOREFRONT AND EXTERIOR EIFS AS PER PLANS FILED HEREWITH. I… |
| X00607449 ↗ | 350 EAST FORDHAM ROAD BRONX | Alteration | Permit Issued | 11/23/2021 | 11/29/2021 | Design HIGH LINE ENGINEERING PC Owner GINDI CAPITAL Contractor MNC GENERAL CONTR CORP | REMOVAL OF MECHANICAL EQUIPMENTS PER PLANS FILED HEREWITH. |
| X00571697 ↗ | 981 EAST 167 STREET BRONX | Alteration | Signed-off | 08/11/2021 | 10/25/2021 | Design ENSIGN ENGINEERING, P.C. Contractor PIPE RITE CORP Filer ENSIGN ENGINEERING,P.C | FILING NEW INSTALL ATION OF A CONDENSING BOILER |
| X00573415 ↗ | 978 EAST 167 STREET BRONX | Alteration | Permit Issued | 08/11/2021 | 10/25/2021 | Design ENSIGN ENGINEERING, P.C. Contractor PIPE RITE CORP Filer ENSIGN ENGINEERING,P.C | Removal of existing meter and 1 1/2 gas piping to boiler room and installing new meter and new 3 gas piping to new duel fuel burner in Boil… |
| X00459442 ↗ | 803 EAST 163 STREET BRONX | Alteration | Signed-off | 01/27/2021 | 10/19/2021 | Design PATRICK E ALLEN ARCHITECT PC Contractor JOHNNY NANHU | Approval of plumbing work in conjunction to job # X00459385-I1 |
| X00572373 ↗ | 981 EAST 167 STREET BRONX | Alteration | Signed-off | 08/13/2021 | 10/19/2021 | Design ENSIGN ENGINEERING, P.C. Contractor PIPE RITE CORP Filer ENSIGN ENGINEERING,P.C | APPLICATION BEING FILED IN CONJUCTION WITH DOB JOB # X00571697-l1 TO REPLACE EXISTING METER AND ADD GAS PIPING TO NEW BOILER ON EXISTING GAS… |
| X00380218 ↗ | 978 EAST 167 STREET BRONX | Alteration | Signed-off | 08/11/2021 | 09/30/2021 | Design ENSIGN ENGINEERING, P.C. Contractor MICHAEL S. KAPLAN Filer ENSIGN ENGINEERING,P.C | Filing to replace Existing oil burner to a Duel Fuel Burner. Replacing existing fuel oil piping with new and providing new gas service. |
| S00570419 ↗ | 3139 VETERANS ROAD WEST STATEN ISLAND | Alteration | Filed — no permit on record | 09/20/2021 | — | Design ENSIGN ENGINEERING, P.C. Filer ENSIGN ENGINEERING,P.C | — |
| B00539186 ↗ | 19 VERMONT STREET BROOKLYN | Alteration | Signed-off | 07/19/2021 | 07/29/2021 | Design CATANIA-NACK ARCHITECTS Contractor MATTHEW GERSTUNG | Replace attic floor, walls and roof |
| M00331111 ↗ | 141 WEST 53 STREET MANHATTAN | Alteration | Permit Issued | 03/25/2020 | 07/01/2021 | Owner PARAMOUNT GROUP Contractor P.S.I. MECHANICAL | PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT AS PER PLANS. |
| M00431154 ↗ | 326 EAST 110 STREET MANHATTAN | Alteration | Permit Issued | 11/30/2020 | 06/18/2021 | Design ENSIGN ENGINEERING, P.C. Contractor CHARLES A DIMINO INC | FILING PAA TO ADDRESS INSPECTORS COMMENTS. |
| Q00455812 ↗ | 37-23 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 01/18/2021 | 05/03/2021 | Design KEYOWNER ENGINEERING, P.C. Contractor MATTHEW GERSTUNG | HEREBY FILING TO REPLACE 3 HVAC UNITS IN KIND ON THE ROOF AS PER PLANS . NO CHANGE IN USE, EGRESS, OR TYPE OF OCCUPANCY. |
| M00399514 ↗ | 141 WEST 53 STREET MANHATTAN | Alteration | Permit Issued | 11/23/2020 | 03/30/2021 | Owner PARAMOUNT GROUP Contractor COOLTECH MECHANICAL CORP | Installation of HVAC System and Hood on the first floor as per plans. No change to Use, Egress or Occupancy. |
| B00479818 ↗ | 16 SAINT MARKS PLACE BROOKLYN | Alteration | Signed-off | 03/03/2021 | 03/29/2021 | Design WILLIAM JAMES O'HANLON Owner TH270 LLC Contractor EUDA CONSTRUCTION & Filer BURNHAM NATIONWIDE INC | FULL STRUCTURAL WORK RELATED TO RENOVATIONS ON AN EXISTING 3 FAMILY HOME FILED UNDER DOBNOW# OT-General Construction B00476315-I1 AS PER DRA… |
| X00460520 ↗ | 821 EAST 215 STREET BRONX | Alteration | Signed-off | 01/26/2021 | 02/09/2021 | Design KEYOWNER ENGINEERING, P.C. Owner AVITYFAM CAPITAL, LLC Contractor MHM CONSTRUCTION NYC INC | THIS APPLICATION IS FILED TO REMOVE SOME INTERIOR PARTITIONS AND TO INSTALL A NEW ONE, REMOVE KITCHEN AND BATHTUB TO ADDRESS VIOLATIONS 3901… |
| X00346139 ↗ | 2269 CINCINNATUS AVENUE BRONX | Alteration | Signed-off | 06/02/2020 | 01/08/2021 | Contractor JOHN FARR P & H CORP | LEGALIZATION OF THREE FIXTURES BATHROOM & SINK IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00352352 ↗ | 2239 CROTONA AVENUE BRONX | Alteration | Permit Issued | 06/09/2020 | 12/24/2020 | Design KEYOWNER ENGINEERING, P.C. Contractor DK CONSTRUCTION ONE, CORP | PROPOSED STRUCTURAL WORK AS SHOWN ON PLANS. |
| B00367536 ↗ | 155 20 STREET BROOKLYN | Alteration | Signed-off | 07/21/2020 | 12/07/2020 | Design BICALURO ASSOCIATES PC Contractor GOODWILL MECHANICAL | Mechanical work filed in conjunction with alteration type # 321783272. |
| M00341126 ↗ | 12 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 07/21/2020 | 11/04/2020 | Design REUTHER BOWEN Contractor COMFORT ZONE MECHANICAL | STRUCTURAL MODIFICATIONS FOR INSTALLATION OF A GUARDRAIL ON A PORTION OF THE THE PENTHOUSE'S ROOF.. |
