💬 Discuss this project
1940Year Built
6Stories
W6Building Class
R9Zoning
—Gross Floor Area
1Units
0 Active Violations
Other college and university · 2.69 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Rockefeller University Main Campus3p · 1 filing · 6 docs
CellarRockefeller University Main CampusUnder Construction14p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sean P. Cunningham PE110/20/2026
RLM Engineering208/17/2026
Vincent J. Liotta P.E111/14/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.T.J. Electrical CoElectrical303/21/2026
Power CoolingGeneral Contractor203/21/2026
Boilermatic Welding Industriesspecialty_contractor110/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ase Engineering5785110/20/2026
RLM Engineering6913208/17/2026
Vincent J. Liotta P. E1974111/14/2025
Building Lifecycle
All (28)Filed (4)Permit Issued (2)Signed Off (1)Violation (4)Objection (2)Special Inspection (15)
10/20/2026
Filed — Alteration
Removal of three fuel oil storage tanks and replace with two tanks with related piping and pumps in cellar and change grade from #4 to #2 oil as per plans filed herewith.
M01422738-S2
10/20/2026
Special inspection requirement — Masonry
alon egozi
10/20/2026
Special inspection requirement — Sprayed fire-resistant materials
alon egozi
10/06/2026
Permit issued — Mechanical Systems
M01422738-I1-MS
08/31/2026
Special inspection requirement — Final
alon egozi
08/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
08/27/2026
Objection resolved — Addressed
08/21/2026
Objection raised — Other
08/17/2026
Filed — Alteration
Removal of three fuel oil storage tanks and replace with two tanks with related piping and pumps in cellar and change grade from #4 to #2 oil as per plans filed herewith.
M01422738-S1
08/12/2026
Filed — Alteration
Removal of three fuel oil storage tanks and replace with two tanks with related piping and pumps in cellar and change grade from #4 to #2 oil as per plans filed herewith.
M01422738-I1
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Merhige
06/25/2026
Special inspection requirement — Mechanical Systems
Ronald Merhige
06/25/2026
Special inspection requirement — Final
Ronald Merhige
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
06/25/2026
Special inspection requirement — Maintenance information
Ronald Merhige
12/16/2025
Signed off — Alteration
REPLACEMENT OF WATER COOLED CHILLER ON THE GROUND FLOOR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01262432-I1
11/21/2025
Permit issued — Mechanical Systems
M01262432-I1-MS
11/14/2025
Filed — Alteration
REPLACEMENT OF WATER COOLED CHILLER ON THE GROUND FLOOR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01262432-I1
07/28/2025
Special inspection requirement — Maintenance information
Vincent Liotta
07/28/2025
Special inspection requirement — Final
Vincent Liotta
07/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
07/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
07/28/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
07/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBoilermatic Welding Industries10/06/2026
DOB NOWMechanical SystemsSigned-offPower Cooling11/21/2025
BISPLISSUEDMetrocity Group01/22/2024
BISPLISSUEDNW Subsurface11/06/2019
BISOTISSUEDBoilermatic Welding Industries12/06/2018
BISOTISSUEDTurner Construction Company11/02/2018
BISPLISSUEDCardoza Plumbing10/16/2018
BISFBISSUEDBoilermatic Weldng Inds I10/09/2018
BISPLISSUEDNW Subsurface10/09/2018
BISOTISSUEDThe Rockefeller University10/31/2017
BISOTISSUEDTurner Construction Company10/31/2017
BISPLISSUEDCardoza Plumbing10/25/2017
BISSPISSUEDSirina Fire Protection01/05/2017
BISOTISSUEDTurner Construction Company11/17/2016
BISMHISSUEDTurner Construction Company11/17/2016
BISOTISSUEDTurner Construction Company11/17/2016
BISPLISSUEDCardoza Plumbing10/12/2016
BISOTISSUEDTurner Construction Company05/18/2016
BISPLISSUEDNW Subsurface05/12/2016
BISMHISSUEDBoilermatic Welding Industries04/29/2016
BISFBISSUEDRichards P&H Co11/24/2009
BISOTISSUEDBoilermatic Welding Industries11/23/2009
BISPLISSUEDRichards P and H Co11/23/2009
BISOTISSUEDCaldwell & Walsh Building Construction01/17/2007
BISMHISSUEDCaldwell & Walsh Building Construction01/17/2007
BISPLISSUEDCardoza11/16/2006
BISMHISSUEDCaldwell & Walsh Building Construction11/03/2006
BISOTISSUEDCaldwell & Walsh Building Construction11/03/2006
BISPLISSUEDOlympic Plumbing & Heating06/29/1992
BISOTISSUEDMorse Diesel International05/29/1992
BISOTISSUEDMorse Diesel International05/29/1992
BISMHISSUEDMorse Diesel International05/29/1992
BIS—ISSUEDLinear Abatmnt01/29/1992
1 project · most recent 10/20/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026Permit IssuedBoilermatic Welding IndustriesVentilation Systems
Ventilation
Greenheck Greenheck Model#QEI-12 900 CFM · Exhaust Fan ×1
Greenheck Model#SQ-100-VG 900 CFM · Exhaust Fan ×1
1 project · most recent 10/16/2019
General Wiring
FiledStatusContractorScope
