← Back
Elevator cooperative
1218 3 AVENUE
MANHATTAN · BIN 1042740
💬 Discuss this project
1962Year Built
20Stories
D4Building Class
C1-9Zoning
212,118 sfGross Floor Area
103Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: THE TOWNSEND HOUSE CORP · 15,052 sf lot · 14.09 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof7p · 2 filings · 10 docs
Floor 18Under Construction5p · 1 filing · 20 docs
Floor 17
Floor 16
Floor 15Under Construction6p · 1 filing · 15 docs
Floor 1411p · 2 filings · 8 docs
Floor 13
Floor 127p · 3 filings · 16 docs
Floor 11
Floor 10
Floor 9
Floor 82p · 1 filing · 3 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 32p · 1 filing · 11 docs
Floor 2
Floor 18p · 1 filing · 7 docs
Cellar1p · 1 filing · 7 docs
1 job · most recent 11/21/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/21/2025Permit IssuedK & K RENOVATION INCHeating and Air Conditioning Systems
Heat / Cool
Iec FHA-04 13,100 BTU · Fan Coil Indoor ×8
CPY04 13,800 BTU · Fan Coil Indoor ×6
CPY02 6,900 BTU ×2
4 jobs · most recent 11/21/2025
Water/Sanitary Gas
FiledStatusContractorScope
11/21/2025Signed-offK.O.S. PLUMBING&HEATING,IWater/Sanitary
06/05/2025Signed-offMAM PLBG & HTG CORPWater/Sanitary
04/21/2025Signed-offPFL MECHANICAL CORPWater/Sanitary
05/30/2024Permit IssuedSMART PLBG & HTG CORPGas, Water/Sanitary
25 jobs · most recent 08/12/2026
General Wiring
FiledStatusContractorScope
08/12/2026CompleteASSET ELECTRIC CORP—
07/16/2026CompleteJALEX ELEC'L CONTR. INC—
07/15/2026Pending Payment VerificationJALEX ELEC'L CONTR. INC—
06/25/2026Permit IssuedVMA ELECTRICAL CORP.General Wiring
06/18/2026Permit IssuedK & G ELECTRIC CO., INCGeneral Wiring
05/07/2026Permit IssuedV.I.P. ELECTL CONTR CORPGeneral Wiring
03/19/2026Permit IssuedEXECUTIVE ELECTL SER INC—
08/08/2025CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
06/08/2025CompleteTM SELECT ELECTRIC CORPGeneral Wiring
05/29/2025CompleteACCURATE ELEC'L CORP.General Wiring
04/24/2025CompleteJUMPER ELECTRIC CORPGeneral Wiring
08/01/2024CompleteMUM ELECTRICAL CORPGeneral Wiring
05/08/2024CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
04/05/2024CompleteSAFETECH ELECL CONTNG CORGeneral Wiring
12/02/2023CompletePRECISION ELECL CONT CORPGeneral Wiring
1 job · most recent 04/17/2026
FiledStatusContractorScope
04/17/2026Signed-offCANIDO BASONAS CONST. COR—
Building Lifecycle
All (246)Filed (42)Permit Issued (43)Signed Off (24)Facade (FISP) (18)Violation (60)Inspection (15)Objection (14)Special Inspection (30)
08/12/2026
Signed off — Alteration
M01199005-I1
07/27/2026
Signed off — Alteration
Herewith file mechanical plans for Apt. 18F filed in conjunction with general construction
M01185659-S2
07/24/2026
Signed off — Alteration
Removal of non-structural partitions, ceilings, light fixtures, flooring, and paint perimeter walls.
M01354853-I1
06/22/2026
Signed off — Alteration
Renovation of an existing apartment#3C on the third floor.
M01202810-S1
06/01/2026
Signed off — Alteration
Renovation of an existing apartment#3C on the third floor.
M01202810-I1
05/26/2026
Signed off — Alteration
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
M01388998-I1
04/29/2026
Permit issued — Suspended Scaffold
M01388998-I1-SC
04/17/2026
Filed — Alteration
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
M01388998-I1
04/01/2026
Permit issued — General Construction
M01354853-I1-GC
03/20/2026
Permit issued — Mechanical Systems
M01185659-S2-MS
03/20/2026
Permit issued — General Construction
M01185659-I1-GC
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Scope
02/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/09/2026
Filed — Alteration
Removal of non-structural partitions, ceilings, light fixtures, flooring, and paint perimeter walls.
