Office with commercial, 7-19 stories
121 EAST 24TH STREET
MANHATTAN · Gramercy · BIN 1018069
💬 Discuss this project
1913Year Built
12Stories
O6Building Class
C6-2AZoning
58,744 sfGross Floor Area
18Units
LL97 Covered1 Active Violation 1 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 121 East 24th Street · 4,938 sf lot · 11.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofImprov AsylumUnder Construction3p · 3 filings · 20 docs
Floor 1Improv Asylum, Asylum NYCUnder Construction53p · 2 filings · 20 docs
MezzanineImprov Asylum, Asylum NYCUnder Construction59p · 2 filings · 20 docs
CellarImprov Asylum, Asylum NYCUnder Construction66p · 2 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed4p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Adams & Co. Real Estate4003/21/2026
Kofler Associates2103/21/2026
Adams & Company1103/21/2026
121 East 24th Street103/22/2026
23 R.P. Associates103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2023$5.8M—T24P LLC → 121 EAST 24TH STREET LLC$100/sf building
12/11/2020$4.0M—THE LFS LLC → AC 121 W 24 2020 LLC$68/sf building
11/09/2020$4.0M—— → —$68/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Violation Solutions1603/21/2026
Municipal Building Consultants103/21/2026
Hierarch-E203/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tomchris ContractingGeneral Contractor907/08/2026
Big Orange Safety FirstGeneral Contractor407/08/2026
Mazza ElectricElectrical403/21/2026
Anthony G FerryElectrical203/21/2026
Pofi ConstructionGeneral Contractor203/21/2026
Central ElevatorElectrical203/21/2026
Schondorf MichaelElectrical103/21/2026
Anthony G FerryElectrical103/22/2026
Rockledge ScaffoldScaffold107/08/2026
Matros Automated ElectricalElectrical103/22/2026
Centennial Elevator IndustriesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544609/10/2024
Paradigm Architecture5931105/11/2023
Building Lifecycle
All (177)Filed (12)Permit Issued (11)Signed Off (2)Facade (FISP) (15)Violation (55)Objection (53)Special Inspection (29)
09/16/2026
Permit issued — Suspended Scaffold
M01412879-I1-SC
06/05/2026
Filed — Alteration
M01412879-I1
12/02/2024
Objection resolved — Resolved
12/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
12/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
12/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
09/26/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
09/26/2024
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
09/26/2024
Special inspection requirement — Final
EUGENE BIFULCO
09/26/2024
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
09/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
09/26/2024
Special inspection requirement — Footing and Foundation
EUGENE BIFULCO
09/26/2024
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
09/26/2024
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
09/20/2024
Objection resolved — Addressed
09/19/2024
Objection raised — Other
09/10/2024
Filed — Alteration
Architectural modifications to existing theatre space as per plans. No change to use, egress or occupancy.
M00900060-P2
09/03/2024
Objection resolved — Addressed
09/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/03/2024
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
09/03/2024
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
09/03/2024
Special inspection requirement — Lighting controls
EUGENE BIFULCO
09/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
08/29/2024
Filed — Alteration
Architectural modifications to existing theatre space as per plans. No change to use, egress or occupancy.
M00900060-P1
08/29/2024
Objection raised — Other
08/19/2024
Permit issued — Structural
M00900060-S2-GC-CX
08/19/2024
Permit issued — General Construction
M00900060-I1-GC
08/07/2024
Permit issued — General Construction
M00882664-I1-GC
07/22/2024
Objection raised — Other
07/22/2024
Objection resolved — Addressed
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
07/18/2024
Filed — Alteration CO
ALT CDO FILED TO SUPERCEDE ALT 1 # 101929497 TO ESTABLISH THEATRE USE IN CELLAR, 001 & MEZZ AS PER PLANS. INTERIOR FITOUT WORK FILED UNDER TENANT APPLICATIONS M00900060 & PA # 102061439.
M00882664-P1
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/15/2024
Filed — Alteration CO
ALT CDO FILED TO SUPERCEDE ALT 1 # 101929497 TO ESTABLISH THEATRE USE IN CELLAR, 001 & MEZZ AS PER PLANS. INTERIOR FITOUT WORK FILED UNDER TENANT APPLICATIONS M00900060 & PA # 102061439.
M00882664-S1
04/15/2024
Filed — Alteration CO
ALT CDO FILED TO SUPERCEDE ALT 1 # 101929497 TO ESTABLISH THEATRE USE IN CELLAR, 001 & MEZZ AS PER PLANS. INTERIOR FITOUT WORK FILED UNDER TENANT APPLICATIONS M00900060 & PA # 102061439.
