| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01359339 ↗ | 1807 66 STREET BROOKLYN | Alteration | Permit Issued | 02/19/2026 | 09/02/2026 | Design R.J. MCGEE ENGINEERING, PLLC Owner FSA CAPITAL LLC Filer DOMANI CONSULTING | TENANT FIT OUT OF SUB-CELLAR (3,010 SF) AND SECOND FLOOR (3,700 SF) COMMERCIAL SPACE. WORK TOINCLUDE NEW CONSTRUCTION OF NON-LOAD BEARING IN… |
| M01222002 ↗ | 146 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 05/22/2025 | 08/14/2026 | Filer TANG STUDIO LLC | Plumbing filing in conjunction with the interior renovation of the existing apartment unit 61T. Project includes demolishing existing plumbi… |
| B01386957 ↗ | 139 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 07/21/2026 | 07/31/2026 | Design VINCENT J. LIOTTA P.E. Owner CUSHMAN & WAKEFIELD | REPLACEMENT OF 60 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M01417090 ↗ | 530 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/20/2026 | 07/27/2026 | Design MG ENGINEERING D.P.C. Owner CLASSIC REALTY LLC Filer METROPOLIS GROUP INC | REPLACEMENT OF ROOFTOP UNIT AND ASSOCIATED DUCTWORK ON THE ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| Q01217682 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Signed-off | 05/19/2025 | 07/27/2026 | Owner CUNY Filer JMV ASSOCIATES LLC | Selective Removal of mechanical equipment at LaGuardia Community College, in preparation for a build out space. All as per plans filed herew… |
| M01364267 ↗ | 130 LEROY ST. MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 07/14/2026 | Design VINCENT J. LIOTTA P.E. Owner FedEx | REPLACMENT OF TWO ROOFTOP UNITS WITH A TOTAL CAPACITY OF 73 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| NEWTEC ENGINEERING | 30 | 04/15/2026 |
| MG ENGINEERING D.P.C. | 10 | 07/20/2026 |
| A&M CONSULTING | 7 | 11/06/2025 |
| JACK GREEN ASSOCIATES | 7 | 11/07/2025 |
| VINCENT J. LIOTTA P.E. | 6 | 07/21/2026 |
| ROBERT DERECTOR ASSOCIATES | 4 | 09/12/2025 |
| INFINITY DESIGN CONSULTANT INC | 3 | 06/07/2022 |
| JMV CONSULTING ENGINEERING | 3 | 01/31/2023 |
| MCLAREN ENGINEERING GROUP | 3 | 06/28/2024 |
| AMA CONSULTING ENGINEERS, PC | 2 | 10/30/2025 |
| GREENMAN-PEDERSEN, INC. | 2 | 12/09/2022 |
| MEP ENGINEERING, P.C. | 2 | 08/05/2021 |
| R.J. MCGEE ENGINEERING, PLLC | 2 | 08/12/2026 |
| RAAD | 2 | 10/09/2025 |
| AK ENGINEERING, PC | 1 | 02/02/2022 |
| AVCON ENGINEERING PC | 1 | 01/04/2022 |
| CAMERON ENGINEERING | 1 | 03/23/2020 |
| DESIGN FORUM ENGINEERING | 1 | 10/06/2021 |
| DOUGLAS P. GONZALEZ | 1 | 06/15/2026 |
| FMC ENGINEERING | 1 | 02/21/2020 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 09/12/2025 |
| HIGHLAND ASSOCIATES | 1 | 06/18/2025 |
| JACK STONE ENGINEERS, PC | 1 | 08/28/2020 |
| KOSTOW GREENWOOD ARCHITECTS LLP | 1 | 06/28/2024 |
| LONGTIN ENGINEERING INC. | 1 | 08/11/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| ASHLAR MECHANICAL CORP | 3 | 03/23/2026 |
| EVERGREEN MECHANICAL CORP | 2 | 06/15/2026 |
| CAMA CONSTRUCTION INC | 1 | 09/02/2025 |
| CONNELLY & SONS PLUMBING | 1 | 09/11/2023 |
| CONTINENTAL NETWORK CORP | 1 | 08/12/2026 |
| CREATIVE TEAM INTERIORS I | 1 | 02/26/2026 |
| EL-ROC CONTG OF BKLYN INC | 1 | 02/26/2026 |
| EL-ROC CONTRACTING OF BK | 1 | 02/26/2026 |
| ENOBRAC PLUMBING, INC | 1 | 03/26/2024 |
| FMB INC | 1 | 06/17/2022 |
| GG CRAFTWORK LLC | 1 | 12/19/2023 |
| H INTERIOR DESIGN CONSTRU | 1 | 08/11/2022 |
| HYDRONIC CONCEPTS NY P&H | 1 | 06/28/2024 |
| RRP PLUMBING CORP | 1 | 08/12/2026 |
| SIRINA FIRE PROT CORP | 1 | 12/19/2023 |
| THE SHUBERT ORGANIZATION | 1 | 06/28/2024 |
| VAND MECHANICAL INC | 1 | 08/12/2026 |
| W5 GROUP LLC | 1 | 06/15/2026 |
| WF PLUMBING AND HEATING L | 1 | 09/02/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| BLDG MANAGEMENT CO., INC. | 11 | 02/26/2026 |