M01354853-I1
02/09/2026
Signed off — Alteration
M00818172-I1
02/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
02/03/2026
Special inspection requirement — Final
Anthony Accardo
01/08/2026
Permit issued — General Construction
M01202810-I1-GC
12/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Bendix
12/02/2025
Special inspection requirement — Ventilation and air distribution system
Matthew Bendix
12/02/2025
Special inspection requirement — Maintenance information
Matthew Bendix
12/02/2025
Special inspection requirement — Final
Matthew Bendix
12/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
12/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Bendix
12/02/2025
Special inspection requirement — Mechanical Systems
Matthew Bendix
11/25/2025
Signed off — Alteration
Sound concrete surfaces (walls, ceilings, floors, beams, columns) remove and replace deteriorated steel/concrete, resurface floor coating, concert patching, replace sealant, replace masonry units and pointing.
M01023247-I1
11/21/2025
Filed — Alteration
Herewith file mechanical plans for Apt. 18F filed in conjunction with general construction
M01185659-P3
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
10/16/2025
Special inspection requirement — Final
Jacquelyn Hawkins
10/16/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Jacquelyn Hawkins
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jacquelyn Hawkins
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacquelyn Hawkins
10/14/2025
Permit issued — General Construction
M01178446-I1-GC
10/10/2025
Objection resolved — Addressed
10/08/2025
Objection raised — Scope
10/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/27/2025
Objection resolved — Addressed
09/27/2025
Objection resolved — Addressed
09/25/2025
Objection raised — Scope
09/25/2025
Objection raised — Scope
09/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/17/2025
Filed — Alteration
Herewith file mechanical plans for Apt. 18F filed in conjunction with general construction
M01185659-P2
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
09/04/2025
Filed — Alteration
Herewith file mechanical plans for Apt. 18F filed in conjunction with general construction
M01185659-P1
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Jacquelyn Hawkins
09/03/2025
Special inspection requirement — Final
Jacquelyn Hawkins
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacquelyn Hawkins
09/03/2025
Special inspection requirement — Lighting in dwelling units
Jacquelyn Hawkins
09/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jacquelyn Hawkins
09/03/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
07/28/2025
Permit issued — General Construction
M01199005-I1-GC
07/16/2025
Filed — Alteration
M01199005-I1
06/20/2025
Permit issued — Plumbing
M01178446-S1-PL
Latest 60 of 246 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORSID NEW YORK407/08/2026
FIRSTSERVICE RESIDENTIAL507/08/2026
SCHNELLBACHER-SENDON GROUP503/22/2026
EMPIRE SCAFF SYSTEM103/22/2026
EMPIRE SHAFT SYSTEMS103/22/2026
TO OWNER OF 174 E. 71TH S103/22/2026
KRIESEL203/22/2026
PRO SAFETY SERVICES103/22/2026
JOYCE CONTRACTING103/22/2026
CHARTER103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING603/21/2026
D D EXPEDITORS1603/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
J A EXPEDITING603/21/2026
AE DESIGN SOLUTION403/21/2026
LOUIS STRIAR203/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
OUTSOURCE CONSULTANTS, INC.203/21/2026
CSMR DESIGNS203/21/2026
NEXUS CONSULTING NYC, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHNELLBACHER-SENDON GRO*General Contractor1507/08/2026
BH DESIGN GROUP LLCGeneral Contractor704/09/2026
K & K RENOVATION INCGeneral Contractor407/08/2026
ETHAN CNSTION & PIPING LLGeneral Contractor407/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
AIR ZONE HVAC INCGeneral Contractor303/21/2026
EAST SIDE INTERIORS INCGeneral Contractor207/08/2026
PRACTICAL PLBG & HTG INCPlumbing207/08/2026
RED HOOK SIGN ELECTScaffold207/08/2026
ASTER ELECTRIC, INCElectrical203/22/2026
MCKENNA, KERWINElectrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
SULLIVAN, JAMESElectrical103/21/2026
THE METRO GROUP ELECTRICElectrical103/22/2026
TRI-POWER ELECTRICAL LLCElectrical103/22/2026
ALBAN CONSTRUCTION LLCGeneral Contractor104/09/2026
BHD GROUP LLCGeneral Contractor107/08/2026
CITI CONTRACTING OF NEW YGeneral Contractor107/08/2026
D.P. & SON PAINTING INCGeneral Contractor104/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
NEW ENTITY LLCGeneral Contractor104/09/2026
RELIABLE DESIGN INCGeneral Contractor107/08/2026
A. HTG AND PLBG WORKS INCPlumbing107/08/2026
A.M.N. CORPORATIONPlumbing106/28/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAG ENGINEERING & CONSULT608402/09/2026
