Predominantly retail with other uses
121 LENOX AVENUE
MANHATTAN · BIN 1057405
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R7-2Zoning
51,072 sfGross Floor Area
2Units
LL97 Covered5 Open Violations 3 unresolved · 2 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · 20,022 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 1 filing · 19 docs
Floor 2Under Construction27p · 4 filings · 20 docs
Floor 1Under Construction44p · 3 filings · 20 docs
Cellar1p · 1 filing · 6 docs
Sub-BasementUnder Construction17p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEBSTER ASSOCIATES4009/13/2026
DEMOCRACY PREP HARLEM MIDDLE SCHOOL607/08/2026
101-115 WEST 116TH STREET103/22/2026
THE OWNER OF103/22/2026
101-115 W 116 ST. CORP.703/22/2026
101-115 WEST 116 ST REALTY703/22/2026
101-115 WEST 116 CORP103/22/2026
101-115 W 116 ST RLTY COR103/22/2026
OWNER OF 101 WEST 116 STR103/22/2026
OWNER OF PIONEER SUPERMAR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J PROFESSIONAL EXPEDITING COMPANY803/21/2026
JM ZONING, LLC.1003/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
VMARCHDESIGN403/21/2026
VAA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A#1 ACE GENERAL CONTRACTOGeneral Contractor603/21/2026
TOM RECTENWALD CONSTRUCTIGeneral Contractor407/08/2026
PASQUALE QUARATINO INCPlumbing307/08/2026
SIGNSTAR NYCScaffold208/20/2026
JOSEPH WEINSTEIN ELECTRICElectrical203/22/2026
ALLSTATE CONSTRUCTION & RGeneral Contractor207/08/2026
PROCIDA CONSTRUCTION CORP.General Contractor204/09/2026
LUIS JIMENEZElectrical103/21/2026
MCCLARIN, LEROYElectrical103/21/2026
MOORE, JOHNElectrical103/21/2026
PARKER, ALLISTERElectrical103/21/2026
ZVI GELBElectrical103/21/2026
AMENDOLA, ANTONIOElectrical103/21/2026
FIREQUEST CORPFire Protection109/09/2026
CS BRIDGE CORPGeneral Contractor107/08/2026
UNITY CONSTR. SVCS INCGeneral Contractor107/08/2026
ADRIANO PLMBG & HTG CORPPlumbing107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
MILLER PLBG & HTG INCPlumbing107/08/2026
ADRIANO PLUMBING & HEATINGFire Protection107/08/2026
ASTRO ELECL CONTNG INCElectrical103/22/2026
DI FUSCO, VITTORIOElectrical103/21/2026
DONOHUE, MICHAELElectrical103/21/2026
JIMENEZ LUISElectrical103/21/2026
JOHN MOOREElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WHITESTONE ASSOCIATES ENG8144404/03/2026
HALO ARCHITECTURE PLLC8021403/06/2026
C.M. TESTING LABORATORY,1352312/16/2025
BENAZZI ENGINEERING, PC5603307/01/2022
Building Lifecycle
All (186)Filed (26)Permit Issued (22)Signed Off (8)Violation (60)Inspection (13)Objection (27)Special Inspection (30)
09/08/2026
Permit issued — Sprinklers
M01377356-S4-EW-SP
08/19/2026
Permit issued — Sign
M01431267-I1-SG
08/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2026
Permit issued — Sign
M01378980-I1-SG
08/07/2026
Filed — Alteration
Filing plans herewith for the installation of a temporary construction fence. No change to use, egress, or occupancy.
M01378976-P1
07/31/2026
Special inspection requirement — Final
Mudar Khantamr
07/21/2026
Filed — Alteration
Filing herewith installation of building signage as indicated on plans. No change to use, egress, or occupancy.
M01378980-P1
07/21/2026
Filed — Alteration
Filing herewith installation of building signage as indicated on plans. No change to use, egress, or occupancy.
M01431267-I1
07/20/2026
Special inspection requirement — Final
Mudar Khantamr
07/08/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/06/2026
Permit issued — Plumbing
M01377356-S3-PL
06/26/2026
Permit issued — Construction Fence
M01378976-I1-FN
06/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/25/2026
Objection resolved — Addressed
06/24/2026
Objection raised — Other
06/24/2026
Objection resolved — Addressed
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
06/11/2026
Permit issued — General Construction
M01377356-I1-GC
06/11/2026
Permit issued — Mechanical Systems
M01377356-S2-MS
06/11/2026
Permit issued — Structural
M01377356-S1-ST
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2026
Filed — Alteration
Filing herewith installation of building signage as indicated on plans. No change to use, egress, or occupancy.
