← Back
BuildNYC
Two family brick
1221 TABOR COURT
BROOKLYN · Borough Park · BIN 3141608
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R5BZoning
1,376 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 1,800 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 16 docs
Floor 27p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Site & exterior2p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2025$990K—Private party → Private party$719/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Iseed Construction704/10/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SJ Construction DesignGeneral Contractor204/09/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Iseed Construction8336704/10/2026
Building Lifecycle
05/26/2026
Signed off — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-I1
05/20/2026
Signed off — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-S1
05/18/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/22/2026
Signed off — Alteration
TO PROPOSE PLUMBING & GAS WORK AT EXISTING 1-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB B01255889 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01255898-I1
04/10/2026
Filed — Alteration
To resolve ECB violation #39152875Z. Legalizing the condition of brick wall removal. Install columns and a transfer beam to support the upper structure. Thanks.
B01255889-P3
34 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSJ Construction Design10/15/2025
DOB NOWGeneral ConstructionSigned-offSJ Construction Design10/09/2025
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/07/2025
1 project · most recent 04/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
04/10/2026Signed-offSJ Construction DesignHeating and Air Conditioning Systems
3 projects · most recent 08/02/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
08/02/2026CompleteCombined Electrical ContngHVAC Wiring
04/07/2026Pending PaymentCombined Electrical ContngGeneral Wiring
09/16/2025CompleteCombined Electrical ContngGeneral Wiring
1 project · most recent 04/10/2026
Steel
FiledStatusContractorScope
04/10/2026Signed-offSJ Construction DesignSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/18/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/04/2025Fire-Resistant Penetrations and JointsYIPENG LUANspecial
12/04/2025Energy Code Compliance InspectionsYIPENG LUANprogress
12/04/2025HVAC-R and service water piping design and insulationYIPENG LUANenergy_progress
09/15/2025Structural Steel - DetailsYIPENG LUANspecial
09/10/2025FinalYIPENG LUANprogress
25 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account