| SL GREEN REALTY CORP | 10 | 03/23/2026 |
| CUSHMAN & WAKEFIELD | 6 | 07/21/2026 |
| THE SHUBERT ORGANIZATION, INC. | 5 | 06/28/2024 |
| 625 BROADWAY VENTURE LLC | 2 | 02/20/2024 |
| CROWN ACQUISITIONS | 2 | 10/09/2025 |
| FSA CAPITAL LLC | 2 | 08/12/2026 |
| KAPLAN INC | 2 | 01/14/2022 |
| WMC ASSOCIATES LLC | 2 | 04/25/2023 |
| 168 USA LLC | 1 | 01/26/2021 |
| 401 FIFTH LLC | 1 | 10/31/2022 |
| 5TH MIDTOWN LLC | 1 | 06/30/2020 |
| 69th Tenants Corp. | 1 | 03/29/2021 |
| BLDG MANAGBEMENT CO., INC. | 1 | 01/17/2020 |
| BRICKMAN | 1 | 08/23/2023 |
| CAPSTONE ON-CAMPUS MANAGEMENT | 1 | 10/07/2020 |
| CBRE | 1 | 01/28/2020 |
| CENTERLIGHT | 1 | 07/06/2023 |
| CLASSIC REALTY LLC | 1 | 07/20/2026 |
| COLUMBIA PROPERTY TRUST | 1 | 03/19/2021 |
| CUNY | 1 | 06/15/2026 |
| EQUINOX | 1 | 07/21/2020 |
| F AND T GROUP | 1 | 08/05/2021 |
| FEDEX | 1 | 07/08/2026 |
| HOULIHAN PARNES PROPERTIES | 1 | 08/26/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 5 | 10/30/2025 |
| JAM CONSULTANTS, INC. | 4 | 02/26/2026 |
| NYCCODE LLC | 3 | 06/28/2024 |
| DESARNO ASSOCIATES, INC. | 2 | 03/23/2026 |
| KOSSAR + GARRY ARCHITECTS, LLP | 2 | 04/25/2023 |
| OUTSOURCE CONSULTANTS, INC. | 2 | 11/06/2025 |
| A&M ENGINEERING CONSULTING DPC | 1 | 09/19/2022 |
| BASIC GROUPS CORP | 1 | 08/11/2022 |
| CONSTRUCTION PERMIT SERVICES | 1 | 10/06/2021 |
| DOMANI CONSULTING | 1 | 08/12/2026 |
| EA DESIGN GROUP, INC. | 1 | 04/05/2024 |
| EMPIRE CITY CONSULTANTS, INC. | 1 | 09/07/2023 |
| GREEN LIGHT EXPEDITING LLC | 1 | 03/09/2026 |
| J. CALLAHAN CONSULTING, INC. | 1 | 01/30/2024 |
| JM ZONING, LLC. | 1 | 02/02/2024 |
| JMV ASSOCIATES LLC | 1 | 06/15/2026 |
| JMV CONSULTING ENGINEERING, P.C | 1 | 01/31/2023 |
| MBE CODE & ZONING LLC | 1 | 01/14/2022 |
| METROPOLIS GROUP INC | 1 | 07/20/2026 |
| PROJECT TACTICAL SOLUTIONS | 1 | 09/12/2025 |
| SHALAT ARCHITECTS P.C. | 1 | 01/26/2021 |
| TANG STUDIO LLC | 1 | 09/02/2025 |
| WALTER T. GORMAN, PE, PC | 1 | 04/19/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01359339 ↗ | 1807 66 STREET BROOKLYN | Alteration | Permit Issued | 02/19/2026 | 09/02/2026 | Design R.J. MCGEE ENGINEERING, PLLC Owner FSA CAPITAL LLC Filer DOMANI CONSULTING | TENANT FIT OUT OF SUB-CELLAR (3,010 SF) AND SECOND FLOOR (3,700 SF) COMMERCIAL SPACE. WORK TOINCLUDE NEW CONSTRUCTION OF NON-LOAD BEARING IN… |
| M01222002 ↗ | 146 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 05/22/2025 | 08/14/2026 | Filer TANG STUDIO LLC | Plumbing filing in conjunction with the interior renovation of the existing apartment unit 61T. Project includes demolishing existing plumbi… |
| B01386957 ↗ | 139 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 07/21/2026 | 07/31/2026 | Design VINCENT J. LIOTTA P.E. Owner CUSHMAN & WAKEFIELD | REPLACEMENT OF 60 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M01417090 ↗ | 530 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/20/2026 | 07/27/2026 | Design MG ENGINEERING D.P.C. Owner CLASSIC REALTY LLC Filer METROPOLIS GROUP INC | REPLACEMENT OF ROOFTOP UNIT AND ASSOCIATED DUCTWORK ON THE ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| Q01217682 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Signed-off | 05/19/2025 | 07/27/2026 | Owner CUNY Filer JMV ASSOCIATES LLC | Selective Removal of mechanical equipment at LaGuardia Community College, in preparation for a build out space. All as per plans filed herew… |
| M01364267 ↗ | 130 LEROY ST. MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 07/14/2026 | Design VINCENT J. LIOTTA P.E. Owner FedEx | REPLACMENT OF TWO ROOFTOP UNITS WITH A TOTAL CAPACITY OF 73 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| X01345184 ↗ | 1200 WATERS PLACE BRONX | Alteration | Permit Issued | 03/09/2026 | 05/22/2026 | Design MQ CONSULTING | Filing to replace existing (6) gas-fired Roof units with (6) Heat Pump Roof units as per plans. No change in use, egress, or occupancy under… |