M01378980-I1
05/14/2026
Objection raised — Other
05/13/2026
Filed — Alteration
Filing plans herewith for the installation of a temporary construction fence. No change to use, egress, or occupancy.
M01378976-I1
04/22/2026
Signed off — Alteration
Propose to modify plumbing and sprinkler as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
M00447430-I1
04/16/2026
Objection raised — Plumbing
04/16/2026
Objection raised — Plumbing
04/16/2026
Objection raised — Inspections
04/09/2026
Objection raised — Other
04/08/2026
Objection raised — Scope
04/03/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-S1
04/01/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-S2
04/01/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-S3
03/31/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-I1
03/30/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Mudar Khantamr
03/30/2026
Special inspection requirement — Subgrade Inspections
Mudar Khantamr
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
03/30/2026
Special inspection requirement — Maintenance information
Mudar Khantamr
03/30/2026
Special inspection requirement — Shutoff dampers
Mudar Khantamr
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Mudar Khantamr
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Mudar Khantamr
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
03/30/2026
Special inspection requirement — Masonry
Mudar Khantamr
03/30/2026
Special inspection requirement — Post-installed Anchors
Mudar Khantamr
03/30/2026
Special inspection requirement — Structural Cold-Formed Steel
Mudar Khantamr
03/24/2026
Special inspection requirement — Final
Mudar Khantamr
03/24/2026
Special inspection requirement — Final
Mudar Khantamr
03/24/2026
Special inspection requirement — Structural Steel - Details
Mudar Khantamr
03/24/2026
Special inspection requirement — Mechanical Systems
Mudar Khantamr
03/13/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01321545-I1
03/13/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01321545-S1
03/09/2026
Permit issued — General Construction
M01321549-I1-GC
03/09/2026
Permit issued — General Construction
M01321545-I1-GC
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
03/09/2026
Special inspection requirement — Final
Hanli Liu
03/06/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01321545-P1
01/01/2026
Special inspection requirement — Sprinkler Systems
JOHN SEMIOLI
12/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedFIREQUEST CORP09/08/2026
DOB NOWSignPermit IssuedSIGNSTAR NYC08/19/2026
DOB NOWSignPermit IssuedSIGNSTAR NYC08/12/2026
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR07/06/2026
DOB NOWConstruction FencePermit IssuedTOM RECTENWALD CONSTRUCTI06/26/2026
DOB NOWGeneral ConstructionPermit IssuedTOM RECTENWALD CONSTRUCTI06/11/2026
DOB NOWMechanical SystemsPermit IssuedTOM RECTENWALD CONSTRUCTI06/11/2026
DOB NOWStructuralPermit IssuedTOM RECTENWALD CONSTRUCTI06/11/2026
DOB NOWGeneral ConstructionPermit IssuedPROCIDA CONSTRUCTION CORP.03/09/2026
DOB NOWGeneral ConstructionSigned-offPROCIDA CONSTRUCTION CORP.03/09/2026
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC12/15/2025
DOB NOWPlumbingSigned-offPASQUALE QUARATINO INC11/28/2023
DOB NOWPlumbingSigned-offPASQUALE QUARATINO INC04/25/2023
DOB NOWPlumbingSigned-offPASQUALE QUARATINO INC08/16/2022
DOB NOWGeneral ConstructionSigned-offUNITY CONSTR. SVCS INC08/01/2022
DOB NOWGeneral ConstructionSigned-offALLSTATE CONSTRUCTION & R05/23/2022
DOB NOWGeneral ConstructionSigned-offALLSTATE CONSTRUCTION & R03/30/2022
DOB NOWGeneral ConstructionSigned-offA#1 ACE GENERAL CONTRACTO03/25/2022
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP03/14/2022
DOB NOWGeneral ConstructionSigned-offA#1 ACE GENERAL CONTRACTO10/08/2021
DOB NOWPlumbingSigned-offADRIANO PLUMBING & HEATIN03/03/2021
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP02/08/2021
BIS—ISSUEDSARDAR RESTORATION CORP10/15/2025
BISPLISSUEDPASQUALE QUARATINO INC07/17/2025
BIS—ISSUEDSARDAR RESTORATION CORP04/02/2025
BISPLISSUEDPASQUALE QUARATINO INC01/07/2025
BISPLISSUEDPASQUALE QUARATINO INC09/27/2023
BISPLISSUEDPASQUALE QUARATINO INC09/27/2023
