← Back
BuildNYC
Elevator cooperative
12 WEST 13TH STREET
MANHATTAN · Greenwich Village · BIN 1077932
💬 Discuss this project
1961Year Built
13Stories
D4Building Class
C6-2Zoning
235,875 sfGross Floor Area
105Units
LL97 CoveredRent Stabilized21 Active Violations 18 unresolved · 3 paperwork only 7 likely answered 3 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: Butterfield House Inc-B.H.S.(37120) · 29,110 sf lot · 8.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof145 East 15th Street Tenants CORP.Under Construction5p · 3 filings · 16 docs
PenthouseUnit PH, Unit PHC, Unit PHHUnder Construction13p · 3 filings · 20 docs
Floor 1233p · 1 filing · 20 docs
Floor 11Unit 11E11p · 2 filings · 14 docs
Floor 10
Floor 9Unit 9J5p · 1 filing · 1 doc
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Unit 2C, Unit 2J14p · 2 filings · 20 docs
Floor 1
Cellar145 East 15th Street Tenants CORP.3p · 1 filing · 13 docs
Site & exteriorInstallation of heavy duty sidewalk shedUnder Construction12p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Butterfield House3703/21/2026
145 East 15th Street Tenants1109/13/2026
37 W 12th St Owners403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec2003/21/2026
Municipal Building Consultants403/21/2026
AR Architecture103/21/2026
Codegreen503/21/2026
Clarke Construction Consultants203/21/2026
William Vitacco Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold603/21/2026
Headwater ContractingGeneral Contractor507/08/2026
Pofi ConstructionGeneral Contractor504/09/2026
Donato PlumbingPlumbing307/08/2026
Yates Exterior RestorationScaffold310/09/2026
E. S. Renovation & ConstructionGeneral Contractor307/08/2026
Arcon Plumbing SolutionsPlumbing207/08/2026
HobbsGeneral Contractor207/19/2026
Yates Exterior Restorationspecialty_contractor107/08/2026
P.L. Electrical ContractingElectrical103/22/2026
HTC Construction ManagementGeneral Contractor107/08/2026
Vivid Home FinishesGeneral Contractor107/08/2026
Axcel Electric CoElectrical103/22/2026
AAA Total PlumbingPlumbing107/08/2026
Delta-Sigma MechanicalPlumbing107/08/2026
DNA Plumbing ContractorsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BHK Engineering9589204/10/2026
Advanced Professional Engineering1599102/26/2026
AR Architecture6643201/27/2026
Joseph K. Blum Co1741310/30/2025
Socotec Engineering4983305/19/2025
DNA Controlled Inspection554102/05/2025
Katz Engineering238103/13/2023
AK Engineering678303/03/2023
Ettinger Commissioning7384204/15/2022
Building Lifecycle
All (198)Filed (32)Permit Issued (25)Signed Off (14)Facade (FISP) (12)Violation (60)Inspection (13)Objection (12)Special Inspection (30)
10/08/2026
Permit issued — Sidewalk Shed
M01385167-I1-SH
07/23/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01354826-P2
07/17/2026
Permit issued — General Construction
M01347124-I1-GC
07/13/2026
Permit issued — Sidewalk Shed
M01385167-I1-SH
07/08/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JONATHAN CRUICKSHANKS
06/18/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01354826-P1
06/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JONATHAN CRUICKSHANKS
05/08/2026
Violation issued (HPD, open)
A
04/20/2026
Permit issued — General Construction
M01361273-I1-GC
04/10/2026
Filed — Alteration
FACADE AND ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01361273-I1
04/10/2026
Permit issued — Sidewalk Shed
M01385167-I1-SH
04/09/2026
Filed — Alteration
Installation of a heavy duty sidewalk shed to include storage.
M01385167-I1
03/31/2026
Permit issued — Suspended Scaffold
M01354826-I1-SC
03/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01354826-I1
03/05/2026
Objection resolved — Addressed
03/04/2026
Objection raised — Other
02/26/2026
Filed — Alteration
HVAC work associated with interior renovation of (12th/penthouse flr.) apt. PH-H. Including interior air handlers & outdoor heat pump. No change in use, egress, or occupancy.