| M01378975 ↗ | 215 WEST 125 STREET MANHATTAN | Alteration | Signed-off | 04/15/2026 | 04/16/2026 | Design NEWTEC ENGINEERING | HVAC unit replacement. All existing ductwork to remain. No change in use egress and occupancy. |
| M01355065 ↗ | 424 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/17/2026 | 04/08/2026 | Design SB Consulting Engineers, LLC Owner BLDG Management Co. Filer JAM CONSULTANTS, INC. | FILING PL/SP FOR 8th FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. SPRINKLER HEADS AS PER PLAN. |
| X08048156 ↗ | 260 EAST 161 STREET BRONX | Alteration | Signed-off | 01/31/2023 | 12/09/2025 | Design JMV CONSULTING ENGINEERING Owner 625 BROADWAY VENTURE LLC | MODIFICATION OF EXISTING VENTILATION SYSTEM IN SUBCELLAR AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01279317 ↗ | 21 EAST 22 STREET MANHATTAN | Alteration | Permit Issued | 09/09/2025 | 11/26/2025 | Design ROBERT DERECTOR ASSOCIATES | STRUCTURAL WORK IN CONJUNCTION WITH AC REPLACEMENT AT THE CELLAR LEVEL AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPA… |
| M01287111 ↗ | 600 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/06/2025 | 11/26/2025 | Design A&M CONSULTING Owner CUSHMAN & WAKEFIELD | Herewith Filing Modification to Existing Mechanical System, work scope includes the installation of new water cooled heat pumps and piping a… |
| B01186895 ↗ | 1 HOYT STREET BROOKLYN | Alteration | Signed-off | 10/09/2025 | 11/13/2025 | Design RAAD Owner CROWN ACQUISITIONS | INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH |
| M01301386 ↗ | 885 THIRD AVE MANHATTAN | Alteration | Signed-off | 10/30/2025 | 11/13/2025 | Design AMA CONSULTING ENGINEERS, PC Owner SL GREEN REALTY CORP Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON THE 36TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01215376 ↗ | 51 EAST 42 STREET MANHATTAN | Alteration | Signed-off | 08/25/2025 | 08/27/2025 | Design NEWTEC ENGINEERING Owner SL GREEN REALTY CORP | Installation of air conditioning unit. No change in use egress and occupancy. |
| M01244111 ↗ | 424 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 07/17/2025 | 08/21/2025 | Design JACK GREEN ASSOCIATES Owner BLDG Management Co. Filer JAM CONSULTANTS, INC. | FILING MS FOR 2nd FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. 2. NEW FINISHES, CEILING, LIGHTI… |
| M01227041 ↗ | 424 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/18/2025 | 07/14/2025 | Design HIGHLAND ASSOCIATES Filer JAM CONSULTANTS, INC. | FILING MS FOR 6TH FLOOR INTERIOR RENOVATION - CONSTRUCT NEW OFFICES, PANTRY AS PER PLAN. 2. NEW OPEN CEILING AND FINISHES AS PER PLAN. |
| M01168414 ↗ | 600 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/26/2025 | 03/19/2025 | Design STANTEC Owner CUSHMAN & WAKEFIELD | Herewith filing replacement of AC Unit and related systems as per plans. No change in use, egress, or occupancy. |
| Q01119391 ↗ | 66-26 METROPOLITAN AVENUE QUEENS | Alteration | Signed-off | 11/19/2024 | 01/23/2025 | Design ROBERT DERECTOR ASSOCIATES | Removal of existing drycoolers and installation of new drycoolers |
| X01142951 ↗ | 260 EAST 161 STREET BRONX | Alteration | Signed-off | 12/13/2024 | 12/16/2024 | Design NEWTEC ENGINEERING | Replacement of 10 ton split air conditioning unit. No change in use egress and occupancy. |
| M01080639 ↗ | 149 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/21/2024 | 08/21/2024 | Design NEWTEC ENGINEERING | Replacement of air conditioning unit on the 2nd floor. Existing ductwork to remain. No change in use egress and occupancy. |
