| Owner | Filings | Most Recent |
|---|---|---|
| 122 FIFTH AVENUE ASSOCIATES | 17 | 07/08/2026 |
| LEVAIN BAKERY HQ | 9 | 07/08/2026 |
| DORIA, INC | 5 | 03/22/2026 |
| MDB DEVELOPMENT CORP. | 5 | 03/22/2026 |
| OWNERS REP | 4 | 03/22/2026 |
| 122 FIFTH ASSOCIATES | 109 | 03/22/2026 |
| OMNIBUILD CONSTRUCTION IN | 4 | 03/22/2026 |
| AMERICON CONSTRUCTING INC | 1 | 03/22/2026 |
| 122 5TH ASSOC | 1 | 03/22/2026 |
| CONSTRUCTION LLC OMNI BUI | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MG ENGINEERING D.P.C. | 38 | 09/16/2026 |
| AMA CONSULTING ENGINEERS, PC | 25 | 09/10/2026 |
| VOCON | 17 | 08/25/2026 |
| ARCHITECTURAL AND ENGINEERING SERVI | 6 | 06/11/2026 |
| MMOSER ASSOCIATES | 4 | 04/17/2026 |
| SALVATOR A. CARADONNA JR. | 2 | 01/14/2026 |
| STUDIO HUJI | 3 | 10/23/2025 |
| DESIMONE CONSULTING ENGINEERING | 9 | 09/29/2025 |
| BRAND ACCESS SOLUTIONS | 1 | 08/20/2025 |
| ARCHYTECX DESIGN AND ARCHITECTURE | 2 | 07/08/2025 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 05/02/2025 |
| CHIPMAN DESIGN ARCHITECTURE GROUP P | 2 | 05/01/2025 |
| KETT MURPHY | 1 | 12/04/2024 |
| TWIG NJ ENGINEERS | 6 | 09/04/2024 |
| ADG ARCHITECTURE AND DESIGN PC | 2 | 08/29/2024 |
| WATERSHAPE CONSULTING | 2 | 07/12/2024 |
| CONCEPT DESIGN GROUP | 3 | 05/01/2024 |
| WILSON & ASSOCIATES ENGINEERING DPC | 3 | 06/15/2023 |
| JOSE L. PENA,P.E. | 2 | 05/25/2023 |
| HC ARCHITECT, PC | 2 | 04/04/2023 |
| GILSANZ MURRAY STEFICEK LLP | 4 | 03/31/2023 |
| JOHN QUILLEN | 4 | 03/14/2023 |
| ARCHITECTURAL GROUP INTERNATIONAL | 2 | 03/14/2023 |
| WAVIC ENGINEERING PLLC | 2 | 03/14/2023 |
| MPP ENGINEERS LLC | 1 | 03/07/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 23 | 03/21/2026 |
| GILLMAN CONSULTING | 64 | 03/21/2026 |
| PATUXENT ENGINEERING | 12 | 03/21/2026 |
| LOUIS STRIAR | 8 | 03/21/2026 |
| SIGNS CAD | 2 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 67 | 03/21/2026 |
| PAUL FUSCO CONSULTING | 8 | 03/21/2026 |
| RPO | 6 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 4 | 03/21/2026 |
| KD DESIGNS | 5 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| AMERICON CONSTRUCTION INC. | General Contractor | 21 | 07/08/2026 |
| OMNIBUILD CONSTRUCTION IN | General Contractor | 20 | 07/08/2026 |
| DHS FRACO LLC | General Contractor | 19 | 07/08/2026 |
| KCC D+B, LLC | General Contractor | 12 | 07/08/2026 |
| MPS PLUMBING & HEATING INC | Fire Protection | 9 | 07/08/2026 |
| NEW YORK CONSTRUCTION ASS | General Contractor | 9 | 07/08/2026 |
| WEEKES CONSTRUCTION INC | General Contractor | 7 | 07/08/2026 |
| DONALDSON INTERIORS INC | General Contractor | 7 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 7 | 07/08/2026 |
| TRV MECHANICAL CONTRACTOR | General Contractor | 6 | 07/08/2026 |
| PRIMARY BUILT LLC | General Contractor | 6 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 6 | 09/30/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 6 | 07/08/2026 |
| ALCHEMY DEVELOPMENT | General Contractor | 5 | 07/08/2026 |
| SIGNS CAD | Scaffold | 4 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 4 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 4 | 07/08/2026 |
| R & S PLUMBING & HTG INC | Plumbing | 3 | 09/07/2026 |
| WNW & SONS PLUMBING & HTG | Fire Protection | 3 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 3 | 07/08/2026 |
| MDB DEVELOPMENT CORP | General Contractor | 3 | 07/08/2026 |
| NYFF EVENTS LLC | General Contractor | 3 | 03/21/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 3 | 03/21/2026 |
| MPS PLUMBING & HEATING INC | Plumbing | 3 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 2 | 07/02/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 7 | 09/16/2026 |
| AK ENGINEERING PC | 678 | 44 | 09/10/2026 |
| ETI CONSULTANTS LLC | 7694 | 1 | 08/21/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 5 | 04/22/2026 |
| DESIMONE CONSULTING ENGIN | 5942 | 2 | 09/05/2025 |
| FENAGH, INC | 6942 | 3 | 03/17/2025 |
| CDG ARCHITECTS LLC /DBA: | 1327 | 9 | 09/04/2024 |
| CATALPA SPECIAL INSPECTIO | 2004 | 4 | 06/15/2023 |
| MEP INSPECTIONS, INC | 1102 | 1 | 03/14/2023 |
