Office with commercial, 1-6 stories
Mercy University-bronx Campus
1200 WATERS PLACE · BIN 2087151
💬 Discuss this project
1974Year Built
4Stories
O5Building Class
M1-1Zoning
450,879 sfGross Floor Area
30Units
LL97 Covered4 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: HUTCH METRO CENTER I LLC · 396,174 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 2 filings · 10 docs
Floor 15p · 1 filing · 15 docs
Basement3p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY807/08/2026
HUTCH METRO CENTER I LLC203/22/2026
HUTCH REALTY PAARTNERS19403/22/2026
NEWMAN DESIGN103/22/2026
EWMAN DESIGN103/22/2026
SIMONE DEVELOPMENT703/21/2026
HUTCH 40 LLC C/O TO HUTCH MANAGE303/21/2026
HUTCH METRO CENTER 1703/21/2026
FRANCIS LEWIS REALTY203/21/2026
1733 EASTCHESTER REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEWMAN DESIGN ARCHITECTS PLLC709/08/2026
MQ CONSULTING103/09/2026
SJ ENGINEERING PLLC203/26/2024
ASHRAF CORP201/17/2023
THREE STUDIO ARCHITECTURE, D.P.C.111/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS1403/21/2026
CLARKE CONSTRUCTION CONSULTANTS103/21/2026
GREEN LIGHT EXPEDITING LLC203/21/2026
GREEN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALESSANDRO PLUMBING, INCPlumbing607/08/2026
MCG CONSTRUCTION LLCGeneral Contractor407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
ALESSANDRO PLUMBING, INCFire Protection107/08/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor107/08/2026
ALEXANDER FEDERICO.JRElectrical103/21/2026
DIFUSCO, NICOLINOElectrical103/21/2026
ROYAL CONCRETE AND MASON*General Contractor107/08/2026
ALESSANDRO PLUMBINGPlumbing103/22/2026
LINVAL BROWNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL PATINO ARCHITECTU8170103/09/2026
VIBRANALYSIS INC., DBA VT6864601/22/2025
Building Lifecycle
All (143)Filed (12)Permit Issued (12)Signed Off (10)Violation (60)Inspection (6)Objection (14)Special Inspection (29)
09/08/2026
Filed — Alteration
IT IS PROPOSED TO MODIFY EXISTING PLUMBING SYSTEM ON 3FL AS SHOWN ON PLANS. NO CHANGE OF USE EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH X01371785-I1 (GC) AND X01371785-S1 (MS)
X01371785-I1
06/30/2026
Signed off — Alteration
IT IS PROPOSED TO REMOVE NON-LOAD BEARING PARTITIONS AND FINISHES AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. PLUMBING, MECHANICAL AND SPRINKLER TO BE FILED UNDER SEPARATE APPLICATIONS (BY OTHERS)
X01380246-I1
05/22/2026
Permit issued — Mechanical Systems
X01345184-I1-MS
05/06/2026
Permit issued — General Construction
X01380246-I1-GC
04/30/2026
Filed — Alteration
IT IS PROPOSED TO REMOVE NON-LOAD BEARING PARTITIONS AND FINISHES AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. PLUMBING, MECHANICAL AND SPRINKLER TO BE FILED UNDER SEPARATE APPLICATIONS (BY OTHERS)
X01380246-I1
03/30/2026
Special inspection requirement — Final
EDWIN HOPKINS
03/26/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/24/2026
Objection raised — Cost
03/24/2026
Objection raised — Other
03/13/2026
Special inspection requirement — Lighting controls
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
03/13/2026
Special inspection requirement — Final
03/13/2026
Special inspection requirement — Interior lighting power
03/09/2026
Filed — Alteration
Filing to replace existing (6) gas-fired Roof units with (6) Heat Pump Roof units as per plans. No change in use, egress, or occupancy under this application.