BENDIX ENGINEERING, P.C.4293411/21/2025
HAWKINS ROMAN ARCHITECTS6863209/04/2025
CHRISTIAN L. MARTOS ENGIN5965209/04/2025
STEVEN MICHAEL PETERSON S2035206/05/2025
AR CONSULTING ENGINEER P.4054104/21/2025
ACCARDO ENGINEERING, PLLC1247403/31/2025
DELACOUR, FERRARA & CHURC4041111/07/2024
RICHARD H. BALSER ENGINEE3028205/16/2023
GREEN DESIGN CONSTRUCT, L4145405/06/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR04/29/2026
DOB NOWGeneral ConstructionSigned-offALBAN CONSTRUCTION04/01/2026
DOB NOWMechanical SystemsSigned-offK K RENOVATION03/20/2026
DOB NOWGeneral ConstructionPermit IssuedK K RENOVATION03/20/2026
DOB NOWGeneral ConstructionSigned-offBH DESIGN GROUP LLC01/08/2026
DOB NOWGeneral ConstructionPermit IssuedEAST SIDE INTERIORS10/14/2025
DOB NOWGeneral ConstructionSigned-offNEW ENTITY LLC07/28/2025
DOB NOWPlumbingSigned-offCM PLUMBING INC06/20/2025
DOB NOWGeneral ConstructionPermit IssuedEAST SIDE INTERIORS06/18/2025
DOB NOWPlumbingSigned-offPFL MECHANICAL CORP06/05/2025
DOB NOWGeneral ConstructionSigned-offBH DESIGN GROUP LLC05/21/2025
DOB NOWGeneral ConstructionSigned-offBH DESIGN GROUP LLC05/21/2025
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*05/21/2025
DOB NOWPlumbingSigned-offA.M.N. CORPORATION04/24/2025
DOB NOWGeneral ConstructionPermit IssuedK K RENOVATION04/17/2025
DOB NOWMechanical SystemsSigned-offK K RENOVATION04/16/2025
DOB NOWGeneral ConstructionPermit IssuedD.P. & SON PAINTING INC12/13/2024
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*09/03/2024
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*08/19/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/06/2023
DOB NOWGeneral ConstructionSigned-offCITI CONTRACTING OF NEW Y09/04/2023
DOB NOWPlumbingPermit IssuedSMART PLBG & HTG CORP05/16/2023
DOB NOWGeneral ConstructionSigned-offBHD GROUP LLC04/08/2023
DOB NOWSignSigned-offSIGNS CAD CORP10/12/2022
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*05/23/2022
DOB NOWSupported ScaffoldSigned-offSCHNELLBACHER-SENDON GRO*05/20/2022
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*05/20/2022
DOB NOWSupported ScaffoldSigned-offSCHNELLBACHER-SENDON GRO*05/05/2022
DOB NOWConstruction FenceSigned-offETHAN CNSTION PIPING LL05/03/2022
DOB NOWGeneral ConstructionSigned-offETHAN CNSTION PIPING LL04/13/2022
DOB NOWMechanical SystemsSigned-offAIR ZONE HVAC INC04/06/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/29/2022
DOB NOWPlumbingSigned-offD.H. EAGLE PLUMBING, LLC02/14/2022
DOB NOWGeneral ConstructionSigned-offETHAN CNSTION PIPING LL01/04/2022
DOB NOWGeneral ConstructionSigned-offRELIABLE DESIGN INC12/18/2021
DOB NOWStructuralSigned-offSCHNELLBACHER-SENDON GRO*08/03/2021
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*06/03/2021
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*04/07/2021
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC10/28/2020
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT01/24/2020
+ 53 more permits on file
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/13/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
02/03/2026FinalAnthony Accardoprogress
02/03/2026Tenant Protection Plan ComplianceChester Kowalskispecial
12/02/2025FinalMatthew Bendixprogress
12/02/2025Maintenance informationMatthew Bendixenergy_progress
12/02/2025HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
12/02/2025HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
12/02/2025Ventilation and air distribution systemMatthew Bendixenergy_progress
12/02/2025Mechanical SystemsMatthew Bendixspecial
12/02/2025Energy Code Compliance InspectionsMatthew Bendixprogress
12/02/2025HVAC-R and service water heating equipmentMatthew Bendixenergy_progress
10/27/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
10/16/2025FinalJacquelyn Hawkinsprogress
10/16/2025Fire-Resistant Penetrations and JointsJacquelyn Hawkinsspecial
10/16/2025Post-installed AnchorsChristian Martosspecial
10/16/2025Energy Code Compliance InspectionsJacquelyn Hawkinsprogress
10/16/2025Fire-Resistance Rated ConstructionJacquelyn Hawkinsprogress
09/08/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
09/03/2025Post-installed AnchorsChristian Martosspecial
09/03/2025Fire-Resistant Penetrations and JointsJacquelyn Hawkinsspecial
09/03/2025Energy Code Compliance InspectionsJacquelyn Hawkinsprogress
09/03/2025Fire-Resistance Rated ConstructionJacquelyn Hawkinsprogress
09/03/2025Lighting in dwelling unitsJacquelyn Hawkinsenergy_progress
09/03/2025FinalJacquelyn Hawkinsprogress
04/09/2025Fire-Resistant Penetrations and JointsChester Kowalskispecial
04/09/2025Energy Code Compliance InspectionsSTEPHEN WANTAprogress
Latest 25 of 75.