M00882664-S2
04/15/2024
Objection raised — Inspections
04/15/2024
Objection raised — Scope
04/15/2024
Objection raised — Structural
04/15/2024
Objection raised — Energy
04/15/2024
Objection raised — Inspections
04/15/2024
Objection raised — Structural
04/15/2024
Objection raised — Structural
04/15/2024
Objection raised — Inspections
04/03/2024
Objection resolved — Addressed
03/21/2024
Permit issued — Suspended Scaffold
M01020187-I1-SC
03/20/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/19/2024
Filed — Alteration
M01020187-I1
01/26/2024
Special inspection requirement — Final
01/26/2024
Special inspection requirement — Mechanical Systems
01/26/2024
Special inspection requirement — Sprinkler Systems
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration09/16/2026
DOB NOWStructuralPermit IssuedTomchris Contracting08/19/2024
DOB NOWGeneral ConstructionPermit IssuedTomchris Contracting08/19/2024
DOB NOWGeneral ConstructionPermit IssuedTomchris Contracting08/07/2024
DOB NOWSuspended ScaffoldPermit IssuedC.C.C. Renovation03/21/2024
DOB NOWGeneral ConstructionPermit IssuedTomchris Contracting10/10/2023
DOB NOWGeneral ConstructionPermit IssuedTomchris Contracting10/10/2023
DOB NOWGeneral ConstructionPermit IssuedBig Orange Safety First09/15/2023
DOB NOWGeneral ConstructionPermit IssuedBig Orange Safety First08/03/2023
DOB NOWSidewalk ShedSigned-offRockledge Scaffold07/18/2023
DOB NOWGeneral ConstructionSigned-offPofi Construction05/15/2023
BISMHISSUEDIdk Cooling08/10/2018
BISOTISSUEDTech-Nel Electric09/16/2016
BISOTISSUEDTech-Nel Electric05/20/2016
BISMHISSUEDIdk Cooling04/06/2016
BISSPISSUEDM&T Plumbing and Heating Co11/25/2015
BISOTISSUEDAtlas Welding & Boiler Repair09/09/2015
BISPLISSUEDCasa Mechanical Co09/09/2015
BISFSISSUEDBryan A. Ennist06/11/2015
BISOTISSUEDCentury Waste Services02/10/2015
BISMHISSUEDEmcor Services NY/NJ06/11/2014
BISSPISSUEDM&T Plumbing and Heating Co02/03/2014
BISOTISSUEDCentury Waste Services11/20/2013
BISEQISSUEDRockledge Scaffold04/24/2013
BISMHISSUEDEmcor Services NY/NJ12/20/2012
BISSPISSUEDM&T Plumbing and Heating Co11/29/2012
BISPLISSUEDPlumbing P & H10/16/2012
BISOTISSUEDBellis Construction10/04/2012
BISMHISSUEDBellis Construction10/04/2012
BISOTISSUEDW5 Group01/18/2012
BISMHISSUEDEmcor Services NY/NJ12/01/2011
BISMHISSUEDSweeney & Harkin Carp. & DR05/20/2011
BISOTISSUEDSweeney & Harkin Carp. & DR05/20/2011
BISOTISSUEDKoenig Iron Works02/03/2011
BISPLISSUEDJ.G. Plumbing & Heating09/28/2010
BIS—ISSUEDKguk09/24/2010
BISOTISSUEDKguk09/17/2010
BISOTISSUEDBci Communications09/08/2010
BISMHISSUEDEmcor Services NY/NJ07/01/2009
BISMHISSUEDGotham Air Conditioning08/27/2007
+ 21 more permits on file
1 project · most recent 07/18/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/18/2024Permit IssuedTomchris ContractingHeating and Air Conditioning Systems
Heat / Cool
Lg LG ARNU153TAA4 17 BTU · Vrf Indoor ×5
LG ARUM096BTE5 96 BTU · Vrf Outdoor ×1
LG ARNU183M2A4 19 BTU · Vrf Indoor ×1
1 project · most recent 07/18/2024
Sprinkler System
FiledStatusContractorScope
07/18/2024——Sprinkler System
1 project · most recent 07/18/2024
Water/Sanitary
FiledStatusContractorScope
07/18/2024——Water/Sanitary
3 projects · most recent 06/08/2023
General Wiring
FiledStatusContractorScope
06/08/2023CompleteAnthony G Ferry—
05/03/2023CompleteMatros Automated Electrical1 meters, 1 new_meters
01/22/2018Permit IssuedHY-Lee Electric CoGeneral Wiring
1 project · most recent 09/10/2024
Steel Concrete
FiledStatusContractorScope
09/10/2024Permit IssuedTomchris ContractingSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/02/2024HVAC-R and service water piping design and insulation—energy_progress
12/02/2024HVAC-R and service water heating equipment—energy_progress
12/02/2024HVAC-R and service water heating system controls—energy_progress
09/26/2024Post-installed AnchorsEUGENE BIFULCOspecial
09/26/2024Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
09/26/2024FinalEUGENE BIFULCOprogress
09/26/2024Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
09/26/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
09/26/2024Footing and FoundationEUGENE BIFULCOprogress
09/26/2024Structural Steel - WeldingEUGENE BIFULCOspecial
09/26/2024Structural Steel - DetailsEUGENE BIFULCOspecial
09/03/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/03/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
09/03/2024Interior lighting powerEUGENE BIFULCOenergy_progress
09/03/2024Lighting controlsEUGENE BIFULCOenergy_progress
09/03/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
07/22/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/22/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
07/11/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/11/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
04/23/2024Fire-Resistant Penetrations and Joints—special
01/26/2024Final—progress
01/26/2024Mechanical Systems—special
01/26/2024Sprinkler Systems—special
05/11/2023MasonryAnthony Addessospecial