X01345184-I1
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Michael Patino
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Michael Patino
01/12/2026
Special inspection requirement — Final
Michael Patino
01/12/2026
Special inspection requirement — Mechanical Systems
Michael Patino
12/09/2025
Signed off — Alteration
PROPOSED MECHANICAL WORK FOR NEW DEMISED SPACE FOR AN OFFICE TENANT. WORK CONSISTS OF REMOVAL OF PREVIOUS INTERIOR DUCTWORK AND REGISTERS, & INSTALLING NEW INTERIOR DISTRIBUTION DUCTWORK AND REGISTERS AS SHOWN ON PLANS.
X01161912-S1
12/09/2025
Signed off — Alteration
PROPOSED MECHANICAL WORK FOR NEW DEMISED SPACE FOR AN OFFICE TENANT. WORK CONSISTS OF REMOVAL OF PREVIOUS INTERIOR DUCTWORK AND REGISTERS, & INSTALLING NEW INTERIOR DISTRIBUTION DUCTWORK AND REGISTERS AS SHOWN ON PLANS.
X01161912-S2
12/09/2025
Signed off — Alteration
PROPOSED MECHANICAL WORK FOR NEW DEMISED SPACE FOR AN OFFICE TENANT. WORK CONSISTS OF REMOVAL OF PREVIOUS INTERIOR DUCTWORK AND REGISTERS, & INSTALLING NEW INTERIOR DISTRIBUTION DUCTWORK AND REGISTERS AS SHOWN ON PLANS.
X01161912-I1
08/05/2025
Signed off — Alteration
ROOF REPLACEMENT. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
X08031321-I1
07/28/2025
Signed off — Alteration
Proposed to combine M109 and M112 into one (1) tenant space. Removal of demising wall and non-load bearing partitions, finishes and in stall new non-load bearing partitions and finishes and lighting as shown on plans. No Change of use, egress or occupancy
X00929055-I1
07/28/2025
Signed off — Alteration
Proposed to combine M109 and M112 into one (1) tenant space. Removal of demising wall and non-load bearing partitions, finishes and in stall new non-load bearing partitions and finishes and lighting as shown on plans. No Change of use, egress or occupancy
X00929055-S2
03/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2025
Permit issued — Plumbing
X01161912-S2-PL
02/06/2025
Permit issued — Mechanical Systems
X01161912-S1-MS
02/06/2025
Permit issued — General Construction
X01161912-I1-GC
01/22/2025
Filed — Alteration
PROPOSED MECHANICAL WORK FOR NEW DEMISED SPACE FOR AN OFFICE TENANT. WORK CONSISTS OF REMOVAL OF PREVIOUS INTERIOR DUCTWORK AND REGISTERS, & INSTALLING NEW INTERIOR DISTRIBUTION DUCTWORK AND REGISTERS AS SHOWN ON PLANS.
X01161912-S1
01/22/2025
Filed — Alteration
PROPOSED MECHANICAL WORK FOR NEW DEMISED SPACE FOR AN OFFICE TENANT. WORK CONSISTS OF REMOVAL OF PREVIOUS INTERIOR DUCTWORK AND REGISTERS, & INSTALLING NEW INTERIOR DISTRIBUTION DUCTWORK AND REGISTERS AS SHOWN ON PLANS.
X01161912-S2
01/21/2025
Filed — Alteration
PROPOSED MECHANICAL WORK FOR NEW DEMISED SPACE FOR AN OFFICE TENANT. WORK CONSISTS OF REMOVAL OF PREVIOUS INTERIOR DUCTWORK AND REGISTERS, & INSTALLING NEW INTERIOR DISTRIBUTION DUCTWORK AND REGISTERS AS SHOWN ON PLANS.