| M00320290 ↗ | 141 WEST 53 STREET MANHATTAN | Alteration | Permit Issued | 03/13/2020 | 07/07/2020 | Owner PARAMOUNT GROUP Contractor C&A SENECA CONSTRUCTION L | Structural construction work associated with extension of existing mezzanine and erection of a new mezzanine. |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/03/2026 | Energy Code Compliance Inspections | 2511 MARION AVENUE | KWAMI AVITY | progress |
| 08/03/2026 | Fire-Resistance Rated Construction | 2511 MARION AVENUE | KWAMI AVITY | progress |
| 08/03/2026 | Wall Panels, Curtain Walls, and Veneers | 2511 MARION AVENUE | KWAMI AVITY | special |
| 08/03/2026 | Sprayed fire-resistant materials | 2511 MARION AVENUE | KWAMI AVITY | special |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | 2511 MARION AVENUE | KWAMI AVITY | special |
| 08/03/2026 | Mastic and Intumescent Fire-resistant Coatings | 2511 MARION AVENUE | KWAMI AVITY | special |
| 08/03/2026 | Insulation placement and R values | 2511 MARION AVENUE | KWAMI AVITY | energy_progress |
| 08/03/2026 | Fenestration areas | 2511 MARION AVENUE | KWAMI AVITY | energy_progress |
| 08/03/2026 | Fenestration air leakage | 2511 MARION AVENUE | KWAMI AVITY | energy_progress |
| 08/03/2026 | Fenestration and door U-factor and product ratings | 2511 MARION AVENUE | KWAMI AVITY | energy_progress |
| 05/26/2026 | HVAC-R and service water heating system controls | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/26/2026 | HVAC-R and service water piping design and insulation | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/26/2026 | HVAC-R and service water heating equipment | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/26/2026 | Energy Code Compliance Inspections | 821 EAST 215 STREET | KWAMI AVITY | progress |
| 05/26/2026 | Sprinkler Systems | 821 EAST 215 STREET | KWAMI AVITY | special |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | 821 EAST 215 STREET | KWAMI AVITY | special |
| 05/15/2026 | Fire-Resistant Penetrations and Joints | 4738 RICHARDSON AVENUE | KWAMI AVITY | special |
| 05/15/2026 | Masonry | 4738 RICHARDSON AVENUE | KWAMI AVITY | special |
| 05/15/2026 | Energy Code Compliance Inspections | 4738 RICHARDSON AVENUE | KWAMI AVITY | progress |
| 05/15/2026 | Fire-Resistance Rated Construction | 4738 RICHARDSON AVENUE | KWAMI AVITY | progress |
| 05/15/2026 | Interior lighting power | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Fenestration and door U-factor and product ratings | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Protection of exposed foundation insulation | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Air barrier — testing | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Fenestration areas | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Insulation placement and R values | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Permanent certificate | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Electric vehicle service equipment requirements | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Fenestration air leakage | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Metering | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Air barrier - visual inspection | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/15/2026 | Maintenance information | 4738 RICHARDSON AVENUE | KWAMI AVITY | energy_progress |
| 05/07/2026 | HVAC-R and service water piping design and insulation | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/07/2026 | HVAC-R and service water heating system controls | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/07/2026 | HVAC-R and service water heating equipment | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/07/2026 | Energy Code Compliance Inspections | 821 EAST 215 STREET | KWAMI AVITY | progress |
| 05/07/2026 | Sprinkler Systems | 821 EAST 215 STREET | KWAMI AVITY | special |
| 05/07/2026 | Fire-Resistant Penetrations and Joints | 821 EAST 215 STREET | KWAMI AVITY | special |
| 05/04/2026 | Fire-Resistant Penetrations and Joints | 821 EAST 215 STREET | KWAMI AVITY | special |
| 05/04/2026 | Structural Stability – Alterations of existing buildings | 821 EAST 215 STREET | KWAMI AVITY | special |
| 05/04/2026 | Energy Code Compliance Inspections | 821 EAST 215 STREET | KWAMI AVITY | progress |
| 05/04/2026 | Fire-Resistance Rated Construction | 821 EAST 215 STREET | KWAMI AVITY | progress |
| 05/04/2026 | Permanent certificate | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/04/2026 | Maintenance information | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/04/2026 | Fenestration areas | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/04/2026 | Interior lighting power | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/04/2026 | Metering | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/04/2026 | Fenestration air leakage | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/04/2026 | Insulation placement and R values | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |
| 05/04/2026 | Air barrier - visual inspection | 821 EAST 215 STREET | KWAMI AVITY | energy_progress |