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Asylum NYCArts / Culture / EntertainmentCellar, Floor 1, Mezzanine
Project M00882664 Alteration CO · Permit Entire · 07/25/2023
Improv AsylumArts / Culture / EntertainmentCellar, Floor 1, Mezzanine
Project M00900060 Alteration · Permit Entire · 07/13/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 366 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026M00865742-I1Request digital key ↗
08/29/2026M00887437-I1Request digital key ↗
08/29/2026M00900060-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits59
▸BISWORK PERMIT APPLICATION30
08/10/2018123478673Open ↗
09/29/2016122736049Open ↗
05/27/2016122736049Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION29
02/17/2022102686853Open ↗
08/26/2021103682926Open ↗
08/06/2018123478673Open ↗
Showing 3 of 29 on file for this type
▸Seals & Professional Certifications102
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
09/17/2018123478673Open ↗
09/17/2018123478673Open ↗
08/06/2018123478673Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
08/06/2018123478673Open ↗
04/14/2016122727656Open ↗
02/04/2015122256904Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
12/24/2012121468615Open ↗
09/27/2012121380344Open ↗
09/25/2012121381110Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/29/2026M00887437-I1Open ↗
08/29/2026M00900060-I1Open ↗
08/29/2026M00900060-S2Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/06/2018123478673Open ↗
04/14/2016122727656Open ↗
09/08/2015140399432Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00900060-S2Open ↗
09/01/2026M00900060-I1Open ↗
09/01/2026M00900060-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00900060-S2Open ↗
09/01/2026M00900060-I1Open ↗
08/28/2026M00882664-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/08/2015140399432Open ↗
06/11/2015140359350Open ↗
04/24/2013140071632Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/08/2015140399432Open ↗
06/11/2015140359350Open ↗
04/24/2013140071632Open ↗
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING10
09/08/2015140399432Open ↗
11/22/2013121846994Open ↗
11/26/2012121380344Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS6
09/17/2018123478673Open ↗
08/04/2014121977548Open ↗
01/04/2013121468615Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
09/17/2018123478673Open ↗
07/25/2016122727656Open ↗
08/04/2014121977548Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
12/29/2015121380344Open ↗
03/12/2013121381110Open ↗
12/04/2012121381110Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
09/08/2015140399432Open ↗
06/11/2015140359350Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/04/2015122256904Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
12/29/2015121380344Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026M00882664-P1Open ↗
08/13/2026M00882664-I1Open ↗
08/13/2026M00882664-P2Open ↗
▸Environmental & Asbestos32
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
08/06/2018123478673Open ↗
05/12/2016122736049Open ↗
04/14/2016122727656Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/29/2026M00900060-I1Open ↗
08/29/2026M00900060-S2Open ↗
08/15/2026M00900060-P2Open ↗
Showing 3 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
08/06/2018123478673Open ↗
05/15/2017122736049Open ↗
05/12/2017140399432Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
09/17/2018123478673Open ↗
05/15/2017122736049Open ↗
05/12/2017140399432Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/08/2015140399432Open ↗
06/11/2015140359350Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/08/2015140399432Open ↗
06/11/2015140359350Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/08/2015140399432Open ↗
06/11/2015140359350Open ↗
04/24/2013140071632Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
02/16/2022102686853Open ↗
02/15/2022102133932Open ↗
09/17/2018123478673Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
06/27/2014121977548Open ↗
12/24/2012121468615Open ↗
09/27/2012121380344Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/17/2018123478673Open ↗
05/12/2017140399432Open ↗
05/03/2017140359350Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT32
09/17/2018123478673Open ↗
08/06/2018123478673Open ↗
05/15/2017122736049Open ↗
Showing 3 of 32 on file for this type
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET15
08/06/2018123478673Open ↗
05/11/2016122736049Open ↗
04/14/2016122727656Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION6
04/04/2016140359350Open ↗
04/04/2016140399432Open ↗
02/01/2016140359350Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/08/2015140399432Open ↗
06/11/2015140359350Open ↗
04/24/2013140071632Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
09/17/2018123478673Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/13/2026M00882664-P2Open ↗
08/13/2026M00882664-P1Open ↗
08/13/2026M00882664-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification1
08/16/2026M01412879-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01020187-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01020187-I1Open ↗