X01161912-I1
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Brian Newman
01/02/2025
Special inspection requirement — Interior lighting power
Brian Newman
01/02/2025
Special inspection requirement — Lighting controls
Brian Newman
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Brian Newman
01/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Brian Newman
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
01/02/2025
Special inspection requirement — Final
Brian Newman
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
09/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/23/2024
Permit issued — Sprinklers
X00929055-S2-EW-SP
03/26/2024
Filed — Alteration
Proposed to combine M109 and M112 into one (1) tenant space. Removal of demising wall and non-load bearing partitions, finishes and in stall new non-load bearing partitions and finishes and lighting as shown on plans. No Change of use, egress or occupancy
X00929055-S2
01/05/2024
Permit issued — General Construction
X00929055-I1-GC
01/04/2024
Filed — Alteration
Proposed to combine M109 and M112 into one (1) tenant space. Removal of demising wall and non-load bearing partitions, finishes and in stall new non-load bearing partitions and finishes and lighting as shown on plans. No Change of use, egress or occupancy
X00929055-I1
12/05/2023
Special inspection requirement — Ventilation and air distribution system
JUAN GOMEZ
12/05/2023
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
11/17/2023
Special inspection requirement — Final
JUAN GOMEZ
11/17/2023
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
09/05/2023
Special inspection requirement — Interior lighting power
JUAN GOMEZ
09/05/2023
Special inspection requirement — Lighting controls
JUAN GOMEZ
09/05/2023
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
09/05/2023
Special inspection requirement — Final
JUAN GOMEZ
08/30/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDINDS CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00812948-I1
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAIR STREAM AIR CONDITIONING05/22/2026
DOB NOWGeneral ConstructionSigned-offMCG CONSTRUCTION LLC05/06/2026
DOB NOWPlumbingSigned-offALESSANDRO PLUMBING, INC02/20/2025
DOB NOWMechanical SystemsSigned-offMCG CONSTRUCTION LLC02/06/2025
DOB NOWGeneral ConstructionSigned-offMCG CONSTRUCTION LLC02/06/2025
DOB NOWSprinklersSigned-offALESSANDRO PLUMBING, INC05/23/2024
DOB NOWGeneral ConstructionSigned-offMCG CONSTRUCTION LLC01/05/2024
DOB NOWGeneral ConstructionSigned-offROYAL CONCRETE AND MASON*02/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC01/18/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC01/18/2023
DOB NOWPlumbingSigned-offALESSANDRO PLUMBING, INC04/22/2021
DOB NOWPlumbingSigned-offALESSANDRO PLUMBING, INC10/02/2020
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN10/20/2021
BISOTISSUEDMCG CONSTRUCTION LLC01/29/2021
BISOTISSUEDMCG CONSTRUCTION LLC01/28/2021
BISOTISSUEDMCG CONSTRUCTION LLC10/09/2020
BISOTISSUEDMCG CONSTRUCTION LLC07/02/2019
BISOTISSUEDMCG CONSTRUCTION LLC12/11/2018
BISMHISSUEDMCG CONSTRUCTION LLC12/11/2018
BISOTISSUEDMCG CONSTRUCTION LLC12/11/2018
BISPLISSUEDALESSANDRO PLUMBING, INC11/08/2018
BISSPISSUEDALESSANDRO PLUMBING, INC11/08/2018
BISOTISSUEDMCG CONSTRUCTION LLC11/07/2018
