← Back
Elevator cooperative
1212 OCEAN AVENUE
BROOKLYN · BIN 3179159
💬 Discuss this project
1925Year Built
6Stories
D4Building Class
R7AZoning
48,700 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized51 Open Violations 44 unresolved · 7 paperwork only ▸FDNY Report ↗
Elevator cooperative · Owner of record: 1212 OCEAN AVE HDFC INC · 10,150 sf lot · 4.8 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 61p · 1 filing · 6 docs
Floor 5Under Construction1p · 1 filing · 5 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOTAL NY CONSTRUCTION707/08/2026
FINGER MANAGEMENT1607/08/2026
TRIERA CONTRACTING INC503/22/2026
1212 OCEAN AV HPFC INC.2203/22/2026
1212 OCEAN AVE HDFC INC 1303/22/2026
1212 HDFC INC103/22/2026
ROYAL CONSTRUCTION ASSOCI103/22/2026
1212 OCEAN AVE.H.H.F.C.CO103/22/2026
1212 OCEAN AV HOSE DR103/22/2026
1212 OCEAN AVAE HOUSE DV103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEY ASSOCIATES103/02/2026
SERDAR CEYLAN ARCHITECT, PC103/06/2025
NEW YORK ENGINEERING ASSOC., P.C.306/11/2021
ROYAL ENGINEERING, P.C207/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING303/21/2026
M W EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DC BUILDING SERVICES INCPlumbing407/08/2026
TOTAL NY CONSTRUCTION CORPGeneral Contractor407/08/2026
TRIERA CONTRACTING INCGeneral Contractor303/21/2026
APOLLO ELECTRIC INSDUS IN 004990General Contractor303/22/2026
BELL FUEL OIL, LLCPlumbing207/08/2026
AMERICAN VENTILATION SERVGeneral Contractor203/21/2026
GONZALEZ, RAFAELElectrical103/21/2026
CHIMENTI, ROBERTElectrical103/21/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
ROBERT CHIMENTIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899103/02/2026
CEYLAN DESIGN AND CONSULT8422103/06/2025
NEW YORK ENGINEERING ASSO851306/11/2021
Building Lifecycle
All (108)Filed (7)Permit Issued (9)Signed Off (5)Violation (60)Inspection (8)Objection (12)Special Inspection (7)
05/05/2026
Violation issued (HPD, open)
A
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2026
Permit issued — Plumbing
B01365752-I1-PL
03/04/2026
Violation issued (HPD, closed)
C
03/02/2026
Filed — Alteration
Renovate bathroom in unit 5D on the 5th floor. No change to use, egress or occupancy.
B01365752-I1
03/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
03/01/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIYOHU SCHNEIDER
02/24/2026
Violation issued (HPD, closed)
C
12/20/2025
Violation issued (HPD, open)
B
12/20/2025
Violation issued (HPD, open)
B
12/20/2025
Violation issued (HPD, open)
B
12/06/2025
Violation issued (HPD, closed)
C
06/25/2025
Signed off — Alteration
PLUMBING WORK TYPE FILED TO INSTALL SHOWER IN THE EXISTING APARTMENT 6-E ON SIXTH FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, FLOOR AREA, EGRESS OR OCCUPANCY.
B01172539-I1
06/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2025
Permit issued — Plumbing
B01172539-I1-PL
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
03/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/12/2025
Objection raised — Plumbing
03/12/2025
Objection raised — Plumbing
03/12/2025
Objection raised — Plumbing
03/12/2025
Objection raised — Plumbing
03/12/2025
Objection raised — Plumbing
03/12/2025
Objection raised — Plumbing
03/06/2025
Filed — Alteration
PLUMBING WORK TYPE FILED TO INSTALL SHOWER IN THE EXISTING APARTMENT 6-E ON SIXTH FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, FLOOR AREA, EGRESS OR OCCUPANCY.
B01172539-I1
03/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
03/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
03/06/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
08/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2022
Signed off — Alteration
B00513067-I1
12/23/2022
Signed off — Alteration
B00513595-I1
12/23/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND GAS PIPING.
