ECB10/13/2026At the time of inspection, an active job site was observed at a proposed 12-story building. A sidewalk shed was installed at exposure 1. Department records indicate shed permit #X01426698-I1-sh expired on 10/05$1K due
ECB09/29/2026At the time of inspection of a 12-story new proposed new building, building approx. 77 ft 6INCH in height and there was no hoist in state of readiness as per code 3303.12 this created a hazards condition for fd$5K due
ECB09/29/2026At the time of inspection of a 12-story proposed new building, i observed at exp #1 that plastic jersey barriers were not maintained in accordance with bc 3301.1.3. The barriers were not properly filled with wa$1K due
ECB09/29/2026At the time of inspection of a 12-story proposed new building, the building height was approximately 77' ft 6" inch in height, during my inspection i observed the standpipe was not in state of readiness as requ$5K due
ECB09/29/2026At the time of inspection of a 12-story proposed new building, i observed jobsite not maintained housekeeping there was no debris container onsite, throughout the entire building interior and rear yard exp#3 de$2K due
ECB09/29/202612-story proposed NB, i observed at exp#3 horizontal netting erected as require, the netting was loose and not secure to concrete slab, installed as per plan, no warn signage, no control access zone, worker wer$5K due
ECB09/29/2026At the time of inspection of a 12-story proposed NB, i observed on floor 1ST to 8TH exposure#3 with inadequate zero cable and vertical debris netting not maintained and provided long side an open perimeters, co$2K due
ECB09/29/2026At the time of inspection of a 12-story proposed new building pouring concrete on the 9TH floor slab, building height 77 ft 6INCH, i observed that stand pipe was not painted in red as require, contrary to bc 33$2K due
ECB09/29/2026At the of inspection of a 12-story proposed new building, pouring concrete on the 9TH floor slab, the height is 77 ft 6 inch. The stand pipe was erected up to the 6TH floor, upon research the department of buil$5K due
ECB09/29/2026At the time of inspection of a 12-story proposed new building, i observed storage zone on roadway/street and adjacent to sidewalk, concrete truck, box wash out box, and concrete pump truck in place exposure#1 n$2K due
ECB08/14/202612-story new building, multiple unsafe conditions were observed, including missing guardrails and overhead protection, no hoist/elevator, standpipe not in readiness, and propane tank storage without an FDNY per$5K due
ECB08/14/2026At inspection of a 12-story building farmwork at the 12TH-floor level, no overhead protection or controlled access zone was provided at exp# 2 adjacent property active job site in foundation phase. Hazard to pu$10K due
ECB08/14/2026Bc 3303.12, 12-story building forming at the 12TH floor, no hoist or elevator was installed or in readiness. This creates a hazardous condition for the public, property, and FDNY emergency access. Stop all work$5K due
ECB08/14/2026At inspection of a 12-story new building, inadequate guardrails were observed from the 11TH to 12TH floors, with sections missing at the 12TH floor, exp# 2 & 4. This creates a hazardous condition. Stop all work$5K due
ECB08/14/2026Bc 3303.8 12-story building, the standpipe system was not in readiness and was observed below 75 feet while work was at the 12TH floor. This creates a hazardous condition for public, property, and FDNY emergenc$5K due
ECB08/14/2026Bc 3301.1.2 at the time of inspection of a 12-story building, 6 propane tank was observed on site. Upon request, the FDNY permit was found expired since 07/27/2026. This creates a hazardous condition to the pub$2K due
ECB08/10/2026At time of inspection, site safety coordinator lic. No. 003040 was designated on the PW2 for two separate major building sites: 112 east 167TH street, permit no. X01255412, and 120 east 167TH street, permit no.$2K due
ECB07/09/2026While following up on a class one violation re inspection. Reference ECB 39554181X, which concerns the obstruction of the public sidewalk. I found no compliance recorded in my search, and the unsafe condition$1K due
ECB07/09/2026During my inspection of an active 12-story NB, and after reviewing a class one violation issued on 05 15 2026.ref 39554181X: no compliance recorded, and no certificate of correction was made to the department.$1K due
ECB05/15/20263307.2.1 obstruction of streets or sidewalks. During my inspection of an active 12-story NB at the soe phase. I observed that the temporary job site fence at exposure one impeded the pedestrian pathway. No, fiv$5K due
ECB05/11/2026At the time of inspection of a 12-story proposed new building, at exposure #4, the foundation wall was observed extending above the height of the construction fence with concrete residue spilled onto the ground$10K due
ECB05/11/2026At the time of inspection of a 12-story proposed new building undergoing foundation work, a worker was observed performing structural welding on a steel beam. Upon request to produce a valid welder license, the$2K due
ECB03/26/2026Closed proposed 12STORY mb. Noted construction fence dislodged & missing at EXPO3. Viewing panels at EXPO1 were not installed with nonfrangible acrylic "window" as per 3307.7.3. Construction fence encroaches on$1K due
ECB09/29/2026At time of inspection of a 12-story proposed new building, i observed jobsite pouring concrete on the 9TH floor slab building height 77 ft 6 inch the stand pipe was erected up to the 6HT floor, i research the dNothing owed — awaiting certificate of correction