M01347124-S1
02/23/2026
Permit issued — Plumbing
M01347124-S2-PL
02/18/2026
Permit issued — General Construction
M01347124-I1-GC
02/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Dane Barnes
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
02/18/2026
Special inspection requirement — Final
Dane Barnes
02/18/2026
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
02/18/2026
Special inspection requirement — Masonry
Dane Barnes
02/17/2026
Signed off — Alteration
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01224204-I1
01/27/2026
Filed — Alteration
HVAC work associated with interior renovation of (12th/penthouse flr.) apt. PH-H. Including interior air handlers & outdoor heat pump. No change in use, egress, or occupancy.
M01347124-S2
01/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRUCE MERDJAN
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
BRUCE MERDJAN
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arthur Rabinovich
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
BRUCE MERDJAN
01/22/2026
Special inspection requirement — Final
BRUCE MERDJAN
01/22/2026
Special inspection requirement — Shutoff dampers
BRUCE MERDJAN
01/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRUCE MERDJAN
01/22/2026
Special inspection requirement — Maintenance information
BRUCE MERDJAN
01/22/2026
Special inspection requirement — Mechanical Systems
BRUCE MERDJAN
01/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRUCE MERDJAN
01/22/2026
Special inspection requirement — Heating Systems
BRUCE MERDJAN
01/21/2026
Filed — Alteration
HVAC work associated with interior renovation of (12th/penthouse flr.) apt. PH-H. Including interior air handlers & outdoor heat pump. No change in use, egress, or occupancy.
M01347124-I1
01/21/2026
Special inspection requirement — Fenestration air leakage
Arthur Rabinovich
01/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Arthur Rabinovich
01/20/2026
Special inspection requirement — Lighting in dwelling units
Arthur Rabinovich
01/20/2026
Special inspection requirement — Metering
Arthur Rabinovich
01/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Arthur Rabinovich
01/15/2026
Special inspection requirement — Final
Arthur Rabinovich
01/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arthur Rabinovich
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2025
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
11/03/2025
Special inspection requirement — Final
Dane Barnes
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
11/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
10/30/2025
Filed — Alteration
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01224204-P1
06/16/2025
Signed off — Alteration
M01019002-S2
06/16/2025
Signed off — Alteration
M01019002-S3
06/13/2025
Permit issued — General Construction
M01224204-I1-GC
06/13/2025
Violation issued (HPD, open)
A
06/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 198 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedYates Exterior Restoration10/08/2026
DOB NOWGeneral ConstructionPermit IssuedHobbs07/17/2026
DOB NOWSidewalk ShedPermit IssuedYates Exterior Restoration07/13/2026
DOB NOWGeneral ConstructionPermit IssuedYates Exterior Restoration04/20/2026
DOB NOWSidewalk ShedPermit IssuedYates Exterior Restoration04/10/2026
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management03/31/2026
DOB NOWPlumbingPermit IssuedArcon Plumbing Solutions02/23/2026
DOB NOWGeneral ConstructionPermit IssuedHobbs02/18/2026
DOB NOWGeneral ConstructionSigned-offPofi Construction06/13/2025
DOB NOWMechanical SystemsSigned-offHeadwater Contracting05/02/2024
DOB NOWStructuralSigned-offHeadwater Contracting05/01/2024
DOB NOWPlumbingSigned-offDonato Plumbing05/01/2024
DOB NOWGeneral ConstructionSigned-offHeadwater Contracting04/25/2024
DOB NOWGeneral ConstructionPermit IssuedPofi Construction11/13/2023
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical05/19/2023
DOB NOWGeneral ConstructionSigned-offVivid Home Finishes05/18/2023
