School or academy
Winston Preparatory School
122 WEST 17 STREET · BIN 1014587
💬 Discuss this project
1910Year Built
5Stories
W3Building Class
C6-2AZoning
25,732 sfGross Floor Area
1Units
LL97 Covered8 Open Violations ▸FDNY Report ↗
School or academy · 7,314 sf lot · 3.52 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 2 filings · 20 docs
Penthouse1p · 1 filing · 7 docs
Cellar9p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WINSTON PREPARATORY SCHOOL1707/08/2026
AMS CONTRACTOR2907/08/2026
SPRING SCAFFOLDING LLC503/22/2026
GCONTEK203/22/2026
ST FRANCIS XAVIER SCHOOL103/21/2026
YMCA OF GREATER NY103/21/2026
ARAMARK103/21/2026
ST FRANCIS XAVIER CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WELLWORTH CONSULTING LLC106/23/2023
MOHAMMAD AHEAD, PE205/15/2022
SYED ENGINEERING, P.C.404/27/2022
EMTEC CONSULTANTS107/07/2020
ME ENGINEERS206/10/2020
BAZINI ENGINEERING, P.C.106/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE603/21/2026
ADVANCED BUILDERS SERVICES603/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMS CONTRACTOR INCGeneral Contractor1607/08/2026
GSR CONTRACTOR INCGeneral Contractor407/08/2026
APPROVED CHIMNEY LLCGeneral Contractor303/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
UNIVERSAL PLUMBING INCPlumbing307/08/2026
AMN PLUMBING CORPPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
BLAKE, PETERElectrical103/21/2026
SWEET, ROBERTElectrical103/21/2026
GARY EATONElectrical103/21/2026
GOLD, MElectrical103/21/2026
JOSEPH SORTINOElectrical103/21/2026
LOCAL IRONWORKERSElectrical103/21/2026
NICHOLAS, GILBERTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808106/08/2020
DOMANI INSPECTION SERVICE843110/18/2019
Building Lifecycle
All (61)Filed (11)Permit Issued (16)Signed Off (4)Violation (20)Inspection (2)Special Inspection (8)
11/20/2023
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00894393-I1
06/23/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00894393-I1
06/23/2023
Permit issued — Sidewalk Shed
M00894393-I1-SH
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/14/2023
Permit issued — Supported Scaffold
M00738307-I1-SF
06/13/2023
Permit issued — Sidewalk Shed
M00738305-I1-SH
07/15/2022
Permit issued — Sidewalk Shed
M00738305-I1-SH
07/07/2022
Permit issued — Supported Scaffold
M00738307-I1-SF
05/25/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2022
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00373507-I1
05/17/2022
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
M00373503-I1
05/16/2022
Permit issued — Sidewalk Shed
M00738305-I1-SH
05/16/2022
Permit issued — Supported Scaffold
M00738307-I1-SF
05/15/2022
Filed — Alteration
M00738307-I1
05/15/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00738305-I1
04/28/2022
Special inspection requirement — Final
RAFI HAMID
04/28/2022
Special inspection requirement — Final
RAFI HAMID
04/27/2022
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00373507-P1
04/27/2022
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
M00373503-P1
01/14/2022
Permit issued — Plumbing
M00362535-I1-PL
12/13/2021
Violation issued (ECB, closed)
Construction
12/13/2021
Violation issued (ECB, closed)
Construction
10/15/2021
Permit issued — Plumbing
M00362535-I1-PL
10/15/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/17/2021
Permit issued — Boiler Equipment
M00241425-I1-BE
08/06/2021
Permit issued — Supported Scaffold
M00373507-I1-SF
02/17/2021
Permit issued — Plumbing
M00362535-I1-PL
08/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/30/2020
Signed off — Alteration
M00352967-I1
07/22/2020
Permit issued — Supported Scaffold
M00373507-I1-SF
07/22/2020
Permit issued — Sidewalk Shed
M00373503-I1-SH
07/21/2020
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00373507-I1
07/21/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
M00373503-I1
07/16/2020
Permit issued — Boiler Equipment
M00241425-I1-BE
07/07/2020
Filed — Alteration
New plumbing equipment (domestic water back-flow prevention assembly) and incoming water service for existing space. No change in use, occupancy or egress under this application.
M00362535-I1
06/11/2020
Permit issued — Mechanical Systems
M00352967-I1-MS
06/10/2020
Filed — Alteration
Boiler replacement. No change to use, egress, or occupancy.
