← Back
BuildNYC
Elevator apt, luxury type
120 UNIVERSITY PLACE
MANHATTAN · Greenwich Village · BIN 1009400
💬 Discuss this project
1959Year Built
7Stories
D8Building Class
C1-7Zoning
59,299 sfGross Floor Area
95Units
LL97 CoveredRent Stabilized1 Active Violation 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, luxury type · Owner of record: University Place Associates · 10,204 sf lot · 5.81 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofC. Gershon Company INC4p · 2 filings · 18 docs
Floor 1C. Gershon Company INC10p · 2 filings · 20 docs
CellarC. Gershon Company INC10p · 2 filings · 20 docs
Sub-CellarC. Gershon Company INC1p · 1 filing · 20 docs
Site & exteriorC. Gershon Company INC2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
University Place Associates4907/08/2026
C. Gershon Company2407/08/2026
120 University Grub203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG Design Group807/20/2021
Navi Structural Engineering103/29/2019
Tectonic Engineering109/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-Dis Design Group803/21/2026
Construction Permit Services203/21/2026
Eurocelt Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CK Plumbing & MechanicalPlumbing307/08/2026
Comcell ConstructionGeneral Contractor203/21/2026
CubenineGeneral Contractor203/21/2026
Fast Track ElectricElectrical103/21/2026
TristruxGeneral Contractor107/08/2026
Universal SystemsScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sead Engineering2665209/19/2020
Tectonic Engineering Cons106109/27/2018
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 10, sub-cycle C)
The filing window opened 02/21/2027. 1 Cycle 10 filing on record, latest 06/17/2025, status Swarmp
08/21/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/13/2026
Elevator Category 1 inspection report filed
09/29/2025
Boiler inspection report filed
Initial · no defects · Accepted
08/19/2025
Closed: Failed to file FISP cycle 9C technical report by 2/21/2024
DOB violation · closed on the city's record
166 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offTristrux03/31/2025
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical03/21/2021
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical01/31/2020
DOB NOWMechanical SystemsSigned-offCubenine01/23/2020
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical01/02/2020
DOB NOWAntennaSigned-offComcell Construction08/16/2019
DOB NOWSidewalk ShedSigned-offUniversal Systems03/30/2019
BISFBISSUEDMichael S. Kaplan12/05/2017
BISPLISSUEDAura Plumbing11/29/2017
BISPLISSUEDDual Fuel Plumbing & Heating11/10/2017
BISFSISSUEDMichael S. Kaplan08/24/2017
BISPLISSUEDTop Dog Plumbing & Heating05/01/2017
BISOTISSUEDYes Contracting04/07/2017
BISMHISSUEDFast Track Electric04/03/2017
BISOTISSUEDJ Caiazzo Plumbing & Heating12/30/2016
BISPLISSUEDJ. Caiazzo Plumbing & Heating12/30/2016
BISPLISSUEDAura Plumbing11/29/2016
BISPLISSUEDDual Fuel Plumbing & Heating08/10/2016
BISFSISSUEDMichael S. Kaplan08/10/2016
BISPLISSUEDAura Plumbing12/18/2015
BISPLISSUEDNaf Pak Plumbing & Heating10/14/2015
BISPLISSUEDNaf Pak Plumbing & Heating10/14/2015
BISMHISSUEDFast Track Electric10/05/2015
BISFPISSUEDFire Zone Vent & Supply04/17/2015
BISOTISSUEDFast Track Electric03/17/2015
BISMHISSUEDHyperion Construction05/02/2014
BISOTISSUEDHyperion Construction04/17/2014
BISPLISSUEDNaf Pak Plumbing & Heating04/04/2014
BISOTISSUEDHyperion Construction04/03/2014
BISEQISSUEDHyperion Construction04/03/2014
BISPLISSUEDNaf Pak Plumbing & Heating03/20/2014
BISOTISSUEDHyperion Construction09/24/2013
BISEQISSUEDMetro Contracting NY07/11/2013
BISOTISSUEDPal General Construction04/01/2013
BISEQISSUEDMetro Contracting NY03/25/2013
BISFPISSUEDNY Fire04/18/2011
BISPLISSUEDBarmor Rehab01/10/2011
BISEQISSUEDHeng Wei Construction12/28/2010
BISEQISSUEDVertex Construction08/18/2008
BISOTISSUEDUniversity Place Assoicates04/16/2008
+ 13 more permits on file
4 projects · most recent 05/06/2021
General Wiring Lighting
FiledStatusContractorScope
05/06/2021Permit IssuedAll City Electrical—
04/20/2021CompleteRobert Chimenti—
01/02/2020Permit IssuedY.S. ElectricGeneral Wiring, Lighting
03/22/2019CompleteTop Shelf Electric—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/28/2020Mechanical SystemsINHWAN CHANGspecial
09/28/2020Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
09/28/2020FinalKyumyeon Leeprogress
09/28/2020Energy Code Compliance InspectionsINHWAN CHANGprogress
09/28/2020HVAC and service water heating equipment INHWAN CHANGenergy_progress
09/28/2020HVAC and service water heating system controls INHWAN CHANGenergy_progress
09/28/2020HVAC insulation and sealing INHWAN CHANGenergy_progress
338 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account