| INTEGRITY CONSULTING SERV | 666 | 4 | 03/14/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 09/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 09/29/2026 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 09/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARMON MECHANICAL INC | 09/21/2026 |
| DOB NOW | Plumbing | Permit Issued | ARMON MECHANICAL INC | 09/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CORE FOUR CONSTRUCTION IN | 09/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CROSS MANAGEMENT CORP | 09/16/2026 |
| DOB NOW | General Construction | Permit Issued | CROSS MANAGEMENT CORP | 09/15/2026 |
| DOB NOW | Plumbing | Permit Issued | R & S PLUMBING & HTG INC | 09/03/2026 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 08/31/2026 |
| DOB NOW | Plumbing | Signed-off | CONNELLY & SONS PLUMBING | 06/01/2026 |
| DOB NOW | Standpipe | Permit Issued | EVERGREEN MECHANICAL CORP | 05/11/2026 |
| DOB NOW | Plumbing | Signed-off | R & S PLUMBING & HTG INC | 03/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | KCC D+B | 01/30/2026 |
| DOB NOW | General Construction | Signed-off | KCC D+B | 01/30/2026 |
| DOB NOW | Mechanical Systems | Signed-off | KCC D+B | 01/30/2026 |
| DOB NOW | Sign | Permit Issued | NATIONAL MAINTENANCE, INC | 01/27/2026 |
| DOB NOW | Sign | Permit Issued | CAPITOL DESIGN & MAINT IN | 10/27/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 10/16/2025 |
| DOB NOW | Standpipe | Signed-off | SIRINA FIRE PROT CORP | 10/16/2025 |
| DOB NOW | Plumbing | Signed-off | CONNELLY & SONS PLUMBING | 10/06/2025 |
| DOB NOW | Structural | Signed-off | JT MAGEN & COMPANY INC | 10/02/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 10/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 09/29/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 09/26/2025 |
| DOB NOW | Structural | Signed-off | JT MAGEN & COMPANY INC | 09/26/2025 |
| DOB NOW | Structural | Signed-off | SKM NORTHEAST INC | 09/11/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | SAFWAY ATLANTIC, LLC | 08/20/2025 |
| DOB NOW | Structural | Signed-off | JT MAGEN & COMPANY INC | 08/18/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 08/14/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 08/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | KCC D+B | 08/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | KCC D+B | 08/08/2025 |
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 07/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PRIMARY BUILT LLC | 06/25/2025 |
| DOB NOW | General Construction | Permit Issued | PRIMARY BUILT LLC | 06/25/2025 |
| DOB NOW | General Construction | Signed-off | KCC D+B | 06/11/2025 |
| DOB NOW | Sprinklers | Signed-off | LEGUCI PIPING&HEATING LLC | 05/29/2025 |
| DOB NOW | Standpipe | Permit Issued | ORBIT SPRINKLER CORP | 05/15/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/16/2026 | Signed-off | KCC D+B, LLC | Heating and Air Conditioning Systems, Ventilation Systems | |
| 09/10/2026 | Permit Issued | CROSS MANAGEMENT CORP | Air Conditioning Systems | Cooling |
| 08/23/2026 | Permit Issued | CORE FOUR CONSTRUCTION IN | Air Conditioning Systems, Heating Systems | |
| 04/22/2026 | Signed-off | JT MAGEN & COMPANY INC | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Permit Issued | EVERGREEN MECHANICAL CORP | Sprinkler System |
| 09/10/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 08/23/2026 | Permit Issued | ARMON MECHANICAL INC | Sprinkler System |
| 04/22/2026 | Signed-off | SIRINA FIRE PROT CORP | 1,178 heads, 6 outlets |
| 07/31/2025 | Signed-off | SIRINA FIRE PROT CORP | 196 heads |
| 03/17/2025 | Signed-off | LEGUCI PIPING&HEATING LLC | 38 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Permit Issued | R & S PLUMBING & HTG INC | Water/Sanitary |
| 09/10/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 08/23/2026 | Permit Issued | ARMON MECHANICAL INC | Water/Sanitary |
| 04/22/2026 | Signed-off | CONNELLY & SONS PLUMBING | Water/Sanitary |
| 07/31/2025 | — | — | — |
| 03/17/2025 | Signed-off | PROSTAR PLUMBING AND HEAT | Water/Sanitary |
| 01/25/2023 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/14/2026 | Permit Issued | BIGMAN BROS., INC. | General Wiring |
| 06/12/2026 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 04/11/2026 | Complete | SOLAS ELECTRICAL CONTRACT | General Wiring |