B00512591-I1
11/08/2022
Signed off — Alteration
B00028859-I1
10/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2022
Permit issued — Plumbing
B00512591-I1-PL
07/28/2022
Violation issued (ECB, closed)
Construction
07/28/2022
Violation issued (ECB, closed)
Construction
07/02/2022
Violation issued (HPD, closed)
A
07/02/2022
Violation issued (HPD, closed)
B
06/30/2022
Violation issued (HPD, closed)
A
06/30/2022
Violation issued (HPD, closed)
B
06/30/2022
Violation issued (HPD, closed)
A
06/30/2022
Violation issued (HPD, closed)
B
04/20/2022
Violation issued (FDNY_NOV, closed)
04/20/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/14/2021
Violation issued (ECB, closed)
Elevators
10/13/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2021
Violation issued (HPD, open)
B
08/13/2021
Violation issued (HPD, open)
B
07/19/2021
Violation issued (ECB, closed)
Site Safety
06/29/2021
Permit issued — Mechanical Systems
B00513595-I1-MS
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP03/13/2026
DOB NOWPlumbingSigned-offDC BUILDING SERVICES INC05/22/2025
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC10/15/2022
DOB NOWMechanical SystemsSigned-offAMERICAN VENTILATION SERV06/29/2021
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN06/24/2021
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC06/18/2021
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC07/23/2019
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR04/20/2018
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR03/22/2018
BISOTRE-ISSUEDCITY BUILDING CONSULTANTS10/19/2022
BISOTISSUEDROYAL CONSTRUCTION ASSOCIATES06/04/2021
BISOTISSUEDRSG CONSTRUCTION CORP11/20/2019
BISOTISSUEDTHE PUMA HOME REPAIR AND09/07/2018
BISOTISSUEDTHE PUMA HOME REPAIR AND06/01/2018
BISPLISSUEDGREGG NY PLUMBING, INC03/09/2016
BISOTISSUEDNELJOS CONTRUCTION12/29/2015
BISPLISSUEDTESTERMAN PLBG & HTG INC11/06/2015
BISOTISSUEDMARKPOL INC10/09/2015
BISEQISSUEDTOTAL NY CONSTRUCTION CORP08/28/2012
BISEQISSUEDTOTAL NY CONSTRUCTION CORP09/28/2010
8 projects · most recent 11/10/2025
General Wiring Boiler Controls
FiledStatusContractorScope
11/10/2025Permit IssuedROBERT CHIMENTIGeneral Wiring
06/17/2025CompleteAPOLLO ELECTRIC INSDUS INGeneral Wiring
06/24/2021Permit IssuedDEMAND ELECTRIC INC—
05/12/2021Permit IssuedNEWLINE ELECTRICAL CORPGeneral Wiring
04/27/2021CompleteDEMAND ELECTRIC INCBoiler Controls
07/10/2019Permit IssuedRICHARD NEU—
05/29/2019CompleteROBERT CHIMENTI—
03/22/2018CompleteMEO ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
03/01/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
03/01/2026Energy Code Compliance InspectionsELIYOHU SCHNEIDERprogress
03/06/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
03/06/2025Tenant Protection Plan ComplianceSERDAR CEYLANspecial
03/06/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
04/28/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
04/28/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/03/2026B00028859-I1Request digital key ↗
09/01/2026B00513067-I1Request digital key ↗
09/01/2026B00512591-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00190490-I1Request digital key ↗
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION14
10/25/2022321909299Open ↗
10/13/2022321909299Open ↗
06/04/2021321909299Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
04/04/2022321909299Open ↗
03/22/2022321909299Open ↗
11/04/2021321909299Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications38
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/21/2019321909299Open ↗
02/21/2019321909299Open ↗
02/21/2019321909299Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026B00028859-I1Open ↗
09/01/2026B00513067-I1Open ↗
09/01/2026B00512591-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/21/2019321909299Open ↗
04/05/2018321700968Open ↗
12/21/2015321287273Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/16/2019340692986Open ↗
02/21/2019321909299Open ↗
04/05/2018321700968Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01365752-I1Open ↗
08/29/2026B00512591-I1Open ↗
08/24/2026B01172539-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01365752-I1Open ↗
08/29/2026B00512591-I1Open ↗
08/24/2026B01172539-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/29/2012320610932Open ↗
09/30/2010320222031Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/16/2019340692986Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/16/2019340692986Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/21/2015321287273Open ↗
04/27/2015321084358Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES3
01/06/2023321909299Open ↗
08/16/2019340692986Open ↗
04/05/2018321700968Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
04/28/2023321909299Open ↗
04/27/2023321909299Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00190490-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/16/2019340692986Open ↗
04/05/2018321700968Open ↗
12/21/2015321287273Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00513067-I1Open ↗
09/01/2026B00512591-I1Open ↗
09/01/2026B00513595-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B01172539-I1Open ↗
08/13/2026B01365752-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/29/2010320222031Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/21/2019321909299Open ↗
04/05/2018321700968Open ↗
01/10/2018321287273Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/04/2022321909299Open ↗
03/18/2022321909299Open ↗
08/16/2019340692986Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/10/2018321287273Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/16/2019340692986Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/27/2023321909299Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00513067-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00513067-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/04/2022321909299Open ↗
03/18/2022321909299Open ↗
08/16/2019340692986Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
04/28/2023321909299Open ↗
04/27/2023321909299Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
04/27/2023321909299Open ↗
04/27/2023321909299Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
04/27/2023321909299Open ↗
04/27/2023321909299Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/01/2023321909299Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSUPERSEDING LETTER4
10/25/2022321909299Open ↗
10/25/2022321909299Open ↗
10/13/2022321909299Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/27/2015321084358Open ↗
09/04/2012320610932Open ↗
09/30/2010320222031Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/02/2023321909299Open ↗
01/10/2018321287273Open ↗
▸BISFINAL1
04/27/2023321909299Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
08/16/2019340692986Open ↗
02/21/2019321909299Open ↗
04/05/2018321700968Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/27/2023321909299Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
10/18/2019340692986Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
01/05/2016321287273Open ↗
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET6
02/21/2019321909299Open ↗
04/06/2018321700968Open ↗
12/21/2015321287273Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
04/04/2022321909299Open ↗
03/22/2022321909299Open ↗
11/04/2021321909299Open ↗
▸BISBOROUGH INTAKE FORM2
10/25/2022321909299Open ↗
01/10/2018321287273Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/16/2019340692986Open ↗
▸Other Documents2
▸BISLAA - Supporting Documentation1
01/10/2018321287273Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00028859-I1Open ↗