M00241425-P1
06/08/2020
Filed — Alteration
M00352967-I1
05/27/2020
Special inspection requirement — Heating Systems
05/27/2020
Special inspection requirement — HVAC and service water heating equipment
05/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/27/2020
Special inspection requirement — HVAC and service water heating system controls
05/27/2020
Special inspection requirement — Maintenance information
05/27/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
05/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/2019
Filed — Alteration
Boiler replacement. No change to use, egress, or occupancy.
M00241425-I1
08/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2005
Violation issued (FDNY_NOV, closed)
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/1997
Violation issued (FDNY_NOV, closed)
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/23/1996
Violation issued (FDNY_NOV, closed)
09/20/1995
Violation issued (FDNY_NOV, closed)
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC06/23/2023
DOB NOWSupported ScaffoldPermit IssuedGSR CONTRACTOR INC06/14/2023
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC06/13/2023
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC07/15/2022
DOB NOWSupported ScaffoldPermit IssuedGSR CONTRACTOR INC07/07/2022
DOB NOWSidewalk ShedPermit IssuedAMS CONTRACTOR INC05/16/2022
DOB NOWSupported ScaffoldPermit IssuedAMS CONTRACTOR INC05/16/2022
DOB NOWPlumbingPermit IssuedUNIVERSAL PLUMBING INC01/14/2022
DOB NOWPlumbingPermit IssuedUNIVERSAL PLUMBING INC10/15/2021
DOB NOWBoiler EquipmentSigned-offAMN PLUMBING CORP09/17/2021
DOB NOWSupported ScaffoldSigned-offAMS CONTRACTOR INC08/06/2021
DOB NOWPlumbingPermit IssuedUNIVERSAL PLUMBING INC02/17/2021
DOB NOWSupported ScaffoldSigned-offAMS CONTRACTOR INC07/22/2020
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC07/22/2020
DOB NOWBoiler EquipmentSigned-offAMN PLUMBING CORP07/16/2020
DOB NOWMechanical SystemsSigned-offAPPROVED CHIMNEY LLC06/11/2020
BISOTISSUEDCRO-INTERNATIONAL INC06/29/2023
BISOTISSUEDGCONTEK INC05/25/2022
BIS—ISSUEDTHE WINSTON PREPARATORY S01/11/2022
BISOTISSUEDGCONTEK INC12/29/2021
BISOTISSUEDTHE WINSTON PREPARATORY S10/22/2021
BISOTISSUEDTHE WINSTON PREPARATORY S10/22/2021
BISOTISSUEDTHE WINSTON PREPARATORY S10/22/2021
BISMHISSUEDTHE WINSTON PREPARATORY S10/22/2021
BISPLISSUEDUNIVERSAL PLUMBING INC09/08/2021
BISOTISSUEDGCONTEK INC05/25/2021
BISOTISSUEDLIBERTY CONTRACTING OF NE10/31/2019
BISSPISSUEDSHAMROCK MECHANICAL INC07/30/2019
BISOTISSUEDLIBERTY CONTRACTING OF NE06/13/2019
BISOTISSUEDLIBERTY CONTRACTING OF NE06/13/2019
BISMHISSUEDLIBERTY CONTRACTING OF NE06/13/2019
BISOTISSUEDLIBERTY CONTRACTING OF NE06/13/2019
BISOTISSUEDJCO ENTERPR.07/27/2004
BISOTISSUEDJ C O ENTREPRISES07/09/2004
BISEQISSUEDT.B.R. INC.08/03/1999
BISEQISSUEDSPRING SCAFFOLDING INC07/12/1999
BISOTISSUEDAA ACTIVE STEEL POLE12/05/1994
BISPLISSUEDTAVELLA PLBG & HTG CORP01/04/1994
BISMHISSUEDENVIRO INTERNATIONAL LTD.12/22/1993
BISOTISSUEDENVIRO INTERNATIONAL LTD12/22/1993
1 project · most recent 07/07/2020
Water/Sanitary
FiledStatusContractorScope
07/07/2020Permit IssuedUNIVERSAL PLUMBING INCWater/Sanitary
3 projects · most recent 06/20/2023
General Wiring
FiledStatusContractorScope
06/20/2023CompleteTOP SHELF ELECTRIC CORP—
07/21/2020Permit IssuedRICHARD NEU—
05/20/2019Permit IssuedA & M ELEC'L SERVICE INC.General Wiring
1 project · most recent 05/15/2022
Sidewalk Shed
FiledStatusContractorScope
05/15/2022Permit IssuedGSR CONTRACTOR INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/15/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/28/2022FinalRAFI HAMIDprogress
04/28/2022FinalRAFI HAMIDprogress
05/27/2020Heating Systems—special
05/27/2020HVAC and service water heating equipment —energy_progress
05/27/2020Fire-Resistant Penetrations and Joints—special
05/27/2020HVAC and service water heating system controls —energy_progress
05/27/2020Maintenance information—energy_progress
05/27/2020Fuel-Oil Storage and Fuel-Oil Piping Systems—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WinstonpreparatoryschoolEducation—
Project M00362535 Alteration · Permit Entire · 07/07/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch3
09/02/2026M00738305-I1Request digital key ↗
09/02/2026M00738307-I1Request digital key ↗
08/30/2026M00894393-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/05/2026M00241425-I1Request digital key ↗
08/15/2026M00241425-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026M00373507-I1Request digital key ↗
09/02/2026M00373507-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00373503-P1Request digital key ↗