BISPLISSUEDPASQUALE QUARATINO INC09/27/2023
BISPLISSUEDPASQUALE QUARATINO INC09/27/2023
BISPLISSUEDPASQUALE QUARATINO INC09/27/2023
BISPLISSUEDPASQUALE QUARATINO INC03/07/2023
BIS—ISSUEDALLSTATE CONSTRUCTION & R07/19/2022
BIS—ISSUEDALLSTATE CONSTRUCTION & R06/14/2022
BIS—ISSUEDALLSTATE CONSTRUCTION & R06/14/2022
BISPLISSUEDPASQUALE QUARATINO INC12/22/2021
BISPLISSUEDPASQUALE QUARATINO INC12/22/2021
BISPLISSUEDPASQUALE QUARATINO INC12/22/2021
BISPLISSUEDPASQUALE QUARATINO INC12/22/2021
BISPLISSUEDPASQUALE QUARATINO INC12/22/2021
+ 32 more permits on file
1 project · most recent 04/03/2026
Heating and Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/03/2026Permit IssuedTOM RECTENWALD CONSTRUCTIHeating and Air Conditioning Systems, Others, Ventilation Systems
Heat / Cool
Mitsubishi Electric TPEFYP054MA144A 60,000 BTU · Vrf Indoor ×4
TPEFYP072MH140A 80,000 BTU · Fan Coil Indoor ×1
Accurex XID-7-VG 600 CFM · Exhaust Fan ×1
Captiveaire CAS-HVAC3-E.902-24-20T-DOAS 3,255 CFM · Doas ×1
Ventilation
Accurex XUEF-4 575 CFM · Exhaust Fan ×2
XID-7-VG 100 CFM · Exhaust Fan ×1
XUEF-13 1,350 CFM · Exhaust Fan ×1
Other
Mitsubishi Electric TURYE2883BN41AN 320,000 BTU · Vrf Outdoor ×1
1 project · most recent 04/03/2026
Sprinkler System
FiledStatusContractorScope
04/03/2026Permit IssuedFIREQUEST CORPSprinkler System
1 project · most recent 04/03/2026
Water/Sanitary
FiledStatusContractorScope
04/03/2026Permit IssuedJ. CAIAZZO PLBG & HTG CORWater/Sanitary
13 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026Permit IssuedKAMP ELECTRIC LLCGeneral Wiring
07/11/2026Permit IssuedLEBO ELECTRIC LLCGeneral Wiring
05/19/2026Permit IssuedAMR ELEC'L CONTRG CORPGeneral Wiring
12/31/2025Permit IssuedJOSEPH WEINSTEIN ELECTRIC1 meters
12/31/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/31/2025Permit IssuedJOSEPH WEINSTEIN ELECTRIC2 meters
12/31/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/02/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/02/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/02/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/02/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
11/28/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/19/2022CompleteASTRO ELECL CONTNG INC—
1 project · most recent 04/03/2026
Steel Concrete Wood
FiledStatusContractorScope
04/03/2026Permit IssuedFIREQUEST CORPSteel, Concrete, Wood
1 project · most recent 08/07/2026
Fence
FiledStatusContractorScope
08/07/2026Permit IssuedTOM RECTENWALD CONSTRUCTIFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2026Pass-Final PL - UndergroundPassView ↗
06/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/11/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/04/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/31/2026FinalMudar Khantamrprogress
07/20/2026FinalMudar Khantamrprogress
06/19/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
03/30/2026Subsurface Conditions – Fill Placement & In-Place DensityMudar Khantamrspecial
03/30/2026Subgrade InspectionsMudar Khantamrspecial
03/30/2026HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
03/30/2026Maintenance informationMudar Khantamrenergy_progress
03/30/2026Shutoff dampersMudar Khantamrenergy_progress
03/30/2026Duct leakage testing, insulation and designMudar Khantamrenergy_progress
03/30/2026HVAC-R and service water heating equipmentMudar Khantamrenergy_progress
03/30/2026HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
03/30/2026MasonryMudar Khantamrspecial
03/30/2026Post-installed AnchorsMudar Khantamrspecial
03/30/2026Structural Cold-Formed SteelMudar Khantamrspecial
03/24/2026FinalMudar Khantamrprogress
03/24/2026FinalMudar Khantamrprogress
03/24/2026Structural Steel - DetailsMudar Khantamrspecial
03/24/2026Mechanical SystemsMudar Khantamrspecial
03/09/2026Fire-Resistance Rated ConstructionHanli Liuprogress
03/09/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
03/09/2026FinalHanli Liuprogress
01/01/2026Sprinkler SystemsJOHN SEMIOLIspecial
11/19/2025Fenestration and door U-factor and product ratingsHanli Liuenergy_progress
11/19/2025Fenestration areasHanli Liuenergy_progress
11/19/2025PreliminaryHanli Liuprogress
Latest 25 of 39.