BISMHISSUEDCHAMPION COMBUSTION CORP09/25/2018
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/09/2018
BISSPISSUEDALESSANDRO PLUMBING, INC01/26/2018
BISPLISSUEDALESSANDRO PLUMBING, INC08/24/2017
BISOTISSUEDMCG CONSTRUCTION LLC08/17/2017
BISMHISSUEDMCG CONSTRUCTION LLC08/17/2017
BISPLISSUEDALESSANDRO PLUMBING, INC07/27/2017
BISOTISSUEDMCG CONSTRUCTION LLC07/24/2017
BISMHISSUEDMCG CONSTRUCTION LLC07/24/2017
BISPLISSUEDALESSANDRO PLUMBING, INC04/21/2017
BISOTISSUEDMCG CONSTRUCTION LLC04/20/2017
BISPLISSUEDALESSANDRO PLUMBING, INC03/07/2017
BISOTISSUEDMCG CONSTRUCTION LLC03/03/2017
BISOTISSUEDHMC CONSTRUCTION LLC02/27/2017
BISOTISSUEDHMC CONSTRUCTION LLC02/27/2017
BISPLISSUEDALESSANDRO PLUMBING, INC12/27/2016
BISOTISSUEDMCG CONSTRUCTION LLC12/21/2016
+ 22 more permits on file
2 projects · most recent 09/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SUZ-AA12NL 12,000 BTU · Condensing Unit ×4
03/09/2026Permit IssuedAIR STREAM AIR CONDITIONIHeating and Air Conditioning Systems
Heat / Cool
Trane DHK240A4SBL**04D0A1B1 246,220 BTU · Rooftop Unit ×3
DHK150A4SBH**04D0A1B1 153,080 BTU · Rooftop Unit ×1
YCH360D4M*2D3RHB0B*D***00B00K0*0000*0000XA 405,930 BTU · Rooftop Unit ×1
YCH420D4M*2D4SHB0B*D***00B00K0*0000*0000XA 434,490 BTU · Rooftop Unit ×1
1 project · most recent 03/26/2024
Sprinkler System
FiledStatusContractorScope
03/26/2024Signed-offALESSANDRO PLUMBING, INCSprinkler System
1 project · most recent 09/08/2026
Water/Sanitary
FiledStatusContractorScope
09/08/2026——Water/Sanitary
5 projects · most recent 04/20/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
04/20/2026Permit IssuedM F ELEC'L SVC CO., INCGeneral Wiring
04/20/2026Permit IssuedM F ELEC'L SVC CO., INCGeneral Wiring
03/26/2026Permit IssuedMRD ELEC'L SERVICES, INCHVAC Wiring
12/04/2025CompleteM F ELEC'L SVC CO., INCGeneral Wiring
12/04/2025CompleteM F ELEC'L SVC CO., INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/30/2026FinalEDWIN HOPKINSprogress
03/13/2026Lighting controls—energy_progress
03/13/2026Fire-Resistant Penetrations and Joints—special
03/13/2026Energy Code Compliance Inspections—progress
03/13/2026Final—progress
03/13/2026Interior lighting power—energy_progress
01/13/2026Energy Code Compliance InspectionsMichael Patinoprogress
01/13/2026HVAC-R and service water heating equipmentMichael Patinoenergy_progress
01/12/2026FinalMichael Patinoprogress
01/12/2026Mechanical SystemsMichael Patinospecial
01/02/2025Energy Code Compliance InspectionsBrian Newmanprogress
01/02/2025Interior lighting powerBrian Newmanenergy_progress
01/02/2025Lighting controlsBrian Newmanenergy_progress
01/02/2025Energy Code Compliance InspectionsBrian Newmanprogress
01/02/2025HVAC-R and service water piping design and insulationBrian Newmanenergy_progress
01/02/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
01/02/2025FinalBrian Newmanprogress
01/02/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
12/05/2023Ventilation and air distribution systemJUAN GOMEZenergy_progress
12/05/2023Energy Code Compliance InspectionsJUAN GOMEZprogress
11/17/2023FinalJUAN GOMEZprogress
11/17/2023Mechanical SystemsJUAN GOMEZspecial
09/05/2023Interior lighting powerJUAN GOMEZenergy_progress
09/05/2023Lighting controlsJUAN GOMEZenergy_progress
09/05/2023Energy Code Compliance InspectionsJUAN GOMEZprogress
Latest 25 of 29.