09/04/2026M00373503-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026M00362535-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00352967-I1Request digital key ↗
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION22
02/09/2024140896225Open ↗
05/18/2021123371840Open ↗
11/20/2020140896225Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION17
06/29/2023140896225Open ↗
01/11/2022123855998Open ↗
10/25/2021123371840Open ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT I: CERTIFICATION1
08/26/2020123855998Open ↗
▸BISZONING DIAGRAM1
06/29/2020123855998Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/26/2020123855998Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/05/2026M00241425-I1Open ↗
09/05/2026M00241425-P1Open ↗
09/04/2026M00362535-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
04/17/2020123855998Open ↗
04/17/2020123855998Open ↗
08/27/2019123371840Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026M00373507-I1Open ↗
08/23/2026M00373503-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/03/2020140896225Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
10/02/2020123371840Open ↗
08/26/2020123371840Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/14/2019123371840Open ↗
01/16/2019123371840Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/09/2021122815105Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan4
09/04/2026M00373503-I1Open ↗
09/02/2026M00373507-I1Open ↗
08/13/2026M00373503-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
05/27/2020123855998Open ↗
04/17/2020123855998Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/27/2019123371840Open ↗
08/09/2019123371840Open ↗
▸BISTenant Protection Plan and Notes1
06/03/2020140896225Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
04/17/2020123855998Open ↗
03/19/2019123371840Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/05/2026M00241425-I1Open ↗
09/04/2026M00362535-I1Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU2150MN201
02/28/2024140896225Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/27/2020123855998Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00352967-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/17/2020123855998Open ↗
04/17/2020123855998Open ↗
08/27/2019123371840Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/08/2024140896225Open ↗
07/07/2020140896225Open ↗
06/03/2020140896225Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/29/2024140896225Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/29/2024140896225Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/08/2024140896225Open ↗
02/08/2024140896225Open ↗
12/11/2020123371840Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/13/2019123371840Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/13/2019123371840Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/29/2024140896225Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/06/2024140896225Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/05/2026M00241425-I1Open ↗
09/05/2026M00241425-P1Open ↗
09/04/2026M00373503-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER5
06/29/2023140896225Open ↗
10/26/2021123371840Open ↗
10/25/2021123371840Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
07/15/2020123855998Open ↗
07/15/2020123855998Open ↗
09/03/2019123371840Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
08/25/2020123855998Open ↗
06/08/2020123855998Open ↗
04/17/2020123855998Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/16/2019122815105Open ↗
01/16/2019123371840Open ↗
01/15/2019123371840Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/11/2024140896225Open ↗
▸BISFINAL1
03/01/2024140896225Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
06/03/2020140896225Open ↗
05/27/2020123855998Open ↗
04/17/2020123855998Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/29/2024140896225Open ↗
02/29/2024140896225Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION14
05/21/2021123371840Open ↗
11/12/2020140896225Open ↗
10/09/2020123371840Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM11
06/29/2023140896225Open ↗
10/25/2021123371840Open ↗
10/25/2021123371840Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
05/27/2020123855998Open ↗
04/17/2020123855998Open ↗
04/17/2020123855998Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/03/2020140896225Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM1
05/27/2020123855998Open ↗
▸BISSupporting Document: Fee Exempt1
05/27/2020123855998Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/29/2020123855998Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/03/2020140896225Open ↗