| 11/25/2025 | Complete | KNIGHT ELEC'L SERV. CORP. | General Wiring |
| 10/09/2025 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 08/14/2025 | Complete | CORPORATE ELEC. GROUP INC | — |
| 08/11/2025 | Complete | SIGNS CAD CORP | — |
| 03/03/2025 | Permit Issued | ALLSTATE ELEC'L CONT INC | General Wiring |
| 03/13/2024 | Complete | MER ELECTRIC, INC | General Wiring |
| 02/12/2024 | Complete | PROFF ELECTRICAL LLC | — |
| 02/04/2024 | Permit Issued | MAGNA ELECTRIC CORP | General Wiring |
| 12/25/2023 | Permit Issued | A&E ELECTRICAL SYSTEMS CO | General Wiring |
| 10/17/2023 | Complete | ALLAN/BRITE-WAY ELEC'L CO | General Wiring |
| 03/22/2023 | Complete | STABILITY ELEC ENTERP INC | Boiler Controls |
| 02/17/2023 | Complete | STABILITY ELEC ENTERP INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Signed-off | CONNELLY & SONS PLUMBING | Steel, Concrete |
| 07/31/2025 | Signed-off | JT MAGEN & COMPANY INC | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2025 | Signed-off | SAFWAY ATLANTIC, LLC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/28/2026 | Certified StandPipe - SD - Fire StandPipe - SD - Roughing | Certified | View ↗ |
| 04/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/15/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/01/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/29/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/29/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/23/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 09/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/23/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/08/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/11/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/08/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/09/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/09/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/07/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 12/18/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/06/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/13/2026 | HVAC-R and service water heating system controls | ANTHONY MUSUMECI | energy_progress |
| 08/13/2026 | HVAC-R and service water piping design and insulation | ANTHONY MUSUMECI | energy_progress |
| 08/13/2026 | HVAC-R and service water heating equipment | ANTHONY MUSUMECI | energy_progress |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 07/20/2026 | Post-installed Anchors | Young Suh | special |
| 07/20/2026 | Sprinkler Systems | Young Suh | special |
| 07/20/2026 | Standpipe Systems | Young Suh | special |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/06/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/06/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/06/2026 | Final | Ari Kamo | progress |
| 07/06/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 07/06/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 07/06/2026 | Mechanical Systems | Ari Kamo | special |
| 07/06/2026 | Lighting controls | Ari Kamo | energy_progress |
| 07/06/2026 | Final | Wyett Baker | progress |
| 07/06/2026 | Maintenance information | Ari Kamo | energy_progress |
| 07/06/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 07/06/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/06/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 07/06/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 07/06/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 07/06/2026 | Sprinkler Systems | Ari Kamo | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Reformation | Retail | Floor 1 | Project M01255892 Project M01217852 Project M01164316 |
| Myodetox | Other | — | Project M01180086 |
| Pandora | Retail | — | Project M00989622 |
| Parachute Home | Office | — | Project M00830726 |
| Parachute | Retail | Cellar, Floor 1 | Project M08054872 Project M08054914 |
| Microsoft Adtech Hub | Office | Lobby, Floors 1, 6–11 | Project M00806036 Project M00806059 Project M00806071 Project M00806081 Project M08036508 Project M00779698 Project M00643690 Project M00643722 Project M00644183 Project M00644251 |
| Microsoft | Office | Floor 11 | Project M00775172 |