▾Documents — 1,111 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch38
09/04/2026M00480849-P2Request digital key ↗
09/04/2026M00480849-I1Request digital key ↗
09/03/2026M00501123-P1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00291144-I1Request digital key ↗
09/05/2026M00291141-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00116750-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00213187-I1Request digital key ↗
▸Applications & Permits216
▸BISWORK PERMIT APPLICATION118
07/27/2020140910245Open ↗
03/06/2020123803287Open ↗
02/28/2020123753465Open ↗
Showing 3 of 118 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION95
01/29/2024123309204Open ↗
11/22/2023123309204Open ↗
11/20/2023123309204Open ↗
Showing 3 of 95 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
05/28/2019123309204Open ↗
05/22/2019123309204Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications256
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION110
03/25/2020123753465Open ↗
03/25/2020123753465Open ↗
03/25/2020123753465Open ↗
Showing 3 of 110 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
09/04/2026M00480849-P2Open ↗
09/04/2026M00480849-I1Open ↗
09/03/2026M00626506-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/02/2026M00501123-P1Open ↗
09/01/2026M00501123-I1Open ↗
08/31/2026M00872675-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/18/2026M00872678-I1Open ↗
09/01/2026M01185659-P2Open ↗
08/31/2026M00872675-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
04/15/2019123735832Open ↗
Showing 1 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
04/15/2019123735832Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/22/2020140910245Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment68
▸BISSELF-CERT PLUMBING NOTICE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
01/06/2020123735832Open ↗
12/30/2019123735832Open ↗
06/27/2019123775227Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/23/2021140910245Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/23/2021140910245Open ↗
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes11
06/22/2020140910245Open ↗
08/26/2019123803287Open ↗
06/27/2019123775227Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00213187-I1Open ↗
08/13/2026M00291144-I1Open ↗
08/13/2026M00291141-I1Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos79
▸BISASBESTOS: CERTIFICATION (DEP ACP5)33
07/27/2020140910245Open ↗
07/14/2020140910245Open ↗
08/29/2019123775227Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/04/2026M00480849-P2Open ↗
09/04/2026M00480849-I1Open ↗
09/03/2026M00626506-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/27/2026M00818171-I1Open ↗
08/13/2026M00818172-I1Open ↗
08/13/2026M01185659-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance100
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS56
03/25/2020123753465Open ↗
03/25/2020123753465Open ↗
03/11/2020123550558Open ↗
Showing 3 of 56 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
04/13/2021123735832Open ↗
02/23/2021140910245Open ↗
07/18/2020123309204Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
07/20/2021123775227Open ↗
07/20/2021123775227Open ↗
04/13/2021123735832Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis5
09/03/2026M00626506-I1Open ↗
09/02/2026M00701881-I1Open ↗
08/13/2026M00653416-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
06/22/2020140910245Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/18/2021123309204Open ↗
07/20/2021123775227Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY18
11/09/2022103117798Open ↗
11/09/2022103117798Open ↗
07/20/2021123775227Open ↗
Showing 3 of 18 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/06/2020123309204Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/06/2020123309204Open ↗
▸Approvals, Objections & Sign-offs92
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST50
08/24/2021123775227Open ↗
04/13/2021123735832Open ↗
02/23/2021140910245Open ↗
Showing 3 of 50 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
03/25/2020123753465Open ↗
02/28/2020123753465Open ↗
Showing 2 of 13 on file for this type
▸BISSUPERSEDING LETTER4
12/05/2019123775227Open ↗
Showing 1 of 4 on file for this type
▸BISCCD1-Construction Code Determination3
03/25/2020123753465Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership96
▸BISCOST AFFIDAVIT92
11/11/2022103117798Open ↗
08/24/2021123775227Open ↗
08/24/2021123775227Open ↗
Showing 3 of 92 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/18/2021123309204Open ↗
▸Filing & Intake Forms112
▸BISEFILING COVER SHEET47
01/30/2020123884252Open ↗
08/26/2019123803287Open ↗
06/27/2019123775227Open ↗
Showing 3 of 47 on file for this type
▸BISADDITIONAL INFORMATION30
08/23/2021123775227Open ↗
08/09/2021123775227Open ↗
07/14/2020140910245Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM28
03/25/2020123753465Open ↗
03/11/2020123550558Open ↗
03/06/2020123753465Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
06/22/2020140910245Open ↗
Showing 1 of 6 on file for this type
▸BISEFILING COVER SHEETPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
08/29/2019123775227Open ↗
Showing 1 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01388998-I1Open ↗