| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00806036 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 02/01/2023 | 06/04/2024 | Design VOCON Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on 6th floor including installation of non-load bearing partitions, doors/frames, and related finishes. No change … |
| M00806059 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/25/2023 | 06/04/2024 | Design AMA CONSULTING ENGINEERS, PC Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on the 6th floor including installation of new HVAC system and related ductwork/piping. No change in use, egress, … |
| M00953237 ↗ | 640 8 AVENUE MANHATTAN | Alteration | Signed-off | 12/11/2023 | 12/13/2023 | Design VOCON Contractor CLUNE CONSTRUCTION CO LP | Elevator lobby refresh consisting of removal and replacement of ceilings as shown on plans filed. No change in use, egress or occupancy. |
| M00643690 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 04/25/2023 | Design VOCON Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on multiple floors including installation of non-load bearing partitions, doors/frames, and related finishes. No c… |
| M00643722 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 04/25/2023 | Design AMA CONSULTING ENGINEERS, PC Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on multiple floors including installation of new HVAC system and related ductwork/piping. No change in use, egress… |
| M00644251 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 03/01/2023 | Design AMA CONSULTING ENGINEERS, PC Contractor ABCO-PEERLESS SPRKLR CORP Filer GILLMAN CONSULTING INC | Installation of full floor sprinkler coverage and provide auxiliary fire hose valves where required and to connect to existing base building… |
| Name | Projects together | Most recent |
|---|---|---|
| VOCON | 6 | 10/31/2024 |
| AMA CONSULTING ENGINEERS, PC | 5 | 11/04/2024 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 03/31/2023 |
| HC ARCHITECT, PC | 1 | 04/06/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| AMERICON CONSTRUCTION INC | 7 | 11/04/2024 |
| ABCO-PEERLESS SPRKLR CORP | 1 | 05/01/2023 |
| CLUNE CONSTRUCTION CO LP | 1 | 12/11/2023 |
| SIGNS CAD CORP | 1 | 04/06/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| NG 300 LAFAYETTE ST. LLC | 1 | 04/06/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| GILLMAN CONSULTING INC | 9 | 11/04/2024 |
| PARK ENGINEERING CONSULTING INC | 1 | 04/06/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00806036 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 02/01/2023 | 06/04/2024 | Design VOCON Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on 6th floor including installation of non-load bearing partitions, doors/frames, and related finishes. No change … |
| M00806059 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/25/2023 | 06/04/2024 | Design AMA CONSULTING ENGINEERS, PC Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on the 6th floor including installation of new HVAC system and related ductwork/piping. No change in use, egress, … |
| M00953237 ↗ | 640 8 AVENUE MANHATTAN | Alteration | Signed-off | 12/11/2023 | 12/13/2023 | Design VOCON Contractor CLUNE CONSTRUCTION CO LP | Elevator lobby refresh consisting of removal and replacement of ceilings as shown on plans filed. No change in use, egress or occupancy. |
| M00643690 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 04/25/2023 | Design VOCON Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on multiple floors including installation of non-load bearing partitions, doors/frames, and related finishes. No c… |
| M00643722 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 04/25/2023 | Design AMA CONSULTING ENGINEERS, PC Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on multiple floors including installation of new HVAC system and related ductwork/piping. No change in use, egress… |
| M00644251 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 03/01/2023 | Design AMA CONSULTING ENGINEERS, PC Contractor ABCO-PEERLESS SPRKLR CORP Filer GILLMAN CONSULTING INC | Installation of full floor sprinkler coverage and provide auxiliary fire hose valves where required and to connect to existing base building… |
| M00806071 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Filed — no permit on record | 01/25/2023 | — | Design AMA CONSULTING ENGINEERS, PC Filer GILLMAN CONSULTING INC | — |
| M00806081 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Filed — no permit on record | 01/25/2023 | — | Design AMA CONSULTING ENGINEERS, PC | — |
| M08036488 ↗ | 122 5TH AVENUE MANHATTAN | No Work | Filed — no permit on record | 12/08/2022 | — | Design VOCON | — |
| M08036508 ↗ | 122 5TH AVENUE MANHATTAN | No Work | Filed — no permit on record | 12/08/2022 | — | Design VOCON | — |
| M00779698 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 08/02/2022 | 08/05/2022 | Design GILSANZ MURRAY STEFICEK LLP Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Structural modifications associated with 11th floor roof terraces, to include but not limited to, steel supports and tie downs for the propo… |
| M00775172 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 07/28/2022 | 08/03/2022 | Design VOCON Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Interior tenant build-out on 11th floor office Pavilion and exterior work at the 11th floor roof, including the installation of new deck, pa… |
| M00644183 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 05/10/2022 | Design GILSANZ MURRAY STEFICEK LLP Contractor AMERICON CONSTRUCTION INC. Filer GILLMAN CONSULTING INC | Structural modifications for interior tenant build-out on multiple floors to include, steel, concrete and slab openings. No change in use, e… |
| M00479877 ↗ | 298 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 04/06/2021 | 04/06/2021 | Design HC ARCHITECT, PC Owner NG 300 LAFAYETTE ST. LLC Contractor FRANK ZANFARDINO | ERECT NON-ILLUMINATED ACCESSORY WALL SIGN ON EXISTING CANOPY RAIL, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANC… |
| Building | Filings | Most Recent |
|---|---|---|
| 122 5TH AVENUE ↗ | 11 | 11/04/2024 |
| 103 5 AVENUE ↗ | 1 | 04/15/2024 |
| 640 8 AVENUE ↗ | 1 | 12/11/2023 |
| 298 LAFAYETTE STREET ↗ | 1 | 04/06/2021 |