DOB NOWGeneral ConstructionSigned-offE S Renovation Construction06/13/2022
DOB NOWGeneral ConstructionSigned-offPofi Construction05/04/2022
DOB NOWPlumbingSigned-offDNA Plumbing Contractors03/19/2022
DOB NOWGeneral ConstructionSigned-offE S Renovation Construction03/09/2022
DOB NOWPlumbingSigned-offAAA Total Plumbing02/14/2022
DOB NOWGeneral ConstructionSigned-offHTC Construction Management02/14/2022
DOB NOWPlumbingSigned-offArcon Plumbing Solutions07/10/2020
DOB NOWSidewalk ShedSigned-offKings Group NY10/02/2018
DOB NOWSidewalk ShedSigned-offKings Group NY02/07/2018
BISOTISSUEDHeadwater Contracting09/13/2020
BISOTISSUEDHeadwater Contracting07/06/2020
BISOTISSUEDSkyline Windows01/30/2020
BISPLISSUEDPractical Plumbing & Heating03/14/2019
BISPLISSUEDOrbit Plumbing & Heating02/05/2019
BISOTISSUEDSignature Audio Design01/03/2019
BISOTISSUEDBulado General Contractor07/10/2018
BISOTISSUEDBulado General Contractor04/10/2018
BISPLISSUEDPractical Plumbing & Heating08/16/2017
BISOTISSUEDNew York Floorman07/17/2017
BISPLISSUEDI.M.P. Plumbing & Heating02/08/2016
BISOTISSUEDInter Connection Electric12/04/2015
BISPLISSUEDI.M.P. Plumbing & Heating11/10/2015
BISPLISSUEDJNJ Plumbing and Heating09/23/2013
BISBLISSUEDI.M.P. Plumbing & Heating05/09/2013
+ 22 more permits on file
1 project · most recent 02/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2026Permit IssuedHobbsHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-L12NMAU-A 12,000 BTU · Vrf Indoor ×2
MXZ-SM48NLHZ 54,000 BTU · Heat Pump Outdoor ×1
PVFY-L12NMAU-A 12,000 BTU · Vrf Indoor ×1
PVFY-L18NMAU-A 18,000 BTU · Vrf Indoor ×1
1 project · most recent 02/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/26/2026Permit IssuedArcon Plumbing SolutionsGas, Water/Sanitary
7 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedAll City Electrical—
04/08/2026Permit IssuedTop Shelf Electric—
07/08/2025CompleteBanner ElectricGeneral Wiring
05/08/2023CompleteAxcel Electric Co—
02/17/2022CompleteP.L. Electrical ContractingGeneral Wiring
01/21/2021CompleteAxcel Electric Co—
02/06/2018CompleteMeo Electric—
1 project · most recent 02/26/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/26/2026Permit IssuedHobbsTenant Protection Plan 72 Hour
1 project · most recent 07/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/23/2026Permit IssuedCentral Construction ManagementSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
07/08/2026Alternative Materials - OTCR Buildings Bulletin NumberJONATHAN CRUICKSHANKSspecial
05/11/2026Alternative Materials - OTCR Buildings Bulletin NumberJONATHAN CRUICKSHANKSspecial
02/18/2026Energy Code Compliance InspectionsDane Barnesprogress
02/18/2026Tenant Protection Plan ComplianceDane Barnesspecial
02/18/2026Structural Stability – Alterations of existing buildingsDane Barnesspecial
02/18/2026MasonryDane Barnesspecial
02/18/2026Air barrier - visual inspectionDane Barnesenergy_progress
02/18/2026FinalDane Barnesprogress
01/22/2026Fire-Resistant Penetrations and JointsArthur Rabinovichspecial
01/22/2026FinalBRUCE MERDJANprogress
01/22/2026Heating SystemsBRUCE MERDJANspecial
01/22/2026Energy Code Compliance InspectionsBRUCE MERDJANprogress
01/22/2026Fire-Resistance Rated ConstructionBRUCE MERDJANprogress
01/22/2026HVAC-R and service water heating system controlsBRUCE MERDJANenergy_progress
01/22/2026HVAC-R and service water piping design and insulationBRUCE MERDJANenergy_progress
01/22/2026HVAC-R and service water heating equipmentBRUCE MERDJANenergy_progress
01/22/2026Shutoff dampersBRUCE MERDJANenergy_progress
01/22/2026Maintenance informationBRUCE MERDJANenergy_progress
01/22/2026Mechanical SystemsBRUCE MERDJANspecial
01/21/2026Fenestration air leakageArthur Rabinovichenergy_progress
01/20/2026MeteringArthur Rabinovichenergy_progress
01/20/2026Lighting in dwelling unitsArthur Rabinovichenergy_progress
01/20/2026Fenestration and door U-factor and product ratingsArthur Rabinovichenergy_progress
01/15/2026Energy Code Compliance InspectionsArthur Rabinovichprogress
01/15/2026FinalArthur Rabinovichprogress
Latest 25 of 70.
