| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01460848 | 222-05 56 AVENUE QUEENS | — | Permit Issued | — | 09/29/2026 | Design THE LIRO GROUP | Proposed installation of a new steam generator, a large heat exchanger supplied by the campus high-temperature hot water system. This unit i… |
| Q01219238 ↗ | 175-10 88 AVENUE QUEENS | Alteration | Permit Issued | 05/05/2025 | 06/12/2026 | Design LABELLA ASSOCIATES Owner DHS Filer MARTELL SOLUTIONS INC. | This project is for the legalization of an existing 660 MBH gas-fired hot water boiler. Existing boiler previously installed under LAA Q0037… |
| Q01272012 ↗ | 59-06 LAUREL HILL BLVD QUEENS | Alteration | Permit Issued | 10/08/2025 | 03/25/2026 | Design PURE POWER ENGINEERING, INC. Owner NYPD | Installation of new concrete piers in conjunction with the installation of steel to new solar power system on roof as per plans filed herewi… |
| Q01266292 ↗ | 59-06 LAUREL HILL BLVD QUEENS | Alteration | Permit Issued | 09/26/2025 | 03/13/2026 | Owner NYPD | Replacement of personnel doors and the upgrade of overhead garage door controls and the replacement and installation of new windows in desig… |
| Q01243804 ↗ | 59-06 LAUREL HILL BLVD QUEENS | Alteration | Permit Issued | 09/19/2025 | 11/06/2025 | Design RLM ENGINEERING PLLC Owner NYPD | Remove/cap in cellar existing hot water heater with related gas piping and gas meter and installing new water sanitary piping to new electri… |
| M01101657 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Permit Issued | 10/15/2024 | 11/03/2025 | Design LIZARDOS ENGINEERING Filer UPRIGHT EXPEDITERS, INC. | Northwell OLD MEETH Em Gen Project: installation/modification of mechanical infrastructure in conjunction with installation of new Emergency… |
| Name | Projects together | Most recent |
|---|---|---|
| RLM ENGINEERING PLLC | 3 | 06/23/2026 |
| Guth DeConzo Consulting Engineers | 2 | 11/05/2024 |
| LIZARDOS ENGINEERING | 2 | 02/27/2026 |
| NYC DEPARTMENT OF SANITATION | 2 | 10/14/2022 |
| RAMBOLL | 2 | 10/16/2024 |
| EAB ARCHITECTURAL DESIGNS, PLLC | 1 | 09/26/2025 |
| EME CONSULTING ENGINEERING GROUP | 1 | 02/25/2021 |
| KOUZMANOFF BAINTON ARCHITECTS | 1 | 10/16/2024 |
| LABELLA ASSOCIATES | 1 | 05/27/2026 |
| PURE POWER ENGINEERING, INC. | 1 | 04/23/2026 |
| SEAN P. CUNNINGHAM PE, PC | 1 | 04/23/2026 |
| THE LIRO GROUP | 1 | — |
| YSRAEL A. SEINUK, P.C. | 1 | 12/06/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| METROCITY GROUP,INC | 2 | 06/23/2026 |
| PARKVIEW P&H INC | 2 | 10/16/2024 |
| BOILERMATIC WELDNG INDS I | 1 | 05/27/2026 |
| BROSNA CONSTRUCTION CORPO | 1 | 10/16/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC DEPARTMENT OF SANITATION | 4 | 12/06/2022 |
| NYPD | 3 | 06/23/2026 |
| DAJIA US | 2 | 11/05/2024 |
| FORDHAM UNIVERSITY | 2 | 10/16/2024 |
| NORTHWELL HEALTH LENOX HILL HOSPITA | 2 | 02/27/2026 |
| COLLIERS TRI-STATE | 1 | 08/26/2022 |
| DHS | 1 | 05/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NYCCODE LLC | 3 | 10/16/2024 |
| METROPOLIS GROUP INC | 2 | 11/05/2024 |
| UPRIGHT EXPEDITERS, INC. | 2 | 02/27/2026 |
| MARTELL SOLUTIONS INC. | 1 | 05/27/2026 |