▾Documents — 847 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch21
09/03/2026M00573560-I1Request digital key ↗
09/02/2026M00691429-I1Request digital key ↗
09/02/2026M00766078-S1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/20/2026M00447430-P2Request digital key ↗
08/20/2026M00447430-I1Request digital key ↗
08/15/2026M00447430-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/20/2026M00447430-P2Request digital key ↗
08/20/2026M00447430-I1Request digital key ↗
08/15/2026M00447430-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
09/02/2026M00757549-I1Request digital key ↗
09/02/2026M00757549-P1Request digital key ↗
▸Applications & Permits248
▸BISPLAN / WORK APPROVAL APPLICATION163
10/15/2025102561577Open ↗
04/02/2025100436798Open ↗
02/07/2025100436798Open ↗
Showing 3 of 163 on file for this type
▸BISWORK PERMIT APPLICATION73
04/02/2025100436798Open ↗
03/26/2025100436798Open ↗
09/27/2023102561577Open ↗
Showing 3 of 73 on file for this type
▸BISPLACE OF ASSEMBLY11
01/21/2025123550629Open ↗
01/21/2025123550610Open ↗
Showing 2 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications106
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/03/2026M00573560-I1Open ↗
09/03/2026M00573560-P1Open ↗
09/02/2026M00691429-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M00766078-I1Open ↗
09/01/2026M01377356-S2Open ↗
09/01/2026M01377356-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01377356-S4Open ↗
09/01/2026M00766078-I1Open ↗
09/01/2026M01377356-S2Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment85
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE32
10/04/2022103093484Open ↗
10/04/2022101930644Open ↗
02/11/2022100436798Open ↗
Showing 3 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING25
10/15/2025102561577Open ↗
05/31/2024102561577Open ↗
05/07/2024101009249Open ↗
Showing 3 of 25 on file for this type
▸BISEQUIPMENT USE PERMITS22
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
Showing 3 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/20/2026M01321545-P1Open ↗
08/20/2026M01321545-S1Open ↗
08/20/2026M01321545-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/05/2022100436798Open ↗
08/05/2022100436798Open ↗
Showing 2 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEMERGENCY LIGHTING - PA1
12/17/2024123550629Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY12
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
Showing 2 of 12 on file for this type
▸BISLetter to Change Work Order (Prior to Inspection)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-012
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
▸BIS* SOIL BEARING PRESSURE (AI-1) 27-6781
02/01/2023101930644Open ↗
▸BIS* WELDING 27-6161
02/01/2023101930644Open ↗
▸Approvals, Objections & Sign-offs135
▸BISLETTERS - SUPPORTING DOCUMENTATION44
04/02/2025100436798Open ↗
09/27/2023102561577Open ↗
09/27/2023102561577Open ↗
Showing 3 of 44 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
10/08/2025101009249Open ↗
03/01/2024102096535Open ↗
11/02/2023104555312Open ↗
Showing 3 of 35 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE26
10/11/2023100436798Open ↗
10/06/2023100436798Open ↗
09/29/2023100436798Open ↗
Showing 3 of 26 on file for this type
▸BISSUPERSEDING LETTER23
04/02/2025100436798Open ↗
06/15/2022103093484Open ↗
06/15/2022100436798Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISANSUL SYSTEM SIGNOFF1
12/17/2024123550629Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
02/01/2023101930644Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸Filing & Intake Forms150
▸BISBOROUGH INTAKE FORM85
03/07/2023100967116Open ↗
03/01/2023100967116Open ↗
Showing 2 of 85 on file for this type
▸BISADDITIONAL INFORMATION53
12/17/2024102561577Open ↗
12/17/2024102561577Open ↗
03/15/2024102561577Open ↗
Showing 3 of 53 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00757549-P1Open ↗
08/16/2026M00757550-P2Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BIS* FIRE STOPS 27-3452
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7792
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
▸BISTCO - Supporting Documents1
01/12/2023100436798Open ↗
▸BIS* * VENTILATION / AIR CONDITIONING1
02/01/2023101930644Open ↗
▸BIS* HIGH STRENGTH BOLTS TABLE 10-21
02/01/2023101930644Open ↗