10/16/2019CompleteA.T.J. Electrical CoGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/20/2026Masonryalon egozispecial
10/20/2026Sprayed fire-resistant materialsalon egozispecial
08/31/2026Finalalon egoziprogress
08/31/2026Structural Stability – Alterations of existing buildingsalon egozispecial
06/25/2026Fire-Resistant Penetrations and JointsRonald Merhigespecial
06/25/2026Mechanical SystemsRonald Merhigespecial
06/25/2026FinalRonald Merhigeprogress
06/25/2026Energy Code Compliance InspectionsRonald Merhigeprogress
06/25/2026Maintenance informationRonald Merhigeenergy_progress
07/28/2025Maintenance informationVincent Liottaenergy_progress
07/28/2025FinalVincent Liottaprogress
07/28/2025HVAC-R and service water heating equipmentVincent Liottaenergy_progress
07/28/2025HVAC-R and service water heating system controlsVincent Liottaenergy_progress
07/28/2025Mechanical SystemsVincent Liottaspecial
07/28/2025HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Rockefeller University Main CampusEducationCellar, Floor 1
Project M01422738 Alteration · Permit Entire · 08/12/2026
Project M01262432 Alteration · LOC Issued · 11/14/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026M01262432-I1Request digital key ↗
08/16/2026M01422738-S1Request digital key ↗
08/16/2026M01422738-I1Request digital key ↗
▸Applications & Permits52
▸BISWORK PERMIT APPLICATION29
01/23/2024122745654Open ↗
11/06/2019122745654Open ↗
12/07/2018122745654Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION23
01/23/2024122745654Open ↗
03/02/2020122745654Open ↗
02/27/2020122745654Open ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
11/14/2019122745654Open ↗
10/22/2019122745654Open ↗
10/15/2019122745654Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/01/2017123109741Open ↗
06/08/2016122779145Open ↗
05/24/2016122660593Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/22/2026M01422738-S2Open ↗
08/16/2026M01422738-S1Open ↗
08/16/2026M01422738-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026M01262432-I1Open ↗
09/23/2026M01262432-I1Open ↗
08/31/2026M01422738-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/01/2017123109741Open ↗
06/08/2016122779145Open ↗
05/03/2016122660593Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01262432-I1Open ↗
08/31/2026M01422738-I1Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
03/02/2020122745654Open ↗
02/27/2020122745654Open ↗
02/24/2020122745654Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
11/05/2010120169450Open ↗
11/05/2010120169450Open ↗
11/05/2010120169450Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/15/2010120169450Open ↗
08/24/2010120169450Open ↗
10/02/2009120169450Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/29/2016122745654Open ↗
10/02/2009120169450Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
03/29/2016122745654Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/01/2017123109741Open ↗
06/08/2016122779145Open ↗
05/24/2016122660593Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/22/2026M01422738-S2Open ↗
08/16/2026M01422738-S1Open ↗
08/16/2026M01422738-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
10/11/2017123109741Open ↗
05/02/2016122660593Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
10/23/2009120169450Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/22/2019122745654Open ↗
10/17/2016122660593Open ↗
10/07/2016122660593Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
09/30/2020122660593Open ↗
10/22/2019122745654Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/30/2020122660593Open ↗
▸Inspections & Test Reports3
▸BISMECHANICAL SYSTEMS2
02/20/2024122745654Open ↗
02/20/2024122745654Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/30/2020122660593Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/21/2024122745654Open ↗
09/30/2020122660593Open ↗
08/23/2019122779145Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
10/22/2026M01422738-S2Open ↗
08/16/2026M01422738-S1Open ↗
08/16/2026M01422738-I1Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
02/20/2024122745654Open ↗
02/20/2024122745654Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/02/2009120169450Open ↗
08/14/2009120132515Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/30/2019122745654Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT13
09/30/2020122660593Open ↗
08/23/2019122779145Open ↗
02/25/2019122779145Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/20/2024122745654Open ↗
▸Filing & Intake Forms25
▸BISBOROUGH INTAKE FORM9
03/02/2020122745654Open ↗
02/27/2020122745654Open ↗
02/24/2020122745654Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET9
06/14/2018123564678Open ↗
09/01/2017123109741Open ↗
01/30/2017122893949Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
06/12/2019122745654Open ↗
02/25/2019122779145Open ↗
10/09/2018122660593Open ↗
Showing 3 of 7 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
09/01/2017123109741Open ↗
01/30/2017122893949Open ↗
06/06/2016122779145Open ↗
Showing 3 of 6 on file for this type