▾Documents — 968 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/15/2026X01371785-S2Request digital key ↗
09/15/2026X01371785-S1Request digital key ↗
09/15/2026X01371785-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00389480-I1Request digital key ↗
▸Applications & Permits176
▸BISPLAN / WORK APPROVAL APPLICATION105
02/17/2026220414139Open ↗
02/11/2026220414139Open ↗
02/04/2026220380987Open ↗
Showing 3 of 105 on file for this type
▸BISWORK PERMIT APPLICATION71
10/20/2021220359582Open ↗
08/03/2021220485124Open ↗
01/28/2021240284116Open ↗
Showing 3 of 71 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE DESIGN CERTIFICATION2
11/02/2020240284116Open ↗
09/16/2020240283956Open ↗
▸Seals & Professional Certifications176
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION116
04/09/2020220552658Open ↗
02/14/2020220414139Open ↗
08/26/2019220540662Open ↗
Showing 3 of 116 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/15/2026X01371785-S2Open ↗
09/15/2026X01371785-I1Open ↗
08/26/2026X00389480-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
07/09/2019220706868Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/28/2026X01345184-I1Open ↗
09/28/2026X01345184-I1Open ↗
09/28/2026X01345184-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
11/02/2020240284116Open ↗
09/16/2020240283956Open ↗
07/09/2019220706868Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026X01345184-I1Open ↗
08/25/2026X01161912-I1Open ↗
08/23/2026X01161912-S2Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/02/2020240284116Open ↗
09/16/2020240283956Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/02/2020240284116Open ↗
09/16/2020240283956Open ↗
▸Trade Schedules & Equipment56
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
08/29/2019220706868Open ↗
07/09/2019220706868Open ↗
Showing 2 of 20 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFIRE ALARM: FDNY RECEIVED & ACCEPTED PLA1
09/23/2020220580119Open ↗
▸BISSEWER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
07/10/2023220580119Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
07/09/2019220706868Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/26/2022220287696Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos51
▸BISASBESTOS: CERTIFICATION (DEP ACP5)29
11/02/2020240284116Open ↗
09/16/2020240283956Open ↗
07/09/2019220706868Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/15/2026X01371785-I1Open ↗
09/15/2026X01371785-S1Open ↗
08/26/2026X00389480-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026X08031321-I1Open ↗
▸Energy Compliance98
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS54
02/14/2020220414139Open ↗
08/01/2019220706868Open ↗
07/09/2019220706868Open ↗
Showing 3 of 54 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
10/27/2021220659810Open ↗
10/20/2021220359582Open ↗
09/16/2021220528677Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
09/20/2021220528677Open ↗
09/16/2021220528677Open ↗
03/18/2021240284116Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/02/2020240284116Open ↗
09/16/2020240283956Open ↗
▸BIStechnical Report Energy2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/16/2021220528677Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY20
01/11/2022220287696Open ↗
12/14/2021220359582Open ↗
09/16/2021220528677Open ↗
Showing 3 of 20 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/11/2022220287696Open ↗
▸Approvals, Objections & Sign-offs131
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST78
07/12/2023220580119Open ↗
07/11/2023220580119Open ↗
02/15/2022220287696Open ↗
Showing 3 of 78 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION25
09/10/2020220552658Open ↗
06/24/2019220669550Open ↗
Showing 2 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
05/02/2023200698343Open ↗
04/27/2023200698343Open ↗
07/29/2022200698343Open ↗
Showing 3 of 12 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMaster Plumber Seal Temporary Approval Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership89
▸BISCOST AFFIDAVIT86
03/18/2021240284116Open ↗
03/17/2021240283956Open ↗
01/15/2021220659810Open ↗
Showing 3 of 86 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/18/2021220359582Open ↗
09/16/2021220528677Open ↗
06/17/2020220706868Open ↗
▸Filing & Intake Forms119
▸BISEFILING COVER SHEET56
07/09/2019220706868Open ↗
06/27/2019220706868Open ↗
Showing 2 of 56 on file for this type
▸BISBOROUGH INTAKE FORM38
04/09/2020220552658Open ↗
02/14/2020220414139Open ↗
01/15/2020200698343Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION23
05/09/2023200698343Open ↗
07/07/2022200698343Open ↗
01/24/2022220580119Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/02/2020240284116Open ↗
09/16/2020240283956Open ↗
▸Other Documents19
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFEMA FORM (81-31): ELEVATION CERTIFICATE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
09/30/2020220580119Open ↗
09/30/2020220580119Open ↗
Showing 2 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
09/16/2020240283956Open ↗