▾Documents — 362 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
09/06/2026M01385167-I1Request digital key ↗
09/06/2026M00017018-I1Request digital key ↗
09/06/2026M00017018-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits52
▸BISWORK PERMIT APPLICATION28
07/07/2020123858904Open ↗
01/30/2020140883952Open ↗
01/29/2020140883952Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION24
03/02/2020123858904Open ↗
02/12/2020123858904Open ↗
01/29/2020140883952Open ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications107
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/06/2026M01385167-I1Open ↗
09/06/2026M00017018-I1Open ↗
09/06/2026M00017018-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026M00838503-I1Open ↗
09/01/2026M01019002-P1Open ↗
08/27/2026M01019002-P5Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
02/12/2020123858904Open ↗
04/04/2019123297262Open ↗
04/02/2019123297262Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/28/2026M01354826-P1Open ↗
09/01/2026M00838503-I1Open ↗
09/01/2026M01019002-P1Open ↗
Showing 3 of 19 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/29/2020140883952Open ↗
04/09/2018140751078Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/29/2020140883952Open ↗
04/09/2018140751078Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/22/2011120876374Open ↗
07/07/2010120405169Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/29/2020140883952Open ↗
04/09/2018140751078Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/22/2011120876374Open ↗
07/07/2010120405169Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/15/2018123539233Open ↗
10/22/2018123297262Open ↗
10/16/2018123297262Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
01/05/2016121380512Open ↗
06/21/2014121380512Open ↗
06/21/2014121380512Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING2
09/19/2012121380512Open ↗
11/22/2011120876374Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/11/2013121380512Open ↗
09/19/2012121380512Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION2
05/03/2014121380512Open ↗
03/12/2014121380512Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
02/12/2020123858904Open ↗
11/15/2018123539233Open ↗
07/10/2017123297262Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00306753-I1Open ↗
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/03/2026M00627356-S1Open ↗
09/02/2026M00717299-I1Open ↗
08/31/2026M00662442-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
02/12/2020123858904Open ↗
01/29/2020140883952Open ↗
11/15/2018123539233Open ↗
Showing 3 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
09/19/2012121380521Open ↗
09/19/2012121380521Open ↗
09/19/2012121380512Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/22/2011120876374Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026M00719848-I1Open ↗
08/13/2026M01347124-I1Open ↗
08/13/2026M01347124-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/07/2010120405169Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
04/04/2019123297262Open ↗
04/02/2019123297262Open ↗
11/15/2018123539233Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/09/2020140751078Open ↗
07/09/2020140883952Open ↗
07/01/2020123858904Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/09/2020140751078Open ↗
07/09/2020140883952Open ↗
04/04/2019123297262Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/29/2020140883952Open ↗
04/09/2018140751078Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00719848-I1Open ↗
08/13/2026M00627356-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/22/2011120876374Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/09/2020140751078Open ↗
07/09/2020140883952Open ↗
07/01/2020123858904Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/10/2021123858904Open ↗
07/09/2020140751078Open ↗
07/09/2020140883952Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/19/2012121380521Open ↗
07/07/2010120405169Open ↗
07/07/2010120405169Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
12/04/2015121380512Open ↗
05/14/2013121380512Open ↗
05/14/2013121380512Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/12/2014121380512Open ↗
03/07/2013120876374Open ↗
▸BISSHED LETTER1
05/05/2011120405169Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT22
07/09/2020140751078Open ↗
07/09/2020140883952Open ↗
03/06/2020123858904Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/10/2021123858904Open ↗
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET11
02/12/2020123858904Open ↗
11/15/2018123539233Open ↗
07/10/2017123297262Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION7
02/07/2014121380512Open ↗
10/21/2013120383414Open ↗
12/18/2012120383414Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
04/04/2019123297262Open ↗
04/02/2019123297262Open ↗
10/22/2018123297262Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/29/2020140883952Open ↗
04/09/2018140751078Open ↗
▸Other Documents10
▸DOB NOWCalculations3
08/18/2026M01354826-P2Open ↗
08/18/2026M01354826-P1Open ↗
08/18/2026M01354826-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/18/2026M01354826-P1Open ↗
08/18/2026M01354826-P2Open ↗
08/18/2026M01354826-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/06/2026M00017018-I1Open ↗
09/06/2026M00017018-P1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
08/13/2026M01019002-I1Open ↗