| WILLIAM VITACCO ASSOCIATES | 1 | 12/06/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01460848 | 222-05 56 AVENUE QUEENS | — | Permit Issued | — | 09/29/2026 | Design THE LIRO GROUP | Proposed installation of a new steam generator, a large heat exchanger supplied by the campus high-temperature hot water system. This unit i… |
| Q01219238 ↗ | 175-10 88 AVENUE QUEENS | Alteration | Permit Issued | 05/05/2025 | 06/12/2026 | Design LABELLA ASSOCIATES Owner DHS Filer MARTELL SOLUTIONS INC. | This project is for the legalization of an existing 660 MBH gas-fired hot water boiler. Existing boiler previously installed under LAA Q0037… |
| Q01272012 ↗ | 59-06 LAUREL HILL BLVD QUEENS | Alteration | Permit Issued | 10/08/2025 | 03/25/2026 | Design PURE POWER ENGINEERING, INC. Owner NYPD | Installation of new concrete piers in conjunction with the installation of steel to new solar power system on roof as per plans filed herewi… |
| Q01266292 ↗ | 59-06 LAUREL HILL BLVD QUEENS | Alteration | Permit Issued | 09/26/2025 | 03/13/2026 | Owner NYPD | Replacement of personnel doors and the upgrade of overhead garage door controls and the replacement and installation of new windows in desig… |
| Q01243804 ↗ | 59-06 LAUREL HILL BLVD QUEENS | Alteration | Permit Issued | 09/19/2025 | 11/06/2025 | Design RLM ENGINEERING PLLC Owner NYPD | Remove/cap in cellar existing hot water heater with related gas piping and gas meter and installing new water sanitary piping to new electri… |
| M01101657 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Permit Issued | 10/15/2024 | 11/03/2025 | Design LIZARDOS ENGINEERING Filer UPRIGHT EXPEDITERS, INC. | Northwell OLD MEETH Em Gen Project: installation/modification of mechanical infrastructure in conjunction with installation of new Emergency… |
| M01102545 ↗ | 222 EAST 64 STREET MANHATTAN | Alteration | Permit Issued | 10/15/2024 | 11/03/2025 | Design LIZARDOS ENGINEERING Filer UPRIGHT EXPEDITERS, INC. | Northwell New MEETH: Associated mechanical scope below roof in conjunction with Emergency Generator & Quick Connect Project, as per plans fi… |
| 122745654BIS | 590 EAST 68 STREET MANHATTAN | — | ISSUED | 04/29/2016 | 01/22/2024 | — | FB, MH, OT, PL |
| X00647690 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 05/12/2022 | 11/20/2023 | Design RAMBOLL Owner FORDHAM UNIVERSITY Filer NYCCODE LLC | Plumbing work associated with the installation of three new Boilers at the Theabud Hall, including the removal of the temp.gas piping to the… |
| M00342203 ↗ | 301 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2020 | 10/31/2023 | Owner DAJIA US Filer METROPOLIS GROUP INC | INSTALLATION OF CHP UNITS AND VENTILATION SYSTEMS IN THE CHP ROOM ON THE 6TH FLOOR AND ASSOCIATED ELECTRICAL DISTRIBUTION PANEL ON 7TH FLOOR… |
| X00539835 ↗ | 2540 BELMONT AVENUE BRONX | Alteration | Signed-off | 07/19/2021 | 10/31/2023 | Design RAMBOLL Owner FORDHAM UNIVERSITY Filer NYCCODE LLC | Plumbing scope associated with a new boiler room installation in the Cellar of the Faculty Memorial Hall (FMH). No change of use, egress or… |
| M00343495 ↗ | 301 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2020 | 08/28/2023 | Owner DAJIA US Filer METROPOLIS GROUP INC | BOILERS FILED UNDER SEPARATE APPLICATION. BOILERS ARE CONDENSING TYPE. THIS APPLICATION COVERS HW PIPING, FLUES, VENTILATION AND COMBUSTION … |