| M01025515 ↗ | 420 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 05/29/2024 | 07/15/2024 | Design MG ENGINEERING D.P.C. Owner SL GREEN REALTY CORP Filer DESARNO ASSOCIATES, INC. | Sprinkler Head changes as indicated on plans. |
| Q00994439 ↗ | 36-32 MAIN STREET QUEENS | Alteration | Permit Issued | 03/26/2024 | 04/25/2024 | Design A&M CONSULTING Owner FSA CAPITAL LLC | PROPOSE TO INSTALL A SPLIT SYSTEM AC UNIT AS PER PLANS SUBMITTED HERWITH. |
| M01000962 ↗ | 450 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 04/05/2024 | 04/10/2024 | Design R.J. MCGEE ENGINEERING, PLLC Owner THE MOINIAN GROUP Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC… |
| M01003468 ↗ | 151 DYCKMAN STREET MANHATTAN | Alteration | Signed-off | 02/27/2024 | 03/04/2024 | Design NEWTEC ENGINEERING | Replacement of roof mounted air conditioning unit. All existing ductwork to remain. No change in use egress and occupancy. |
| M00939114 ↗ | 249 WEST 45 STREET MANHATTAN | Alteration | Permit Issued | 01/03/2024 | 03/01/2024 | Filer NYCCODE LLC | Structural scope associated with the installation of the temporary restrooms at the Imperial Theater. No change of use, egress or occupancy. |
| M00967745 ↗ | 424 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 01/30/2024 | 02/29/2024 | Design JACK GREEN ASSOCIATES | This Alteration application is being filed for the mechanical work at the subject premises as per plans submitted herewith. There are no cha… |
| X01000002 ↗ | 260 EAST 161 STREET BRONX | Alteration | Signed-off | 02/20/2024 | 02/21/2024 | Design NEWTEC ENGINEERING Owner 625 BROADWAY VENTURE LLC | Installation of air conditioning unit for the elevator machine room. No change in use egress and occupancy. |
| M00986504 ↗ | 43 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 02/02/2024 | 02/08/2024 | Design A&M CONSULTING Owner LADIES MILE LLC Filer JM ZONING, LLC. | FILING APPLICATION TO REGISTER EXISTING SPLIT AIR-COOLED AC UNITS AT 2ND FLOOR ROOF SETBACK & THE CELLAR AS PER PLANS SUBMITTED HEREWITH. |
| M00925929 ↗ | 930 2 AVENUE MANHATTAN | Alteration | Signed-off | 12/18/2023 | 01/24/2024 | Design VINCENT J. LIOTTA P.E. | INTALLATION OF SPLIT SYSTEM ON FLOOR 001 AND THE ROOF WITH A TOTAL CAPACITY OF 20 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M00914011 ↗ | 420 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 09/11/2023 | 12/06/2023 | Design MG ENGINEERING D.P.C. Owner SL GREEN REALTY CORP Filer DESARNO ASSOCIATES, INC. | Sprinkler Head changes as indicated on plans. |
| M00926391 ↗ | 1634 BROADWAY MANHATTAN | Alteration | Signed-off | 09/14/2023 | 09/15/2023 | Design VINCENT J. LIOTTA P.E. | REMOVAL OF COOLING TOWER ON THE ROOF AND INSTALALTION OF SPLIT SYSTEM CONSISTING OF 2 HEAT PUMP UNITS AND 4 CHILLERS WITH A TOTAL CAPACITY O… |
| M00916017 ↗ | 600 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 09/07/2023 | 09/07/2023 | Design RYAN SOAMES ENGINEERING Owner CUSHMAN & WAKEFIELD | Filing herewith drawings indicating modification of the existing mechanical system on the 4th floor and 26th floor (marketing as 27th floor)… |
| M00915456 ↗ | 256 WEST 38 STREET MANHATTAN | Alteration | Signed-off | 08/23/2023 | 08/30/2023 | Design VINCENT J. LIOTTA P.E. Owner BRICKMAN | REPLACEMENT OF 3 TON CONDENSING UNIT ON 2ND FLOOR LOWER ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| B00878631 ↗ | 139 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 08/08/2023 | 08/09/2023 | Design NEWTEC ENGINEERING Owner CUSHMAN AND WAKEFIELD | Replacement of existing rooftop air conditioning unit on existing steel dunnage. No change in use egress and occupancy. |
| B00878641 ↗ | 625 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 07/19/2023 | 07/19/2023 | Design NEWTEC ENGINEERING Owner CUSHMAN AND WAKEFIELD | Replacement of rooftop air conditioning unit on existing roof curb. Existing ducts to remain unaltered. No change in use egress and occupanc… |
