← Back
Two family brick
1221 TABOR COURT
BROOKLYN · BIN 3141608
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R5BZoning
1,376 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 1,800 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2025$990K—— → —$719/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ISEED CONSTRUCTION INC704/10/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SJ CONSTR DESIGN INCGeneral Contractor204/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISEED CONSTRUCTION INC8336704/10/2026
Building Lifecycle
All (43)Filed (7)Permit Issued (3)Signed Off (3)Violation (6)Inspection (9)Objection (10)Special Inspection (5)
05/26/2026
Signed off — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-I1
05/20/2026
Signed off — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-S1
05/18/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/22/2026
Signed off — Alteration
TO PROPOSE PLUMBING & GAS WORK AT EXISTING 1-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB B01255889 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01255898-I1
04/10/2026
Filed — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-P3
03/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/15/2026
Filed — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-P2
02/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2025
Filed — Alteration
TO PROPOSE PLUMBING & GAS WORK AT EXISTING 1-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB B01255889 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01255898-P1
12/04/2025
Filed — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-P1
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
12/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YIPENG LUAN
11/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/15/2025
Permit issued — Structural
B01255889-S1-ST
10/09/2025
Permit issued — Mechanical Systems
B01255889-I1-GC-CX
10/07/2025
Permit issued — Plumbing
B01255898-I1-PL
09/15/2025
Filed — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-S1
09/15/2025
Special inspection requirement — Structural Steel - Details
YIPENG LUAN
09/10/2025
Special inspection requirement — Final
YIPENG LUAN
08/06/2025
Filed — Alteration
TO PROPOSE PLUMBING & GAS WORK AT EXISTING 1-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB B01255889 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01255898-I1
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Scope
08/05/2025
Objection raised — Scope
08/05/2025
Objection raised — Fire_Protection
08/05/2025
Objection raised — Scope
08/05/2025
Objection raised — Plumbing
07/17/2025
Filed — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-I1
07/07/2025
Violation issued (ECB, closed)
Construction
07/07/2025
Violation issued (ECB, closed)
Construction
07/07/2025
Violation issued (ECB, closed)
Unknown
07/03/2025
Violation issued (ECB, closed)
Construction
07/03/2025
Violation issued (ECB, closed)
Construction
07/03/2025
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSJ CONSTR DESIGN INC10/15/2025
DOB NOWMechanical SystemsSigned-offSJ CONSTR DESIGN INC10/09/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/07/2025
1 project · most recent 04/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2026Signed-offSJ CONSTR DESIGN INCHeating and Air Conditioning Systems
Heat / Cool
Gree H09SBH23XPE H09SBH23XPE H09SBH23XPE LIV09HP115V1R32AH LIV09HP115V1R32AH H09SBH23XPE H09SBH23XPE H09SBH23XPE H09SBH23XPE 84,000 BTU · Split System ×27
TUM18HA2/I2I22-21ES H09SBH23XPC LIV09HP115V1R32AH 4LIV09HP115V1AO H09SBH23XPC 4LIV12HP115V1AO H18FMH22XPC H09SBH23XPC 83,000 BTU · Split System ×21
4LIV09HP115V1AO 4LIV12HP115V1AO 21,000 BTU · Split System ×2
4LIV09HP115V1AO 4LIV12HP115V1AO 21,000 BTU · Split System ×2
3 projects · most recent 08/02/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
08/02/2026CompleteCOMBINED ELECL CONTNG INCHVAC Wiring
04/07/2026Pending PaymentCOMBINED ELECL CONTNG INCGeneral Wiring
09/16/2025CompleteCOMBINED ELECL CONTNG INCGeneral Wiring
1 project · most recent 04/10/2026
Steel
FiledStatusContractorScope
04/10/2026Signed-offSJ CONSTR DESIGN INCSteel
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/18/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/04/2025Fire-Resistant Penetrations and JointsYIPENG LUANspecial
12/04/2025Energy Code Compliance InspectionsYIPENG LUANprogress
12/04/2025HVAC-R and service water piping design and insulationYIPENG LUANenergy_progress
09/15/2025Structural Steel - DetailsYIPENG LUANspecial
09/10/2025FinalYIPENG LUANprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01255889-S1Request digital key ↗
08/20/2026B01255889-I1Request digital key ↗
08/20/2026B01255889-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 16
08/13/2026B01255889-P2Open ↗
08/13/2026B01255889-P3Open ↗
08/13/2026B01255889-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01255889-S1Open ↗
08/20/2026B01255889-I1Open ↗
08/20/2026B01255889-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026B01255889-S1Open ↗
08/29/2026B01255898-P1Open ↗
08/29/2026B01255898-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B01255889-S1Open ↗
08/29/2026B01255898-P1Open ↗