| B00695353 ↗ | SCHOLES STREET BROOKLYN | Alteration | Signed-off | 03/12/2022 | 02/01/2023 | Design NYC DEPARTMENT OF SANITATION | Remove current exhaust vents and install new exhaust vents per the requirements of the proposed condensing boiler at the BK4 facility. Relat… |
| Q08037675 ↗ | 30-04 121 STREET QUEENS | Alteration | Signed-off | 12/06/2022 | 12/13/2022 | Design YSRAEL A. SEINUK, P.C. | Filing structural work to repair of the openings in the first floor slab as per plan filed herewith. No change in use egress and occupancy. |
| M00777488 ↗ | 693 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/26/2022 | 09/13/2022 | Design RLM ENGINEERING PLLC Owner COLLIERS TRI-STATE | Filing for the registration of a 275KW back-up generator, (new 10 diesel header and related piping filed under M00783903) as per plans file… |
| B00694313 ↗ | SCHOLES STREET BROOKLYN | Alteration | Signed-off | 03/12/2022 | 09/09/2022 | Design NYC DEPARTMENT OF SANITATION | Remove current exhaust vents and install new exhaust vents per the requirements of the proposed condensing boiler at the BK1 facility. Relat… |
| 421691404BIS | 139-30 QUEENS BOULEVARD QUEENS | — | ISSUED | 11/08/2018 | 03/01/2022 | — | BL, OT, PL |
| Q00624476 ↗ | 75-05 DOUGLASTON PARKWAY QUEENS | Alteration | Signed-off | 11/15/2021 | 01/05/2022 | Design RLM ENGINEERING PLLC | Filing for the installation of two new exhaust fans on the roof and breeching in the cellar, and one combustion intake fan in the boiler roo… |
| X00468795 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Permit Issued | 02/25/2021 | 03/08/2021 | Filer NYCCODE LLC | installation of a new 300-ton water-cooled, centrifugal electric chiller to replace an existing as shown on plans filed herewith. no change … |
| 220363158BIS | 98 CO-OP CITY BOULEVARD BRONX | — | ISSUED | 10/14/2015 | 03/13/2020 | — | BL, FB, MH, OT, PL |
| 220426796BIS | 98 CO-OP CITY BOULEVARD BRONX | — | ISSUED | 06/20/2016 | 02/06/2020 | — | OT |
| 220390707BIS | 98 CO-OP CITY BOULEVARD BRONX | — | ISSUED | 10/14/2015 | 01/31/2020 | — | OT |
| 220529060BIS | 98 CO-OP CITY BOULEVARD BRONX | — | ISSUED | 09/29/2016 | 01/31/2020 | — | OT |
| 122543202BIS | 4035 10 AVENUE MANHATTAN | — | ISSUED | 05/29/2019 | 05/29/2019 | — | MH |
| 122530449BIS | 25 WEST 52 STREET MANHATTAN | — | ISSUED | 09/06/2016 | 09/06/2016 | — | MH |
| 420910170BIS | 19-25 SEAGIRT BOULEVARD QUEENS | — | ISSUED | 11/22/2013 | 07/25/2014 | — | MH, PL |
| 420910161BIS | 155 BEACH 19 STREET QUEENS | — | ISSUED | 11/15/2013 | 11/22/2013 | — | MH, PL |
| 120169450BIS | 590 EAST 68 STREET MANHATTAN | — | ISSUED | 11/23/2009 | 11/24/2009 | — | FB, OT, PL |
| Building | Filings | Most Recent |
|---|---|---|
| 222-05 56 AVENUE ↗ | 1 | 09/30/2026 |
| 301 PARK AVENUE ↗ | 11 | 07/08/2026 |
| 441 EAST FORDHAM ROAD ↗ | 3 | 07/08/2026 |
| SCHOLES STREET ↗ | 3 | 07/08/2026 |
| 75-05 DOUGLASTON PARKWAY ↗ | 1 | 07/08/2026 |
| 693 5 AVENUE ↗ | 1 | 07/08/2026 |
| 2540 BELMONT AVENUE ↗ | 3 | 07/08/2026 |
| 59-06 LAUREL HILL BLVD ↗ | 7 | 07/08/2026 |
| 222 EAST 64 STREET ↗ | 5 | 07/08/2026 |
| 175-10 88 AVENUE ↗ | 1 | 04/09/2026 |
| 441 EAST FORDHAM ROAD ↗ | 2 | 03/21/2026 |
| 30-04 121 STREET ↗ | 2 | 03/21/2026 |
| 208 EAST 64 STREET ↗ | 4 | 03/21/2026 |