| M08047601 ↗ | 1681 BROADWAY MANHATTAN | Alteration | Signed-off | 04/07/2023 | 07/19/2023 | Design MITCHELL KURTZ ARCHITECT PC Filer NYCCODE LLC | Structural scope associated with the construction of temporary seating & performance platforms in connection with Here Lies Love TPA for the… |
| X00870718 ↗ | 656 ALLERTON AVENUE BRONX | Alteration | Permit Issued | 07/06/2023 | 07/07/2023 | Design NEWTEC ENGINEERING Owner CENTERLIGHT | Replacement of (2) roof mounted air conditioning units. All existing ductwork to remain unaltered. No change in use egress and occupancy. |
| M00844034 ↗ | 101 EAST 106 STREET MANHATTAN | Alteration | Signed-off | 04/04/2023 | 04/19/2023 | Design AMA CONSULTING ENGINEERS, PC Owner WMC ASSOCIATES LLC | Herewith filing for the installation of (2) air-cooled chillers complete with all equipment, ductwork, piping, insulation, controls, accesso… |
| M00803662 ↗ | 149 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/02/2023 | 02/03/2023 | Design NEWTEC ENGINEERING | Replacement air conditioning units on the 4th floor. No change in use egress and occupancy. |
| M08044659 ↗ | 149 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/28/2022 | 01/05/2023 | Design JACK GREEN ASSOCIATES Filer WALTER T. GORMAN, PE, PC | Propose to perform mechanical work. No change to use, egress or occupancy. |
| M08018828 ↗ | 205 EAST 67 STREET MANHATTAN | Alteration | Signed-off | 12/09/2022 | 12/09/2022 | Design GREENMAN-PEDERSEN, INC. | Replacement of (2) cooling towers on the roof cooling tower penthouse area. No change in use egress and occupancy. |
| M08012868 ↗ | 222 WEST 45 STREET MANHATTAN | Alteration | Signed-off | 11/18/2022 | 11/30/2022 | Design VINCENT J. LIOTTA P.E. | INSTALLATION OF SPLIT SYSTEM ON THE ROOF AND 2ND FLOOR WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| Q08026342 ↗ | 30-16 37 STREET QUEENS | Alteration | Signed-off | 11/01/2022 | 11/09/2022 | Design NEWTEC ENGINEERING | Replacement of existing air cooled condensing units & air handling units. No change in use egress and occupancy. |
| M07996849 ↗ | 391 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/31/2022 | 11/01/2022 | Design NEWTEC ENGINEERING Owner 401 FIFTH LLC | Replacement of (2) cooling towers on the roof. No change in use egress and occupancy. |
| M08020552 | 51 EAST 42 STREET MANHATTAN | — | Signed-off | — | 10/29/2022 | — | Installation of air conditioning unit for the loading dock office. No change in use egress and occupancy. |
| M08000638 ↗ | 56 CROSBY STREET MANHATTAN | Alteration | Signed-off | 10/12/2022 | 10/26/2022 | Design NEWTEC ENGINEERING | Replacement of cooling tower and air conditioning units. No change in use egress and occupancy. |
| M00721339 ↗ | 1350 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/03/2022 | 10/21/2022 | Owner SL GREEN REALTY CORP. Filer RIZZO GROUP | Chiller replacement as per plans. No change to use, egress or occupancy. |
| M00784221 ↗ | 125 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/14/2022 | 09/22/2022 | Design MG ENGINEERING D.P.C. Owner SL GREEN REALTY CORP. Filer RIZZO GROUP | HVAC modifications (Base Building EMR Upgrade) as per plans. No change to use, egress or occupancy. |
| M00790274 ↗ | 314 WEST 40 STREET MANHATTAN | Alteration | Permit Issued | 09/19/2022 | 09/22/2022 | Design A&M CONSULTING | PROPOSE TO REPLACE 3 AC WATER COOLED UNITS AT BASEMENT AND 3RD FLOOR AS PER PLANS SUBMITTED HEREWITH. |
| B00778822 ↗ | 522 FULTON STREET BROOKLYN | Alteration | Permit Issued | 08/16/2022 | 09/02/2022 | Design RAAD Owner CROWN ACQUISITIONS | INSTALLATION OF HVAC SYSTEM. |
| M00279274 ↗ | 171 VARICK STREET MANHATTAN | Alteration | Signed-off | 08/26/2022 | 08/31/2022 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | Modification of existing mechanical system as per plans. No change to use, egress or occupancy. |
| M00742080 ↗ | 215 WEST 49 STREET MANHATTAN | Alteration | Signed-off | 06/13/2022 | 08/18/2022 | Design MCLAREN ENGINEERING GROUP Filer NYCCODE LLC | Installation of a new dunnage system on the roof of the Ambassador Theater for the new mechanical units. |
| M00667034 ↗ | 605 WEST 51 STREET MANHATTAN | Alteration | Signed-off | 03/07/2022 | 06/10/2022 | Owner NEP STUDIO | Selective removal of ducts and mechanical units. Install new ducts. |
| Q00744467 ↗ | 30-81 STEINWAY STREET QUEENS | Alteration | Signed-off | 06/01/2022 | 06/09/2022 | Design JACK GREEN ASSOCIATES Filer JAM CONSULTANTS, INC. | Filing for the Installation of (4) AC units for administrative purposes only as the EUP card were filed under the signed off new building ap… |
| Q00329180 ↗ | 1815 MADISON STREET QUEENS | Alteration | Signed-off | 04/17/2020 | 05/19/2022 | Design AK ENGINEERING, PC Filer DANA TREZZA | APPLICATION FILED FOR INSTALLATION OF ELECTRIC HEATING AND COOLING VRFSs IN CONJUNCTION WITH GUT/REHAB JOB#: 421914637 |
| M00712791 ↗ | 205 EAST 67 STREET MANHATTAN | Alteration | Signed-off | 04/15/2022 | 04/15/2022 | Design GREENMAN-PEDERSEN, INC. | Ductwork alteration and replacement |
| M00652490 ↗ | 141 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 01/04/2022 | 03/14/2022 | Design AVCON ENGINEERING PC | scope of work will include installation 5 HVAC Condensers located at the 2nd Fl roof setback as indicated on plans.No change in use, occupan… |
| M00663032 ↗ | 131 WEST 56 STREET MANHATTAN | Alteration | Signed-off | 01/14/2022 | 01/25/2022 | Design JMV CONSULTING ENGINEERING Owner KAPLAN INC Filer MBE CODE & ZONING LLC | REPLACEMENT OF HVAC UNITS ON ROOF AS SHOWN ON DRAWINGS FILED HEREWITH. REFILIJG TO CORRECT THE CERTIFICATE OF COMPLIANCE ON THE PREVIOUSLY … |
| Q00591645 ↗ | 90-14 JAMAICA AVENUE QUEENS | Alteration | Signed-off | 10/06/2021 | 01/01/2022 | Design DESIGN FORUM ENGINEERING | Modifications to existing mechanical system in relation to the interior improvement of T-Mobile filed under application #Q00591616 and #Q005… |
| 321743672BIS | 71 SARATOGA AVENUE BROOKLYN | — | ISSUED | 11/29/2018 | 12/23/2021 | — | MH, OT |
| 121917248BIS | 1493 BROADWAY MANHATTAN | — | ISSUED | 02/21/2014 | 12/10/2021 | — | MH, OT, PL, SP |
| M00594046 ↗ | 215 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/09/2021 | 12/01/2021 | Design NEWTEC ENGINEERING | Filing to legalize the installation of AC Units as per plans. No change to use, egress or occupancy. |
| M00390508 ↗ | 145 SPRING STREET MANHATTAN | Alteration | Permit Issued | 11/19/2021 | 11/20/2021 | Design NEWTEC ENGINEERING | Legalization of (2) Condensing Units on the roof. |
| Q00457910 ↗ | 28-25 119 STREET QUEENS | Alteration | Permit Issued | 01/26/2021 | 11/19/2021 | Design TSF ENGINEERING, PC Owner 168 USA LLC Filer SHALAT ARCHITECTS P.C. | Installation of ductless split supplemental air conditioning unit and ventilation unit. No change to egress use or occupancy. |
| M00573039 ↗ | 314 WEST 40 STREET MANHATTAN | Alteration | Signed-off | 10/14/2021 | 10/14/2021 | Design A&M CONSULTING | PROPOSE TO REPLACE 4 20-TON WATER-COOLED AC UNITS AT MECHANICAL ROOMS LOCATED ON 1ST & 2ND FLOORS, AS PER PLANS SUBMITTED HEREWITH. |
| M00577587 ↗ | 304 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/15/2021 | 09/20/2021 | Design NEWTEC ENGINEERING Owner SL GREEN REALTY CORP. Filer RIZZO GROUP | Filing to legalize the installation of an AC Unit as per plans. |
| M00537204 ↗ | 889 BROADWAY MANHATTAN | Alteration | Signed-off | 07/23/2021 | 09/01/2021 | Design NEWTEC ENGINEERING | Replacement of split air conditioning unit. |
| M00542432 ↗ | 171 VARICK STREET MANHATTAN | Alteration | Permit Issued | 07/13/2021 | 07/19/2021 | Design NEWTEC ENGINEERING | Replacement of split air conditioning unit |
| M00547997 ↗ | 36 WEST 37 STREET MANHATTAN | Alteration | Signed-off | 07/07/2021 | 07/19/2021 | New mechanical units and ductwork for new office layout. | |
| M00497535 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 04/07/2021 | 06/21/2021 | Design LONGTIN SOLUTIONS LLC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. PARTITION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| Q00500459 ↗ | 89-53 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 04/26/2021 | 04/27/2021 | Design NEWTEC ENGINEERING Owner QUEENS CROSSROADS LLC | REPLACEMENT OF 20 TON AIR CONDITIONING UNIT ON THE ROOF. |
| B00317457 ↗ | 6405 7 AVENUE BROOKLYN | Alteration | Permit Issued | 03/17/2020 | 04/15/2021 | Design MEP ENGINEERING, P.C. | MECHANICAL WORK ON FIRST FLOOR AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 2 APPLICATION 322069998. |
| M00429224 ↗ | 357 GRAND STREET MANHATTAN | Alteration | Permit Issued | 03/29/2021 | 03/30/2021 | Design NEWTEC ENGINEERING Owner 69th Tenants Corp. | REPLACEMENT OF 7.5 TON SPLIT AIR CONDITIONING UNIT. |
| M00478917 ↗ | 261 11 AVENUE MANHATTAN | Alteration | Signed-off | 03/19/2021 | 03/22/2021 | Design MG ENGINEERING D.P.C. Owner COLUMBIA PROPERTY TRUST Filer RIZZO GROUP | General mechanical modification in cellar, floors 1-5, and associated ductwork connections to temporary chiller, as per plans filed herewith… |
| Q00332322 ↗ | 38-25 MAIN STREET QUEENS | Alteration | Signed-off | 03/23/2020 | 03/18/2021 | Design MEP ENGINEERING, P.C. Owner F AND T GROUP | Installation of mechanical units as per plans filed herewith. |
| Q00460852 ↗ | 117-16 SUTPHIN BOULEVARD QUEENS | Alteration | Signed-off | 02/24/2021 | 02/25/2021 | Design NEWTEC ENGINEERING | REPLACEMENT OF 25 TON ROOF MOUNTED UNIT. |
| M00422633 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/22/2021 | 02/17/2021 | Design MG ENGINEERING D.P.C. | Install ceiling diffusers and minor ductwork modifications. |
| M00320765 ↗ | 3 WEST 35 STREET MANHATTAN | Alteration | Signed-off | 03/23/2020 | 02/16/2021 | Design CAMERON ENGINEERING Filer JAM CONSULTANTS, INC. | Administrative filing to add the EUP cards to the scope of work. All fees and work was done under approved, permitted and signed off applica… |
| M00445081 ↗ | 1350 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 01/22/2021 | 01/25/2021 | Design NEWTEC ENGINEERING Owner SL GREEN REALTY CORP. | REPLACEMENT OF (2) 5 TON AIR CONDITIONING UNITS FOR THE ELEVATOR MACHINE ROOM. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 421087727BIS | 35-11 9 STREET QUEENS | — | ISSUED | 03/08/2019 | 01/06/2021 | — | MH |
| M00414391 ↗ | 314 WEST 40 STREET MANHATTAN | Alteration | Permit Issued | 11/16/2020 | 11/19/2020 | Design A&M CONSULTING Filer JM ZONING, LLC. | PROPOSE TO REPLACE 4 20-TON WATER COOLED AC UNITS AT MECHANICAL ROOMS LOCATED ON 4TH & 5TH FLOORS, AS PER PLANS SUBMITTED HEREWITH. |
| Q00414456 ↗ | 32-01 30 AVENUE QUEENS | Alteration | Signed-off | 11/04/2020 | 11/13/2020 | Design JACK GREEN ASSOCIATES Filer JAM CONSULTANTS, INC. | Installation of new air cooled AC units and associated ductwork |
| M00379612 ↗ | 101 EAST 106 STREET MANHATTAN | Alteration | Signed-off | 09/23/2020 | 10/19/2020 | Design PAVANE & KWALBRUN Owner WMC ASSOCIATES LLC Filer JAM CONSULTANTS, INC. | HEREWITH FILING FOR MODIFICATION TO EXISTING HVAC SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| B00354224 ↗ | 590 HART STREET BROOKLYN | Alteration | Signed-off | 06/30/2020 | 10/16/2020 | Design NEWTEC ENGINEERING | REPLACEMENT OF (2) 40 TON AIR CONDITIONING UNITS ON THE ROOF. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M00366340 ↗ | 130 5 AVENUE MANHATTAN | Alteration | Signed-off | 09/04/2020 | 10/14/2020 | Design A&M CONSULTING Filer JM ZONING, LLC. | PROPOSE TO REPLACE COOLING TOWER AT ROOF, REPLACE WATER CONDENSER AT CELLAR AND AIR COOLED CONDENSING UNIT AT FIRST FLOOR AS PER PLANS SUBMI… |
| Q00410023 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 10/07/2020 | 10/08/2020 | REMOVE EXISTING RTU-9 AND REPLACE WITH NEW ROOF TOP UNIT WITH SAME MODEL # AND CAPACITY. | |
| M00277496 ↗ | 505 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/30/2020 | 10/07/2020 | Design NEWTEC ENGINEERING Owner 5TH MIDTOWN LLC | Replacement of 8 ton water cooled heat pump unit in the cellar. No change in use egress or occupancy. |
| M00401895 ↗ | 1328 BROADWAY MANHATTAN | Alteration | Signed-off | 09/23/2020 | 09/25/2020 | Design MG ENGINEERING D.P.C. Owner SL GREEN REALTY Filer BROOKBRIDGE CONSULTING | MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON THE ROOFTOP; INSTALLATION OF SPLIT SYSTEM HVAC IN THE ELEVATOR MACHINE ROOM ON THE ROOFTOP (LAN… |
| M00371547 ↗ | 625 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 08/28/2020 | 09/10/2020 | Design JACK STONE ENGINEERS, PC Owner NATIONWIDE MGMT CORP. | Installation of mechanical units and dunnage as per plans filed herewith. |
| M00342784 ↗ | 895 BROADWAY MANHATTAN | Alteration | Signed-off | 07/21/2020 | 08/21/2020 | Design MG ENGINEERING D.P.C. Owner EQUINOX Filer METROPOLIS GROUP INC | Modification of duct work in the Cellar FL. No change in egress, use or occupancy. |
| M00377710 ↗ | 180 SUFFOLK STREET MANHATTAN | Alteration | Signed-off | 08/12/2020 | 08/13/2020 | Design NEWTEC ENGINEERING Owner MARKIS MANAGEMENT LLC | REPLACEMENT OF EXHAUST FAN AND INSTALLATION OF 1 TON SPLIT AIR CONDITIONING SYSTEM. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M00350046 ↗ | 131 WEST 56 STREET MANHATTAN | Alteration | Signed-off | 06/19/2020 | 06/22/2020 | Design JMV CONSULTING ENGINEERING Owner KAPLAN INC Filer MBE CODE & ZONING LLC | REPLACEMENT OF HVAC UNITS ON ROOF ALONG WITH ASSOCIATED DUCTS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O… |
| M00301019 ↗ | 424 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/10/2020 | 03/13/2020 | Design FMC ENGINEERING Filer JAM CONSULTANTS, INC. | Filing for the removal and installation of new AC unit and related ductwork. |
| M00319058 ↗ | 358 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/21/2020 | 02/25/2020 | Design JACK GREEN ASSOCIATES Filer JAM CONSULTANTS, INC. | Administrative filing to add the EUP cards to the scope of work. All fees and work was done under approved, permitted and signed off applica… |
| M00271501 ↗ | 105 3 AVENUE MANHATTAN | Alteration | Signed-off | 01/08/2020 | 02/21/2020 | Design OLA CONSULTING ENGINEERS, PC Filer JMV ASSOCIATES LLC | Proposed Mechanical work being filed in conjunction to PL application#M00271453 and OT application #123868644 |
| M00317960 ↗ | 34 HUDSON YARDS MANHATTAN | Alteration | Signed-off | 02/20/2020 | 02/21/2020 | Design NEWTEC ENGINEERING | INSTALLATION OF SPLIT AIR CONDITIONING UNIT FOR THE IT ROOM. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M00280328 ↗ | 1462 BROADWAY MANHATTAN | Alteration | Signed-off | 01/28/2020 | 02/20/2020 | Design MG ENGINEERING D.P.C. Owner CBRE INC | MECHANICAL MODIFICATIONS INS THE SUB CELLAR |
| M00246465 ↗ | 2380 BROADWAY MANHATTAN | Alteration | Signed-off | 01/17/2020 | 01/21/2020 | Design NEWTEC ENGINEERING | REPLACEMENT OF 15 TON UNIT INSIDE A MECHANICAL ROOM. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M00229974 ↗ | 358 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/04/2019 | 01/09/2020 | Design JACK GREEN ASSOCIATES Filer JAM CONSULTANTS, INC. | Filing for the installation of a New AC unit, fans, piping and related ductwork |